Operation Overview-Standard Values Rounding

In production order operation overview screen, the standard values (setup time & Processing time duration) are rounding up and displaying with one decimal place. Where as in routing the same standard values are displaying with 3 decimal places.
Is there any config setting (or screen exit) for to display setuptime duration in CO02/CO03 operation overview screen with more than one decimal places?

Saiful,
Execute T code CUNI.
Select 'Time' & click on 'Unit of measurement'.
In the next screen, select the desirder UOM. Click on details.
Under 'Display' put 3 for 'Decimal places'.
And under conversion put 6 for 'Decimal places rounding'. Save.
It will solve your problem.
Hope this helps you.
SmanS

Similar Messages

  • Production order operation's standard value

    hi,
    can anyone shed some lights where does the production order operation's standard values derive from?
    thanks.

    hi there,
    see in work centre inital screen u define the std value key . depending upon the std value key u get the fields for  execution time . set up time , labour time ....etc
    u define here that wether timmings by clicking the drop down .
    should be maintainned ,
    can be maintained ,.......
    if u define here that the timming for execution time should be maintained ,the system while ,creating the operation by using this workcentre ,system will ask u to put a value which will define the operation time for the operation on that work centre .
    depending upon the drop down in workcentre for the execution time should be maintained or can be maintained system will either will allow u to go ahead or not with out entering the operation timming

  • How to determine the value of a Standard Value in a routing operation

    Dear Experts,
    Kindly guide me on how to detemine the value of my Standard Value in the  operation of my routing, or in the phase of my Master Recipe.
    I mean what determines the value that I enter for the Standard Values: Machine  and Labor in the phase of my Master Recipe?

    Hi,
    In the Routing / Master Recipe, the standard values are based on the lot size.
    For Example, if you have the lot of 100 KG, then in recipe the machine time will be 2 hr and labor time will be 2 hours, it means to make 100 KG we require 2 hrs of machine and 2 hrs of labor.
    Normaaly all production manager / supervisor will have the date for the hours. The system will calculate will respect to batch / lot size.
    If you have order for 1000 KG, then the system will assign 20 hrs for Machine and 20 hrs for labor.
    This will be used for Capacity planning and Costing.
    Capacity plan here your requirement is 20 hrs for machine and labor. If you have a reacto which wil run for 24 hrs a day, then the order will be completed in a day.
    Costing is concerned, all std. valur key will be assigned with an activity type in work center / Resources and the prices for activity type / cost center will be maintained in KP26.
    Based on the cost and hours, the system will allocate cost for the order (it will be planned cost). When you are confirming the order you will enter the actual time for the operation, then that will be your actual cost.
    Pl do a sample test scenario in your sand box, and surely you will understand more.
    The data for Routing / Recipe will be provided by the production manager of the plant and activity price will be provided by the finance team.
    Thanks,
    JK

  • Standard test key in operation overview in routing

    Iam not able to see standard text key in operation overview in routing beside control key column. Any setting for it .

    hi,
       I dont think that that the STK is dispalayed in the operation overview.
    so first ensure that the STK is defined in the WORK centre basic data view. Then goback to the operation view of u r routing.
    Double click on the operation ,then u will find in the OPERATION details view that u r STK is diplayed just below your CONTROL key.
    GURUS pls correct me if i am wrong,
    PLs update on this
    THNX
    HKR

  • Formula to fill standard value in RC operation

    Hello,
    We are using serial number  effectivty parameter . We were asked to fill one of the standard values of  the RC operation , using a formula, thus each serial number will contain a different value, that will be calculated according to to formula.
    For example: S.N 1 will contain the value 20 ,  S.N 2 will contain the value 19.7,  S.N 3 will contain the value 19.4 etc.
    Is there any standard way to do it?
    Thanks,
    Eti

    Dear,
    Please elaborate ur que since its not getting cleared.Regarding serial nos i think u have created serial nos profile and assign it in ur work sch view.What exact req u have regarding std value formula for operation with serial nos.What is this RC operation.
    Regards.

