Hello All
I am looking for information (case studies/white papers/others) on OPM Implementation in Pharma industry primarily to learn :
- How active drug mfg & formulations mfg was mapped to OPM
- Business requirements that could be fulfilled by standard package
- Business requirements not fulfilled by std package and the workarounds for the same.
Any info this regards would be great to have.
Thank you !

We have implemented OPM in a pharma company. I will try to give you some of the inputs.
- How active drug mfg & formulations mfg was mapped to OPM
These were mapped as items and we used recipe versions extensively. For Samples we used the same itemcode prefixed with S.
- Business requirements that could be fulfilled by standard package
OPM was able to fulfill almost all the requirements of the pharma business.
- Business requirements not fulfilled by std package and the workarounds for the same.
We had problem in costing. The cost is maintained at item level in OPM. However the company wanted the cost at a lot level. For example, the same item could be manufactured inhouse or purchased outside. They wanted to track costs separately. This was not possible in OPM. Hence we mapped the company on Standard cost for accounting purposes. This was more of a compromise.
I have recently implemented lot costing which specifically addresses the above problem.
I feel that Oracle OPM with lot costing will address most of the manufacturing / costing requirements of a pharma industry.
If you want more info. kindly update these columns or you can contact me at [email protected]
Regards
Ram

Similar Messages

  • OPM Solution in Petrochemical Industry

    Hello Experts,
    I would appreciate your sugggestions on possible solution @ Petrochemical Industry. Any suggestion, documents, possible soultions are welcomed.
    Thanks

    We have implemented OPM in a pharma company. I will try to give you some of the inputs.
    - How active drug mfg & formulations mfg was mapped to OPM
    These were mapped as items and we used recipe versions extensively. For Samples we used the same itemcode prefixed with S.
    - Business requirements that could be fulfilled by standard package
    OPM was able to fulfill almost all the requirements of the pharma business.
    - Business requirements not fulfilled by std package and the workarounds for the same.
    We had problem in costing. The cost is maintained at item level in OPM. However the company wanted the cost at a lot level. For example, the same item could be manufactured inhouse or purchased outside. They wanted to track costs separately. This was not possible in OPM. Hence we mapped the company on Standard cost for accounting purposes. This was more of a compromise.
    I have recently implemented lot costing which specifically addresses the above problem.
    I feel that Oracle OPM with lot costing will address most of the manufacturing / costing requirements of a pharma industry.
    If you want more info. kindly update these columns or you can contact me at [email protected]
    Regards
    Ram

  • PI sheet for pharma industry - step by step customization required very urg

    Hi,
    We are implementing sap PP-PI for pharma industry.Can some one please send some good document explaining the customization for PI sheet , custom pi sheet .
    any help is gretaly appreciated.
    sonia

    Hi,
    Please check with following Baseline Buliding Block link provided  by SAP. Here u can select industry type and contry type.
    <b>http://help.sap.com/bp_blv1470/BL_UK/index.htm</b>
    i hope this will help.
    regards
    pardeep

  • CTM or optimizer in Pharma Industry

    Dear Gurus,
                       Is CTM or Optimizer usually used in Pharma industry? I understand the reasons behind the selection of SNP solution that if you just need a simple supply planning with capacity levelling, you go for Heuristics, if you need rule based go for CTM and if you need cost optimization, you go for Optimizer.
    In your experience, does Pharma industries go for CTM or optimizer? While I understand it's specific to the business model , does the Pharma industry process support the CTM or Optimizer?
    Thanks.

