Online project progress and status implementation.

Hi friends,
What are the different methods availalbe in SAP for integrating project Sites with Project office for online progress and status implementation.
Thank you,
Prashant

Hello Prashanth,
SAP xAPPS provides this feature. xRPM and cProjects are web based applications which are tightly integrated with SAP PS.
The configuration is done in R/3 backened for the same and front end is web based application. But note that they are not a part of SAP PS soln and are seperate apllications.
Thanks
Sarang

Similar Messages

  • 6.1 NPD - Project Name and Status not showing in the Project Header

    I have this issue in 6.1 NPD - The NPD Project Name and Status is not showing in the Project header when opening a project. Any ideas? Thank you.

    Is this happening for NPD Projects that are newly created, prior to clicking Save? Or for already existing NPD projects?

  • IDOC - Projects / WBS and Status

    Hi Expert
    In my testing I find that only realesed (I0002) project travel througth the master system into the host system.  Someone knows or has a list about the status of Project / WBS that the IDOCs takes to transfer by the master system???
    Thanks in advance.

    Hi Expert
    In my testing I find that only realesed (I0002) project travel througth the master system into the host system.  Someone knows or has a list about the status of Project / WBS that the IDOCs takes to transfer by the master system???
    Thanks in advance.

  • Milestone Configs in Project progress

    Hi Friends,
    Pls. Send me the Usage of Milestone in Project progress and Milestone trend analysis.
    What are all the config. has to do?
    Looking for your speedy response.
    Regards
    Prabu K

    This can be configured using Milestone Billing.
    1. Create New Sales Order Type, say ZOR (Copy of OR) through T.Code: VOV8
    Maintain Delivery Type as LF & Billing Type As 'F1' - Order Related / 'F2' Delivery Related.
    IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Header > Define Sales Documents Types
    2. Assign New Sales Document Type to Sales Area, For Eg:
    1000 (S.Org) / 10 (D.Channel) / 10 (Division) / ZOR (S.O Type)
    IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Header > Assign Sales Area to Sales Document Type
    3. Create New Item Category, say ZTAN - Copy of TAN (For delivery Related) / ZTAD - Copy of TAD (For Order realted) / ZTAS - copy of TAS (For Third Party)
    Maintain as under (others remaining same)
    Billing Relevance: I
    Billing Plan Type: 01
    IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Item > Define Item Category
    4. Assign Item Category, for ex (assuming Usage & higher level item category as blank):
    Sales Document Type | Item Category Group | Default Item Category
    ZOR | NORM | ZTAN
    ZOR | DEIN | ZTAD
    ZOR | BANS | ZTAS
    IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Item > Assign Item Category
    Note: In the above Billing Type '01' plays the main controller for milestone billing.  In Sales order, at item level, we require to maintain the billing plan.
    Follow the Sales cycle as normal sales cycle for particular Scenarios
    Regards,
    Rajesh Banka
    Reward point if Helpful

  • Link between Progress and Consumption

    Dear Sir,
      I want to link between project progress and consumption.
    Means we get work for testing of no. of joints say 1000. Now I want to make some restriction say for  testing of 10 joints , only 100 qty of this material shud consumed. System should triger some message that I am exceeding my allocated amount.
    Please help the needful
    Regards
    Umesh

    Dear Umesh,
    Please refer SAP Help where this method is explained in detail.
    SAP Help > Logistics > Project System > project progress > progress analysis process > progress calculation > measurement methods > quantity proportionality.
    Tnx.
    Abdul.

  • Error in Project Progress Config and process steps

    Hi experts,
    I am implementing PS for Asset procurement, in this i will procure material against material component which is added in Internal activity. I am using scheduling also. Now My client requirement is that he want project progress report on cost basic.
    I am using CJ40, CJ30 and CJ32.
    IN IMG i have configured like given below
    1. I have created Progress version 100
        EV base - Cost Plan ( active Proejct, Annual Value)
        POC weighting - Weight
        Planning type - Basic dates
        Early/Late - Earliest Possible
        Actual method and Ref plan method tick.
    2. Measurement method -
       for cost based report i have selected - Cost proportional
    3. Default value for measuremnt method -
        100 -WBS element - Plan - Cost proportional
        100 - WBS element - Actual - Cost proportional
        100 - Acitvity ( int)- Actual - Cost proportional 
        100 - Acitvity ( int)- Actual - Cost proportional 
    I have put this in CJ20N. I followed following steps
    1. CNE1
    2. CNE5
    but it is showing 0 value in all tabs such as Aggregate planned percentage of completion, Non-aggregated planned percentage of completion
    can anyone tell me the total process to get this report perfectly. It is very urgent need so please help me guys.
    Thanks,

