Order confirmation question

Hi,
on Jan 3rd I downloaded Photoshop CC, 12 month subscription.
I received email conflation with my order number.
however while downloading/installing I think something went wrong because at the end I got the message that I had downloaded a 30 day trial version?!
how can I check if my photoshop will be active for 12 months as per my order??
thanks!

Sign in, activation, or connection errors | CS5.5 and later
Mylenium

Similar Messages

  • EDI Order Confirmation Question : attach additional .PDF file

    Hello,
    Is it possible to attach to an Order confirmation (for customer standard order)  an additional  pdf.file automatically? If yes, what are the necessary steps needed?
    Hoping for reply.
    Many thanks !

    Hi,
    You can attach any document to Sales Order.
    First you need to enter that document through tcode CV01N in SAP.
    Then in Sales Order select one Item then go to Extras & then select document. You can browse the document here which you have enter through CV01N.
    Thanks

  • Report  showing list of order confirmations and open/close reservations?

    Hi
    Can we have any standard report having list of  order confirmations and open/close reservations in SAP PM ?
    Regards
    Pooja

    Hi Pooja,
    Try IW12, Display Document flow, if you are looking for a combined report of Order confirmations and Material status.There are various other reports related to order confirmations and Material status seperately. For material status you can use IWBK.
    Better place to post PM questions is in Enterprise Asset management Forum.
    Warm regards,
    Srinivas Potluri

  • Credit block not allowing delivery dates on the order confirmations

    Hello,
    We are a full module SAP shop on ECC 6.0.
    For one of our businesses, we have credit checking to take place at the time of Sales Order entry.  This is causing an issue for the business because they are using Demand planning and need to have the Delivery Dates on the Order confirmations and they also want to be able to run an ATP check on the Sales Order.  The credit check on sales order entry, prevents them from doing both of these things.
    Does anybody know if there is a way to get the dates to show up on the order confirmations when a sales order is on credit block?   Also, is it possible to run the order through ATP checking with this sales order credit block taking place?
    thanks for your help!

    Dear,
    Ideally this question should have been posted in ERP SD forum.Please check out your credit check settings in OVAK and OVA8. Hopefully it help you.

  • Outbound Order Confirmation - Output control for incomplete sales orders

    Hi EDI Folks,
    I have a simple question. I want to send EDI 855 for only the completed sales orders.
    Whenever inbound sales order is processed and if the order is incomplete. I don't want to send the order confirmation for the order at that point of time. When that order is made complete, then only i want to send the order confirmation (EDI 855).
    How can we do it??
    What is the output determination requirement for this??
    Right now i am using requirement '02' which proposes EDI output for both complete and incomplete sales orders.
    Please respond to the above quesition.
    Thanks and waiting for your reply,
    Creasy Matt

    MxG,
    For both plant and pricing condition functional config was already done. If any of these two fields are missing, the status of sales order will be incomplete.For incomplete orders also, the EDI output is being proposed.
    Now just tell me, in which SAP program, do i have to put the break point?
    Where exactly ??
    Thanks and kind regards,
    Creasy Matt

  • WHile playing a game why am i getting this.....To display this page, Firefox must send information that will repeat any action (such as a search or order confirmation) that was performed earlier. [Resend][Cancel]......and what can i do to get it to quit?

    I am playing a facebook game called Kingdom of Camelot. This come up when I refresh the game. To my knowledge no information is sent. I need it to stop interfering with my page when i refresh . I have deleted/uninstalled my extensions and plug ins and i am still getting the message.

    Perhaps someone should report this to MarketWatch. There are ways for web developers to work around this issue (GET after POST, for example).
    This is a longstanding issue. Examples:
    [https://support.mozilla.com/en-US/questions/668932 how do i stop this-To display this page, Firefox must send information that will repeat any action (such as a search or order confirmation) that was performed earlier.?]
    [https://support.mozilla.com/en-US/questions/780884 To display this page, Firefox must send information that will repeat any action (such as a search or order confirmation) that was performed earlier]
    In past discussions about this message, I have never seen an easy solution. Arguably it should be made a user preference: those who prefer to be warned about the risk that they will double-submit a transaction or instruction on a poorly designed site can have their warning, and those who prefer to take their chances can take their chances. Not sure whether that is on anyone's "to do" list.
    Separate issue: I wasn't aware of any difference between 3.6.12 and 3.6.13, but both are riddled with security vulnerabilities so it's hard to recommend using either of them at this point.

  • Reg:Bapi for mass creation of production order/confirmation

    Dear Experts,
    I wanted to know with the following BAPI is it possible to create Multiple production orders for different semifinshed Materials along with material availability check and other functions similar to CO01 transaction.
    I knew there are standard transactions for mass confirmation for production orders. But i need a confirmation on this BAPI . As i am planning to go-ahed with ,mass creation of production order creation / Order confirmation in single custom transaction.Need back flush activity even supported.
    BAPI_PRODORD_CREATE to create the orders.
    BAPI_PRODORD_RELEASE to release the orders.
    BAPI_PRODORDCONF_GET_TT_PROP to get the default data for the confirmation.
    BAPI_PRODORDCONF_CREATE_TT to ost the confirmation of production order.
    Along with this BAPI do i need to commit any other BAPI to carry out back flush for components.
    Need your suggestions to take it further.
    Regards,
    Daya.

