I would like to request your expertise on my issue. My PI sheet was not able to create a message when they cancel the recipe in CO60. Due to this I cannot TECO my order because of status CRCR and since there is no message in CO54 i cannot send the message. I'd like to ask on how can i change the status in CO60 since i dont have access to transaction CO57 to create a message?
Thanks,
sara

Hi,
You need to discard/cancel or delete the PI sheet from CO60....check the below screen shot...once you delete the PI sheet you can teco the order...
Thanks
Kumar

Similar Messages

  • Sales order cannot be rejected -problem log status item status is incorrect

    Hi,
    I need to reject this particular sales order, but when i try to reject it says to check the problem log which states that the item status is incorrect. It says subsequent documents exists for some lines even though no documenst are attached.
    There were a delivery attached to this order earlier but that has been archived. I ran repors SDVBUK00 etc but nothin seem to sort this issue..
    I just need to reject the whole sales order. does anyone know any reports or somethin to rectify this issue.
    Thanks
    Keshini

    Dear Keshini,
    Could you please update with the process of Delivery Document Archieved?
    I mean, had you reversed the delivery (T. Code: VL09) and then deleted the items from reversed Delivery Doc (T. Code: VL02N), before deleteing the Delivery Doc?
    Was there any subsequent document for Delivery Doc.?
    Best Regards,
    Amit
    Note: Also, check with Copy-Control settings for Order-to-Delivery (T. Code: VTLA)
    1. Field: Update Document Flow is marked ticked at
    Item (Dialog Structure) --> Item Category --> Control data
    2. Field: Pos./neg. quantity with entry "+"

  • Cannot complete document due to status of preceding document

    Hi everyone,
    We encounter the following problem;
    We have a grantor application and from there we create a grantor agreement via the copy control settings in customizing.
    Both transaction types have their own status profile (user status).
    Now, when we have created the agreement (as follow up document), we are missing some of the user statussses, for example 'CANCEL'.
    This is simply not available to select.
    Investigation turns out that this is due to the fact that the preceding document (grantor application) is not yet completed. After we manually change the status of the application to 'Completed', then in the agreement we can select the missing user status.
    How can we fix this? It is not a workable solution to first create the follow up document, then go back to the preceding document to change the status of that document and then go back again to the follow up document and start processing that one.
    I was told that it should be possible with normal customizing to make sure that the follow up document is "leading" and will not be affected by any status of the preceding document.
    Another option would be to use some function modules and badi's to make sure that the status of the preceding document is automatically set to completed during the copy control.
    But to be honest, we would prefer not to enhance any FM's and/or badi's but to use standard customizing.
    Does anybody have some ideas how to solve this.
    Thank you very much for your help.
    Regards,
    Pieter

    please check SCVMM 2012 | Force Remove vCenter Server
    http://digitaljive.wordpress.com/2012/07/06/scvmm-2012-force-remove-vcenter-server/
    Mohamed Fawzi | http://fawzi.wordpress.com

  • Set Deletion Flag for Process Order is not possible due to status ORRQ

    Hi Guys,
    I need to mark some process orders for deletion, but the status ORRQ (order record required) is blocking me. I've read some SAP Documentations and SAP Notes and it's recommending run tcode COPA to store the order records. A
    Although the Process Order is appearing there to be stored, we I execute store process it gives me a message that "Zero Orders were stored".
    So, can you help me on this?
    Thanks.
    Pérsio Kojima

    Hi Pérsio,
    Check In Customizing whether the order type has been set up for storing in T code COR4 (order type-dependent parameters, Master data tab page, Order record required indicator).
    IF the option is selected, the system will not delete the record directly. The order record must be archieved and then deleted.
    based on this either you can de activate the option or archive before deletion.
    Hope this answers your question.
    regards,
    Pradeep.

