Order can not carry out revenues

Hi Experts ,
                  I was trying to release production order and got message no valuation variant is assigned . Even after assigning it in opn2 and reading PP master data it is showing same error .
Also while doing goods receipt ( MB1A ) I am getting error : Order 600003045 can not carry out revenues .
Please guide
Thanks
Neal

Hi neal
As per controlling config. Planed cost has to be calculated during release are create of prod order. For that you have to assign costing carriant in OPL8. both for Plan and actual . in standard SAP PPP! is costing variant for plan and PPP2 is costing variant for actual.
For this costing cariant you have to assign costing type and valuation variant.
Please do it SPRO-Production-SFC-Integration-Order costing
Do these setting.
Standard valuation variant for PPP1 is 006 and for PPP2 is 007.
Regards
J. Saravan

Similar Messages

  • Order can not carry revenues

    Hi all,
    we have a product cost colllector of RM01 type. we have a material say fg and a componet RAW. This product cost collector is for FG. we wanted to scrap RAW by 551 but in cogi it is showing error order can not carry revenues showing component RAW in the error.
    Can you please help in this issue.
    Thanks.
    Edited by: s j on Jun 8, 2010 12:59 PM

    Hi,
    Check in the order type of the relevant order (via KOT2) whether the order can carry the revenues.
    Regards,
    Eli

  • Invoice corrections Sales order- New Pricing is not carried out

    Hi All,
    waiting for some one to guide me in a right way...
    I have Scenario where creating a invoice correction request with reference to Invoice document.New pricing is not carried in debit line item even though i changed the pricing date as current date for the line item
    When i copied with the invoice document, 2 new line items are created with a same price conditions.
    1st line item is a credit and 2nd line item is a debit item.
    I need to do a price adjustment in debit line. So i maintained a new pricing record for the material to carry out the price.
    To achieve this in customizing VTAF (billing to sales) I have  tried multiple options  as below in  2nd pricing type field as B,C,D,E and F
    2nd Pricing type  - B Carry out new pricing
    C     Copy manual pricing elements and redetermine the others
    D     Copy pricing elements unchanged
    E     Adopt price components and fix values
    F     Copy pricing elements, turn value and fix
    But still the new pricing is not carried out.I tried to manually change the Pricing date in the line item level, still the new price is not updated in the order.
    I have seen SAP Help in below link the Debit line can update with correct price point 3 in proces flow , check this below link for reference.
    http://help.sap.com/saphelp_46c/helpdata/en/dd/55feeb545a11d1a7020000e829fd11/content.htm.
    Please help...
    Regards,
    Parthiban

    Hello Parthiban,
    I feel you are aware of the effect/functionality of 2nd pricing type.
    In the invoice correction request, two items are automatically created for each item in the invoice to be copied (which you did mention):
    - first item:   credit memo item
    - second item:  debit memo item
    And for invoice correction request, a particular pricing type is needed for the second item.
    So as per standard, you have to use pricing type 'E' for the credit memo item to guarantee that the item will not be changed.
    And you should give a new pricing type to the debit memo item. 
    The system creates a credit or debit memo depending on whether a postive or negative difference is generated.
    So that means
    Pricing type will effect ItemCat Proposal-G2N
    and 2nd pricing type will effect 2ndItemCatProposal-L2N
    Now, make changes in pricing type based on your business requirement.
    I hope this will assist you in understanding.
    Thanks & Regards
    JP

  • No Availabilty Check can be carried out

    Dear All,
    While do the availablity check for material, I face an error :- "No Availability Check can be carried out for Material XYZ".
    As per my opinion,if this material is blocked with some sales transactions like Sales orders & Delivery,it will show the same.
    How to rectify this problem and why it is coming ? Kindly Elaborate.
    Best Regards,
    Ankur

    Hi
    First of all No Availability Check can be carried out for Material XYZ
    This is not a error message and it is a information message
    This comes while sales order creation because
    Say Material X plant 1000 and user A is entering a sales order and hes has not finished sales order creation still in VA01 transaction only
    Say the available qty for thar material is 25 units and user A has put 20 units and has not pressed enter
    Now user B creates another sales order for  same Material X and same plant 1000  say for 15 units
    Now for user B the system will throw this message No Availability Check can be carried out for Material for material X
    Because the system doesnot know at the time of user B craeting sales, what is going to the order of user A and it cannot do Availabilty Check for two sales orders simultaneously for the same material in same plant
    To control this only , define material block for users in we have  Availability Check in sd--basic fns in img
    Once the user A comes out VA01 t code and pressed enter for that material the system then can do Availability Check  for user B or otherwise settings are reqd define material block for users in we have  Availability Check in sd--basic fns in img
    Regards
    Raja

