OPU5 settings and Capacity planning-CM01

Hi All,
I have a confusion while configuring the settings for scheduling for planned orders in REM environment PE order type, when i select the scheduling and capacity requirements in DS section system shows me capacity requirements in CM01,CM50 reports  and also DS tab in planned order but when i deselect the same check boxes there si no data in CM01, CM02 or CM50,
If I need to generate the CM01, etc reports in REM environment , then do i need to select DS check boxes also?
My OPU5 settings are as attached in this case CM01 reports are fine.
Regards,
Anupam Sharma

Hi Anupam,
Screen shot is missing. Rate based scheduling is fine for REM.
Create a "Run schedule" planned order and schedule it via rate-based scheduling.
In transaction OPU5, choose order type PE and the plant you use.
Choose "Details" and in the field "Scheduling level", set "1 Via rate-based scheduling" and save the change.
For more information on this visit the following links
http://help.sap.com/saphelp_47x200/helpdata/en/8a/a58a864adc11d189740000e8322d00/frameset.htm
Levels of Scheduling - Planning Process - SAP Library
Regards,
R.Brahmankar

Similar Messages

  • Maintenance Work Center : Capacity Planning CM01

    Hello Gurus,
    We are using T-code CM01 to determine the Requirements / RemAvailCap of the Maintenance Work Orders in a given Maintenance Work Center.
    After executing CM01, the detail capacity list contains Not Scheduled orders( CRTD )and  capacity of these not Released orders also taking into consider.
    How to restrict CM01 Order selection based on the work order System status or User status ?
    I found below discussions on SCN but couldn't get precise answere.
    Plant Maintenance: Capacity planning CM01/ CM07
    Configuring profiles in CAPACITY PLANNING (CM07)
    Please help.
    Thanks in Advance
    Ashok M

    There are a few ways:
    Create a new status profile via BS42 and assign the REL status only (see image 1). Then in the CM01 display screen, use menu path: Planning->Selection->Order and enter the status profile created above (see image 2)
    Create a new selection combination via OAP0. In the CM01 display screen, use menu path: Planning->Selection->Combination and enter the selection combination created above (see image 3)
    The above settings can then be defaulted via the various capacity planning profiles.

  • Financial And Capacity Planning Charts

    Hi folks,
    In 4.5 version, wWithin Financial And Capacity Planning when I click on View Chart, no chart is displayed. Error - NO Items to display.
    There are plenty of items with correct financial info.
    Any specific note or config/service to be made for this one?
    Thanks!

    Hi,
    for this can u check whether in customisation u have defined any charting grps for Financial and Capacity.
    Please check for your portfolio the following SPRO path.
    SPRO -> xRPM -> Global Customizing -> Portfolio Depedent settings Define finanacial capacity settings for Portfolio type.
    Here u need to select ur portfolio to check financial charting grps and capacity charting grps.
    I hope this will help you to charts in rpm protal.
    Thank you
    Pramod

  • Plant Maintenance: Capacity planning CM01/ CM07

    Hi
    In capacity planning CM01, the standard sap shows all the maintenance orders which have system status created. But we would like to look at onlly the released pm order in the standard overview list and detailed capacity list. Please let me know if there is way we can configure it.
    Thanks

    Hi Nayan202,
    You could configure desired "selection set" T.code "CSM1" and then assign this to appropriate "Selection Profile" under initial set.
    Hope this helps.
    Shahnawaz

  • Capacity planning CM01 not displaying PM Order capacity

    Hi experts,
    I have created one order with the work center and defined operations...... but i am not able to see the CAPACITY REQUIREMENTS in the capacity planning (CM01)............
    Please suggest me what should  i do for this.............

    Hi Maheswaran,
    Thanks for the information , in configuration "Capacity Requirement Planning" have been maintained and now i am getting the CAPACITY REQUIREMENTS and CAP. LOAD also .........................but there is one problem i.e. when i am seeing the capacity planning (CM01) , IT IS NOT SHOWING THE VALUES ON THE DAY WHICH IS WORKING actually according to factory calendar FRIDAY and SATURDAY are holiday, but it is showing the value on SATURDAY and not showing the value on THURSDAY that is today........Please see the screen shot also......
    what should i do.......

