Operation subcontracting (one operation outside scenario)

Hi
I am desperately looking for an answer to this scenario regarding operation subcontracting one operation outside, how will be the BOM, Work center, Routing pl provide docs pdf.
Thanks in advance

Please follow below.
1. In Routing assign PP02 control key for second operation.
2. It will create PR while order release.
3.Create PO for wrt PR with item cat " L"and do Component Posting to vendor wrt PO(MB1B-541)
4.DO GR for that PO movement 101
5.AT the time of GR 543 movement will be done and stock will be consumed from Vendor end( IN SAP it will reduce from stock provided to vendor in MMBE).
6. If Components which you are sending outside are excisable then you required CIN consultant also, check below steps(It can be without payment of duty and full payment of Duty).
check below transactions
7. Creation of Subcontracting Challan w.r.t. Transfer Posting Doc ()
8. - Reconciliation of Subcontracting Challan (J1IFQ)
9. - Completion of Subcontracting Challan (J1IF13).
10.- Generation of Annexure IV (J1IFR)
Thanks
Neeraj Dixit

Similar Messages

  • Subcontract one operation

    Hi all,
    I am creating a production order in which 2nd operation is subcontracted from other plant. I have set up control key PP02 for that operation in routing. Also set up in order type dependent requirements for automatic create PR on release. But i am still not able to get purhcase request on release of order.
    Please help
    Thanks

    Hi,
    Please check if the sub-contracting check box is selected & purchase info record number is entered in the routing for the seond operation (control key PP02).
    Then after release of order goto the operation overview, double clcik the second operation & check the enternal processing tab page.
    Regards,
    Senthilkumar
    Edited by: Senthilkumar SD on Apr 10, 2008 11:28 AM

  • Operational subcontracting scenario

    We have a requirement in operation subcontracting.
    In our production process some of the routing operations we are doing outside (external procurement). But the customer doesnu2019t want to create a Purchase Order for this process (each subcontracting requires a order and release). Since the number of operation level of subcontracting is more per day and they have contract with the subcontractor for the price for a year. Further they will send the order quantity by different schedule
    Please suggest for the above situation which process we need to follow and what are all the master data requirement and the transaction data requirement in a frequent manner.
    Regards
    Sridharan

    Create a  Contract and then create a Subcontracting PO  with reference to contract ( for a year )and assign the Component to be sent( Mostly  Dummy Material)
    And give the material description Similar to subcontractiong process.
    & IN OPL8, Production order dependent parameter : Set The dependent reqmt/.reservation - Never,  in General valid setting tab, this will restrict to create a PR while releasing Production order.
    and follow the same process as per the existing process.
    Note: IF you go to scheduling agreement for subcontracting You can't able to assign the component.
    Edited by: Sundaresan . E. V on Oct 5, 2010 11:29 AM

  • PR to PO conversion in operation subcontracting

    Dear friends,
    We are trying this scenario of operation subcontracting.
    I have a semi - finish material SM01 on which i m carrying 5 operations. The 20th operation is sub contracting. I do not want to maintain a separate material for this operation.  I have done all the necessary settings which are required. I m also getting a PR when a Production order is generated for operation 20.
    Now the problem is when i go to convert this PR to PO in ME58 the system gives me an error, "Not possible to determine any components".
    I do not understand where i have gone wrong.
    The PR document type that is created is NB.
    The PO does not take any material even if I try to maintain one.
    What can be the possible solution.
    Thanking all you for your kind assistance.

