Operations in Preventive maintenance order has to release then only order has to TECO

Hi,Friends
is there any standard in R/3 that as soon as i am not releasing Operations in Preventive maintenance order, order should not be TECO
when ever i have released Operations then only Preventive Maint order has to be TECO
Your response is highly appriciated
Regards,
Kumar

Kumar,
I'm still confused...
When you release the order header (REL), then all operations are also set to released (REL). You cannot individually release operations using the system status.
However, you can set user statuses for each operation which are configured in the IMG.
Please give more details.
PeteA

Similar Messages

  • Sales order and automatic release of prod order

    please tell me how a sales order can be automatically converted into production order by running MRP.
    please give me configuration details

    Hi Kumar
    Please letus know the planning startegy .
    If MTO  u can use planning startegy = 82,
    When  u create sale order for header material , assembly prod  order will be created automatically with out MRP Run.If u have Multi level Bom u have to run MRP.
    MRP will not create prod order directly, it will create planned order based on cutomer requirements, u have to convert it to prod order manually.   
    Regards
    Pradeep

  • Stop new planned order when process order GR qty less then sales order qty

    Hi All,
    How should SAP be configured so that when a process order is GRu2019ed, the sales order requirement is fulfilled regardless of the quantity difference between the sales order and process order?
    The system behavior we are currently experiencing is MRP will generate another planned order for the fixed lot size if the GRu2019ed quantity is less than the sales order quantity.
    Additional background information:
                    Make to order scenario
                    Process industries
                    Batch control
                    Warehouse management
                    Fixed lot size
    Any comments or suggestion are welcome.
    Thanks.

    Brahmaji,
    Thanks for the reply.
    I agree that changing from FX to EX will produce a planned order for the quantity difference (SO qty less the GR qty).  So this would be an improvement to our present situation, but not quite what we are looking for.
    The system behavior we want is MRP to ignore the requirement for the difference, in other words, when the GR is done for the entire batch quantity, we won't be producing any addition product.  The sales order would be considered complete.

  • Preventive Maintenance Order is not releasing as per scheduled Planning in Counter Based Plan

    Hi Experts
    In The below schenario
    There is a  counter based maintenance plan. of strategy 100 km,200 km,...1800 km..
    Operaton1,  Operation2,... Operation3... defined in maintenance package for 100 km, 200 km,.... respectively.
    Now issue is that system is releasing order as per sequence of scheduled planing & not according to schedule of current counter reading of counter.
    case:  At 200km order 1 is released with operation1 only, logicaly system should release order with operation1, & operation2
              same like that at 300 km, system has released order with op1 & op2, logicaly system should release order with operation1, & operation3 as per strategy defined in maintenance plan.
    In the present condition, what we have to do to get the desired result like for next counter reading of 400 KM system should release order with op1, & op4.
    Best Regards
    Pravin Gautam

    1st order is getting generated by 100 KM. While doing Preventive Maintenance, vehicle will not have any movements so that counter reading at the completion should as same as 100 KM.
    I am not clear how & why you entered 200 KM for completion of PM order.
    Also, if you complete the 1st Preventive Maintenance at 200 KM, from there only system should calculate the next order. Its not Time based as this will come automatically with predefined frequency. Your plan is Performance based & system will act according to the completion of previous Preventive Maintenance.
    I don't find any reason to change behavior which is correct. I am not convinced with the development which is giving wrong details to the business.

  • Hardware Preventive Maintenance Schedule

    I'm trying to find a recommended schedule for Sun Server maintanence. If anyone can point me in the right direction it would be greatly appreciated.

    Dear Makarand Gurjar
    The purpose of the report is, every month begining maintenance person will give the list of equipment scheduled for preventive maintenance to production department.  If that list has planned time for preventive maintenance, it will be very useful for them to release the equipment for preventive and plan the production accordingly.  In IW38 / IW39, we will get only the equipment for which preventive maintenance order is created.  Say for Eg. If an equipment is scheduled for every month preventive maintenance and the scheduled date is 25th of every month and call horizan is 90%, then the order will be released only on 22nd.  If we take the report on 1st of the month it will not come.
    In IP24 we can get all the equipment schedule for that month, but in the planned time is not there .
    Regards,
    Babu R

  • Working Skype for Thunderbolt has been released

    http://www.androidpolice.com/2011/08/04/skype-for-android-updated-to-v2-1-with-support-for-17-more-devices-yes-including-evo-3d4g-thunderbolt-sgs12-and-more/

    As @codiac1881 suggests this is a shortcoming of the current OS. When there is an official solution, there should be no need to cut corners and adopt workarounds. The OS version upgrade on Thunderbolt is long overdue. Where the lifespan of devices is approximately a year, it is 4 months since Thunderbolt has been released and the OS has not been upgraded. The community is not asking to upgrade this to 3.0, they are asking Verizon / HTC to take it up a notch from 2.1 to 2.3 to officially support a ton of capabilities, but for some strange / unknown reason, both Verizon and HTC are holding back.

