Oracle MES for EAM Work Order
Hi,
We know Oracle MES supports discrete Work orders.
Is it supports EAM Work Order also.
we need to introduce Clock in Clock out functionality against resources of EAM WO.
Thanks
Raman
Hi Din;
Please check below notes and see its helpful for your issue:
Department Wise Work Order Release Approvers in EAM using AME [ID 944918.1]
EAM DOCUMENT APPROVALS USING AME [ID 972652.1]
Regard
Helios
Similar Messages
-
Oracle EBS drill link targets for EAM Work Order and Asset
Hi All - I am running Oracle EBS 12.1.3 and OBIEE 11g and I'm trying to link from OBIEE to EBS, but struggling to find the target functions / parameters to provide a direct URL link to EBS EAM Work Order and Asset. I have successfully linked to a Purchase Order View page, I would like to find the similar for EAM Asset and Work Order.
I can see some parameters in WorkOrderDetailsPGCO but can't seem to work out how to get to the page from a URL.
For reference MOS Note 555254.1 has some details, but not for EAM.
Has anyone provided users in any reporting system with a link to EAM Work Order or Asset page and if so how were the links generated?
Thanks,
GarethI am giving this a bump as I really need some help with this. Is I run the SQL with TOAD or SQLPlus it seems to consistently runs fine, The problem seems to only be from APEX. I think it has do to with the non-persistent state.
-
Unable to Update EAM Work Order
Hi Team,
I want to update the attribute columns of EAM Work Order. The eam_work_orders_v.attribute10 has to be updated with a quote number that is generated from order management. I tried using the following api
set serveroutput on;
Declare
l_eam_wo_rec EAM_PROCESS_WO_PUB.eam_wo_rec_type;
l_eam_op_tbl EAM_PROCESS_WO_PUB.eam_op_tbl_type;
l_eam_op_network_tbl EAM_PROCESS_WO_PUB.eam_op_network_tbl_type;
l_eam_res_tbl EAM_PROCESS_WO_PUB.eam_res_tbl_type;
l_eam_res_inst_tbl EAM_PROCESS_WO_PUB.eam_res_inst_tbl_type;
l_eam_sub_res_tbl EAM_PROCESS_WO_PUB.eam_sub_res_tbl_type;
l_eam_res_usage_tbl EAM_PROCESS_WO_PUB.eam_res_usage_tbl_type;
l_eam_mat_req_tbl EAM_PROCESS_WO_PUB.eam_mat_req_tbl_type;
l_out_eam_wo_rec EAM_PROCESS_WO_PUB.eam_wo_rec_type;
l_out_eam_op_tbl EAM_PROCESS_WO_PUB.eam_op_tbl_type;
l_out_eam_op_network_tbl EAM_PROCESS_WO_PUB.eam_op_network_tbl_type;
l_out_eam_res_tbl EAM_PROCESS_WO_PUB.eam_res_tbl_type;
l_out_eam_res_inst_tbl EAM_PROCESS_WO_PUB.eam_res_inst_tbl_type;
l_out_eam_sub_res_tbl EAM_PROCESS_WO_PUB.eam_sub_res_tbl_type;
l_out_eam_res_usage_tbl EAM_PROCESS_WO_PUB.eam_res_usage_tbl_type;
l_out_eam_mat_req_tbl EAM_PROCESS_WO_PUB.eam_mat_req_tbl_type;
l_out_eam_direct_items_tbl EAM_PROCESS_WO_PUB.eam_direct_items_tbl_type;
x_eam_wo_rec EAM_PROCESS_WO_PUB.eam_wo_rec_type;
x_eam_op_tbl EAM_PROCESS_WO_PUB.eam_op_tbl_type;
x_eam_op_network_tbl EAM_PROCESS_WO_PUB.eam_op_network_tbl_type;
x_eam_res_tbl EAM_PROCESS_WO_PUB.eam_res_tbl_type;
x_eam_res_inst_tbl EAM_PROCESS_WO_PUB.eam_res_inst_tbl_type;
x_eam_sub_res_tbl EAM_PROCESS_WO_PUB.eam_sub_res_tbl_type;
x_eam_res_usage_tbl EAM_PROCESS_WO_PUB.eam_res_usage_tbl_type;
