One characteristc for multiple plants

Hello All,
In our project we have two company codes and two plants in each company code. In first company QM module is already implemented and we are doing roll out for second company codes. Major QM activities and batch charactristics are same as products are same. For characteristics selected sets are assigned along with plant one. Now I want to use same batch charactristics for the second plant and I maintained all selected sets for the second plant also. But how can I assign second plant in the charactristics valu tab page? There is only one plant field. I want to use same selected sets for the second plant also.
Regards,
Mayura

Hello,
Thanks for the quick reply.
But how can I create same charactristic codes in second plant? Now client is saying that if same characteriscts are available in the system what is the use of creating new one? If we created with diff codes still description will reman same and it will show duplication in the syswtem.
Please suggest other solution
Thank you.
Mayura

Similar Messages

  • One delivery for multiple STO's

    Folks,
    I have multiple STO's for the same ship-to (plant). Items due for shipping would need to be combined into 1 delivery and not 1 delivery per STO.
    Would this be possible? And if yes, how?
    Thanks,
    MZ

    Hi ,
    Yes , We can create one delivery for multiple PO's .
    Go to VL10D tcode --> Purchase order tab -- > enter the STO's and press execute
    Select the STO's and click on background tab. Then it creates the log
    Select the item again and press shift +F4
    It will gives the log inforamation for the STO's and select the item and press on documents tab.
    It will creates only one Delivery for all the STO's.
    Now go to VL02N tcode and enter the delivery number then goto picking tab then enter picking qnty = delivery qnty
    then press on " post goods issue "
    Now go to MIGO to do the goods reciept then enter all the STO's here and check the item then save .
    Only one document will be posted for all the STO's
    Regards,
    Usha.

  • Single Subcon Vendor for multiple Plants - CTM

    Dear friends,
    We are planning some materials with Subcontracting scenario using CTM
    Facing issue when same vendor is executing sub-con process of same material for multiple plants
    Total demand of lower level material is flowing to a single plant instead of flowing to the corresponding multiple plants
    Because of which excess planning is happening in one unit & no planning is occuring at other units which is leading to a mess
    In library, it is provided to proceed with 1050 Location type but not clear on how to proceed further
    Kindly guide on this
    Regards,
    Antony

    Hi,
    Now Planning has to happen at dummy location of type 1050 and not at 1011 to transfer demand to correct plant.
    Please check following-:
    1. If you are using PPm create product in new location of type 1050.
    2. Also check whether Tlane is created for components from plant to this new location.
    3. Suggest to retransfer all master data including your subcontracting inforecord post creation of location of type 1050.
    If you are using PDS product should get created in new location automaticaly.
    Regards,
    Santosh

  • Is ATP for Multiple Plants possible????

    Hi Gurus,
    I have requirement like this
    we are having two SAP Systems in one Sales order is raised.. and tha will pass to 2nd system with ALE. in Second system actual Availability Check will run for the plant given in the line item of sale order.
    but in second system there will be 6 plants containing the same material. here my requirement is system has to check all the stock lying in all the plans at it need to propose the plant at line item level in sales order.
    I know that Avail.Check will run for single plant. Is there any way to run this for multiple plants. at present user is changeing sales order and splitting line item into 6 line Items and performing Availability check based on that he is abelt find the in which plant stock is availble it become cumbersome process.
    is any User Exit can we give multiple plants for checking Stocks???.
    if End User is doing any mistake in doing Avail.Check it leads to Dead Stock.
    please provide your Inputs on this
    -Pradeep

    BC,
    Well, I will assume that you have been diligent and have already determined that the material masters are comparable between your qual system and your production system (I don't know what pre-production means).
    First thing I would check would be the differences between qual and prod in availability check configuration.  OVZ2.  Look especially at the 'accumul' settings.  Actually, any difference between qual and prod should be reviewed.  Differences are a no-no!
    Best Regards,
    DB49

  • Release Streatgy for multiple plants

    Hi All,
    I have one PO with multiple Item having different Plants.
    For Each plant i have a release streatgy with different release codes for each plant and in release streatgy  i put characterstics like
    1. Plant
    2. Value
    3. Purchase Organisation
    4. Document Type.
    Now my Question is that when i use mutliple plants for different line items of one PO.
    How will my release streagty will work ? and how it should be configured ?
    Regards,
    Pardeep Malik