  • Run MRP for production order/maintenance order has been release

    Hi all,
    please tell me how to configure for running mrp for production order/maintenance order has been release. as you know, i want production order has not release will not appear in MD04. I think that is the way for running mrp will not take care about this production order has not release
    Thanks all

    Hi Hoai,
    It is impossible to exclude production order from net requirement calculation in MRP run. You may take a look at the online documentation under the PP-MRP area.
    Material Requirements Planning (PP-MRP)
       Planning Process
         Net Requirements Calculation
           Net Requirements Calculation for MRP
    But there is a way to temporarily exclude production order from MRP. That is you can set the 'delivery completed' indicator in 'Goods receipt' Tab in in production order. Please note that this order will not appear in MD04. Actually to some degree, this order could be considered as completed because ticking the indicator could set status 'DLV' for the order. But you still can execute confirmation, goods issue and goods receipt activities. This way is just a workaround. You may
    consider it.
    Or maybe you can consider the useage of BADI: MD_CHANGE_MRP_DATA to change the MRP run data to see if this could fulfill your requirement.
    Regards,
    Rachel

  • Reversal of a maint. order which was released through a maintenance plan?

    Hi All,
    Is there a way to do reversal of a maintenance order that was released through a maintenance plan?
    Because I do not want to process the order; as such I would like to put a reversal indicator for that order and go ahead with the next order that was called through a maintenance plan.
    If YES, kindly let me know how to do it?
    Many thanks in advance.
    Kannan J

    Hi Thyagarajan, Thanks for the response!
    When I want to skip the maintenance call object that was generated through a plan, the system gives me the following message.
    "CALL CAN NO LONGER BE SKIPPED"
    When I press for further help, system gives me the following message:
    "Call can no longer be skipped
    Message no. IP405
    Diagnosis
    You have tried to skip a date that has already been called.
    System Response
    Since maintenance call objects, for example, maintenance orders, already exist for the dates that have been called, you can no longer skip a date within the scheduling process.
    Procedure
    If you do not want to perform the maintenance call objects due on that date, you must reverse the orders that have been called.
    You can select the maintenance call objects that have been called using the list editing functions in maintenance processing."
    Which means there should be a way to reverse the order, isn't it?
    May be with this message you may be able to throw some help on this.
    Many thanks in advance
    Kannan J

  • Changing basic finish date in Preventive maintenance orders

    Hi Experts,
    My requirement is to block PP work centre when maintenance schedule the equipment for preventive maintenance. I am making system condition as zero in generated preventive maintenance order but basic finish date is not changing in the order automatically. Can anybody please explain how to bring this? Finally my requirement is system should change basic finish date and time as time given in operation of task list.
    Thanks in advance.
    best regards,
    Srinivas M

    Hi Praveen,
    I have done all setting and tested but there is no change.
    My client requirement is like this - whenever maintenance plans are scheduled, for the scheduled dates, production capacity should not be considered by production. We could do this for breakdown orders but not happening for PM orders unless we change the finish date.
    The issue is to get the finish date automatically when scheduling maint.plans with respect to values given in operations. Please suggest how to get the  basic finish dates automatically.
    best regards,
    -Srinivas

  • Preventive maintenance order header description

    Hi all,
    Preventive maintenance order (from Plans) header description is showing the task list title instead of Plan title.
    normally Plan header or item header short text will be the order header short text, what is the reason for this
    kind of problem.
    Pl give your suggestions
    Thanks

    Hi!
    I have checked by creating a maintenance plan with item and task list. I t is taking maintenance item header text in maintenance order. Would you please elaborate. If any user exit or any enhancement has beed done with this acivity?
    Regards,
    Vaibhav

  • Preventive maintenance order actual completion time and date

    Hey gurus,
    In preventive maintenance order the basic and scheduled start dates are picked from the maintenance plan. Now the actual start and end dates are in display mode. My client wants an overall completion time and date of the preventive order and not of individual operations. Also at the end of the month they want to see the total time spent on preventive maintenance. Can you suggest any way to sort out the above problem.
    Regards,
    Abhishek

    hi.
    the basic start date and end date is coming from maintenance plan. but you can change that dates according to your requirment. For that you have to remove the automatic schduling check in the dates header in maintenance order. Afetr that you can put basic start and end dates as per your requirement.
    Also the actual start and end dates and coming when you confirm the operation.
    When you confirm the first operation, that date the system will take as actual start date and the day you confirm you last operation or fully confirmed the order will be taken as actual end date.
    So i dont think yu have any problem. You can take basic start or basic end dates for this and change the dates as per your maintenace requirments.

