Only remaining var. in version 0 - no target costs

Hi!
We are doing settlement for process orders, most of the process orders are created and goods receipts happened before standard cost estimation is released.
So during varaince calculation (KKS2/KKS1) we are getting error message: Only remaining var. in version 0 - no target costs
as we cannot cancel the goods receipts for process orders, we are doing settlements with remaining variance only.
The variance will directly go to CO-PA, as we have activated the same.
the example of one process order:
Total goods receipt is : 44175.58     co-product 1
                                   3757.38     co-product 2
total receipt              47932.96
Materials Issued(GI)     20025.98     
Activity Cost          11985.3     
_Total Cost     _     32011.28     
the variance is:            13764.86             co-product 1 ( as per settlement rule 95%)
                                  2156.82              co-product 2  ( as per settlement rule 5%)
                                  15921.68
Once we have done the settlement there are 4 accounting documents posted for variance:
1.     Cost of production a/c DR 3757.38
                    TO Variance A/C Cr 3757.38  ( value flowing to COPA)
2.     Cost of production a/c DR 44175.58
                    TO Variance A/C Cr 44175.58 ( value flowing to COPA)
3.     Cost of production a/c CR 1600.56
                   TO Variance A/C Dr 1600.56 ( value is not flowing to COPA)
4.     Cost of production a/c CR 30410.72
                    TO Variance A/C Dr 30410.72 ( value is not flowing to COPA)
So the net effect of variance account posting in FI is OK.
But where as in CO-PA, variance is different, because only first two values ( total goods receipt value as variance amount) as above are passing to COPA.
Now how can we rectify the variance values in CO-PA?
We are using PA transfer structure A1 with the following assignments:
10     Input price variance
20     Mat Input quantity variance
30     Mat Resource-usage variance
40     Remaining input variance
50     Mixed-price variance
60     Output price variance
70     Lot size-/fixed-cost variance
80     Remaining variance
90     Scrap
regs,
ramesh
Edited by: Ramesh Balivada on Jul 28, 2011 6:41 PM

Hi ramesh
You need to live with this as you cant reverse the GR
To check this henceforth, use badi Workorder_update and write abap code for the Method AT SAVE or AT RELEASE... Check if field MBEW-LPLPR is INITIAL
br, Ajay M

Similar Messages

  • KKS1 Only remaining var. in version 0 - no target cost Message no. KV151

    Hi,
    I am trying to variance calculation using T-code KKS1 but i am facing error as below,
    Only remaining var. in version 0 - no target costs for 000001000010
    Message no. KV151
    Diagnosis
    For the calculation of variances with 000001000010 , the target costs in target cost version 0 are missing for the following reasons:
    There were no planned costs and/or planned quantities (see earlier message).
    The quantities on which the planned costs were based are zero in the time period concerned. This may be caused by the fact that no goods receipt for a cost object (such as a product cost collector or production order) has been entered.
    This results in target costs of zero.
    System Response
    Because no target costs were calculated, the difference between the
    planned and actual costs could not be broken down into variance categories. The difference is updated as a remaining variance.
    please guide me or missing any config
    Thanks
    Shital

    Hi Shital
    there are many posts available in the forum already on this topic... I would recommend to search the forum before posting any question, thats the rule of the forum
    You are facing this error for one or more of the following reasons
    1. Your standard cost estimate is not released. This must be released before GR from the production order
    2. If your contr area currency is diff than comp code currency, then your cost estimate must also be updated in contr area currency.. You do this in costing variant (OKKN)
    3. GR might not have been done in the month for which you are calculating variance... i.e. This production order was created, say, in July end but actual processing and GR done in August.. So when you calculate variance for July, this error appears. In this case, you can ignore this error
    Regards
    Ajay M

  • Only Remaining var. in version 0 - no target cost for order

    Hi,
    I am getting the error message "Only remaining var. in version 0 - no target costs for 000060003328" while performing the Variance Calculation in KKS2 transaaction.
    The order is having status DLV and TECO.
    Kidny give your suggestions
    Thanks and regards
    Murugesan