  • MRS and Capacity planning

    Hello Experts,
    Could anyone please provide me with definite comparison/difference between the Multi-Resource Scheduling MRS and Capacity planning?
    Regards,
    Amr

    Please refer to the link below there is a big difference between MRS and SAP standard capaicity planning. Hopefully the attached link to the latest MRS PDF will help
    https://websmp205.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000377142010E
    Jim

  • Charset and capacity planning

    Hello and happy new year everybody !
    A question to start over:
    How does charset (ex. UTF8, WE8MSWIN1252 etc.. ) encoding impacts on storage space utilizations ?
    I would like a capacity planning for a large DWH with 10TB data that grows of about 1TB per year.
    Thanks in advance,
    Regards

    Hi;
    I suggest please also see below notes:
    Character Sets & Conversion - Frequently Asked Questions [ID 227330.1]
    Choosing a database character set means choosing Unicode [ID 333489.1]
    Unicode Character Sets In The Oracle Database [ID 260893.1]
    Which Character Set Supports Which Language [ID 62421.1]
    Regard
    Helios

  • Capacity planning ( CM01 ) across Plants

    Hi all
    I have a scenario where a material can be manufactured across Plants as an example
    Plant1 - Work Center ( WC 1)
    Plant 2 - WC2
    Plant 3 - WC3
    I want to look at capacity across all the 3 work centers at a group level so that if WC1 is overloaded then I can shift my production to WC 2. I want to use a 'pooled' capacity concept. If I use Work center heirarcy then I am restricted to creating a heirarcy at a Plant level.
    Is there a way I can pool capacity of work centers in different plants into one pooled capacity?
    thanks a bunch

    Hello
    1)Using CM50 you will get details capacity load irrespective of plant,just u have to enter the work center  and execute it will display the work center wise capacity detail
    2)Using CM21 transaction enter only work center and execute it will display the planning table with order number details on which date work center is loaded. So manually u can allowcate the operation to the particular work center
    I think this will be helpfull to u

  • Capacity Planning CM01 Question?

    We have a production order schedule for a workcenter over 3 Days.
    The workcenter capacity is 15.74 HR
    When i run CM01 without any Qty confirmed.
    Day 1 has Requirements as 14.24 HR
    Day 2 has 15.7HR
    Day 3 has 15.7 HR
    After i did a confirmation for Qty 1000.
    Day 1 has 13.28 HR
    Day 2 has 14.67 HR
    Day 3 has 14.67 HR
    My questions is why would capacities for Day 2 and Day 3 reduce. All the hours should have been consumed from Day 1 ?

    Please check your order. It must have been scheduled over >= 3 days. Thereby adding capacity requirement over 3 days.
    When you confirm the order, where confirmed order quantity is equivalent to 3 days of your capacity. Thus system reduces the capacity requirement from 1st Day and subsequently from next days also.
    Thanks

  • Error code 161 and capacity planning

    Hi,
    Can any on kindly explain o me why the error code 161 appears during CIF and does it have any thing to do wih the capacity
    Thanks,
    SS

    Hi,
    The receipt date of the primary product is compared without taking into account the goods receipt processing time between SAP APO and SAP R/3. Because of this this inconsistency occurs.
    In SAP APO, if the receipt date of the primary product deviates from the end date of the last activity of the order (for example, due to an offset or scheduling at the end of a fixed block), the receipt date always identifies this as inconsistent.
    You cannot rectify inconsistencies of this type by using the reconcile provided in the CIF compare/reconcile function.
    In this case, you should deactivate the receipt date comparison. Alternatively, you can activate the order end date comparison if the primary product is assigned to the final operation.
    You can use the business add-in /SAPAPO/CIF_DELTA3 Enhancements Comparison Report to deactivate individual comparisons.
    In SAP Note 645597, you can find example coding with which you can activate the order end date comparison.
    Thanks,
    nandha

  • Capacity Planning CM01

    Hello Experts,
    The required hours of a production order are the actual hours and not the remaining hours. So if the order has 8 hours and there is already 6 hours booked, I want to see the remaining 2 hours and not the complete 8 hours. How to do that? I have tried a lot off things but donu2019t get the result that I want?
    Mukesh

    Not clear how you have booked 6 hours out of 8. You mean dispatched? Ot they are in different operations and you have dispatched the first ? Or you have confirmed 6 hours as partial confirmation in an operation having 8 hours as planned time ?

  • DMVPN fast convergence with ebgp and capacity planning

    Hi.
    In a dual hub/dual dmvpn design, EBGP is running over the GRE DMVPN tunnel (without ipsec/NO encryption). Once the main hub is down, it takes so long for the spokes to detect the primary hub is down (bgp hold down timer) and then converge to the secondary hub.
    Apart from the bgp timers tunning, is there any other way to achieve fast convergence? and without overutilizing resources? (memory/cpu).
    The hub routers are ASR1001 and there will be ~70 dmvpns, with ~100 spokes per DMVPN.
    Thanks,
    Carlos.