    Dear SAP Daya
    If the issue has been solved, please close this thread.
    You have already mentioned that the issue has been resolved, thefore, you should not ask for help on another thread before closing this one, as it looks like you are trying to force people to answer your threads.
    Users are always trying to answer as many threads as possible on good will we don't need this kind of "incentive".
    Please read carefully the The SCN Rules of Engagement, especially point 8:
    Be responsive. If an SCN member has answered your question, please mark the answer as "helpful” or “correct”. Mark the discussion as “answered,” so that other members can find the answers more easily
    Also, I checked your old threads and I could observe that there is only one closed. Please review your old threads and close those already solved.
    BR
    Caetano

  • PM Order Confirmation create actual posting in Cost Center, with CE type 43

    Dear Expert,
    I would like to know the business flow of Plant Maintenance that impacts cost center reporting.
    During PM order confirmation, it will create an actual posting in Cost Center from Cost Center Reporting (No FI posting), say CC Operation, with Cost Element type: 43, which is attached with the activity type of Labor Cost assigned the the PM module.
    Example: Cost Center: CC Operation, Cost Element: 840001 (CE type: 43), Amount: USD 100- (negative sign)
    My Question:
    How does this posting (currently is in controlling only) in cost center Operation with Cost Element type: 43 be reflected in my FI reporting?
    Let say there is an FI posting of labor cost in CC Operation, amount USD 100, then from Cost Center Reporting, it actually offset both amounts, and this cost center become 0 in amount.
    Kindly advise the concept of Plant Maintenance.
    This seems like same with the concept of KB21N.
    Thanks.

    Hi Karthikeyan,
    My issue and concern is similar to the issue raised as follows:
    Secondary Cost Element Configuration for Plant Maintenance Order
    http://scn.sap.com/thread/3488730
    In this forum, it says that the posting in CO, during PM order confirmation is ...
    +10 for Order and -10 for cost center A
    After PM Order settlement:
    -10 for Order and +10 for cost center A
    From the cost center and PM Order CO report, they are 0 in value ...
    Is this the correct way?
    Thanks,
    -Chin

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Production Order confirmed finish date

    Good morning,
    I have a question concerning the confirmed finish date (GLTRI) on the general tab of the production order header. We have an order that a partial confirmation was done on the last operation with no yield. This was the first confirmation of the order. The general tab shows a confirmed start date and a confirmed finish date. First question is why the confirmed finish date if nothing was completed. The confirmation was then canceled and the start confirmed date was removed but the confirmed finish date remained. More testing revealed if a final confirmation was performed on the last operation where it is set to do an automatic goods movement the start and finish confirm date was filled in. When the confirmation was canceled the start and finish confirmed dates were removed. Has anyone come across this before?

    dear John,
    I played in our TST system and found the same behaviour (which I consider is a standard).
    I can't see this "confirmed dates" settings in config.
    It seems like as soon the first entry comes in AFRU system sets the 'Start Confirmed' date even if LMNGA is zero
    After cancellation system cleans this field date because the order status comes back to REL (the was only the one zero partial confirmation which was cancelled later). but keeps 'Finished Confirmd' field populated. Of course, the second record in AFRU (the cancellation) is created.
    To avoid a misunderstanding I suggest advise your users to run CO14 (display prod.order confirmation) or just use COOIS.
    good luck!

  • I haven't got any order confirmation e-mail from Adobe and cannot install Photoshop due to no serial number information.

    Please give me order confirmation e-mail so that I can install Photosho.
    After download installation file, I am stacking due to no serial No information.

    お世話になります。オーダー確認のメールが届かずフォトショップをダウンロードで購入したのですがシリアル番号の情報がないため入力出来ずインストールできません。
    iPadから送信
    2015/01/27 16:58、Chikuromochi <[email protected]> のメッセージ:
    I haven't got any order confirmation e-mail from Adobe and cannot install Photoshop due to no serial number information.
    created by Chikuromochi in ダウンロード、インストール、セットアップ (Japan) - View the full discussion
    OW72247756さん
    AdobeJapanForumをご利用いただきありがとうございます。
    恐れ入りますが、JapanForumですのでご質問内容を日本語で記載していただく事は可能でしょうか?
    If the reply above answers your question, please take a moment to mark this answer as correct by visiting: https://forums.adobe.com/message/7135151#7135151 and clicking ‘Correct’ below the answer
    Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page:
    Please note that the Adobe Forums do not accept email attachments. If you want to embed an image in your message please visit the thread in the forum and click the camera icon: https://forums.adobe.com/message/7135151#7135151
    To unsubscribe from this thread, please visit the message page at , click "Following" at the top right, & "Stop Following"
    Start a new discussion in ダウンロード、インストール、セットアップ (Japan) by email or at Adobe Community
    For more information about maintaining your forum email notifications please go to https://forums.adobe.com/thread/1516624.