    Hi pankaj
    The concept is like that. You need to send a material out with gate pass to the vendor for that particular P.O.
    You might have issued the material from stock for the previous operation so that you will not have a component for that operation. There may be two options.
    Options 1) Create a dummy material with MRP type ND so that the planning will not happen and no plan order. keep stock through a movement type update. Allocate this component to the operation in your routing. If the external operations is pre defined.
    Option 2 )  Create a dummy material with MRP type ND so that the planning will not happen and no plan order. keep stock through a movement type update. Include this component in P.O while converting from PR. If the external operations is not pre  defined.
    The component will now appear in ME 2O
    Hope this is clear
    Regards
    J . Saravan

  • SUBCONTRACTING IN  OPERATION

    hi friends,
    i have a senario where i am using 27 operations in routing for the finished product .where i have a option to go for subcontract (incase of bottleneck)
    or go for inhouse  production ,in each operation.we are following MTS scenario.then please suggest how can  configure routing.?
    Thanks in Advance
    omkar

    Omkar,
    Since the number of operations are high i would suggest you to breakdown this flow into manageble semifinished products.
    Create 2 routing for the materail where ever both options are possible one for Inhouse production and another for external processing, create production versions with respect to this. In the material master make production version mandatory(MRP4 view)
    In the ordertype dependent parameters, define selection of production version as manual. With this when you convert the planned order to production order you can decide whether inhouse mfg or external processing.
    Regards,
    Prasobh

  • CreateInsert and Commit in one operation

    Is there a way to CreateInsert and Commit in one operation? I just want the user to click one button to create a new record.

    Hi..
    You can try as this scenario one way is without bean class also you can with bean any way i will explain how do you do without bean
    Refresh your Data Control and say you have ViewObject name sampleVO and Application Module as AM.
    Drag and drop CreateInsert as ADF Button(DataControl --> AM -->sampleVo --> Operations --> CreateInsert),To fill data for newly created row Drag and Drop sampleVO as ADF - Form(DataControl --> AM--> sampleVo).Now want to commit this form to database for that purpose you can use Commit Operation in your Application Module Drag and Drop Commit as ADF Button(DataControl --> AM --> Operations -->Commit).Now you can successfully inserted data to DataBase using CreateInsert and Commit.

  • Several operation in one machine

    Dear All,
    my clile requirement is they have one machine they produce several things for example there is mixing machine where they mix chocolate, nuts, biscuits, etc many things in one machine with different capacity how can i map this scenario in sap.
    kindly help me in this regard i will be very obliged.
    thanks in advance
    irfan

    Dear,
    You need to assign the same work center (Machine) in routing of the material  chocolate, nuts, biscuits and define there operion time accordingly. So you can carry out the several operation in one machine .
    Hope clear to you.
    Regards,
    R.Brahmankar

  • How to map operation subcontracting in a process order.

    Dear Gurus,
    How to map operation subcontracting in a process order.
    there are five operations in a process after three operations the material is send to a subcontract for further processing(i.e the fourth) then it comes to the plant and the fifth operations completed
    How can i map this process .
    Thanking you in advance
    Regards
    Ram

    Hi,
    have you tried external operations in  receipe.  There you need to maintain all the procurement realted data for that particular operations that is done outside,  and system creates PR for every process order that you release.  However the material goes and comes in without any material number  (as WIP).
    If you want to have more control,  create a part number before SC operations  and afer SCoperations   and then use subcontracting process in procurement. 
    The need determines which option you can go with.
    cheers
    Rav

  • Operation Subcontracting involving special stock

    Hi All,
    We have a business scenario as below.
    Operation Subcontracting process involved in a Project. The Components send to Vendor is a project stock. As already there a Special stock Indicator, we cannot send the material to Subcontractor. Any integration with PP-MM is possible ?What is the best solution for such situation?
    Regards
    Divya

    IS the  component is in  project stock, then You can send to subcontractor, check Whether the stock is in project stock, or unrestricted,

  • I m doing operation subcontracting  . i that i m converting planned order

    dear sir
    i m doing operation subcontracting  . i that i m converting planned order into prod order . i m facing error like Error or warning occurred during master data  transfer (see ). plz explain whole opration sub contracting step by step