    Hi,
    Your Release strategy will not work.
    In you want to get the release strategy for multiple plant then you have to define another strategy in OMGS u2013 say 01 u2013 07  as Multiple plant  and for that  strategy in CL24n mating all the characteristics  and donu2019t maintain any value for your characteristics plant and then check.
    Try it its very helpful

  • Creating Authorization for multiple plants

    Hi,
    I have one requirement that, Creating Authorization for multiple plants
    SELECT-OPTIONS:    s_werks FOR mseg-werks.
        AUTHORITY-CHECK OBJECT 'M_MSEG_WMB' 
               ID 'ACTVT' FIELD '03'
               ID 'WERKS' FIELD s_werks.
    1. If have no of plants in s_werks then how to authorize the plants?
    2.if i dont enter any plant in my selection screen how to authorize that?
    3. if i have 5 plant only then how i can authorize those perticular plants only?
    Thanks in advance,
    Thanks,
    DP.

    S_WERKS is not a field; it's a set of fields.  Use simple ABAP to select your plants and loop at the selection(s) to check...

  • Product Costing Period end processing - for multiple plants at a time

    Hello SAP gurus,
    Does any one knows how to handle the Product Costing Period End operations like WIP calculation, Variant calculation and Settlements for multiple plants (but not all). Even if knows how to do it as a period end batch job, that would be nice.
    I know that we can handle this with Closing Cockpit.  But i am looking for anything other than Closing Cockpit
    Thanks in advance
    Surya

    Hi
    Apart from CO Closing cockpit, you can use the following programs to schedule the background jobs
    T codes   -              Program names
    CPTD    -                   RKWTP_CPTD
    KKS1    -                  RKKKS1N0
    CON2    -                  RKAZCON2
    KKAO   -                 SAPKKA07
    CO88    -                 RKO7CO88
    Regards
    Ajay M

  • MRP Run for Multiple plants

    Hi Guys:
    IN SAP R/3
    My client has requirement to merge planning of material for multiple plants and run the MRP under one head plant.
    For example:
    Plant : 1000, 1001, 1002, where plant 1000 is a head plant who had authorization to perform MRP run.
    if I run MRP Sepeartely:Each plant has below requirement for one material number (M1)
    Plant 1000 : 3 EA
    Plant 1001 : 2 EA
    Plant 1002 : 5 EA
    Instead of running MRP per plant, my client needs to run MRP for multiple Plants  that Consolidate  total requirement for all plants.
    and generate PR--->PO , In the PO, M1 should be delivered to 3 different plant locations by vendor and Po Will be issued from Head Plant 1000?
    Is there any Report in SAP , Where MRP Controller can See Requirements from Different Plants @ Central Purchasing  level after one Multi Plant MRP run, So that he can decide on how much to allocate to each plant?
    Thanks for help
    Thanks
    Sweth

    Hi,
    If u want to perform the MRP in one plant for all the plant requirement is depends on the bussiness process.
    You can try the following scenario:
       Planning in one plant nd production in other plant - Respective master data and special procurement have to maintain.For 
    further clarity please follow the below link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm.
    We can evaluate the PR and PO by providing the authorisation object for the multiple plant to the respective users.
    Revert me back in case of clarification.
    Thanks
    P.Srinivasan

  • Can i install itunes multiple times on one computer for multiple users?

    Can i install itunes multiple times on one computer for multiple users?

    Like most applications you only need to install it once for it to be available to all users. (That said it is possible to install an application and only make it available to the current user, but that's rarely needed.)
    tt2

  • How to create one delivery for multiple sales order

    Hi!! Friends,
    Can some one explain the steps to be followed in creating one delivery for multiple sales order in SAP SD.
    Regards
    AKASH
    Message was edited by:
            AKASH TAMBI

    Hi.,
                  You can combine different orders in to one delivery ,But for the customer Order combination should be checked in  the sales area data of the shipping tab,we can combine orders but the ship to party,Route,Inco terms,Shipping date,shipping point should be same,you can do in T.code VL04 & VL10
    REWARD if helpfull
    Thanks & Regards
    Narayana

