OPERATION CHANGE IN ORDER

Hello Experts,
I have an issue regarding process order.
If i add an operation while process order creation then will it get updated in recipe master table PLPO.
Or suggest me an table in which i can find this updated values of operations.
Thank you.
Regards,
Ashish
Moderator message:
Locked. Reason: improper use of capitals in subject line.
Please read rules of engagement before posting.
Edited by: Csaba Szommer on Feb 1, 2012 8:37 AM

HI
Check Table S022: SFIS: Order Operation Data for Work Center for order no AUFNR as input.
Regards
Anupam Sharma

Similar Messages

  • Custom exit or badi for changing the user fields in operation of process order

    Hi all
        I want to find a exit or badi to set default value to the user fields in operation of process order when COR1.
        I have tried exit 'PPCO0001', but this exit is call after commit work, so I can not change any thing
        I also tried to use badi 'workorder_update', 'before_update', but all parameters in this BADI are importing, can't be changed, I've tried to change it and then program dump.
        Do you have any solution for this question?
    Thanks

    Do a Implicit Enhancement at the PBO of this subscreen.

  • Changing attribute order in a mapping operator

    Is there a way that I can easily change the position or order of a mapping operator or object (e.g. Joiner object) without having to remove all the attributes in an object, and then either entering them manually or pulling them from the source to the mapping object (the target).

    Hi Kurt,
    Unfortunately that is not possible, operator attributes always show in the order you created it.
    Only tables, views, snapshots, dimensions and cubes allow to change the order of their attributes, but then only in their respective editors, not in a mapping.
    Regards, Patrick

  • How do we can change the last done dates of Planned operation by EM orders?

    Hi colleagues
    i defined four opertions for one equipment as performance based or time based plans and scheduled it for next month. then we received a EM notification for mentioned equipment. we iisued order for EM notification and  maintenance opertor carried out the orders but while he doing the EM process , he did two opertion of preventive maintenance from mentioned plan.
    we can add mentioned operations in EM orders as operations but the question is that after we confirm the EM orders and enter the actual dates , and it seems that the last done dates of assigned two operations must be change in PM plans.!
    Is there any solution for it or not?
    Thanks
    Akbar

    Hi Carlos
    thanks for ur attention
    actually i want change the last done dates of some opetions in my scheduled maintenance orders by assigning them to EM orders as operations.
    for example:
    i received a EM orders with this description : oil leakage from sight glass of hydraulic pumps
    in the proceesing of EM order , i will eliminate the leakage and also change the oil of pump .
    the changing the oils is the one of our shecduled Maintenance plan that is it would be called on next month.
    in the confirmation of EM order , i will add this operation from equipment task list ( change the oil) and enter the dates and another data.
    it's obvious that mentioned opertion should not be schedule on next month and according to it's package sequence , the new date for changing the oil must be 3 month later form the date that we entered on EM order.
    Thanks
    AKBAR

  • I cannot change song order on playlist with highlight and drag. I have turned off shuffle and highlighted the far left column( up/down arrow) of playlist. My mac pro is running 10.5.8  and am using itunes 10.4.

    I cannot change song order on playlists (old or new) with highlight and drag. I have turned off shuffle and highlighted the far left column (up/down arrow) of playlist. My mac pro is running 10.5.8  and am using itunes 10.4. I can't drag and drop "music" to "playlist" but can right click and get the option to "add to playlist." No such option for moving song within playlist, only the up and down arrow which moves song from top to bottom list, so if it is #4 from top it will move to #4 from bottom. Stupid I know. I spent over an hour with Apple support, reinstalled itunes, restarted and rebooted computer. Networked with my laptop which is running 10.6.8 and itunes 10.4 and it can drag and drop. The final Apple support solution was to reinstall my operating system. I would prefer not to. Any other ideas?

    After looking at other people's posts, I think it's official: there is a bug. Itunes support said I should not have lost the drag/drop tool and I haven't on the laptop that is running itunes 10.4 and operating system 10.6.8. I chatted with someboby who lost both his drag/drop and side scroll and what we have in common is a wacom tablet for a mouse. My laptop is a wireless mouse. I reinstalled whatever updated driver that wacom has out there, shut the system down for night, hoping for magic, but alas none to be had. So if I want to change song order, I network the laptop and desktop, share the screen on the laptop, drag and drop to my heart's content and curse Apple for making me work this hard to find the tool that was once at my fingertips. Apple also let me know that if I want to share songs in household that the hundreds on songs that were purchased for .99 need to be repurchased for another .30. Maybe Apple is holding my drag/drop tool captive til I pay up the money or Maybe the next update will fix the problem, I for one give up for now.