    Visu,
    I shall put forth a different argument based on my experience with one of the pharma company mentioned by Ken and another that is not listed in the discussion so far.
    According to my experience Pharma industry is more of Supply-driven rather than Demand-driven.
    As a result PPDS pretty much is the most important planning engine where long-term sequence of orders are carried out. Campaign-based planing is pretty much a mandatory requirement in case of API / Active Ingredient manufacturing. To start with SNP is not capable of doing Campaign-based planning. So it does not matter if its CTM or Optimiser. Frankly speaking I find Heuristic much easier to understand and handle.
    One Golbal Pharma major uses SNP for long-term planning (that too heuristic) basically to pass the demand from the markets all the way to the API manufacturing plants. Then PPDS is run for a shorter horizon depending on the product level. For APIs the PPDS plan is almost 1 year out - because when you are doing campaign planning each campaign (for a particular API) typically lasts 2-3 months. That means if on a manufacturing line (a complex series of pressure vessels and piping) you need to manufacturing 4 different APIs you will make the same API after 1 year (3 months per campaig x 4 APIs). For Semi-finished products (like forming the tablets) the production process is faster and hence PPDS planning is not done for 1 year out but maybe upto 6 months. As for the final finish and packing lines each Production Run lasts for few days and hence te PPDS plan is say upto 3 months only. Now given these different production levels you need to maintain master data parameters suitably to match PPDS and SNP planning runs.
    This client did not use SNP Optimiser or CTM engine in their planning when I was working. Even now I they are not using these engines.
    On the other hand another Indian Pharma major started off APO implementation using SNP especially CTM engine and over a period of time as they rolled out more and more of Production Planning at the plants they realised CTM is not serving the purpose. As far as I know they were in process of switching over to PPDS for the production planning and keep CTM only close to the demand side i.e. the Distribution Centers.
    Hope this helps.
    Somnath

  • SRM 7.0 for Pharma industry

    Hi,
    We plan to implement SRM 7.0 for a pharma industry. Will all the FDA compliances be met in the SRM system or do we need to handle it by some customisation?
    Regards

    Hi,
    As SRM 7.0 is part of the Business Suite the FDA compliance assessments are detailed here:
    U.S. Food and Drug Administration (FDA) Title 21 Code of Federal Regulations (CFR) Part 11 [original link is broken]
    Hope this helps.
    Regards,
    Jason

  • Batch Management Implementation in Cement Industry.

    Dear All
    I would like to understand about Batch Management Implementation in Cement Industry.
    I have some inputs on Batch Management but from Implementation in Cement Industry would like to exactly understand what are the typical scenarios for Batch Management.What should be the Batch level ie at material,client or plant level?
    Has anybody worked on Batch Management Implementation in Cement Industry.?
    Regards

    Closed

  • BW Pharma Industry

    Hi All,
    Have u any one worked under pharma industry...what type of reports client except from BW (pharmaceuticals) and what would there requirements. consider this an very urgent.
    Thanks in Advance,
    Anil.

    Hello,
    Please see below link for standard business content customized for IS-Pharma...
    http://help.sap.com/saphelp_nw04/helpdata/en/cb/e11540bf1af72ee10000000a1550b0/frameset.htm
    hope it helps..
    cheers,
    Vishvesh

  • Sales deals in pharma industry

    can somebody tell me what a Sales Deal  is?
    all i know is that there a corresponding Contract for every Sales deal that we have.
    sk

    Hi Ravi,
    Please go through the information provided by SAP Best Practices for Pharma Industry,if this suits your business process suits you may go ahead with this.
    [SAP Solution Map for Pharmaceuticals|http://help.sap.com/bp_pharmav1600/Pharma_US/HTML/solution_map_EN_US.htm]
    [Preconfigured Scenarios|http://help.sap.com/bp_pharmav1600/Pharma_US/HTML/preconfigured_scenarios_pharma_EN_US.htm]
    Please do let me know if you have any questions.
    Thanks and Regards,
    Naveen Dasari.

  • Business process of Automobile & Chemical & pharma industry

    Hi Experts,
    If anyone worked in  Automobile , Chemical & pharma industry Please provide me various business process that
    take place with examples.
    Such as Manufacturing , production & sales process etc
    Points will be rewarded.
    Thanks
    Shabnum

    Dear Shabnum
    Do you think your question is easy to answer.
    If you are working in any of these industries, let us know where exactly your problem is, so that somebody would try to answer.
    If we take an example for automobile process, client to client the process will vary and it cannot be listed out here.
    Thanks
    G. Lakshmipathi

  • Business Process For pharma industry

    hi,
    can u pls tell me about business process for pharma industry.
    regards
    Guru

    Hi,
    the best place to get an intial overview of the pharma business processes is to look at the solution map. This can be found here: http://www.sap.com/industries/lifesciences/index.epx . On the right there is an area called "SAP Business Maps for Life Sciences".
    I hope this helps.
    Oliver