  • Error: Service process cannot be confirmed due to its status

    Hi Experts,
    we want to create a Service Notification (BUS2000117) as a follow-up document of a service order (BUS2000116). The problem is that we receive the following error:
    Service process cannot be confirmed due to its status
    *Diagnosis*
    You cannot enter a confirmation for the service process due to its status.
    *System Response*
    To enable you to enter a confirmation for a service process, it must be released and may not yet have the status Closed .
    *Procedure*
    Check the service process status and if necessary, change it.
    How can i shut off the control of the status as we need to create service confirmation of service orders which are still in process. Is there any customizing?
    Best Regards
    Oliver

    To solve the problem without using the note it is possible to change customizing.
    Customer Relationship Management -> Transactions -> Status Management -> Define Status Profile for User Status:
    In Transaction Control is has to be assigned the Business Transaction 'To be distributed' to the relevant status.
    Afterwards the service notification can be created without problems.

  • Cannot be confirmed due to its status

    Hi,
    I have got few order for which I am not able to create Service confirmation as the line items system status contains error. I am not able to release it
    When I try creating service confirmation I getting message as Service process  cannot be confirmed due to its status
    Pl help if you have any clue on this.
    Thanx,
    ac

    Hi M, have you found out how to solve this? We want to create a a Service Confirmation follow-up document of service ticket. We need to create it althougt the status of ticket is not concluded. How to shut of this control?

  • Database msdb cannot be opened due to inaccessible files or insufficient memory or disk space - in recovery pending status

    came in this fine monday morning and it looks like developers were running some kind of trace that filled the primary DATA folder with about 80,000 5mb trace files.  now that process has stopped and the logfiles have been cleaned up, but when attempting to connect to the server using the management console i get the error:
    Database 'msdb' cannot be opened due to inaccessible files or insufficient memory or disk space.  See the SQL Server errorlog for details. (.Net SqlClient Data Provider)
    when i check the status it is in recovery pending mode.  i have a backup from yesterday but im not sure if this database became corrupt before that backup or not because this process was ongoing over the weekend.  the last timestamp on the msdb and log files is 7am this morning.. 
    I am not sure how to proceed recovering the msdb database with limiting interruption to the users.  any advice is extremely appreciated.  this is sql server 2008.  i can login via sqlcmd and see it is in recovery pending status:
    1> select state_desc databasestatus_sysdtabase from
    2> sys.databases where name ='msdb'
    3> go
    select state_desc databasestatus_sysdtabase from
    sys.databases where name ='msdb'
    databasestatus_sysdtabase
    RECOVERY_PENDING
    (1 rows affected)
    1>

    For someone experiencing a similar problem this answer is unacceptable. You're basically telling me to reboot the server to fix this.  You vaguely mention using process explorer to find out who is using the file.  Can you please provide
    some more information on that?  I have a similar problem and rebooting the server to fix it is not an option.  This problem keeps reoccurring.
    OS Error 32 means file has an open handle by someone else. If that is a user process then you can catch it via Process Explorer. If it's a kernel mode object then it's difficult to catch that and restart is the only choice.
    http://sqlserver-help.com/2014/08/07/tips-and-tricks-os-error-32the-process-cannot-access-the-file-because-it-is-being-used-by-another-process/
    Balmukund Lakhani
    Please mark solved if I've answered your question, vote for it as helpful to help other users find a solution quicker
    This posting is provided "AS IS" with no warranties, and confers no rights.
    My Blog |
    Team Blog | @Twitter
    | Facebook
    Author: SQL Server 2012 AlwaysOn -
    Paperback, Kindle

  • Process Order status CRCR needs to  re read master data

    All,
    I have an issue with re-reading the master data in process order.
    I have an order which was  released and control recipe was also released since we use pi sheet to record shop floor data.
    After releasing the control recipe user  made changes into bom and he wanted to re-read master data , on the master data tab re-read master data button is not activated not  if i go menu path from the header process order-> functions-> re-read master data is active.
    Neither i am allowed to set the deletion flag for the order, i am getting error message process order status CRCR does not alow to set the delection flag.
    Any solution to this issue is appriciated
    Either i should be able to re-read the master data or set the deletion flag...

    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    You can complete the PI Sheet by clicking the "complete" button in the PI Sheet also.
    Now try to re read master data

  • I haven't got any order confirmation e-mail from Adobe and cannot install Photoshop due to no serial number information.