x_eam_mat_req_tbl EAM_PROCESS_WO_PUB.eam_mat_req_tbl_type;
x_eam_direct_items_tbl EAM_PROCESS_WO_PUB.eam_direct_items_tbl_type;
X_status VARCHAR2(4000);
X_msg_cnt NUMBER;
X_msg_data VARCHAR2(4000);
Begin
fnd_global.apps_initialize (user_id => 27789,
resp_id => 23119,
resp_appl_id => 426
COMMIT;
l_eam_wo_rec := null; Record Group need to be initialized at the beginning
l_eam_wo_rec.WIP_ENTITY_NAME := '665443';
l_eam_wo_rec.organization_id := 12384;
l_eam_wo_rec.attribute10 := '2112000245';
l_eam_wo_rec.NOTIFICATION_REQUIRED := NULL;
l_eam_wo_rec.TRANSACTION_TYPE := '2';
l_eam_wo_rec.ASSET_NUMBER := '11234';
l_eam_wo_rec.ASSET_GROUP_ID := 481810;
l_eam_wo_rec.SCHEDULED_START_DATE := sysdate;
l_eam_wo_rec.SCHEDULED_COMPLETION_DATE := SYSDATE;
l_eam_wo_rec.STATUS_TYPE := wip_constants.released; -'Unreleased';
l_eam_wo_rec.OWNING_DEPARTMENT := 6003;
l_eam_wo_rec.PRIORITY := 10 ;
l_eam_wo_rec.SHUTDOWN_TYPE := null;
l_eam_wo_rec.class_code := 'WS0';
--l_eam_wo_rec.material_issue_by_mo := 'N';
--l_eam_wo_rec.issue_zero_cost_flag := 'Y';
--l_eam_wo_rec.po_creation_time := 1;
--l_eam_wo_rec.job_quantity := 1;
--l_eam_wo_rec.notification_required := 'N';
/* Additional Parameters to be passed Start */
l_eam_wo_rec.ACTIVITY_TYPE := 1; --It should be the lookup code value for the activity_type
l_eam_wo_rec.maintenance_object_source := 1;
l_eam_wo_rec.maintenance_object_type := 3;
l_eam_wo_rec.maintenance_object_id := 26005;
l_eam_wo_rec.requested_start_date := SYSDATE;
l_eam_wo_rec.job_quantity := 1;
l_eam_wo_rec.wip_supply_type := null;
/* Additional Parameters to be passed End */
apps.EAM_PROCESS_WO_PUB.PROCESS_WO
( p_bo_identifier => 'EAM'
, p_api_version_number =>1.0
, p_init_msg_list =>TRUE
, p_commit => 'Y'
, p_eam_wo_rec =>l_eam_wo_rec
, p_eam_op_tbl =>l_eam_op_tbl
, p_eam_op_network_tbl =>l_eam_op_network_tbl
, p_eam_res_tbl =>l_eam_res_tbl
, p_eam_res_inst_tbl =>l_eam_res_inst_tbl
, p_eam_sub_res_tbl =>l_eam_sub_res_tbl
, p_eam_res_usage_tbl =>l_eam_res_usage_tbl
, p_eam_mat_req_tbl =>l_eam_mat_req_tbl
, p_eam_direct_items_tbl => l_out_eam_direct_items_tbl
, x_eam_wo_rec =>x_eam_wo_rec
, x_eam_op_tbl =>x_eam_op_tbl
, x_eam_op_network_tbl =>x_eam_op_network_tbl
, x_eam_res_tbl =>x_eam_res_tbl
, x_eam_res_inst_tbl =>x_eam_res_inst_tbl
, x_eam_sub_res_tbl =>x_eam_sub_res_tbl
, x_eam_res_usage_tbl =>x_eam_res_usage_tbl
, x_eam_mat_req_tbl =>x_eam_mat_req_tbl
, x_eam_direct_items_tbl => x_eam_direct_items_tbl
, x_return_status =>X_status
, x_msg_count =>X_msg_cnt
, p_debug =>'Y'
, p_output_dir => '/user/temp'
, p_debug_filename =>'Amit_6_EAM_WO_DEBUG2.log'
, p_debug_file_mode => 'a'
commit;
DBMS_OUTPUT.PUT_LINE('Status : '||X_status);
IF X_msg_cnt > 0 THEN
DBMS_OUTPUT.PUT_LINE('Error Occurred in WO Creation : '|| X_msg_cnt||' : '||SQLERRM||' : '||SQLCODE);
END IF;
DBMS_OUTPUT.PUT_LINE('First record inserted.......');
END;
The Result:
anonymous block completed
Status : E
Error Occurred in WO Creation : 3 : ORA-0000: normal, successful completion : 0
First record inserted.......