    Hi,
    1) in wbs goto progress tab for enter version plan ,give ur method and actual also give your method  poc weightage give 1
    2) in activity go to progress tab enter your version, give your method for plan and actual give the work measurement method and weightage give 1
    3) now confirm the activities if partial confirmation enter the degree of processing (%).
    4) goto progress calculation screen and give your project number and select with hierachy and with orders. enter the month and year.
    5) excute,
    6) goto the report and check the report.
    if still not working send screen shot of the report.
    Thanking you
    Vengaiah Chowdary

  • Project lite and project online

    I just heard about project lite license and seems pretty cool, we are small company with a PMO, so, I suppose I still need a valid Project Online license for the PMO and then the rest could be just project lite licenses?
    Follow me on Twitter
    levalencia Blog

    Esteban V M --
    The Project Lite license is specifically for team members, and allows them to manage tasks, to collaborate, and to submit timesheets.  Your project managers and members of the PMO staff will need Project Online licenses.  I would also strongly
    recommend that you purchase licenses for Microsoft Project Professional 2013 for your project managers and for your Project Server administrators as well.  Hope this helps.
    Dale A. Howard [MVP]

  • Reg:BAPI for updation of Progress parameter and status profile

    Hi,
    Can anybody suggest name of BAPI used for updating "progress parameter" & "Status Profile" in actvity.
    With Regards
    Rohit Prakash

    Hi Ammar,
    I have checked both BAPI but BAPI are not working as per our requirement.
    Firstly we wanted to update progress parameter like measurement method(progress version,method plan,method actual) & POC weight into activity but as per BAPI given by you there is no any field available related to measurement method(progress version,method plan,method actual).
    And secondly we wanted to update status profile residing in Activity tab not in network header or WBS.
    Waiting for some more input related to  query.
    With Regards
    Rohit Prakash

  • Yesterday i buy used iphone 4 from my friend i want to know that can i checked online or on internet status and history of this mobile ? that it is no

    yesterday i buy used iphone 4 from my friend i want to know that can i checked online or on internet status and history of this mobile ? that it is no

    https://selfsolve.apple.com/agreementWarrantyDynamic.do

  • Updating User Status and Status Profile for a Project

    Hi,
          I am creating a Project using  BAPI_BUS2001_CREATE.
          which uses a structure  BAPI_BUS2001_NEW for storing details of a New Project.
          It <b>does not have fields for User Status and Status Profile</b> , if any one of you worked on Project Systems, please tell me is there any way to update these 2 fields.
      I have tried lot of FuncModules and BAPIs which deal with PROJECT CHANGE and PROJECT MODIFY but none of them has these 2 fields.
    Please provide me some solution for this.
    Thanks in Advance.