    Marcin,
    After deleting the command "if-state nhrp" from both tunnels, I see that one of the tunel changes it state to up/up and I can recover reachability to the remote hub.
    R21#show ip int brief
    Interface                  IP-Address      OK? Method Status                Protocol
    FastEthernet0/0            unassigned      YES NVRAM  administratively down down
    FastEthernet1/0            172.16.254.3    YES DHCP   up                    up
    FastEthernet1/1            unassigned      YES NVRAM  administratively down down
    Loopback0                  21.21.21.21     YES manual up                    up
    Tunnel178                  178.178.178.21  YES NVRAM  up                    down
    Tunnel179                  179.179.179.21  YES manual up                    up
    R21#config t
    Enter configuration commands, one per line.  End with CNTL/Z.
    R21(config)#int tun 178
    R21(config-if)#no if
    R21(config-if)#no if-state nh
    R21(config-if)#no if-state nhrp
    R21(config-if)#int tun 179
    R21(config-if)#no if-state nhrp
    R21(config-if)#
    *Jun 27 00:18:06.511: %LINEPROTO-5-UPDOWN: Line protocol on Interface Tunnel178, changed state to up
    R21(config-if)#^Z
    R21#show ip
    *Jun 27 00:18:16.103: %SYS-5-CONFIG_I: Configured from console by console
    R21#show ip int brief
    Interface                  IP-Address      OK? Method Status                Protocol
    FastEthernet0/0            unassigned      YES NVRAM  administratively down down
    FastEthernet1/0            172.16.254.3    YES DHCP   up                    up
    FastEthernet1/1            unassigned      YES NVRAM  administratively down down
    Loopback0                  21.21.21.21     YES manual up                    up
    Tunnel178                  178.178.178.21  YES NVRAM  up                    up
    Tunnel179                  179.179.179.21  YES manual up                    up
    R21#show ip nhrp nhs detail
    Legend: E=Expecting replies, R=Responding, W=Waiting
    Tunnel178:
    178.178.178.1   E priority = 0 cluster = 0  req-sent 6  req-failed 0  repl-recv 0 (01:11:41 ago)
    Tunnel179:
    179.179.179.1  RE priority = 0 cluster = 0  req-sent 1020  req-failed 0  repl-recv 522 (00:00:01 ago)
    R21#
    From the last output of "show ip nhrp nhs detail" I see only peer from tunel 179 is marked as RE: Responding, Expecting replies. Want to know why the peer from tunel 178 is not also in that state?
    I can ping both nbma (physical) and virtual (tunnel) ip address of both hubs.
    ########## Ping to hub 1 nbma (physical) address:
    R21#ping vrf dmvpn 200.0.0.178
    Type escape sequence to abort.
    Sending 5, 100-byte ICMP Echos to 200.0.0.178, timeout is 2 seconds:
    Success rate is 100 percent (5/5), round-trip min/avg/max = 200/303/436 ms
    ########## Ping to hub 2 nbma (physical) address:
    R21#ping vrf dmvpn 201.0.0.178
    Type escape sequence to abort.
    Sending 5, 100-byte ICMP Echos to 201.0.0.178, timeout is 2 seconds:
    Success rate is 100 percent (5/5), round-trip min/avg/max = 144/220/268 ms
    ########## Ping to hub 1 virtual (tunnel) address:
    R21#ping 178.178.178.1
    Type escape sequence to abort.
    Sending 5, 100-byte ICMP Echos to 178.178.178.1, timeout is 2 seconds:
    Success rate is 100 percent (5/5), round-trip min/avg/max = 164/186/228 ms
    ########## Ping to hub 2 virtual (tunnel) address:
    R21#ping 179.179.179.1
    Type escape sequence to abort.
    Sending 5, 100-byte ICMP Echos to 179.179.179.1, timeout is 2 seconds:
    Success rate is 100 percent (5/5), round-trip min/avg/max = 228/395/560 ms
    R21#
    R21#show ip nhrp nhs detail
    Legend: E=Expecting replies, R=Responding, W=Waiting
    Tunnel178:
    178.178.178.1   E priority = 0 cluster = 0  req-sent 74  req-failed 0  repl-recv 0 (01:15:08 ago)
    Tunnel179:
    179.179.179.1  RE priority = 0 cluster = 0  req-sent 1088  req-failed 0  repl-recv 590 (00:00:02 ago)
    R21#
    Thanks,
    Carlos Trujillo.