  • "Cleaning Validation Process Scenario" in SAP QM/PM for Pharma Industry

    Dear Gurus,
    I have a client requirement in the Pharma Industry. The scenario needs to be mapped in SAP for which I need your help.
    The scenario is that the company is making medicines (tablets/capsules). Whenever, there is a changeover of the product, there are certain regulatory requirements which the client needs to adhere to.
    For example, a shutdown of machinery for 10-12 days may be planned during which the machines are cleaned with soap/cleaning agents. Now, during this cleaning process, the QA department would take samples of the soap water recovered after cleaning process. These samples would be inspected for residues of the previous product that was being run on the line.
    If everything is ok, then the approval is given by QA to start the next product.
    This process has to be mapped in SAP, maybe in QM or PM.
    I thought over the following process. Please let me know your inputs to fine tune the below process -
    1. As the shutdown for changeover will be a planned one, we can create a Maintenance Plan in IP42.
    2. Schedule the Mantenance Plan by IP10.
    3. Release the maintenance plan in IP10.
    4. Preventive Maintenance order will be created. (Also assign an Inspection Type in config to this maintenance order so that inspection lot also is triggered. The doubt here is that the inspection lot would be triggered for all preventive maintenance orders which may not be required. How to control this?)
    5. Carry out Result Recording in QA32.
    6. Confirm Preventive Maintenance order in IW41.
    7. Carry out Usage Decision in QA32. The status of order will now become TECO.
    8. Order Settlement in KO88.
    9. Business Completion of Order in IW32
    Thanks for you time!
    Regards,
    Nitin

    Your ASIS Process 
    1. Cleaning is done by maintenance before change over
    2. Inspection is done to ensure that cleaning is acceptable
    3. Records of inspection are to be maintained
    4. Information is to be sent to concern regarding  quality testing  and its status
    5. Change over performed
    You can MAP this by Notifications also. Follow the steps
    1. Create a new notification type ( config)
    2. Ensure you have following mapped in the action box (config)
        a. Send a mail
        b. Create a inspection lot
        c. Create a QM order
        d. Close Notification
    The process will be as follows
    1. Create a dummy material and activate insp type 08 in the QM set up.
    2. PM creates the notification (t-code QM01) (New notification & triggers a mail (Action box) which is delivered to QC as information regarding the start of process .
    3. QC on looking at the information creates the inspection lot through the notification (action box) the QTY specified in the notification is moved from unrestricted to Quality .
    3. Perform  RR & UD and post stock  to unrestricted
    4. Close the notification giving your remarks or set the notification for further processing if required .
    Note :
    1. The material is a dummy material
    2. The intial stock can be one qty which is posted to quality -
    from unrestricted and then again to unrestricted.
    Deepak

  • "Cleaning Validation Process Scenario" in SAP PM/QM for Pharma Industry

    Dear Gurus,
    I have a client requirement in the Pharma Industry. The scenario needs to be mapped in SAP for which I need your help.
    The scenario is that the company is making medicines (tablets/capsules). Whenever, there is a changeover of the product, there are certain regulatory requirements which the client needs to adhere to.
    For example, a shutdown of machinery for 10-12 days may be planned during which the machines are cleaned with soap/cleaning agents. Now, during this cleaning process, the QA department would take samples of the soap water recovered after cleaning process. These samples would be inspected for residues of the previous product that was being run on the line.
    If everything is ok, then the approval is given by QA to start the next product.
    This process has to be mapped in SAP, maybe in PM or QM.
    I thought over the following process. Please let me know your inputs to fine tune the below process -
    1. As the shutdown for changeover will be a planned one, we can create a Maintenance Plan in IP42.
    2. Schedule the Mantenance Plan by IP10.
    3. Release the maintenance plan in IP10.
    4. Preventive Maintenance order will be created. (Also assign an Inspection Type in config to this maintenance order so that inspection lot also is triggered. The doubt here is that the inspection lot would be triggered for all preventive maintenance orders which may not be required. How to control this?)
    5. Carry out Result Recording in QA32.
    6. Confirm Preventive Maintenance order in IW41.
    7. Carry out Usage Decision in QA32. The status of order will now become TECO.
    8. Order Settlement in KO88.
    9. Business Completion of Order in IW32
    Thanks for you time!
    Regards,
    Nitin

