OPEN PERIOD SLOW

Hi,
I'm having EBS 11.5.9 on Oracle9.2.0.4 db.I'm using UNDO management auto.Open period is taking longer.Per metalink note 136012.1 I may think manual undo managemnet.DOes any one had have issue,if yes what would be fix? If not does any one having 9i db and using MANUAL undo manager in EBS11.5.9 ?
please advice.
thanks

sometimes is posible that if you choose to track the average balance for the SOB
the open period was taking longer, because the system calculate more account balances

Similar Messages

  • Asset Close and Open period

    hi
    how close asset period and want to make entry in 2010 the how open period 2010 for Asset Accounting entry in which Transaction code .
    thanks
    Kisanp
    Moderator: Please, read basic SAP material

    Hi,
    You can close asset fiscal year by AJAB.
    Coming to periods you can restrict at OB52 account(A and +).
    Regards,
    Sankar

  • Balance for open periods in a time series enabled cube

    Hi,
    We have a request to calculate balance for open periods in a time series enabled cube, I don’t there is any inbuilt function for this.
    Any ideas on how to calculate this without adding new members/formulae in the time dimension. Currently we compute this in the report
    EX:
    BOY(May) = Jun+Jul + … + Dec
    Thanks,

    You will have to add a member somewhere. Suppose you add it in scenario, then you could use sumrange for the current member range offsetting the current monthe by 1 and use null for the end month wich gives you the last month in the time dim.

  • FI - Restrict Open periods

    I am implementing FICO and we already have deployed FIGL in our company. I need to restrict open periods from displaying. I am not sure whether I should restrict at the extraction or bring in the open periods and restrict based on T001B table in ECC which stores the open and closed periods at a given point. looking for the best solution if someone has implemented this.

    Hi,
    BI system is a common system used for reporting the R3 system data. Hence it is always advisable to pull all the data to BI and at report level you can filter on those data.
    In the Reporting cube level add a field called ZPeriod apart from 0FISCPER you have , Add an attribute Validity to this Zperiod infoobject maintain them with status fields like O for Open Periods C for Closed Periods.
    In the report restrict the Validity field with C for getting only closed periods data.
    ZPERIOD infobject has to updated with status daily from T001b from ECC system so that attribute will always have correct periods and their validity status. This is a good and dyanmic method of solution which can be used at report level.
    All these loads automate thro process chain so that no manual activity will be available.
    Dont go for filtering of data and if some other users need FIGL data as of today for validating or tallying it becomes difficult.
    Hope this helps for you.
    Thanks,
    Arun

  • T CODE FOR OPEN PERIOD.

    Dear all Guru's
                                    I know that for closing period the T.CODE is MMPV , Pl tell
    me that wat is the code for opening period . & also suggest wat is to enter when using MMPV & ( T CODE for opening period.
    rewarded if helps.
    rc

    Dear RC,
    This T-code for opening period to company.
    it means to plant reports will take every month.so we need to close plant transactions in every month ending.then only we will see the reports of every month of plant.
    in MMPV we have to give company code and opening month name and press execute button.
    this is the main uses and functions or MMPV.
    Hope this will helps you
    Prem.

  • Preview takes forever to open, much slower than on my old MacBook. It has been like this since I bought the computer last January. Why is Lion so much slower?

    Preview takes forever to open, much slower than on my old MacBook running Snow Leopard. It has been like this since I bought the computer last January. Any ideas?

    Take it to an Apple Store for testing. If you don't get immediate satisfaction, exchange it for another one, which you can do at no cost, no questions asked, within 14 days of delivery.

  • Function Module to find out detail of open period of Finance (FI)

    Hi  All,
    I have a query that I want to know the existing function module to find out
    FI period detail thatis detail of opened period in FI.
    Regards,
    Rishi

    Hi Rishi
    Go to transaction SE37 and you can see the list of FM.
    Thanks
    Ashok
    Assign points for useful answer

  • After GL Year opening the months of new year are not appearing in open period window of Gl?

    Hi All,
    After GL Year opening the months of new year are not appearing in open period window of Gl? Am i missing any thing???
    regards
    Shahzad M. Saleem

    Have you checked GL setups
    Setup accounting manager >
    Query your OU >
    Under setup steps click on Update for ledger
    Under accounting calendar
    Number of future enterable periods.

  • Warning : No Rate found in the opening period

    Hello,
    i want to make the currency translation and it works, but everytime there is one message that irritates me.
    SPRunConversion Version 7.0.114
    Warning : No Rate found in the opening period
    20081200 - 18 Rows Calulated
    20081200 - 0 Rows Updated
    What is the opening period and where can i set the parameter for each entity?
    Thx
    Dirk
    Edited by: Dirk Unkelbach on Oct 2, 2009 11:59 AM
    Edited by: Dirk Unkelbach on Oct 2, 2009 12:00 PM
    Edited by: Dirk Unkelbach on Oct 2, 2009 12:01 PM

    Hi Dirk,
    Opening period is normaly used for carry forward rules, but you get this warning in currency conversion also.
    You can set the parameters for Opening Period in the CATEGORY Dimension.
    First Parameter is OPENING_PERIOD : if its blank it uses the last month of a year (=> DEC if you use calendar year)
    Second Parameter is OPENING_YEAR: blank means previous year (same as inserting -1)
    This means, if you calculate budget for  the whole year or a month in 2009, Opening Period is 2008.DEC.
    If you dont have any rates in Time = 2008.DEC;Category=Budget (for each of your specific rates) you will get this warning.
    Gruß
    Jörg
    Edited by: Jörg Finster on Oct 6, 2009 12:34 PM