    Hello,
    U need to do like this:
      PERFORM CHANGE_STATUS_CLSD.
    FORM CHANGE_STATUS_CLSD.
      DATA: LR_PROJ LIKE PROJ,
            WA_JEST LIKE JEST,
            LT_PRPS LIKE PRPS OCCURS 0 WITH HEADER LINE,
            LT_JEST LIKE JEST OCCURS 0 WITH HEADER LINE,
            RA_PRPS TYPE RANGE OF POSID WITH HEADER LINE.
      CLEAR: LR_PROJ.
      SELECT SINGLE * FROM PROJ INTO LR_PROJ WHERE PSPID = SP_PSPID.
      IF SY-SUBRC = 0.
        SELECT * FROM JEST INTO TABLE LT_JEST WHERE OBJNR = LR_PROJ-OBJNR.
        LOOP AT LT_JEST INTO JEST.
          IF JEST-STAT = 'I0001' OR JEST-STAT = 'I0002'.
            JEST-INACT = 'X'.
            UPDATE JEST.
          ELSE.
            JEST-INACT = SPACE.
            UPDATE JEST.
          ENDIF.
        ENDLOOP.
        CLEAR: LT_JEST.
        REFRESH: LT_JEST.
        SELECT * FROM PRPS INTO TABLE LT_PRPS WHERE PSPHI = LR_PROJ-PSPNR.
        IF SY-SUBRC = 0.
          SELECT * FROM JEST INTO TABLE LT_JEST FOR ALL ENTRIES IN LT_PRPS
                                                WHERE OBJNR = LT_PRPS-OBJNR.
          LOOP AT LT_JEST INTO JEST.
            IF JEST-STAT = 'I0001' OR JEST-STAT = 'I0002'.
              JEST-INACT = 'X'.
              UPDATE JEST.
            ELSE.
              JEST-INACT = SPACE.
              UPDATE JEST.
            ENDIF.
          ENDLOOP.
        ENDIF.
        LOOP AT LT_PRPS.
          CLEAR WA_JEST.
          SELECT SINGLE * FROM JEST WHERE OBJNR = LT_PRPS-OBJNR
                                      AND  STAT = 'I0046'.
          IF SY-SUBRC NE 0.
            WA_JEST-MANDT = SY-MANDT.
            WA_JEST-OBJNR = LT_PRPS-OBJNR.
            WA_JEST-STAT = 'I0046'.
            WA_JEST-INACT = ' '.
            WA_JEST-CHGNR = '001'.
            INSERT INTO JEST VALUES WA_JEST.
          ENDIF.
        ENDLOOP.
        COMMIT WORK AND WAIT.
      ENDIF.
    ENDFORM.                    " CHANGE_STATUS_CLSD
    REagrds,
    Vasanth

  • BAPI/FM for setting the user status for the Project definition and WBS elem

    Hi,
    I have to set the User Status for the Project Definition and the WBS elements in that project.
    The User status to be set is the same for the project and wbs elements.
    Please let me know if there is any BAPI/FM to set the user status..
    Thanks in advance.
    Regards
    Shiva

    Hi Shkithija,
    There is a dump encoutered in the form "PS_FLAG_GET_GLOBAL_FLAGS" for 'chk_precommit_ok' in the "BAPI_PS_PRECOMMIT".
    But it is showing SY-SUBRC = 0 when used along with BAPI_TRANSACTION_COMMIT.
    May i know what are input parameters we need to pass it to "BAPI_PS_PRECOMMIT".
    Do you have any idea.
    Please let me know
    Regards
    vishnu

  • Major Differences between Project Server and Project Proffessional

    Hi,
    We are planning to use MS Project with SharePoint. In the initial research i came to know that we will need MS Project Professional to syn task lists on SharePoint. We are looking at a solution where all the Project Leaders (Across the world) can update
    their project statuses online using SharePoint (right now this is being done manually).
    I then came to know that we can access MS Project on SharePoint using MS Project Server. I am now not able to decide on which one to choose. So I want to know the major differences between MS Project server
    and MS Project professional. Which one would full fill my requirements. I cannot limit my requirements to only updates. but also would want to add some extra features like Site Mail box and Project Issues log, so that my Project Management is more effective
    and is better.
    Please answer at earliest
    Regards
    Srikar Gundabathula 

    Srikar --
    Microsoft Project Server 2013 is an enterprise project management (EPM) application in which all data is stored in a SQL Server database.  This EPM software application allows organizations to manage dozens, hundreds, or thousands of projects and
    to manage dozens, hundreds, or thousands of resources as well.  To use Project Server 2013, your PMs would each need a copy of Microsoft Project Professional 2013 and would use this software to plan their projects and to save and publish the projects
    to Project Server.  Your team members and executives would use their Internet Explorer to access the web-based user interface to Project Server 2013 called Project Web App, or PWA for short.
    In PWA, your team members can use either The Timesheet page or the Tasks page to report progress on their task assignments.  In PWA, your PMs would be able to see the updates from their team members and be able to approve those updates.  Once
    approved, the task updates are applied to the appropriate project so that the PM does NOT have to retype the updates.  For executives, PWA offers the Project Center page which shows the portfolio of published projects in Project Server, where they can
    see the current status of each project.
    Beyond this, Project Server also includes a Business Intelligence Center where your Project Server administrator can create very customized reports for various audiences.  In brief, there is a LOT of power in Project Server 2013.  If you think
    you might want to use it, you have two options:  (1) Buy the software, install it yourself, set it up yourself, and maintain it yourself, or (2) contract with Microsoft to use Project Online, which is a hosted version of Project Server 2013 that is maintained
    by Microsoft in the cloud.
    You can learn even more about Project Server 2013 at the following link:
    http://office.microsoft.com/en-us/project/project-portfolio-management-for-the-enterprise-project-server-FX103802061.aspx
    Hope this helps.
    Dale A. Howard [MVP]