    Got answer from Financials forum

  • The target costs in target cost version 0 are missing

    Dear Experts,
    I am getting following error while running Varience cost through KKS2:
    Only remaining var. in version 0 - no target costs for 000001061683 0001
    Message no. KV151
    Diagnosis
    For the calculation of variances with 000001061683 0001, the target costs in target cost version 0 are missing for the following reasons:
    There were no planned costs and/or planned quantities (see earlier message).
    The quantities on which the planned costs were based are zero in the time period concerned. This may be caused by the fact that no goods receipt for a cost object (such as a product cost collector or production order) has been entered.
    This results in target costs of zero.
    System response
    Because no target costs were calculated, the difference between the
    planned and actual costs could not be broken down into variance categories. The difference is updated as a remaining variance.
    Please suggest, How to proceed.
    Regards

    First check this...
    1.Go to t.code OKEV.Select Controlling Area 2222 and create Plan / Target version.
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs. For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    2.Also try In CO02 goto cunctions...cost...
    3.Go to transaction OKV6 these settings control what values are used to update the target costs.
    Target cost comes from the standard price calculated when doing a costing run. Actual costs are costs that you incur during the production order (we can reassign costs during the order so this could be different from the standard price).
    Target Costs=Actual Quantitiy X the Standard Cost Estimate Price..
    Probably the stand.cost estimate will be missing in ur case...

  • KKS1- Target cost version found zero

    Hi,
    We are using PPPI route for the creation of Process order..plant person convert planned order to process order, but due to some reason they can not confirm that order and finally without GR/GI they can do TECO the order...Now at the month end when costing team run KKS1, every time they can found error of those order...Error - Only remaining var. in version 0 - no target costs for order..."...My question is,can we remove this error during running of KKS1...
    Rajesh Mehta

    Hi!
    Are you using target cost for Production Order? Without having target cost (Planned Cost), it is not possible to run transaction KKS1 (variance calculation)? Because for variance calculation, it will compare with your actual cost on the production order. Hope it useful to you.
    Thanks & Regards,
    Taral Patel

  • Exclusion of target cost in Variance calculation

    Hi,
    While calculating variance in period end closing for a process order we are getting the errors.
    1)     “No standard cost estimate for material 400000020 in plant TSIL on 26.12.2006          Target Costs: Determine Valuation Basis”
    2)     “Only remaining var. in version 0 - no target costs for 000001000109          Variances”
    We do not want to include the Target cost in variance calculation.
    Please advise.
    Regards
    Aniruddha

    Hello Anirudh,
    If you choose costing version in variance calculation 0, then system calculates variance based on std. cost est. and actual cost. if you select 1, then system calculates variance based on planned cost and actual cost.
    Go to customization settings in variance analysis calculation and change the costing version from 0 to 1.
    Please let me know if you require any more clarifications.
    Reward points if helpful.
    Regards,
    Santosh

  • Target cost is zero in KKF6N

    Hi experts:
        I'm using REM. I've released the standard cost (CK40N), created the cost collector (KKF6N, preliminary cost estimate is automatically created). I checked cost estimator using variant "PREM", it's fine. Then I did backflush and GR. But still in cost collector (KKF6N), the target cost is still zero.
        I also tried to calculate variance. But still target cost is zero. But in this client, in some other plants, target cost has value.
        Not sure what I did wrong in master data, configration or transaction. Looking forward to your advce. Thanks.

    hi!
    thanks for your reply.
    I have exeucted CO8b, then system is posting controlling document and profit center document ( no accounting document).
    then I have executed KKS2, system is calculating target costs, but in process order cost analysis, the target cost is ZERO only, even for co products also.
    while executing KKS2, I am getting error message for other co-products  like "Only remaining var. in version 0 - no target costs for 000001000279 0003 (KV151)", as I am receiving only some co-products. I have changed the settlement rule in header of process order, but even then error message coming. any suggestion to avoid error message for other co-products, as we are not receiving them?
    Is there way to get target costs in process order cost analysis also?
    regs,
    ramesh b