    Please give me order confirmation e-mail so that I can install Photosho.
    After download installation file, I am stacking due to no serial No information.

    お世話になります。オーダー確認のメールが届かずフォトショップをダウンロードで購入したのですがシリアル番号の情報がないため入力出来ずインストールできません。
    iPadから送信
    2015/01/27 16:58、Chikuromochi <[email protected]> のメッセージ:
    I haven't got any order confirmation e-mail from Adobe and cannot install Photoshop due to no serial number information.
    created by Chikuromochi in ダウンロード、インストール、セットアップ (Japan) - View the full discussion
    OW72247756さん
    AdobeJapanForumをご利用いただきありがとうございます。
    恐れ入りますが、JapanForumですのでご質問内容を日本語で記載していただく事は可能でしょうか?
    If the reply above answers your question, please take a moment to mark this answer as correct by visiting: https://forums.adobe.com/message/7135151#7135151 and clicking ‘Correct’ below the answer
    Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page:
    Please note that the Adobe Forums do not accept email attachments. If you want to embed an image in your message please visit the thread in the forum and click the camera icon: https://forums.adobe.com/message/7135151#7135151
    To unsubscribe from this thread, please visit the message page at , click "Following" at the top right, & "Stop Following"
    Start a new discussion in ダウンロード、インストール、セットアップ (Japan) by email or at Adobe Community
    For more information about maintaining your forum email notifications please go to https://forums.adobe.com/thread/1516624.

  • Job Determine Adjustment Modes cannot be modified due to its status

    Hi Gurus.
    After running program SAPRUPGM during SPAU adjustments, the green question marks are not replaced by either green, yellow or red traffic lights. When I check in SM37, the program has finished running. I tried to release the job but I get the message: Job Determine Adjustment Modes cannot be modified due to its status.
    I must mention that our SAPRouter is down and we cannot reach Service Marketplace. Is this the problem?
    Your help is appreciated.

    Configuration of the ODBC services caused this error and was resolved by reversing the documented approach.
    3.2.1.     Add DataStore entries to DataDirect odbc.ini
    For each ODBC data store, an entry must be added to the DataDirect $LINK_DIR/bodi_odbc/lib/odbc.ini file as follows:
    [<ODBC datastore name>]
    Driver=/opt/bodi/bodi_odbc/lib/DAmsss22.so
    Description=<Description of the ODBC Entry>
    Address=<SQL Server Host Machine>,<Port#>
    Database=<database name>
    RebrandedLib=YES
    For example:
    [test_sqlServer]
    Driver=/opt/bodi/bodi_odbc/lib/DAmsss22.so
    Description=Development SQL Server DB
    Address=choqhfcdb1,1433
    Database=devRMDS
    RebrandedLib=YES
    3.2.2.     Add DataStore entries to BODI odbc.ini
    For each ODBC data store, an entry must be added to the BODI $LINK_DIR/odbc.ini file as follows:
    [<ODBC datastore name>]
    Driver=/opt/bodi/bodi_odbc/lib/DAmsss22.so
    RebrandedLib=YES
    For example:
    [test_sqlServer]
    Driver=/opt/bodi/bodi_odbc/lib/DAmsss22.so
    RebrandedLib=YES
    3.2.3.     Configure the DSConfig.txt file
    This is a one time activity.  Update the $LINK_DIR/bin/DSConfig.txt file to ensure that Data Integrator is using the correct ODBC driver and entries.
    UseDIUnixODBCDriverManager=TRUE
    UNIX_ODBC_DRIVER_MANAGER_LIB=

  • Cannot create STO due to Material Not released

    Hi experts,
    I have a query here.
    A part number has block code BL (Blocked) in MM in MRP1 & Costing views. Because of which we cannot create Intercompany Stock Transport Orders.
    However it allows us to create normal PO's for the same part to the vendors. The material status of this block code BL has only Inventory Mgmnt blocked with "B" whereas rest of the settings
    Material 82001 cannot be taken from plant 1001 due to status "Not Released"
    Message no. ME125
    System Response
    Procedure (system administrator)
    Check the material status in Customizing:
    Define material status
    Could you let me know why it behaves differently in normal PO to that of Intercompany Stock Transport Orders?
    Regards,
    Pri