Can i know if missed something over here??
Thanks
MohanHi,
If you have a maintenance BOM and Routing for the activity in use for your work order
The work order created will get the data defaulted from those BOM and Routing ie operations , BOM and Routing.
Please check whether you have the BOM and routing and also please compare the BOM and routing information with the information you are adding.
Also make sure that you are passing all the mandatory inputs.
thanks
Krishna -
BADI for Updating work order component data
Hi,
I need to update the field special stock indicator for the work order component data when it is saved. I am using the BADI WORKORDER_UPDATE for the same, but when I implemented the ZWORKORDER_UPDATE_IM using the standard defenition WORKORDER_UPDATE , the code does not allow me to change the it_component internal table belonging to the BEFORE_UPDATE method. Could you please help me in this.
Basically if we are implementing a standard defenition how to change the parameters of the methods in it.
Regards,
Prabaharan.GHi ,
It is giving the below dump. The parameter is importing parameter and it does not allow to change even using field symbol. Is there any other way. Is there an user exit which will be called when pressing enter button in component screen. The exit EXIT_SAPLCOBT_001 did not work for this.
Error analysis
The program tried to assign a new value to the field "<F_FS1>" even though
it is protected against changes.
The following objects are protected:
- Character or numeric literals
- Constants (CONSTANTS)
- Parameters of the category IMPORTING REFERENCE for functions
and methods
- Untyped field symbols to which a field has not yet been assigned
using ASSIGN
- TABLES parameters if the corresponding actual parameter is protected
against changes
- USING reference parameters and CHANGING parameters for FORMs if
the actual parameter for this is protected against changes
Regards,
Prabaharan.G -
Purchase Info Record for Frame work Order
Hi Friends,
Do we have Purchase info record for Frame work Order(FO) ?. If yes, Please tell me which info category should i need to select to create a Purchase Info Record.
ThanksHi
Is that means, Framework PO will also use the same standard Purchase info record ?
Thanks -
Purchase and release order not allowed for TECO work orders
Hi
We are typically setting maintenance work orders to TECO once the physical work as been performed as that sets the reference date for showing the history of when the maintenance was performed, and when the maintenance call was completed. However, we have invoices that may come in significantly later than when the physical work was performed.
Once the order is in TECO a purchase or release order (for services against a contract) cannot be created for the work order. Additionally it appears that even if we have a release order,or purchase order, if it is not for the exact amount of the invoice the release or purchase order cannot be ammended - we get the sameerror mssage (BS007) as when creating a new purchase order for the TECO order.
I had wondered about using BS22 to change TECO to continue to allow purchase and release orders when the order is in TECO status.
Any input on pros/cons or other approachs appreciated.
PhilipThanks
That was what I initially thought. However I was informed that if the invoice is not for the originally determined amount that to post the invoice means having to change the PO, and changing the PO appears to hit the same business transaction as creating a PO, and so we get the error mssage.