    Dear,
    Procedure
    1. Create Purchase Info Record using T code ME11.(Vendor & material combination) for subcontracting.
    2. While creating routing for that header material and defining operation, For the
    10 to 40th operation for which outsourcing is given set the control key as
    PP02.After entering the control key as PP02 ,press enter -the system asks you
    for the purchasing info record no & check the tick mark for Sub-contracting. Here
    give the number which u obtained while using T code ME11.
    4) The moment you release the order system will create the PR for all external processing operations.
    5) That material you can transfer to your subcontracting vendor by ME2O or you can post transfer posting.
    6) In transfer posting you need to mention as a reference of Subcontracting PO, which you have already converted from SubPR.
    7) In that transfer posting, system will automaticaly generate 541Mtyp.
    8) You need to create SubCon Challan (J1IF01), for the material which you are sending outside of your plant.
    9) You need to mention that material doc number in creating challan.
    10) The same challan will be reconcilled after receipt of the material thru simple MIGO process.
    11) Your challan should get reconcilled by J1IFQ. It will remove the stock from supplier end from your system.
    Regards,
    R.Brahmankar

  • Operations Subcontracting

    Hi,
    Can anyone explain in Detail about the Process flow of Operations Subcontracting scenario ?
    Also let me know the customizing settings that need to be maintained to map the process in SAP.
    Thanks and Best Regards
    Vijay

    HI Vijay,
    Follow step by step procedure for Operations subcontracting:
    Subcontracting: Operation Wise:
    10, 20 & 30 total 3 operations. 10& 30 are internal, i.e., in-house and Operation 20 is External i.e. sending material for external processing u2013 subcontracting
    The control key PP02 meant for external processing is to be allocated to the operation 20 in the routing.
    Once you allocate PP02, in the operation detail screen Activate Subcontracting, then system will ask for the Purchase info record no.
    (Create Purchase Info Record TC: ME11, Give Details of Vendor, Purchase Organization, Plant and Select Subcontracting Press ENTER, maintain the required data)
    Next MD61, MD02, MD04. Then after confirm Operation 10,
    Then external processing has to be started.
    Go to operation overview in the prod order, choose operation 20 & double click.
    Get the Purchase Requisition number from the external processing tab. Then convert into Purchase Order. (Using TC: ME58)
    Send the Material to the Subcontractor using TC: ME2O or TC: MB1B with Movement Type: 541.
    Then receive Material from Subcontracting Vendor by using TC: MIGO with Movement Type: 101.
    (Goods Receipt with Reference to Purchase Order)
    Then confirm Operation 20 &
    Continue with Operation 30, Confirm Operation 30. Do GR by TC: MB31 Movement Type: 101.
    Regards
    Jagadeesh K

  • Error while creating PO in operation subcontracting

    I am getting an Error while creating PO in operation subcontracting.When I'm trying to convert the purchase requisition for the operation in the routing into a Purchase order it gives me the error "Not possible to determine any components".Please guide me why I am getting this error. I have already assigned the component to the operation in the routing. I also have this component in stock. But no Idea why I'm getting this error

    Hi  Sam,
    please check ,
    Assign a recursive BOM for the material for which you want to  create the purchase order .ie. create a BOM  of mat say X having a component  X and marking the indicator  recursive ticked.
    Please create the BOM  which is valid much before the date of creating a purchase requisition .
    And proceed for the creation of subcontract purchase requisition.
    Please Revert back, if the problem is solved.
    OMKAR