  • Changing song order in playlists - changes no longer show on ipod until sync

    I organize my playlists according to how I rate songs; songs with higher ratings go at the top. When the last operating system came out there was a glitch where on the iPod (but not in iTunes) songs were ordered inversely, ie. songs with higher ratings were stuck at the bottom. This was annoying, but one bonus was that when rating songs on the iPod, the position of the song would change automatically. For example, if Song A had two stars but I changed the rating to 3 stars on my iPod, Song A would immediately move and join the other 3-star songs. The changes would then be tranferred to iTunes upon syncing my device.
    Now, after having updated iTunes, the playlists are in the correct hierarchical order, but I can't seem to immediately change the order of songs in playlists according to their ratings. Instead, I have to rate the song and sync my device for it to change in iTunes, and then sync my iPod again to have the playlist updated on the iPod itself. This isn't a big deal, but I enjoyed the ability to instantaneously alter my playlists based on the song ratings. Am I missing something? Any advice?

    What did you do when you " i recently added iCLOUD service "?
    Try:
    - Reset the iOS device. Nothing will be lost
    Reset iOS device: Hold down the On/Off button and the Home button at the same time for at
    least ten seconds, until the Apple logo appears.
    - Unsync all music and resync
    - Reset all settings      
    Go to Settings > General > Reset and tap Reset All Settings.
    All your preferences and settings are reset. Information (such as contacts and calendars) and media (such as songs and videos) aren’t affected.
    - Restore from backup. See:                                 
    iOS: How to back up                                                                
      - Restore to factory settings/new iOS device.

  • No Authorization to change Purchase Order for Professional Purchaser

    Hi Experts, I am facing the following issue,
    System Info :
    SRM 5.0
    ECC 6.0
    IE 6.0
    I logged in as the professional Purchaser in to My SAP SRM browser and when I try to change a Direct material purchase order, I get the following message:
    No Authorization to change Purchase Order xxxxxxxxxxx.
    Here is my sequence of operations:
    Logged in as Proff Purchaser, selected the process purchase order link, then selected the purchase order from  the worklist and click on the change icon.
    Please let me know if need to customize any settings.
    Thanks in advance,
    Raj

    hi,
       In trascn PFCG,for the role of Startegic purchaser,under the Personalization tab,set the attribute  BBP_WFL_SECURITY to '4'.Also,check the authorisation data for the Strategic purchaser role.
    HTH.
    BR,
    Disha.
    Pls reward points for useful answers.

  • I want to order files (e.g., photos) in a particular order (not necessarily an order that is an option in MacOS. Ie, my own custom order, and I want them STAY in that order until I change the order. Is this possible?

    I want to order files (e.g., photos) in a particular order (not necessarily an order that is an option in MacOS. Ie, my own custom order, and I want them STAY in that order until I change the order. Is this possible?

    Custom sort order is not a typical option in the list view of any desktop computing systems I know of. The way you're seeing it work is also how it works in Windows and other systems.
    There is no "None" sort order. What you're seeing is a "None" option under "Arrange By." Arranging is not the same as sorting; arranging is how the files are grouped in the window. For example, you can arrange (group) files by Kind while sorting by Name. You'll notice that if you are in List view and you choose Arrange By "None," in the window there is still a sort triangle next to the column name that it's sorting by.
    If Arrange is set to None, the files appear in one big group (the traditional view) that is controlled by the Sort order (where there is no None option).
    I didn't even know the difference between Sort and Arrange until I saw your question and did a little research! This Macworld article helped:
    How to arrange and sort files in Lion Finder (also applies to later OSs like Mavericks)
    As for your main question, how to do a custom sort order in the Finder, you can only rearrange files manually in Icon view. As with other operating systems, if you want to create a custom sort order for photos there are other ways:
    Use a photo organizer application like iPhoto or Lightroom. Some let you have custom sort orders in folders, but others only let you have a custom sort inside a different container like an "album" or "collection". Having those additional container types is part of why photos are often best managed in an organizer application and not on the desktop.
    Rename the files. You can use a renaming utility program to rename the photos with numbers that will enforce your sort order when sorted by name on the desktop, like
    01 Photo.jpg
    01 Photo.jpg
    01 Photo.jpg
    or
    Photo 01.jpg
    Photo 02.jpg
    Photo 03.jpg