  • Pages with JavaScript open extremely slow IE 10/Win 8

    Few weeks ago, started noticing some pages opening extremely slow. Top 2 examples are nbcnews.com and oregonlive.com, with the commonality between the 2, lots of scripting (javascript). The sites don't allow me to scroll right away, takes about 20 seconds
    before that's available. The content is slowly loading, takes about 2 minutes to fully load. I am noticing a loading wheel next to the mouse pointer that is going nuts, appearing to process a large amount of info.
    I went through lots of different troubleshooting steps; below are some of the things I tried:
    - Reset IE/clear cache/ temp files
    - Ran disk optimization
    - Ran Full antivirus scan, with computer coming up clean
    - Logging in under another user
    - Compatibility mode
    - Trying the sites on another windows 8/ IE 10 computer on the same network-works just fine
    - Installing chrome, same problem
    - disabling scripts on pages from internet options, the sites load quick, but half of the content is missing.
    The only thing I've done that seemed to have fixed the issue temporary is uninstalling and re-installing a cumulative update that MS released last month. The sites were loading quickly right of the bat, after the update was re-installed. Later though, it
    ended up getting worse again. Also,  I compared the results from the metric at (https://www.webkit.org/perf/sunspider/sunspider.html) and on the troubled computer, results show Total
    of 575ms response time, while on another computer, it's 120ms response time.
    Please advise if there is anything else I can (besides resetting the OS) to resolve the issue. Thanks!

    Please advise if there is anything else I can (besides resetting the OS) to resolve the issue. Thanks!
    Use the Developer Tools to find out where your delay is.  FWIW the NBC one was noticeably slower opening than the other.
    Robert Aldwinckle

  • Firefox wont open periode

    firefox is the only browser on my laptop have no way to fix it
    firefox wont open periode so please how can i fix the probleme

    See [[Uninstalling Firefox]], try the [http://firefox.com/all-older.html older version], or the [http://firefox.com/beta beta]. If nothing happens when you try to launch or uninstall any of these versions, try these malware removal links:
    *http://www.safer-networking.org ,
    *http://www.malwarebytes.org ,
    *http://www.spywareterminator.com ,
    *http://www.microsoft.com/security/malwareremove/default.aspx

  • The GL date is not in an open period: APP-PO-14230

    Hi,
    I am using R12.1.1 version.
    I am getting this error "The GL date is not in an open period: APP-PO-14230" when i open the "Inventory > Transactions > Receiving > Receipts" screen for the Intransit shipment.
    The Accounting calendar period (DEC -2011) is opened in both source & destination organisation.
    When i try to check the " General Ledger > Setup > Open/Close" screen, it asking the Ledger value to find out the periods.
    If i entered my primary ledger name on this field, its not matching.
    How to resolve this error.
    I am functional person. I dont have rights to see any database table levels.
    Please help me. Thank you in advance.

    Hi;
    Please see below notes:
    RVTPT-098: ORA-01086: savepoint 'START_TRX' never established [ID 987686.1]
    APP-PO-14230 Or APP-PO-14376 : When Saving Receipts [ID 552244.1]
    Run Masscancel Error App-Po-14230: The GL Date Is Not In An Open Period. [ID 1131265.1]
    Mass Cancel Error APP-PO-14230 GL Date Not In an Open Period, But Can Manually Cancel The Same Purchase Orders [ID 882329.1]
    Hope it helps
    Regard
    Helios

  • Opening Period

    Dear Experts,
    What is opening period for planned orders/ MRP? How do we set it up?
    Regards,
    Sachin

    Dear Sachin,
    1) Opening period can be define in schedule margin key, while scheduling the Number of days
    Maintained in Schdule margin key will be taken by system in MRP
    2) in initail settings of MRP we have option Create Purchase Requisition in opening period
    means MRP creates Pur Req in Opening period.
    Also Plz refer this thread
    [Planned order opening date;
    Regards
    Madhu

  • Opening period (schedule margin key) in forward scheduling

    Please advise whether opening period is used in forward scheduling that we specify in schedule margin key? if not, what will be the reason?

    Hi,
    Opening period is used only in Backword scheduling.
    b'cause opening period is period of workdays deducted from the start date to determine the creation date of order.
    reward points if useful to you.

  • How to check the opening period

    Hi,
    During MRP run,the selection 2 Purchase requisitions in opening period.
    How system determine when is the opening period and propose for PR?
    Thank you

    Dear Sasy,
    Check this thread for example
    [Schedule Margin Key|SCHEDULE MARGIN KEY;
    Regards
    Madhu

Maybe you are looking for

  • Refresh table after creation of new Toplink BO

    Hi, i have the following Problem and i hope someone can help me. I use ADF11g/Taskflows with TopLink-mapped BOs (no ADF BC). Consider following Taskflow(s): main activity is a jsff-page (view) showing a table of BOs. From this view there are two acti

  • Printing errors (font substitution?) in Reader 9.0

    A client is having problems printing PDFs from Reader 9.0. The file is viewing correctly, but when she prints it, parts, but not all of the document text is printing as what she has described to me as 'Arabic looking' (I am going off her description,

  • Table of Contents - Styles not ordering as I want them to

    Hi This has been driving me crazy! Hopefully someone can help. I have set up a table of contents with 3 styles as so: 1. Chapter heading      2. Page title (with page number)           3. Sub or item headings (from each page where relevant) However t

  • SQL MAX QUERY / SQL COUNT QUERY

    Hi all, i would like to get the value of the number of rows i have, but i dun seem to work it out with the getRow statements. i think the syntax of my statement is ok, but maybe i am doing the wrong way to get the value out. I tried with COUNT, and i

  • Sabre web service call from servlet

    hi all: I need to call sabre web service from my application. sabre have provided one utility (bat file for windows environment), this is working fine. I have just created servlet and called this web service in the same way as this batch file calling