  • Transport Type and Status

    Hi All,
    I was checking transport type and status in E070 table. By pressing F1 I saw there can be 3 types of transport K,C and T. But in my production system table I found another 2 types R and F,and in transport status I saw R and D.
    It will be helpful if anyone explain me these transport types and status.
    Thanks in advance..
    Moderator message: please press F4 as well, will give you all possible values.
    Locked by: Thomas Zloch on Jun 22, 2011 9:21 AM

    you need to create 2 status schemes.
    Goto SPRO > SAP Solution Manager Implementation Guide > SAP Solution Manager > Advanced Configuration > Scenario-Specific Settings > Implementation > Document Management > Status for Documents > Define Document Status Schemes
    Do these steps for a blueprint schema and config schema
    1. Click yes to the Cross-Client popup
    2. Click the New Entries button
    3. Name you status Schema
    4. Click Save
    5. Highlight the new schema
    6. Click the status value folder on the left
    7. Click the New Entries button
    8. Add you values in the order you wish, initial status, min, max, ect..
    9. Click save
    Go to SOLAR_PROJECT_ADMIN
    Open your project
    Click the Project Standards tab
    Click the Documentation Types tab
    Click the Project Template button (bottom right)
    Find you documentation types for Blueprint and Configuration in the right hand box
    Go to the last column for those documentation types (you'll need to scroll)
    Select the newly created schema
    Click the save button
    regards,
    Jason

  • Project Online: project will not move to next workflow stage

    Hi, another workflow question: I've created a workflow using the SPD 2013 for a Project Online PWA. When a project has gone through the portfolio analysis it should move to either the Selected or the Not selected workflow stage. The problem is that some
    projects do and some don't:
    ("Naam van werkstroomfase" = Workflow Stage Name)
    All projects were checked in when I committed the portfolio scenario.
    Does anyone else have the same experience and how did you solve it?
    Kind regards,
    Hester

    Hello All:
    I have an issue open with Premier Support and through hours of testing and tweaking, I've summarized as follows:
    The 'stalls' always happen when any of the following code is added to the SPD2013 workflow. The common thread is Project Custom Fields and the code has been inserted at various points to prove the failure.
    When a SharePoint Designer 2013 workflow attempts to access a large number (more than 10?) of Project Custom fields from the Start a process command, the workflow stalls. In this case we are adding custom field values to the
    email body for Gate Approvers.
    When accessing a large number (12 or more?) of custom fields and writing those values out to a SharePoint List as a baseline 'snapshot' of custom fields, the workflow stalls.
    When attempting to update a Project Custom field value, the workflow stalled. (i.e. Set Project Status = ‘Approved’ at Gate 3)
    We have pulled that code (and function) from this release and begin user training tomorrow.

  • Project Progress Catch-up Plan

    Dear PS Friends,
    I would like to know if any of you have worked on Project Progress Catch-up Plan.
    Basically, it is the third dashed-curve which comes in a project progress graph of plan vs actual to cover u2013up the delay.
    Below is an example to explain this.
    M3 being the current month.
    Months     M1     M2     *M3*     M4     M5     M6     M7     M8     M9
    Plan PoC     0%     12%     20%     35%     42%     52%     60%     72%     90%
    Actual PoC     2%     7%     12%                              
    Catch-up               12%     18%     24%     40%     52%     72%
    If yes, please let me know and also how we can implement in SAP PS.
    Thanks in advance for your help!
    Regards,
    Aparna

    Hi Abdul,
    We are using the planned dates and actual dates spread over duration to calculate the monthly PoC.
    Now, if there is a delay i.e. there is a variance between planned and actual, then we need to reschedule   or u2018crashu2019 the project .
    This in turn will give us a new planning curve that would need to be followed  in order to make up for the delay.
    But the problem is that if we reschedule, the original plan is overwritten and hence, the u2018baselineu2019 vanishes.
    So the requirement is that in CNE1 , we should be able to calculate three set of dates u2013 original planned PoC ,actual Poc till date, rescheduled PoC.
    Given that progress version  supports  only  two set of dates, is there any way to achieve this ?
    Regards,
    Aparna