    I dont know the reason, but probably it is to to avoid potential business trouble, to inform requesters at the earliest time that the supplying plant cannot delivery what you request.
    Assume you would create STO today for a delivery in November.
    You would be lucky because you succefully created the STO.
    In November someone in the sending plant would starf processing the goods issue to you, would then realize that it is not possible, would then inform you about that.
    you would get in trouble with your customer, as you cannot meet the promised delivery date.
    Wouldn't you ask him why he did not tell you that in August already?
    But the sending plant has no chance to know this prior to the processing (except they would lookup manually everytime the material master status when you send an order).
    So the easisest way to let you know that it is not possible to move material in the sending plant, is thru the message at order creation.
    As I said, it is just my assumption. You may ask SAP for the correct answer. Maybe another one here knows it.
    Can it be that you do not use delivery processing for this STOs?

  • System status CRCR is active (ORD 100000705277)

    HI All,
    I am getting the following error message when try to TECO the process order
    "System status CRCR is active (ORD 100000705277)"
    Could anyone tell me what happend and What should i do to fix it ??
    Thanks & Regards,
    Saiful arif

    CRCR: control recipe created..
    Go to CO55 or CO60 and complete (if not completed) the control recipe of that process order then go to co54 and send Process Message regarding completion of control recipe.
    Once messages is sent status of process order turns to CRFI from CRCR.
    Edited by: karthick PP on Jun 25, 2009 5:55 AM

  • System status CRCR is active (ACT 1101073 0150)

    Hi friends,
    I will need to close de OP with (TECO), but the system show the message:"System status CRCR is active (ACT 1101073 0150)".
    I want to know what i can do to close this OP.
    Thanks

    Dear ,
    CRCR mean control recipe created..
    Go to CO55 or CO60 and complete (if not completed) the control recipe of that process order then go to co54 and send Process Message regarding completion of control recipe.
    Once messages is sent status of process order turns to CRFI from CRCR  and now try to Close the Operation
    Check the below thread for farther help
    Error while closing process order
    Hope this will work
    Regards
    JH
    Edited by: Jiaul Haque on May 28, 2010 11:33 PM

  • This device cannot start. (Code 10) Status Device Power Failure for Intel (R) Audio Display

    Hi I just bought HP Envy M7 Sleekbook last week and upgraded from 8.0 to 8.1 for Windows 8.
    Now I have no sound and this is the error message I get:
    This device cannot start. (Code 10) Status Device Power Failure  (for  Intel (R) Audio Display)
    under Sound, Vieo and Game Controllers in the Device Manager.
    Anyone else having this issue after upgrading? 
    Getting a new lappy is stressful enough but to alreay have issues is ridiculous
    If the upgrade is not the issue could something have happened in transit? (I have an issue with the way Best Buy packed it for shipment and wonder if it could have been compromised)
    Any help is appreciated. Or should Ibe taing this back to best buy and have them address it?
    Thanks
    Pam

    Ahmed, if your HP Envy has an Intel processor chances are it will be necessary to download new drivers for both sound and chipset due to compatibility issues with Windows 8.1. After 4-1/2 hours on the phone with various technical agents and a lot of frustration I finally got one who had the knowledge and training to resolve my issue. I believe he downloaded the new drivers from the HP support site. Good luck!!

  • Stop Process order settlement (CO88/KO88) for DLV status orders

    Hello gurus,
    My business requirement is to prevent process orders with status DLV (Delivery completed). In standard SAP orders with DLV/TECO are being settled to settlement receiver. ANy help would be richly rewarded.
    Thanks
    RG

    Dear Ajay,
    Thanks.
    I am able to change the profile. But after that when I try to exit from the screen system throws the following error/message :
    1  Receiver categ. MAT is not allowed by settlement prof. 000090 for this sender
    2. Maximum number of 0 rules reached
    3. Rules exist, but set. prof. 000090 states no settmt of act.costs/cost of sales
    First two are Errors and last one is message with yellow mark.
    Thanks and Regards,
    Nirav

Maybe you are looking for