  • Preventive Maintenance Order

    Hi Experts,
    I want to know about Preventive Maintenance,
    The Case is I run schedulle preventive maintenance August 3, 2011  call date August 3, 2011 and the order will automatic created on August 3, 2011
    my question is system status on order preventive maintenance always Release (REL) or not?
    Thanks for the answer
    Best Regrads,
    Bernardus Jalu

    IMG => PM & CS => Maintenance & Service Processing => Maintenance & Service Orders => Functions & Settings => Configure Order types (OIOA)
    In that, for order type, check the check box release immediately. That too will work only in IP30 (Automatic Scheduling). In IP10, release should be done manually.

  • Consider preventive maintenance schedule into PP order capacity planning

    Hi PP experts,
    My client's requirement is that when a preventive maintenance order is created in PM module for a particular work center (used in production) on a given date, NO production order (which is processed on that work center) should get released or confirmed. In other words, the capacity should be blocked at all for the subject work center.
    Could you please guide how to make this effective?
    We are using discrete manufacturing with capacity planning. At the time of PP order release, system shows capacity situation so as to decide whether go-ahead even with overloaded capacity.
    Regards,
    HKV...

    First, you should assign the PP work center in the location tab of the PM equipment which refers this workcenter.
    Secondly you should enter the sytem condition in the task list of the equipment.
    During preventive schedule  the work center  will be reserved by PM orders for maintenance and this can be seen from capacity planning from PP side.
    regards

  • Release of Production Order at operation level

    Dear Experts,
    Production order to be released at operation level automatically one by one, after confirmation of operation.
    Let us suppose
    Op 10 ...... 10 Confirmed
    Op 20 ...... 10 Confirmed
    then in the Op 30 ..... 4 Qunatity to be released automatically once Operation 20 is confirmaed.
    Please give your valuble inputs
    regards
    Ram Kumar

    Dear Experts,
    Production order to be released at operation level automatically one by one, after confirmation of operation.
    Let us suppose
    Op 10 ...... 10 Confirmed
    Op 20 ...... 10 Confirmed
    then in the Op 30 ..... 4 Quantity to be released automatically once Operation 20 is confirmed.
    How to create trigger point for this?
    Can anybody give clear idea, what all the fields I need to maintain ?
    regards
    Ram Kumar

  • Production order status, header released, operations created

    Hello, I´m struggling with the following problem on production orders
    When you look to first line in the header you see that the order is on release. When you go to the operation operation overview the operations are still on created
    How is this possible and how to resolve?
    If I click on release operation: Invalid function selected comes up.
    Br Matthias

    Hi,
        Plz go to production order operation tab, select operations & just check below a relese flag , just 3 ICON RIGHT TO Component tab, prt tabs.
    & click it , operation should be released, if still not released then delete opeartion & recreate them manually.
    Thanks.........Rakesh

Maybe you are looking for

  • What happened to the Grouping field in Get Info?

    I asked this question before and was referred to a specialist on the phone that solved the problem by telling me to click on "Add Field" and "Always show current fields."  Grouping was there and was editable.  All worked well ... Until today.  Now, c

  • How to increase photo size whilst viewing on HDTV using Airplay?

    Hello, I am using a new Apple iphone 4s with IOS 5.1 etc and I am trying to view photos on my HDTV in widescreen format via Apple TV (3rdGen) ... The video playback mirrored from the iphone in 1080P automatically appears in widesreen using the full s

  • BB Link - Sync not possible - Support needed

    BB Link advised me to upgrade to the new designed BB Link Version 1.2.3.23 As immediate effect, the sync of the calender does not work anymore with the remark "Sync failed - calender data could not be processed" Two questions 1) how can I solve this

  • What is sap BW-BPS?

    hi Guys,           Can any body explain me what is SAP BW-BPS and could you pls. expand this BPS. Sunil.

  • Excluding sites from favourites in safari for yosemite

    In the previous version of safari it was possible to set certain sites to be "excluded" from the "top sites" or favourites page. in Yosemite this doesn't seem to be possible - which is a bit of a step back and in my view a serious omission. I use the