  • Machine capacity planning and efficency

    Dear Guru,
    I have number of machines and i want there individual capacity and efficency can we see that by any report or any tcode to see all capacity of machine.What is capacity leveling.
    Is thee any configuration for capacity planning.
    Thanks in advance

    Hi, the following configuration steps involved in the capacity planning: SPRO --> IMG --> PRODUCTION --> CAPACITY REQUIREMENT PLANNING Capacity Requirements Planning: 1) Define time units 2) Define Capacity Category 3) Set up Capacity Planner. 4) Define parameters 5) Define Standard value key. 6) Define Move time matrix. 7) Define Setup matrix. 8) Define Control Key. 9) Define Shift Sequence. 10) Define Key for performance efficiency rate. 11) Define Formula parameters. 12) Specify Scheduling type. 13) Set up Production scheduler group 14) Select Automatically. 15) Define Scheduling parameters for Production orders 16) Define Scheduling parameters for networks. 17) Define Reduction Strategies planned/ production orders. 18) Define Reduction Strategies for network/process orders. 19) Define Control Profile. 20) Define Selection profile. 21) Define time profile. 22) Define Evaluation profile. 23) Define Strategy Profile. You can follow these above configuration steps in capacity planning Yes you need to active your all work center for the finite scheduling at the bottom of capacity view. Use all standard SAP configurations, Capacity Leveling Profile. Define time profile in OPD2. Define the strategy profile in OPDB Define the Overall profiles in OPD0. Then only you need to to active your all work center for the finite scheduling at the bottom of capacity view in work center.(CR02) Then run MRP with scheduling- 2 Lead time scheduling and capacity planning.(MD02) You will get your capacity requirement in CM01, or CM25/CM21. In rem you can use MF50. -
    OR refer below steps Capacity Planning Evaluation: Use this procedure to Evaluate the Capacity of a Work Center (Resource). The same transaction will be used for finding out the Capacity Overload on the Work Center Select Logistics -> Production -> Capacity Planning -> Evaluation ->Work Center View ->Load and go to the Capacity Planning Selection screen (CM01) Through capacity planning : Standard overview :System will show week wise overload in Red Color. If there is no overload then system will show in the normal color. Date wise Capacity can be overviewed. If there were capacity overload, system would show with Red Color indication and Percentage overload can be viewed. Through capacity planning : Standard overview: Details: Date wise, planned process order wise capacity requirement. Through capacity planning : Standard overview: Graphical: Yellow Color indicates capacity lying un-used. Red Color Bars is the indication for Capacity Overload and Blue Color Bars indicate for Capacity available Use this procedure to Level / Schedule the Capacity of a Work Center Capacity Planning - Levelling/Scheduling: Select Logistics ->Production->Capacity Planning -> Levelling -> Work Center View and go to the Planning Table (Graphical) screen (CM21) Key Points u2022 This would be used for Shop floor production scheduling u2022 Capacity Scheduling is mandatory for correct results of Master Production Schedule and Material Requirement Planning For settings: Define formulas for resources: (OP54) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formulas for resources. For formula parameters for Resource/workcentre:(OP51) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formula parameters for resources-> Standard Value u2013 Define Parameters (OP7B) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Parameters Define standard value key(OP19) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Standard Value First configure the below settings in the capacity Planning. 1) Define time units Path : SPRO ->Production-> Capacity Requirements planning ->Master Data-> Define Time units (OPCF) 2) Define Capacity Category Path : SPRO ->Production ->Capacity Requirements planning->Master Data-> Capacity Data ->Define Capacity category. 3) Set up Capacity Planner. Path : SPRO ->Production ->Capacity Requirements planning -> Master Data->Capacity Data -> Set up Capacity Planner 4) Define parameters Path : SPRO->Production ->Capacity Requirements planning -> Master Data ->Work Center Data->Standard value ->Define Parameters (OP7B) 5)Define Move time matrix. Path : SPRO -> Production-> Capacity Requirements Planning -> Master Data-> Work Center Data -> Define Move time Matrix (OPCN) 6) Define Setup matrix. Path : SPRO -> Production ->Capacity Requirements Planning -> Master Data -> Routing data -> Define Setup Time Matrix 7)Define Control Key. Path : SPRO-> Production-> Capacity Requirements Planning -> Master Data ->Routing data -> Define Control Key(OPCG) 8) Define Shift Sequence. Path : SPRO -> Production-> Capacity Requirements Planning -> Operations -> Define Shift Sequences (OP4A) 9) Define Key for performance efficiency rate. Path : SPRO-> Production -> Capacity Requirements Planning -> Operations-> Available Capacity-> Define Key Performance Efficiency Rate (OPDU) 11) Specify Scheduling type. Path : SPRO ->Production ->Capacity requirements Planning->Operations->Scheduling ->Specify Scheduling Type (OPJN) 12) Set up Production scheduler group. Path : SPRO ->Production->Capacity requirements Planning -> Operations -> Scheduling -> Set up Production Scheduler Group (OPCH) 13) Select Automatically. Path : SPRO -> Production -> Capacity Requirements Planning ->Operations->Scheduling ->Task List Type-> Select Automatically (OPJF) 14) Define Scheduling parameters for Production orders. Path : SPRO -> Production ->Capacity Requirements Planning-> Operations->Scheduling -> Define Scheduling Parameters for Production orders (OPU3) 15) Define Reduction Strategies planned/ production orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies->Define reduction strategies planned-/production order 16) Define Reduction Strategies for network/process orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies-> Define reduction strategies for network/process order 17) Define Selection profile. Spro->Production->Capacity requirements Planning->Evalution->Profiles-> Define selection profiles Hope clear to u. Regards Alok