    Hi,
    For multiple samples we can use no of sample(SAmpling Procedure) to record more than one results and system will calculate the arithmetic mean of all results of all sample
    For this we have to maintain control indicator of MIC . Single result radio button will enable us to record results based on the number of sample defined in sampling procedure
    And if you have requirement like different target values at different level,
    Then you can configure inpection point -
    SPRO > Quality Management > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    in this Field act - 2 and give description
    Regards,
    SandeepV

  • FICO implementation in paint industry

    Hi everyone,
                      I want to know the experience of anyone who has done FICO implementation in a paint industry. Please give me a detailed scenario of why and what all was done in the project. I will deeply appreciate your help and reward points suitably.
    Thanks
    Chandan

    Hi
    theses doc will help u lot
    GL account
    http://help.sap.com/saphelp_46c/helpdata/en/c7/a889b343dd11d182b30000e829fbfe/frameset.htm
    FI-GL Data Source
    http://help.sap.com/saphelp_erp2004/helpdata/en/28/5ccfbb45b01140a3b59298c267604f/frameset.htm
    FI-AR
    http://help.sap.com/saphelp_erp2004/helpdata/en/55/02142e7bcffa43afa904f62d3e62ca/frameset.htm
    FI-AP
    http://help.sap.com/saphelp_erp2004/helpdata/en/d6/114936d1e7534a9ad27a40e12ddf3f/frameset.htm

  • SAP implementation in food industry

    Hi all
    Does anybody has implementaion experience in food industry..
    specially wafers industry.....
    Coz i wud like to know more abt excise..here for purchasing excise duty has to be paid to vendor ,and this excise duty is loaded on basic price during MIRO
    Where as they dont avail the credit
    Can anybody share their different experience in food industry .....
    This can be helpful for others also those who are implementing SAP in food industry
    regds
    shail

    Hi,
    This type of functinality can be Map through using Inventorised  excise  duty.
    In this tax procedure is if TAXINN.
    then you have to make tax code using FTXP.
    In which you will maintain  Condition records for those  condition types which are of inventory type rather than set off.
    Like for BED - JMIP.
                ECS-JEIP
    and then two other conditions  JMX2 and JEP2.
    hope this is clear if any doubt please ask.
    Regards,
    Vijay

  • SAP implementation in Utilities Industry

    Hi,
    What is the major difference while implementing SAP CO for a utilities industry? How does it differ with other industries?
    Any help is appreciated.
    Thanks

    Hi,
    What is the major difference while implementing SAP CO for a utilities industry? How does it differ with other industries?
    Any help is appreciated.
    Thanks

Maybe you are looking for

  • Server 2012 R2 Crashes with NIC Team

    Server 2012 R2 Core configured for Hyper-V. Using 2-port 10Gbe Brocades, we want to use NIC teaming for guest traffic. Create the team... seems fine. Create the virtual switch in Hyper-V, and assign it to the NIC team... seems fine. Create a VM, assi

  • ERROR FRM-92100

    sir i frequently get the following error on client machine "FRM-92100 your connection to the server is interrupted this may be the result of network error or a failure on the server you need to reestablish your session" pls guide what may be the reas

  • CLUVFY failing with 'User Equivalence check failed for...'

    New 2 node RAC configuration. Oracle 10gR2, Linux RHEL 5 x64. I'm at the post hardware config, pre install clusterware stage. Running the cluster verification utility command: cluvfy comp sys -n node-01,node-02 -p crs -verboseReturns the following er

  • Proper WSUS+SCUP on SCCM 2012 SP1 with SQL 2012

    Been pulling my hair out a new build. System: Windows 2012 SQL 2012 SP1 WSUS 4.0 SCUP 2011 WSUS itself will synch if I set source= Microsoft Update. SCCM SUP will synch with if I set source= Microsoft update. SCUP will not connect to "update server"

  • PowerPC G5 10.5.2 and Virtual PC problem reading .iso

    Hi there, I don't know if I've posted in the right area, but all I'm trying to do is boot Virtual PC 7.0.3 with a factory disc of XP Home I have. I created an .iso using Toast 8, then try to capture disc image, but I still get the same "OS not found.