  • How to create one TO for multiple TRs

    Dear All,
    how to create one TO for multiple TRs, kindly suggest me
    Regards,
    balu

    As for your question: it is discussed in sAP online help:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f841f24afa11d182b90000e829fbfe/frameset.htm
    Sorry I misunderstood your question.
    The above mentioned solution won't create one single TO from multiple TR.
    Edited by: Csaba Szommer on Aug 11, 2010 9:46 AM

  • One TPV for multiple Countries

    Hi Experts,
    Could you pls share experirnce/knowledge around having one TPV for multiple countries together. The scenario is like below:
    1. There are mutiple Countries in Central America which are small islands for whom we need to roll out the Travel and Expense Solution.
    2. The Company code is only one which contains employees from all these Countries.
    Could you tell us how can we do the setup. Should we create one TPV at the company code level. OR should we rather use some other criteria for selecting the TPV maybe at the Personnel area or Personnel Sub Area level.
    Your help is much appreciated.
    Regards,
    Vijay

    Hi Kiron,
    These things I am aware about too. My real question is if I create only one TPV for the company code and assign the Country of the Company code then what issues would this cause. To name a few pls see below.
    1) The domestic Country would always be the Company code Country so would be treated as Domestic Country and show on the Form also as domestic Country even for the employees who are from other Countries.
    2) There are setting which SAP allows differently for Domestic and International like per diem, miles cumulations. So these necessarily have to be kept as same even though local laws are different in all these countries as Domestic is only the Company code Country.
    So I need detailed analysis of what impact I will have by having only one TPV as against making many TPV like one for each Country by using some other parameter like Personnel area/Personnel sub area etc.
    Appreciate your help!
    Regards,
    Vijay

  • One invoice for multiple deliveries

    Hi Gurus,
    Can any one tell how can i create one invoice for multiple deliveries.
    Regards,
    Vinod

    one invoice for multiple delivers we can do in vf04
    we can do in vf04
    reward points if it is help ful
    Thanks
    mubeen
    Edited by: mahammad mubeen on Mar 5, 2008 10:02 AM

  • One cheque for multiple vendors

    hi,
    is it possible to generate one cheque for multiple vendors ?
    cheque will be sent to bank and bank will deposit the amounts into vendor banks.
    Can you anybody help me?
    regards,
    kalyan

    Hi
    Yes. you can do it 
    First transfer the amount to bank and from there bank will transfer the amount to respective vendors through ther banks.
    Go for implementing automatic payment programme according to your client reqyuirement. Check  TCode F110 which is master transaction for APP.  Check at TCode F110-Environment-maintain Config.....
    Cheers
    Srinivas

  • One lockbox for multiple company codes

    Is it possible to have one lockbox for multiple company codes?

    No, I don't think so. Lockbox is 1:1 for a Company Code.
    You configure Lockbox for a Company Code.
    You can use one of the 2 available Lockbox user exits (not sure which) to write a piece of code that searches invoices against the customer posted to different company codes. You will have to have the intercompany setups.
    You may find an OSS notes for intercompany clearing.
    Hope this helps!

Maybe you are looking for

  • Processing OS Files in an Oracle Directory

    I have an application that gets XML files and stores them in a directory. I'd like to write a PL/SQL program that I can schedule to process all files in the directory. I won't know at run time what the file names are, so I need a way to somehow loop

  • Where do I get Rosetta

    Where do I get Rosetta?

  • HT201376 just got a used macbook pro and want to restore to facory settings how do i do is

    I just got a used macbook pro and want to restore to factory settings....how do i do this safely?

  • Cannot connect to sqlplus as / as sysdba

    Dear Folks, I am not able to connect to sqlplus as / as sysdba .I can see remote_os_authent=true,in the sqlnet.ora SQLNET.AUTHENTICATION_SERVICES= (NTS) but for some reasons i am not able to connect it with / as sysdba.Kindly help me with this issue

  • Time Controlled Loop?

    I am building an application that scrolls through an panoraminc photo to make it appear as if its rotating 360 degrees. So far i can get the image to scroll left and right continously by having a left and right button to click on what i am after is s