  • No Target Costs, so No Variances calculated

    We have an order type (PCOL) for Collective Orders.  If we create 1 that is just a single order, it calculates target costs, and resulting variances fine (same as our std order type PP01).  However, if we create a structured set of PCOL orders (Lead order with multiple sub orders), none of these calculate variances (PA doc), and we get message KV017 when we run variances on them.
    Looking into it further, I can see all the target costs on these orders are nil, despite the fact the all the costing data on the control tab is the same as the songle PCOL order.
    We does this structured set of orders not calculate any Target costs, and consequently no PA variances?
    Any advice greatly appreciated
    Thanks
    Graham

    Hello again
    The full errorr text is during varinace calculation (trans. cosd kks2) is:
    Only remaining var. in version 0 - no target costs for 000002000063
    Message no. KV151
    Diagnosis
    For the calculation of variances with 000002000063 , the target costs in target cost version 0 are missing for the following reasons:
    There were no planned costs and/or planned quantities (see earlier message).
    The quantities on which the planned costs were based are zero in the time period concerned. This may be caused by the fact that no goods receipt for a cost object (such as a product cost collector or production order) has been entered.
    This results in target costs of zero.
    System Response
    Because no target costs were calculated, the difference between the
    planned and actual costs could not be broken down into variance categories. The difference is updated as a remaining variance.
    there is a released standard cost fir the material
    i checek that an itemization is saved for the costing varinat (planned costs for pp order)
    I would be Grateful to get some help
    Best regards
    Michal

  • Understanding Target Cost Version Differences for 0 and 1 for process order

    Our client need to understand the differences between our target cost versions that are utilized in calculating the process order CO03 cost analysis.  When should each target version be used and why do the variances change?  See example below.
    Target Version = 1       Target Cost Prelim Order Cost Estimate
    Version = 0          Target Cost for Prod Variances
    Can you please provide analysis and help me on this.
    I higly appreciate for your help.
    Thanks in advance.
    Seshadri

    I recommend that you post this in CO forum.

  • Target cost version 0

    Hi,
    currently we are using target cost version 0 to calculate production variance. But to get correct production variance in relevant variance category it is needed to have current standard cost updated in material master. 
    But if we skip updating standard cost it'll not present the target cost and variance categories all variance included in remaining variance category.
    We need to change target cosing version 0 to get any updated standard cost when it calculate production variance. But its not possible as target cost version 0 embedded with current standard cost.
    Pls advice and give clear idea of target cost and target cost version if somebody having a good idea on this.
    Thank you !

    Hi,
    Please find below link for your needful.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/90/ba6242446711d189420000e829fbbd/content.htm
    Regards,
    Santosh

  • Extraction error "Target cost version in controlling area does not exists"

    Hi Gurus,
    I am trying to pull some data from a SAP OLTP system into SAP BW 710 system, using extractor "0CO_PC_02". The data load is failing with the below error message:
    Target cost version in controlling area does not exist     KN     147
    Target cost version 2 not defined. Check your entry     KV     35
    Internal program error ( Order 000010510554 Version 002 )     RM     11
    Errors in source system     RSM     340
    The same error is thrown when I am trying to execute the extractor in RSA3 in the source system.
    Please help me with the resolution of the same. It's a high priority job we are handling as of now in this.
    Thanks & Regards,
    Vikas Kr.

    You are attempting to display data on a target cost version that does not exist in controlling area.
    see this http://forums.sdn.sap.com/thread.jspa?threadID=1609418
    http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YV-KN147

  • MESSAGE ERROR: WIP a target cost only possible with Product Cost by Period

    I work with orders assign to WBS Element (Non-valuated stock).
    If I enter confirmation to an order created, and then execute KKAX transaction to calculate WIP, the system shows this error message u201Cu2018WIP a target cost only possible with Product Cost by Periodu2019u201D, but actually the result has been calculated ok.
    If WIP is executed collectively KKAO the error message is the same but the result is not calculated
    Everything suggests that what we want is possible, but the error doesnu2019t disappear
    Does anyone know what could be reason for the error?
    Thanks

    Hi
    Check your RA key and WIP customizing... WIP at target cost is possible only in Product cost by period
    Check your settlement rule in Prod Order.. I guess it would be FUL and not PER.. FUL settlement means you are in product cost by order.. There seems to be a mismatch between your settlement type (FUL/PER) and WIP config
    Moreover, if your stock is non valuated, do you at all need to calculate WIP for prod orders? I dont think so
    Ajay M

  • Error in Target cost version

    Hi Experts,
    Can any body solve following error.
    I was creating Target cost version ( T-code OKV6 ) but facing following error.
    Version 2222 1 not intended to be used as the target cost version
    Diagnosis
    The specified target cost version has not been flagged in central version maintenance as suitable for variance calculation.
    Procedure
    1. Check the entries in the central version table.
    2. If appropriate, flag the version as suitable for variance calculation.