  • Functional module for production order operation standard values

    Hi,
    Is there any functional module/BAPI available where I can get the 'Standard Valuse' (Setup/Machine/Labor) from production order operations directly?
    Regards,

    Hi Caetano,
    Thank you for your reply.
    I checked suggested BAPI BAPI_PRODORD_GET_DETAIL, it gives me the operation details like control key, Activity name (like KMCH, KMOD) but not its standard values (values for: Setup/Machine/Labor).
    Could you please check and confirm?
    The FM: PM_ORDER_DATA_READ gives me all details but as name start with PM, I am not sure if its only related to 'Plant maintenance' orders and if its ok to use this FM for PP production orders.
    Please suggest.
    Regards,

  • Transaction CA02 - change Routing operation Overview

    Hi !
    I need to insert values to column "Unit Quantity" (plpo-vgm04)where the table line is 'SMD' or 'TH_***'. I  need
    to make a massive change for  many record.
    Is in sap a bapi for doing this task ?
    thanks
    moshe

    I am unable to find out the CAPP knowledge button in CA02 but find rest of three fields which you need to know see as given below
    KAP_ARBPL
    FLG_CAPO
    Above two field is coming in header details of particular routing (CA01, 02, 03)there is 6 views of header data
    Task list.
    Production line.
    General data.
    Parameters for dynamic modification /inspection points.
    Further QM data.
    Administrative data .
    Work center for capacity planning
       A work center which should be considered a "critical work center" (bottleneck work center) according to capacity leveling using a planned order.
    As per above view you will get KAP_ARBPL- Work center for capacity planning in General data view as a Planning work center.
    FLG_CAPO-Recalculate standard values at order creation you will get this field in general data view just below of planning work center as a CAPP order and its indicating that, at the time of order creation, standard values are recalculated using CAPP depending on their order category.
    P3007-RUZUS you will find this field in CR01, 02, 03 there is also 6 views for particular work center as below.
    Basic data
    Default values
    Capadities.
    Scheduling
    Costing
    Technical data and you will get P3007-RUZUS in this view as Rnd. & add.val. This specifies the rounding categories and the additional values to be taken into account when standard values are calculated for an operation.
       You can use this key you can assign a rounding category and an additional value percentage to each of the standard values in a work center.
    Regards

  • Unit of measure for Standard Value.

    Hi Gurus
    I have maintained Standard value LABOR in workcenter and maintain deafault value for unit of measure in workcenter Default tab .
    But that unit of measure is not defaulted in routing when i put some value.

    Hi Mayuresh,
    When you insert a work center in the routing, the defaults specified in the Default Values tab gets copied into the operation. The Standard Value Units get copied to the Standard Value fields (1 to 6) i.e. eg: In work center you have specified the Standard Value key as SAP1 which has the fileds - SETUP, MACHINE & LABOR, then in the operations if you scroll, you will find 3 columns named as SETUP, MACHINE & LABOR with the Standard Value Unit which you have maintained in the Work Center - Default Value tab. You can edit these UoM in the routing though.
    The same holds good when you assign the work center directly in a production order, you can edit the values in the StandadVals tab of the Operation.
    Hope the above answers your query.
    Regards,
    Vivek

  • CAPP - standard value calculation origin 9 function module CE22.

    Dear,
    I've a project where i need to calculate standard value time based on multiple and various criteria. (standard price of a all components assigned to one operation)
    I've seen that it should be possible to calculate a characterisitic value based on a function module in a method. (characterisitic value origin 9 - function module).
    When i try to use the method with a function module I get a dump. ( CALL_FUNCTION_PARM_MISSING).
    I don't find any documentation on the usage of a function module. as origin for CAPP.
    Could you please help me ?
    Br,
    Daniel.

    There are so many threads and documentation available on the same..Please search the same.
    Moreover if you share the error then it would be easy to know the exact problem
    Regards,
    AL

  • Standard Values in Production Order for Alternate Work Center

    Hi SAP Expert,
    I would like to find out whether there is possible solution for the requirements as below:
    e.g.
    >>> Routing for Product A only has one Operation 0010.
    >>> 4 Work Centers/Resources (A,B, C, D) can be assigned to run this operation where all these 4 Work centers/resources are having different capacities (Setup, Labour, Machine hour & Electricity are different).
    >>> Out of these 4 work centers, only one work center will be selected (Selection criteria will be based on the capacities & availability).
    >>> In my current setting, only one preferred work center (A) is maintained in the routing for operation 0010.
    Issue:
    >>> If I select the work center B manually in APO during the planned order creation, the Production Order created will be tied to work center B but the standard values captured in the Production Order are still referred to the standard value of A.
    Question:
    1. Is there any way I can maintained in the routing so that it will captured all the different standard values for each work centers?
    2. If the answer is yes for Q1, then can the SAP auto populate the correct standard value into the Production Order according to the work center I selected before the planned order is converted into Production Order?
    Thanks.
    Regards,
    Hooi Chia