  • "No Availability Check Can Be Carried Out"

    Q.- In which all business situations we can get an error message - "No Availability Check Can Be Carried Out" except Material is blocked by another user?
    Please replay as early as possible.
    Thanks and Best Regards,
    Amol
    Edited by: amwsapsd on Aug 25, 2010 8:06 AM

    It will Pop -up the same Message in case if the Order , Delivery note & Reservation of Material is Processing.
    You can then block the relevant Transaction as per the requirements.
    Best Regards,
    Ankur

  • Tax can't carry out for some material and Cusomter

    Hi,
         We found the following two material at Customer(2811165) can't carry out the VAT for create sales order. But the Tax can carry out for the other customer. The customer(2811165) can carry out the VAT for other material sales order. I checked the customer and material the Contry code(KR) and Tax classification(1) is correct and normal. It is only the two material for the special customer can't get the VAT. I check the pricing analysis. The follwoing is the log. Pls help check it.Thanks.
    The mateials:
          KTPJC001-02
          KF-8005-0XXXXXXXXX
    The following is the log:
    Access Message Description
    08 010 Access not executed (Requirement 008 not fulfilled)
    10 010 Access not executed (Requirement 007 not fulfilled)
    20 010 Access not executed (Requirement 008 not fulfilled)
    Best Regards
    Park

    Dear Park
    It seems you have assigned Routine 008 for the table which has the combination of some description and applicable to domestic.  For the same combination, in VK13 / UTXJ, you have maintained a tax code for a domestic customer and you are trying to create a domestic sale order.  Actually routine 008 is meant for Exports and hence the problem.
    If my understanding is correct, Go to V/07, select the condition type JIND and click on "Accesses".  There check whether any routine is maintained under the tab "Requirement".   If so,  just remove  those routines and retry your process.
    thanks
    G. Lakshmipathi

  • Whether MRP can be carried out for work scheduling GR. 20 i.e. work to orde

    Dear Experts,
    Whether MRP can be carried out for work scheduling GR. 20 i.e. work to order.
    mahendra

    Hi MShirodkar,
    Yes, s and it specifies the time needed to process the material in the operations at the different work centers.
    The GR processing time depends on the order quantity.
    The GR processing time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
    You can define work scheduling times in the material master record in one of two ways.
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    I hope it clears you doubt any queries please revert me back.
    Regards,
    Madhu.G

  • I updated my Apple ID but my I Cloud account still has my old ID and I can not figure out how to update it

    I updated my Apple ID but my I Cloud account still has my old ID and I can not figure out how to update it

    Welcome to the Apple Community.
    In order to change your Apple ID or password for your iCloud account on your iOS device, you need to delete the account from your iOS device first, then add it back using your updated details. (Settings > iCloud, scroll down and hit "Delete Account")
    When you delete your account, all the data that is synced with iCloud will also be deleted from the device (but not from iCloud), but will be synced back to your device when you login again.

  • After 10.8.4 Update, I receive a series of capital A's in a box in some of the email signatures I receive. I can not figure out how to correct this.

    After 10.8.4 Update, I receive a series of capital A's in a box in some of the email signatures I receive. I can not figure out how to correct this.

    Back up all data.
    Launch the Font Book application and validate all fonts. You must select the fonts in order to validate them. See the built-in help and this support article for instructions. If Font Book finds any issues, resolve them, then boot in safe mode to rebuild the font caches. Boot again as usual and test.
    Note: If FileVault is enabled under OS X 10.7 or later, or if a firmware password is set, or if the boot volume is a software RAID, you can’t boot in safe mode. In that case, ask for instructions.

  • I changed my my email from bright house to yahoo, and need to change iCloud to yahoo but can not figure out how.

    I have an iMac, iPhone and iPad, my email address has always been with Brighthouse, I dropped Brighthouse to go with Century Link.  Now the problem is
    I have Yahoo as my email account and can not figure out how to change iCloud to that email, can not find anything that lets me edit iCloud . How do I correct the email with iCloud ?
    Russelljr

    Welcome to the Apple Community.
    In order to change your Apple ID or password for your iCloud account on your iOS device, you need to delete the account from your iOS device first, then add it back using your updated details. (Settings > iCloud, scroll down and hit "Delete Account")
    Providing you are simply updating your existing details and not changing to another account, when you delete your account, all the data that is synced with iCloud will also be deleted from the device (but not from iCloud), but will be synced back to your device when you login again.
    In order to change your Apple ID or password for your iCloud account on your computer, you need to sign out of the account from your computer first, then sign back in using your updated details. (System Preferences > iCloud, click the sign out button)
    In order to change your Apple ID or password for your iTunes account on your iOS device, you need to sign out from your iOS device first, then sign back in using your updated details. (Settings > iTunes & App store, scroll down and tap your ID)
    If you are using iMessages or FaceTime, you will also need to log out and into your ID there too.
    After deleting the account from your devices, change your details with Apple,  Start here, change your country if necessary and go to manage your account. You may have already done this.

