Order Dates in production order

Iam having common routing for two materials in same plant.
I use leadtime scheculing in MRP for both materials.
Iam using MTO scenario.
Iam getting production dates as per routing dates for one material and basic dates for other materials.
i want routing dates . Iam using different order types
Please advice how to get it
Edited by: mayuresh  bhurke on Jan 17, 2009 9:44 PM

Hi Mayuresh,
1.What level MRP run is carried out (ie MD01 or MD02)
If you run MRP in MD02 have you selacted Lead time scheduling indicator.
2.Check the selaction indicator for Both material and make sure that both are maintained same.(incase of using Production version) Because routing and BOM selection is based on this indicator only.

Similar Messages

  • How to change operation dates in Production Order /Capacity Leveling

    Dear Experts ,
    We are using ECC 5.0 .In production order , scheduling happing as Backward  based on the Sales Order Delivery Date .I am doing the following :
    1.Demand as Sales Order with Delievery date : 20.03.2010
    2.Running MRP with Lead Time Scheduling -2  in md02 and converting the Planned Order to Production Order .
    4.Production Order have following dates :
             Basic Finsish Date : 21.03.2010
             Basic Start : the day Pl.Or--Pr.Ord
             Schedule Start : 15.03.2010
             Schedule Finsish : 17.03.2010
            Schedule Release : 13.03.2010
    5.In schedueling margin key :  Float Before Production : 3    , FAP : 3 , Release Period : 2
    6.In material master : Work Scheduling View : Setup : 3 days , Processing : 4 ,Interoperation : 2 for one Base Qty 1
    7.In operation : Op1  : Start Date  : 15.03.2010    Finish Date: 15.03.2010
                             Op2 : Start Date : 16.03.2010      Finish Date : 17.03.2010
                             Op2 : Start Date : 17.03.2010      FD : 17.03.2010
    Question :
    1.How to change the Operation dates  in Production Order Operation over view screen ? Today,  operation over view screen , Start date and Finsih Date  of individual operation are not changable with in Production Basic Start /BF date  or beyond .It is only changing based on the Standard Value : Labor
    2.How to change/re-schedule operation dates d in CM21 (Graphical view -Work Center Capacity load as per   Production Order and Operation combination ) based on capacity availale in advance dates? I am using  Time Profile : SAPSFCZ002 -SFC Graph midterm-3 motnhs and Planning  ,
    How to solve this above issue in scheduling operation and capacity distribution .
    Regards
    JH

    Closing the thread

  • How to get change date in Production Order ?

    Dear Friends,
    I want to know it, how to get change date in Production Order "Administration-TAB".
    F1-Help, It is displayed with "Change date for Order Master". and Structure table "CAUFVD".
    But, CAUFVD is not Transp. Table.
    Which table should I read ?
    Thanks in advance
    Yamazaki-H

    Dear Friend
    Thank you for an answer.
    It was settled.
    Best regards.

  • How to collective read PP master data in Production order?

    Hi: Guys
    Please tell me how to collective read PP master data in production orders. in COHV, I can find out some collective functions but read PP master data.
    Thanks
    Henry

    Read PP master data is only to update routing and BOM in production order if it is already created to effect the changesmade in routing and BOM.    I think in that collective option is not possible.  
    Regards
    KrishnamurthyDSS

  • Bapi for update Master Data in Production order

    Dear All ,
        I am working in a car manufacturing company here production order is made month wise planning qty , but every day its Bom is get changed by Autocad/PLM interface and all changes are being recorded through ECN .
       I have to  generate daily reservation for assemblies for a perticular finish vehical ,so I need to update the Masterdata in production order no through the PLM( VB platform) interface .
      So please suggest me any BAPI so that I can update the master data regular basis in monthly production order  or if you have any better way to map this process into SAP please suggest .
    Thanks in advance .
    regards ,
    Pralay ..

    Not sure what master data in production order you want to change. Anyway if it is at header level, then evaluate BAPI - BAPI_PRODORD_CHANGE.
    Alternatively evaluate the usage of Order Change Management if it is feasible in your solution. Do a search in this forum you will find many threads on it, also read SAP help & do a test a test in your sandbox. If you face a specific issue then do revert

  • Sales Order Conversion to Production Order

    Dear All,
    I am from SD and have a doubt reg SD - PP ...
    If i have 3 sales orders and each sales order has 3 line items. Now i need to make a production order --- the production order to have 1 line item from each sales order so in all 3 production orders for the 3 sales orders and each production order has 3 line items and each line item is from diffrent sales orders i.e as above 3 sales orders.
    is it possible and how ?
    I am awaiting for a suitable solution ASAP...
    Thnks
    krishna

    Hi,
    In PP always 1 production order is for only 1 product ( if no co-product is added in BOM).
    In your scenario, If the PP settings & master data are maintained perfectly.
    System will create 9 production orders ( this may vary with respect to the lotsizing procedure used).
    Reward points if useful
    Thanks & regards
    Mahesh babu
    Edited by: Mahesh Babu MG on Jan 30, 2008 7:19 PM