  • Scheduling issue for splitted operations in process order

    Hello All,
    I am facing problem after scheduling splitted operation in process order. The scenario is as follows.
    In process order there are 5 operations. 10, 20, 30, 40 and 50. Out of the above operations 30 is splitted and two different resources are assigned to it. Control key assigned to splitted operation (30) is also scheduling relevant. Now the flow of operations will be as below.
    1. Operation 10
    2. Operation 20
    3. Operation 30 - Operations is splitted (Resource used is A), qty to be produced - 10 kg.
    a. Operation 32 - Quantity of operation 32 is changed to 5 kg. Resource used is B.
    b. Operation 34 - Quantity of operation 34 is changed to 5 kg. Resource used is C.
    4. Operation 40
    5. Operation 50
    Relationship exists between opearion 10-20, 20-30, 40-50 and between 30,32, 34 with 40. But there is no relationship exists between splitted operations 32 and 34 with any of the previous operations for eg. 10 & 20.
    Issue is after scheduling all operations relationship remains maintained between operations 32, 34, 40 & 50. As operation 30 is splitted to two different operations equally total time for scheduling gets reduced but after scheduling of all operations all previous operations before operations 30 does not get resceduled? Scheduling type maintained for order is Backward Scheduling.
    Please check this and guide me how all operations before operation 30 can be rescheduled as per changed timing of operations 32 and 34.
    Best Regards.
    Edited by: Avinash Mohite on Mar 19, 2010 12:43 PM
    Edited by: Avinash Mohite on Mar 19, 2010 3:14 PM

    Hi,
    I hope u r doing in this way:
    In the capacity header screen enter individual capacity as 2. then click on Got( on top of same screen) and go to individual capacites. Enter the names of two individual capacities, for example 1 and 2. These are the names of two work centres where u r splitting ur operation.
    Double Click on operation 0030 and go to tab 'splitting' . Tick on ' required splitting' and enter maximum no. of splits as 2.Then go to capacity requirements assignment tab. enter the individual capacity as 1 and 2 and enter the splitted quanitites.Save and reschedule .
    Check and revert.
    Regards.

  • To Control status of the operations of maintenance orders individually

    Hi,
    To Control status of the operations of maintenance orders individually
    Anyone know how to control individually the operation status of maintenance orders?, see the image below?
    Exsample: I need complete (TECO) only the operation 0010
    Thanks,
    Adilson Delfino

    Adilson Delfino
    The system-statuses cannot be set manually by the user (like you can with user-statuses).
    You need to process a function to make these statuses change, e.g. releasing the order header, TECOing and order or dispatching operations. Alternatively you can develop a solution that may be able to change these statuses (see above post).
    I don't think you will be able to set the TECO status on individual operations.
    Have you considered user-statuses on the operations?
    PeteA

  • DIServer insert operations for sales orders with error

    DIServer insert operations for sales orders with
    That even though the insert is inserted DocDueDate DocDueDate it says error.
    Subtracting the value of the format 'yyyy-mm-dd', 'yyyy/mm/dd', 'mm-dd-yyyy', 'mm/dd/yyyy' put all reporting
    When the input is entered DocDueDate ShipDate also put together ... but I get an error.
    The error message 'env: Receiver-10Enter due date [ORDR.DocDueDate] 171AddObject2EEE7D98-AB71-464A-93AB-933F0AD3D4DC'
    Purchase order entered into the normal value because the xml is missing or wrong with you.
    Please answer all the possibilities that can be resolved
    This Xml used.
    "<BOM>" +
    "<BO>" +
    "<AdmInfo>" +
    "<Object>oOrders</Object>" +
    "</AdmInfo>" +
    "<QueryParams>" +
    "<DocEntry />" +
    "</QueryParams>" +
    "<Documents>" +
            "<row>" +
            "<DocType>I</DocType>" +
            "<DocDate>2012-01-11</DocDate>" +
            "<DocDueDate>2012-01-11</DocDueDate>" +
            "<CardCode>CD00001</CardCode>" +
            "<Address>Anymode</Address>" +
            "<DocCurrency>KRW</DocCurrency>" +
            "<Comments>[sales orders] LGU TEST</Comments>" +
            "<TaxDate>2012-01-11</TaxDate>" +
            "<JournalMemo>JournalMemo</JournalMemo>" +
            "<Address2>Addr</Address2>" +
            "<BPL_IDAssignedToInvoice>1</BPL_IDAssignedToInvoice>" +
            "</row>" +
    "</Documents>" +
    "<Document_Lines>" +
            "<row>" +
            "<ItemCode>ACDT0100ET</ItemCode>" +
            "<Quantity>1</Quantity>" +
            "<Price>5000</Price>" +
            "<DiscountPercent>10</DiscountPercent>" +
            "<WarehouseCode>A100</WarehouseCode>" +
            "<VatGroup>A2</VatGroup>" +
            "</row>" +
    "</Document_Lines>" +
    "</BO>" +
    "</BOM>";

    I had the same error change the Date to the format yyyymmdd, and problem solved.

  • Changing the order of precedence of video card ports

    My video card, a Radeon HD 5450, has three outputs: HDMI, DVI, and D-SUB. I have my TV plugged in to my computer via HDMI and my monitor via DVI. I ignore the D-SUB port.
    The HDMI port appears to take precedence. When I start my computer, the resolution is configured for my TV, which is then mirrored to my monitor. This isn't a problem, because I configured X to switch resolutions (so the monitor is correct, and the TV disabled) as soon as X starts. But this doen't take into account the TTY screens and the other operating systems I have installed.
    Is it possible to change the order of precedence of ports on my video card? Do any video cards support changing this?