  • Sending order confirmation to E-mail

    Hi Experts,
    I need to send the order confirmation to E-mail for different customers. The e-mail id is same but i have to send to 300 different customers.
    Is there any option available in SAP to do this otherwise i have to trigger the output manually for this 300 customer numbers.
    Please help

    Hello Raghu,
    I need to send the order confirmation to E-mail for different customers. The
    e-mail id is same but i have to send to 300 different customers. Is there any
    option available in SAP to do this otherwise i have to trigger the output
    manually for this 300 customer numbers.
    I have a question here with reference to your questions of triggering a Order confirmation E-Mail --> Could you please explain the business reason of triggering E-mail to same recipient multiple times ? Just think over it...Sending E-mails for 300 number of Customer on a single E-mail ID is not making any sense. 
    You can maintain multiple E-mail ID in Customer master record and as per SAP standard, email will be triggered to only one recipient. Anyway please refer to the below suggestion of your question:-
    1:- Please reach out to Technical consultant and try developing a program which will have selection criteria of Sales Order, Customer ID, Output Type and Number of execution as selection screen which in turn will call the driver program and trigger the Email 300 number of times.
    Kindly update the forum after you carry out this exercise.
    Regards,
    Sarthak

  • Mass printing of order confirmation - output BA00

    Hi, can anyone advise if there's a std transaction code that can perform mass printing of order confirmation from SO with output 'BA00'?
    Thanks
    PP

    Hi there,
    I dont think there isany T-code for mass printing multiple O/p types.
    Rather you can run RSNAST00 in SE38. Give the BA00 in Message type, sales order num in Obj Key. Give the default printer to which you want to print the docs.
    Rather, you can ask your ABAPer to develop a custom transaction calling the RSNAST00 when executed. You can also define the selection inpits like sals orders, message type, Sales org, printer, etc.
    Once the user clicks on execute, system will call RSNAST00 in the background.
    1 question: Whay do you want to mas print the BA00? It wil trigger immediately after saving the sales order provided condition records are maintained right?
    Regards,
    Sivanand.

  • Sending order confirmation to external app. for stock transport order

    Hello,
    What I need to do is to send an order confirmation from a STO to an external application. In more practical terms, the scenario is as follows.
    We receive orders from an external application and an STO will be created by using SAP Idoc PORDCR04. Then, after running the availabillity check, I need to send an electronical confirmation back from the STO to this application so they can see the order confirmation in their application
    How can I do that?
    Edited by: Gunnar Aroen on Nov 18, 2011 2:22 PM

    Hello Raghu,
    I need to send the order confirmation to E-mail for different customers. The
    e-mail id is same but i have to send to 300 different customers. Is there any
    option available in SAP to do this otherwise i have to trigger the output
    manually for this 300 customer numbers.
    I have a question here with reference to your questions of triggering a Order confirmation E-Mail --> Could you please explain the business reason of triggering E-mail to same recipient multiple times ? Just think over it...Sending E-mails for 300 number of Customer on a single E-mail ID is not making any sense. 
    You can maintain multiple E-mail ID in Customer master record and as per SAP standard, email will be triggered to only one recipient. Anyway please refer to the below suggestion of your question:-
    1:- Please reach out to Technical consultant and try developing a program which will have selection criteria of Sales Order, Customer ID, Output Type and Number of execution as selection screen which in turn will call the driver program and trigger the Email 300 number of times.
    Kindly update the forum after you carry out this exercise.
    Regards,
    Sarthak

Maybe you are looking for

  • TM and  Disk Warrior

    The past few months I have had a problem with Time Machine getting corrupted often, but not always, when I do a restart. T M resides on a partition on an external disk. After a restart it either doesn't show up or is not mounted as shown in Disk Util

  • How to delete music in iOS 7?

    Yesterday, I upgraded to the new iOS 7! Yay! It's really cool, and I do like it, though I'm having problems with my music app.. There's a few albums I don't want on my phone, and it won't allow me to delete them. I try sliding to the right, and nothi

  • 802.1x error 23 only on Mac clients

    I have been using server 2008 R2 for NPS using 802.1x for about a year or so with my windows clients and it has been working perfectly.  Recently however my mac clients cannot authenticate successfully.  They get the error posted below.  I cant find

  • Download and Appleworks unable to open

    On Dec. 3, 2006 I downloaded security update 2006-007 1.0 Since then each time I open an appleworks folder or letter, it opens than a small color wheel displays, spins around for about 15 to 20 minutes before the folder or letter will open and I can

  • Is it possible to run garbage collector in publisher instance with out opening a tunnel?

    Hi, In General we are running garbage collector in publisher by opening a tunnel. is there any alternate way to do that. we installed adobe cq5 on solaris10. thanks, vidhyadhar