The issue is that we may know we need to have services estimated at, say, $5.000. But we do not know what the actual final invoice will be. So the actual amount may end up being $4,500 or $5,500 as an example, and it may come ni late from the vendor. The Purchse Order side is not my expertize, but I am being informed that the invoice must match the PO amount, otherwise the PO must be ammended to match. As the order is in TECO, the user cannot amend the PO.
I would be happy to know of other options, or at least good questions to ask. I want the end user to be able to post the invoice against the PO, after the order is in TECO, even it the invoice amount is not exactly the same as what was originally anticipated.
regards
Philip -
Internal Order report for PM work order
Hi There Experts,
My question is related to Plant Maintainance (PM) & Internal orders. Is there any standard report in SAP controlling or anywhere else which provides for each Internal Order number the list of Work Orders which have been charged to the Internal order and also if the Work Orders have PO's then a list of POs for each Work order.
A rough picture of the report is as below:
Internal Order Work Order/s PO's
11112222 5673910 4567890
6789155 1122445
22555111 77889933
If anybody could answer this it would really really help me.
Thanks in Advance
JohnHi,
Thanks for your quick replies.
Can we get the report as follows.
1. Total Po's value for the internal Order (through Table EKKN) xxx
Less: Value already posted to Internal order after creation of cost elements (S_alr_87013019) xxx
Less: Total Value to be invoiced (Tcode -ME2N) xxx
Net amount to be posted to Internal Order manually xxx
Is it correct?
Regards
Madhusekhar Gupta G
Edited by: gms gupta on Feb 20, 2012 4:33 PM -
Automating the services for object for a work order
Hi All,
Can anyone post an ABAP code using which we can automate the process of creating a note for a Work order at the time of saving the work order. I need to create a note with the work order at the time of saving it. This note needs to be attached automatically. Can anyone help me with the code to do this?Uhm... If you want us to do your job, how much are you willing to pay?
How is the note "attached"? If it's an attachment using GOS then the code has already been posted on SDN - look it up. You'll need to add it to the work order creation (I'm guessing there should be some kind of BAPI or FM). -
Intercompny billing for maintenance work orders
All,
I have two scenarios dealing with intercompany activities for maintenance work orders. The first scenario involves a maintenance work order in Company B doing work on equipment also in Company B. The work order requires labor services and material from Company A. What is the most efficient way to consume the labor and material into the Company B work order? My client requires intercompany billing anytime labor services and/or material crosses into another company. So for this scenario, should I execute a cross-company labor confirmation and material consumption and then, create intercompany invoicing from this activity? Or, should Company B provide a purchase order to Company A for the labor and material and then, Company A executes intercompany billing to facilitate the correct intercompany financial postings?
The second scenario requires a maintenance work order settlement from Company A to Company B. How should the intercompany billing be done for this? Should I settle to the cost object in company B and then do the intercompany billing? Or, should I settle to a sales document (i.e., debit memo) and then execute the intercompany billing?
Pleases advise.
Thanks!Alex,
You should be able to use the List edit transaction iw38 to select and print Multiple Orders simultaneosuly. Once you have selected the orders in the Output screen, use the menu path ORDER > PRINT ORDER.
Regards
Narasimhan -
FM for Uploading Delivery address for Components for PM Work Order (IW31)
Can any one please help me out in finding any Function module or any other method for uploading the Delivery address for Components to SAP system in transaction IW31 for PM Work Order.
Hi
I am using text items (T Text item).Therefore, there will be no checking for those items form a MM prespective.
There is no error appear. The only thing is that i have status MANC (Mat.availability not checked) on my WO
I'm just trying to figure out if status should be removed some how, or if this is the normal behaviour.
Many thanks
Joana -
Settlemnt Required For Bulk Work Orders
Hi All,
How to create settlement rule for Bulk Work Orders?
Is there Any T-code is there
or using LsmwSettlement rule can be created during Order release or TECO. By defining Settlement Profile, Allocation Structure with Default Object, appropriate details in Equipment / Functional Location Master data, will do the trick.
Order release or TECO can be done in mass in IW38.