    Have you tried doing it through Catalyst Control Center (or whatever it's called these days)?
    Or maybe there's some jumpers/headers on the card itself.
    The only [remotely] similar experience I have had was with an nVidia card. It had VGA, DVI and HDMI. The HDMI was inactive during POST, and there was nothing could be done about it.

  • How to change delete order?

    Hello,
    I have classes C, C1, C2. C has private owned 1-N mapping to C1 and private owned 1-N mapping to C2. C1 has 1-1 mapping to C2.
    Assume c has c1 and c2, c1 has c2. When I save c, TopLink inserts c, then c2, then c1. Now I remove c1 and c2 from c (from private owned collections) and save c. TopLink tries to delete from database c2 first - I get
    "integrity constraint violated - child record found".
    Of course it is found - I would like TopLink to remove c1 first, then c2. Why are DELETE statements executed in the same order like INSERT statements? How can I change that order?
    Thanks

    I'd like to share one possible workaround. It seems that the order of delete operations depends on the order of mappings in descriptor (attributes seems to be sorted alphabetically in project XML generated in TopLink workbench). So I did something like this (in afterLoad method) to ensure the correct order of DELETE operations.
    DatabaseMapping mapping1 = pDescriptor.getMappingForAttributeName("att1");
    DatabaseMapping mapping2 = pDescriptor.getMappingForAttributeName("att2");
    DatabaseMapping mapping3 = pDescriptor.getMappingForAttributeName("att3");
    DatabaseMapping mapping4 = pDescriptor.getMappingForAttributeName("att4");
    if (mapping1 != null) {
    pDescriptor.removeMappingForAttributeName("att1");
    pDescriptor.addMapping(mapping1);
    if (mapping2 != null) {
    pDescriptor.removeMappingForAttributeName("att2");
    pDescriptor.addMapping(mapping2);
    if (mapping3 != null) {
    pDescriptor.removeMappingForAttributeName("att3");
    pDescriptor.addMapping(mapping3);
    if (mapping4 != null) {
    pDescriptor.removeMappingForAttributeName("att4");
    pDescriptor.addMapping(mapping4);
    }

  • Check of operation sequence in order

    Hi all,
    I don't want to check of operation sequence in order. so  how can I do this? Are there any customizing for this case?
    Best regards,
    Hilal Çak&#305;r
    email : [email protected]

    Make the following changes in control key or use the control key which have this setting
    In OPJ8, for a control key
    Confirmation = Confirmation possible but not necessary
    In OPK4, for a plantb and production order type combination in Generally valid settings tab page -
    Checks sub page
    operation sequence = set operation sequence is not checked
    With this setting  it will work

  • Changing track order after importing

    I am trying to import opera CDs into my iTunes library. Operas usually take up 2 or 3 CDs, and when I try to upload the multiple CDs to my library, iTunes mixes up the order of the tracks so that I can't listen to the opera in order. How do I change the order of the tracks in the iTunes library so that I can listen to the opera in order?

    Try this, I found that it works for me. Right click at the top of any column in your iTunes library and choose **Track Number** from the list. Click at the top of this new column to sort it and after that click on the Album by year column. If you like you can then click on Artist, it will continue to hold the track order as well. Afterwards anything you import should follow this arrangement Track Number>Album>Artist. Make sure the little triangle on the right side of the track number column header is pointing up. In that direction the column is sorted in Ascending order (lowest to highest).

Maybe you are looking for

  • Difference between abap object and function

    hi all, i read the book on abap object of the difference between abap object and classical abap. i know that there is only 1 instance of a specific function group but somehow i still not so clear why subsequent vehicle cannot use the same function. i

  • PDF attachments in gmail

    Unable to open PDF file in Adobe application.  PDPs open in gmail but image size is fixed. Ipad2 iOS5 does not display open icon shown in Adobe reader app.

  • Canvas view

    I've just captured a clip into FCP using my Sony Z1 and using the HDV to DV downconvert on the camera. When I play the clip in the viewer, it looks like I want it to. SD Letterboxed. When I put the clip into the canvas, it becomes quite a bit smaller

  • System Center App Controller Credentials Error

    Hi all I completed scac 2012 but when I try login I got a error credentials The credentials that were used to connect did not work. Verify the credentials and sign in again. If the problem persists, contact your administrator I find event logs and I

  • Table update syntx req?

    hi i had an req to update the records from my ITAB in ZTABLE. say i had 5 records in my table for MATNR with MTART for each MATNR. now i want to update the each MATNR with this ITAB-MTART. please tell hwo to do. the no of records vary on ITAB,so how