    Hi,
    You can use alternative sequence in routing and mainain three different sequence for all 4 workcenter.
    At APO side you can maintain priority for alternative sequence in PPM/PDS.
    Now when you execute the scheduling Heuristic depending on priority and capacity workcenter will be assigned.
    Regards,
    Vishal

  • Standard Value and Activity at maintenance order

    Dear All
    I have created a standard value and attached a parameter of unit meter cube with the work center, however when i create maintenance order of same work center (by using IW31) system is not showing standard value parameter i attached on work center. It only shows activity type to select and operation duration in HRs.
    Kindly respond on you earliest.
    Thanks
    Regards
    Navaid

    Dear Narasimhan
    In this process operation we are consuming natural gas that i want to take as an input that how much gas has been consumed during maintenance. I have created a standard value key and then attached that with workcenter. now i want to take that gas consumption value during confirmation.
    Regards
    Navaid

  • Add columns to CO02-Operations Overview

    Hi Gurus
    I'm trying to add couple of columns to the Operations Overview display layout in CO02 Transaction. Can someone please let me know how this is done?
    Thanks in advance
    Deepak

    HI Brahmankar
    Thank you for the reply.
    But in OPM2 it is about adding fields in CO02-Tab pages. My issue is with inserting Columns in the Operation Overview screen of Production Orders. I wish to display the "Start-Time" column and "Standard Text Key" columns that are not appearing. I wish to know what chnges have prompted them to get hidden as they get displayed in the standard SAP System.
    Regards
    Deepak Prasanna S

  • Production order Standard value field grey out

    Hi,
        When I am using CO02 tcode  THE STANDARD VALUE fields in operation detail screen has to be greyed out. Users should not be allowed to change the standard value key parameter values which flow from routing when the production order is created.
    Please suggest in any way it can be controlled.
    Regards
    madan

    Hi,
      Thanks for the reply. Which user exit will work for that case.
    Please suggest.
    Regards
    madan

  • Standard Values in confirmation

    How to flow standard values maintained in routing into confirmation. This values are coming in production order but not coming in confirmation.

    Dear Mayuresh,
    In OPK4 for ur order type and plant in operation individual entry using initial screen tab tick all check boxes except finaly confirmed and confirmable operations.
    test and come back
    sree

  • Standard Value doesn't carried to Process Order Confirmation

    Dear Experts,
    I was trying to run Process Order Confirmation via COR6N but I found out that the Activities shown are NOT consistent with the Activities set in Master Recipe.  The following are the figures shown in master recipe, process order and order confirmation.
    Master Recipe (via C202)
    Base Qty =1
    Operation/phase = 0020
    1st Standard Value (activity 3 setup) = 1Hr
    2nd Standard Value (acitivity 1 machine) = 2Hr
    3rd Standard Value (activity 11 labour) = 3Hr
    Process Order (via COR2)
    Order Qty = 1,000
    Operation/phase = 0020
    Setup (to be confirmed) = 1Hr
    Machine (to be confirmed) = 2,000Hr
    Labour (to be confirmed) = 3,000Hr
    Order Confirmation
    Operation/phase = 0020
    Machine time (to be confirmed) = 1Hr
    Labour time (to be confirmed) = 2,000Hr
    My question are as follows :-
    1) Why the Machine time NOT same as in Process Order
    2) Why Setup time NOT shown in Order Confirmation
    Does anyone have any idea?
    regards,
    Abraham

    Hi,
    all the master recipe, process order and order confirmation, including the material master are maintained by myself alone.
    Is it due to some parameters are not defined properly such as in the formula key?
    The formula key are defined as below.
    Formula key defined in OP21
    Setup  = SAP005 = SAP_01 x SAP_11
    Machine = SAP006 = SAP_02 x SAP_09 / SAP_08
    Labour = SAP007 = SAP_03 x SAP_09 / SAP_08
    Paramater defined in OP17
    SAP_01 = Setup
    SAP_02 = Machine
    SAP_03 = Labour
    SAP_08 = Base Quantity
    SAP_09 = Operation Quantity
    SAP_11 = Operation Splits
    I'm a bit confused with these formula keys.  Could you explain to me how they work?
    regards,
    Abraham

Maybe you are looking for