    Hi Raja,
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs. For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    Try using "0" Version in combination with your Controlling Area.
    Pls revert back with result...
    Srikanth Munnaluri

  • Calculation of Var. at target cost

    hi gurus,
    i want to know hw are variances occurred using PCC. the various types of variances that can possibly occour during a prodcut costing.
    regards
    sayeed

    Dear Sayeed,
    1.Under what conditions is the variance calculated while using PCC (Product cost collector)?
    Say for example for order qty of 2 nos, planned price is 10 & Hours to be produce is 2 hrs
    Niow while confirming , user will Give activity time as 3 hrs for order qty 2 nos
    so now variance is 1 hr cost of machine, labour etc
    2 .How is target cost determined ?
    Check this link
    [what different between Target cost & Plan cost & Actual cost;
    Regards
    Madhu

  • Target Cost in the settled process order become zero after cost deletion

    Dear all,
    User has standard cost estimates created in Jan 2010 that valid until the end of 2010 for every material in the system.  user created a process order in April 2010. Target cost of the order was created based on the standard cost estimate and recipes as well as order qty.    The order was also confirmed and settled in April 2010 without problem. 
    However, after I deleted all old costing estimates before I did a costing run for all materials in May 2010, the old order was resettled and all Target cost is removed from the order.  I guess system try to look at April costing estimate but it is not there since it was deleted before I created the new costing estimate in May.  Therefore, all varainces are throwed into remaining variances since the target cost become zero.
    Other than mark the settled order for deletion or keep all old costing estimates,  I am just wondering is anyway in the configuration to prevent the system to recaculate the target cost again for the settlement so I can avoid the problem happens?
    Thanks.

    Hi,
    Target costs are only calculated after goods movements have occured on the order, the Target Costs are then calculated during the Variance calculation.
    Target costs will only be calculated after the first goods receipt has been posted to the order. Also you have to ensure that the information to calculate target costs exists on the system in particular in OKV6.
    This estimation is based on the customizing for the Target cost version in transaction OKV6 as in turn will the "real" calculation of the Target costs via the variance calculation.
    So in OKV6 the Target cost will be based on preliminary costing on the order, an alternative cost estimate or the current standard cost estimate. Importantly if the choosen option is not fulfilled e.g. no current standard cost estimate, the target costs will not be predicted or calculated.
    regards
    Waman

Maybe you are looking for

  • Upgrade from Windows 8.1 Preview to RTM destroyed MSSQL databases

    I am not really sure WHY this happened, but I am so upset right now. On my development machine, I installed the Windows 8.1 release from the Windows Store on a machine that had the Windows 8.1 preview installed. It's bad enough that much to my surpri

  • Internet-required apps not connecting (even though internet works!)

    Hi, just purchased a shiny new iMac 27inch after my old faithful G5 tower finally went to the great PC in the sky. Enjoying the experience immensely but have a big problem with bootcamp. I installed xp service pack 2 via bootcamp and after hundreds o

  • Fix: Entrypoint error with newest ATi drivers on R200 series

    Hey, It seems that copying the libGL.so.1.2 from 8.24.8 works around this problem. I've taken out the middle man, and in the latest (ati-fglrx-utils-8.26.18-2) update to ati-fglrx-utils, I included it as /usr/lib/libGL.so.1.2.R200 If you are affected

  • Nightguy2000

    I need to transfer hi8 Sony tapes to elements 11. Do I need extra. Hardware

  • Deprecated Methods and NoClassDefFoundError

    Hi, I wonder if using deprecated methods in a Java program could cause java.lang.NoClassDefFoundError? I have a Java program with a few deprecated methods. The program worked well when I last ran it about half a year ago. But it shows java.lang.NoCla