If you have any other settlement rule different than these settings, then you should use LSMW. -
SAP EAM Work Order 1.0 and SAP Field Service 1.0
Hi All,
Related to these two new applications launched recently by SAP, taking advantage of the fusion between SAP and Sybase (SAP EAM Work Order 1.0 and SAP Field Service 1.0), someone already implemented some of these new features in mobile?
If someone did, may share some information regarding these new features?
Best regards,
Rogério Reis
Someone can help?
Edited by: Rogério Reis on Dec 12, 2011 11:33 AMHi,
Please review the link below
http://news.techworld.com/mobile-wireless/3280507/sap-announces-new-push-into-mobile-applications/
Regards
Carlos -
Can we capitalize incomplete Work Order, as this comes under the definition of CIP, especially at the period close if Work order is still open, this cost has to be shown in CIP, if to be caplitalized later.
Kindly suggest
Regards
YasirHi.
I have downloaded the latest client from Service Marketplace: Support Packages and Patches -> My Company's Application Components -> My Company's Software -> SAP EAM WORK ORDER -> SAP EAM WORK ORDER 1.0 -> Comprised Software Component Version -> SAP EAM WORK ORDER CLIENT 1.0 -> Win32.
Under installations and upgrades you can find it at My Company's Application Components -> My Company's Software -> SAP EAM WORK ORDER -> SAP EAM WORK ORDER 1.0 -> 51041739.
Hope it helps.
/Michael. -
HOW TO: EAM - Work Order Page - Change Concurrent Program to run
Hi,
my customer is using EAM and in the Work Order Search page the customer can select a work order and press the button "Print Work Orders". The standard work order (BI Publisher report) print is submitted.
Their request is to submit the Customized version of this concurrent program.
Can this be done and how can this be done?
Thanks in advance.
Regard Roel
Edited by: user13071061 on 6-okt-2010 6:26Hi,
Can you please check that what is the Template of Standard Work Order Report.
It comes from the setup for Document Types in Oracle. Most probably the template will be
XXL-FO. And if yes, then you need to have the customized report also, in XXL-FO Template and then in Document Types just give the name of the customized Template Name (Register the Template and Data Definition in Oracle first). Save it
and then run the page again to see if now it picks the template of your customized report or not.
Thanks,
Gaurav -
Eam Work order assignment info
Hi Guys
This is a followup to a question I asked in the SCM forum but was asked to post EAM questions here by Sandeep who answered my previous questions graciously.
A> I am tracking a specific situation- when every operation assigned to a work order is completed I need to execute a pl/sql Concurrent program.
For this one I think the work order status would be changed to complete?
B>I am also tracking another situation- When a resource is assigned to a work order I need to execute a pl/sql conc prog.
What table info gets set when this happens?
Thanks
JakeA> WIP_MOVE_TRANSACTIONS is probably what you are looking for. Write a trigger on that table.
B> WIP_OPERATION_RESOURCES is the table used. So you can write a trigger on that table.
Hope this helps,
Sandeep Gandhi
Maybe you are looking for
-
Issues with using 6.0Gb/s drive with W520 and Windows 7
I ordered 2 ThinkPad 500GB 7200RPM SATA 3.0GB/s 7mm 4K hard drives and was instead shipped 2 6.0GB/s drives. Even though the outside of the box has the correct configuration that I ordered. I installed the drive in the W520 and tried to run my compan
-
Outer Join not giving correct result
I have two tables=> tab_child_tmp (product_id,region,child_val,mst_product) and tab_master_tmp (master_product_id,region,master_val) tab_child_tmp.mst_product is the foreign key referencing tab_master_tmp.master_product_id. Currently the tables are p
-
Providing F4 help standard transaction
Hi All, Could anyone suggest me a way to provide F4 help in the standard transaction - ME51N at the field "requester" or "short text". Thanks
-
hi all... CC:to Anjith how to creat an include program in "MV45AFZZ"....for USER exit....VA01 Pls post ur comments...on urgent basis. thnanks & regards sankar
-
When downloading flash player an error actionlist not found?
actionlist not found when tring to download flash player