  • Warning could not carry out all normings

    Hi Experts,
    why would a user get the following error in BEx?
    "warning could not carry out all normings"
    Thanks
    Dave

    Hi,
    I think in this case there might have been norming set up in the query, or that some one accidentally set the norming on in the calculation.  You can always switch this off at the workbook.  At any query cell, right-click > ALL CHARACTERISTICS > NORMALIZE > NO NORMALIZATION.  The error should then go away.
    Cheer,
    Gimmo

  • Can not get out of screensaver

    Hello,
    I have a Lenovo R500 with Windows 7. When i leave my computer on for a while without using it gets into a screensaver state where i can not get out of, only by restarting abruptly the computer and so all open programs that are still running. How can i solve this?
    Thanks!
    Johan

    Hi Johan1974,
    Here are a few more details:
     Open Device Manager by clicking the Start button Picture of the Start button, clicking Control Panel, clicking System and Maintenance, and then clicking Device Manager.‌ Administrator permission required If you are prompted for an administrator password or confirmation, type the password or provide confirmation.
          In the list of device categories, expand Mice and other pointing devices.
          Right-click the entry for your mouse, and then click Properties.
          In the Mouse Properties dialog box, click the Power Management tab, check the Allow this device to wake the computer check box, and then click OK.
    There are some screenshots here although the instructions are to remove the check because it is advising how to disable it. You will be doing the opposite.:
    Sleep Mode
    ThinkPad: T530 / X1 Gen 2 / Helix - Yoga: Tablet 2 Pro (Win) / Yoga 3 Pro
    If you find a post helpful and it answers your question, please click the "Accept As Solution" button.
    Lenovo Advocate ~ I am not employed by Lenovo or Microsoft. I am a volunteer.
    Microsoft MVP - Consumer Security
    SpywareHammer

  • When I try to open Firefox, a pop up says it is already running and I must close a window or restart. I can not figure out how to close the window they are asking me to.

    when I try to start Firefox, a pop up says it is already running and I must close a window or restart. I can not figure out what window they want me to close
    == This happened ==
    Every time Firefox opened
    == User Agent ==
    Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 6.0; WOW64; Trident/4.0; SLCC1; .NET CLR 2.0.50727; Media Center PC 5.0; MDDC; .NET CLR 3.5.30729; .NET CLR 3.0.30618)

    See http://kb.mozillazine.org/Firefox_hangs and [[Firefox hangs]] (Hang at exit)
    Check in the Task Manager (XP: Ctrl+Alt+Del, Vista: Shift+Ctrl+ESC, Processes tab) if there are hanging Firefox processes.
    If you see any ''firefox.exe'' processes then click the End button to end those Firefox processes.
    You can only start Firefox in [[Safe mode]] or launch the [[Managing profiles|Profile Manager]] is all Firefox processes are ended.
    See also http://kb.mozillazine.org/Kill_application

  • I'm staying at my house in Peru, South America. From my PC laptop I can see my neighbor's wifi service network, but I also have my mini iPad and I can not figure out why I can't get any wifi connection from my area. Is there a setting I need to do?

    I'm staying at my house in Peru, South America. From my PC laptop I can see my neighbor's wifi service network, but I also have my mini iPad and I can not figure out why I can't get any wifi connection from my area. Is there a setting I need to do?

    Yes, I did try to go on my settings>wifi and was waiting for any wifi signals to pick up, but nothing shows up. But on my PC I get a whole list of networks to choose from. Regarding my neighbor, I already have her password that is why I was able to get it on my PC, the problem is that the mini Ipad is not picking any signal neither can it locate me when I go to maps.

  • I have an iPOD mini library and now have a IPhone 4S.  I updated my library and synced my phone to the library but can not figure out how to get the music library to download to my  iphone

    I have an iPod mini library which I have update. I now have an iPhone 4S which I have synced to the library using a MS XP computer. I can not figure out how to get the library to download to my iPhone?

    Thanks,  This caused me to go back and try again since the solution seemed so simple.  What I did was when it started downloading, it started with the iphones apps to my computer.  I did not want the apps downloaded on my computer so I stopped it.  If I would have waited, the music was uploaded right after the apps were downloaded.

Maybe you are looking for