  • Handling WebService with more than one operation

    Hi Everybody,
    I have a hassle!
    First of All, I'm Newbie, using Oracle Service Bus
    I have to Implement a WS with aproximately 6 operations, in Service Bus.
    I create my WSD and my XSD Artifacts, with no problem, the issue comes when I try to create My Proxy Service in OSB
    Step 1 .- Create Proxy Service
    Step 2 .- I make a Link from my Proxy Service to my Business Service wich contains the WSDL with the 6 operations
    Step 3 .- I clic on edit the message flow in the actions panel to add route
    Step 4 .- I edit the route looking for a Webservice and selecting the method (In this Case I select one method, because I don't know how to route many operations in one Proxy Service)
    When I did that, my WS in OSB wasn't able to invoke one method. I got a timeout .. I don't know, if maybe I'm doing something wrong!!.
    What I want is a way to route many methods in a same Web Service
    I've done operational bifurcation in the Web Proxy.. With that component, I can choose methods like conditionals, and I can add a route destination for each method.. when I test it .. My OSB WS never reply me an asnwer, I got Timeout. Takes a lot of time
    I also tried to do it with IF ELSE conditionals trying to know the name of the method from the WLS Headers and routing them to a specific webservice method. But I couldn't do it!
    I check the WS out by itself and works in 2 seconds, so it's Working!
    Any clues?, Well I hope you can help me!!
    Thanks in Advance!
    Edited by: user11334562 on 05-ago-2011 17:38

    Pierluigi,
    Thanks for your answer,
    I had to rebuild my OSB project, and refact all my OSB artifacts,
    My Proxy Service, I was trying to do it with my WSDL again, when I already had done in a Business Service,
    So in my proxy I chose the BS instead WSDL and all Works Perfectly using SOAP Content.
    Pretty Thanks!!
    ABC

  • Change duration of multiple still images in one operation

    Hello Folks.
    I am trying to change the duration of each image in a sequence of still images.
    Program: Adobe Premiere Elements 7
    Mode: Standard Definition 4/3 ratio
    File types in use: MOD, AVI, PNG
    Problem: The product manual states: "To apply the new default length to all still images in your project, delete them from Project view and reimport them into your project."
    Question: Is there a way to select a group of still images and then apply a new duration value to all of them in one operation?  An Adobe salesperson told me that this is possble before I purchased the program, but I cannot figure out how this is done. I switched to Adobe from another product in order to get this feature. Now that I need it, I cannot figure a way to get it to work. Time Stretch is not available when I select multiple images.
    Thank you,
    Brian

    Brian,
    Unfortunately not. PrPro CS4.2 has just added a way to change the Duration of previously Imported stills, but so far PrE does not allow for this, unless it is new to PrE 8, but I have not read of this.
    As noted, the method is to set the Edit>Preferences>General>Default Stills, and choose the Duration in Frames. Then Import the stills. If they are in the Project, that setting has already been applied, so one must delete them from the Project Panel and re-Import them with the new Duration.
    Now, one can obviously change the Duration on a one-by-one basis in the Timeline, but that can be tedious, if there are many stills. If I were doing this, I would make sure to have the Info Panel open and nearby, Window>Info.
    Good luck,
    Hunt
    PS - if PrE 8 HAS added the post-Import Duration change, I hope someone steps up with that info.

  • Execution of multiple goods movements in one operation

    Hi,
    Does anyone know of any SAP standard functionality for executing several movememts of materials in one operation?
    For example, is it possible to execute first mvt type 321 for a material, directly followed by a 301 - in one transaction (without posting material with 321 and then use another transaction to do the 301)?
    Of course the number of material documents and accouting documents should be the same as if you executed with 2 transactions.
    Is this something we need to configure or program? We dont use RF in the warehouse.
    Regards,
    Ola

    Hi,
    The several movements of materials in one operation can be executed in MIGO transaction,but the 321 movement is not defined for the MM movement type.
    It cannot be done in any MM movement type,it should cleared with QM side only.
    So the rest of any movement can be excuted in single operation.
    But in QM view they can do in single operation say if 10 stock was in quality,they can move 5 to unrestricted (321), 2 piece to degrade material ,material to material transfer (309), 1 piece to scrap (551)
    1 to vendor return (102).So in QM point they can do in one operation many movements for particular material in quality stock.
    Regards,
    Raj

Maybe you are looking for