  • Need Help - BPEL sizing & capacity planning

    Greetings,
    We are considering moving our EDI processing to Oracle Integration with BPEL. I have searched high and low for sizing and capacity planning guidelines for BPEL (and B2B) but have not been successful.
    Could one of you help me out with this - point me to links, send me actual documents etc. My contact information is included below.
    Thanks very much in advance.
    Milind Gadre
    Advanced Solutions Architect
    adx - Advanced Data Exchange
    t: 510.493.5119
    e: [email protected]

    Thare are some resources:
    Oracle Appserver Performance Guide, chapter 7 Tuning BPEL:
    http://download-west.oracle.com/docs/cd/B31017_01/core.1013/b28942/tuning_bpel.htm
    BPEL Webinar, performance tips
    http://www.oracle.com/technology/products/ias/bpel/htdocs/webinars.html
    In general every customer has his own unique business processs implemented. Based on the implementation of the application architecture of the BPEL processes, the best way to size the system is to measure it. What is the expected / estimated load of message that BPEL PM will process? What type of adapters is used? etc...

  • Planning Capacity using CM01 and CM07 transaction

    Hi,
    there are two kinds of sales order in our company: the "confirmed" order sales and the "not confirmed" order sales. The both we need to plan in PS and need use the factory capacity. But when we need to analyze the capacity planning of these projects, it's interesting if we can separates both types of projects, the "confirmed" and the "not confirmed project". And we have to change the projects from "not confirmed" to "confirmed" when a costumers really confirmed a sale. The input in CM07 transaction that I use is the work center.
    I think this case is very common in the companies since there are situations that it's necessary to use the factory forces even a order sales is not confirmed but probably is going to. Than we need to change this project to "confirmed" and is going to show us in CM07 as a confirmed project.
    Thanks,
    Tiago

    Try this function module,
    CLOI_WC_CAPACITY_READ  Similarly
    Please search in SE37 using f4 by giving the capacity in the description field and search.
    there are many function modules are listed for capacity related one , then try  giving your input value and find the output you are expecting...
    Thanks.

Maybe you are looking for

  • How do I sync an iphone 5 with my itunes library on my pc?

    I have just purchased an iphone 5. I have an account with itunes, my password is correct. The phone is not syncing. The pc says it is but there is nothing in my music library on the phone. My ipod syncs correctly and I figure now, after trying to fin

  • How to make Open Sales Orders consider unallocated stocks in MRP run

    Dear Experts,       Maerial BOM   MATERIAL TYPE    STRATEGY GROUP        PLANNING STRATEGY      DESCRIPTION                                                                                 Req-DM      Req-CU 3.    TF180TK               fert           

  • Xalan XPathAPI selectNodeIterator help

    so i got xml something like this <abc>  <bcd>    <cde/>    <cde/>  </bcd>  <bcd>    <cde/>    <cde/>  </bcd> </abc> so i parse the doc tree using xerces which seems fine, and i pass the root element to XPathAPI with xpath /abc/bcd and it gives me bac

  • Why my System Look and feel got corrupted ??

    HI , I have written a simple swing app which consists of jtextarea in a jscrollpane , and a jbutton, in which the textarea is updated with random text. I decided to change the theme to native look&feel and so i included the UIManager.setLookAndFeel(U

  • Not able to edit assets in Illustrator/Photoshop and save over existing assets in Edge animation

    Not able to edit assets in Illustrator/Photoshop and save over existing assets in Edge animation to update image changes. Has Adobe changed this capability with new releases? Does this mean to update an asset on the Edge animation timeline, you have