  • Question about the rescheduling of a Sales Order and its Production Order

    Hello Everybody,
    I experience something strange with the rescheduling of a Sales Order and its corresponding Production Order.
    It will be easier to explain with an example...
    For a material, I have created a Sales Order.
    And from this Sales Order, I have now a Production Order converted from a Planned Order generated by the MRP Run.
    This is what I have in transaction MD04:
    SALES ORDER
    AV DATE: 20/02/2008
    GR DATE: 20/02/2008
    PRODUCTION ORDER
    AV DATE: 20/02/2008
    GR DATE: 18/02/2008    (GR process time is 2 days).
    ==> OK !
    Now, I have to reschedule the Sales Order one week sooner.
    SALES ORDER
    AV DATE: 13/02/2008
    GR DATE: 13/02/2008
    After transaction COHV to reschedule the Production Order, I have:
    PRODUCTION ORDER
    AV DATE: 15/02/2008
    GR DATE: 13/02/2008
    But I expected to have:
    PRODUCTION ORDER
    AV DATE: 13/02/2008
    GR DATE: 11/02/2008
    Do you have an idea about what is wrong?
    Thanks in advance for your help on this subject.
    Regards,
    Rudy

    Hello.
    Thank you for your reply.
    But in fact, I am doing some tests on a test platform, which is using an "old" copy of production database.
    So, there can't be data already scheduled for the dates I am using.
    Moreover, I just tried now to do the same with dates in November 2008, exactly with the same results.
    In production platform, they experience this problem too.
    Summary of my new test:
    Before rescheduling:
    SALES ORDER:
    AV. DATE = 20/11/2008
    GR. DATE = 20/11/2008
    PROD. ORDER:
    AV. DATE = 20/11/2008
    GR. DATE = 18/11/2008
    After rescheduling of one week sooner:
    SALES ORDER:
    AV. DATE = 13/11/2008
    GR. DATE = 13/11/2008
    PROD. ORDER:
    AV. DATE = 15/11/2008  (ipo  13/11/2008)
    GR. DATE = 13/11/2008  (ipo  11/11/2008)
    I really don't understand why I don't have the same kind of dates as the ones I get before the rescheduling...
    In my mind, I expect to have all these dates set back of one week...
    Regards
    Rudy
    Rudy

  • Sales Order Text to Production Order Text

    Dear Experts,
    When creating a sales order in VA01, I added in some comments in the item level Texts tab.
    How can I configure the system so that when a production order is created from this sales order, the comments entered in the sales order will be automatically populated in the Long Text tab of Production Order header.
    This is because during the creation of sales order, there may be certain comments and/or instructions that need to be passed to the production line. We want the texts to flow through to the production order automatically.
    Any ideas?
    Thanks in advance.

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • BAPI - Goods receipt and then create transfer order for a production order

    Hello Everyone
    We need to do goods receipt and then create transfer order for a production order (Material for WM scenario)
    We are using BAPI 'BAPI_GOODSMVT_CREATE'
          i_items-orderid = wa_afpo-aufnr .
          i_items-order_itno = wa_afpo-posnr.
          i_items-mvt_ind = 'F'.
          i_items-stge_loc   = wa_afpo-lgort.
         i_items-stge_type = '901'. "wf_styp.
         i_items-stge_bin = wf_sbin.
          i_items-entry_qnt  = wf_qty.
          i_items-entry_uom = wa_afpo-meins.
          i_items-entry_uom_iso = wa_afpo-meins.
          i_items-batch      = wa_zmobtag-charg.
          i_items-move_type  = '101'.
          i_items-move_reas  = wl_3131.
    We are passing i_items (like line of goodsmvt_item) along with other parameters to BAPI and its creating material document and Transfer order automatically. Problem is the TO created is showing destination storage bin as default storage bin( from material master).
    The field goodsmvt_item-stge_bin is just changing the Source bin details. There is no field for bin in the BAPI so that we can change the Destination storage bin as per our requirement.
    My requirement : Creating material doc and then TO. Material should move to specified storage bin.
    Please let me know any alternate way( No BDC) so that my requirement is achieved.
    Regards
    Swetabh

    Hi ,
    can u check these fields ,
    STGE_TYPE_PC     UBTYP     CHAR     3     0     Storage type for transfer posting
    STGE_BIN_PC     UBPLA     CHAR     10     0     Storage bin for transfer posting
    Regards
    Prabhu

  • Download Maintenance Orders instead of Production Order in SAP IM-3.2

    Hi All,
    I am trying to fetch Maintenance orders instead of production order in syclo agentry IM-3.2
    In the receipts screen their is a button GetProdOrder which fetches the Production order,instead of fetching the Production Order i want to change it to fetch the Maintenance Orders.
    please suggest me steps for the above change.
    Thanks ,
    Deepak.M
    Tags edited by: Michael Appleby

    Deepak,
    I don't think this will be easily accomplished.  The BAPI is written specifically for production orders.  I believe it would require changes to the BAPI itself, or changing the java to point to a different BAPI.
    Jason Latko - Senior Product Developer at SAP

  • Copy purchase order text to production order text

    Hello,
    purchase order text should be copied to production order text so that the end user can see and edit the text before saving the production order. I'm trying to do it with exit PPCO0006. I can read the purchase order text with read_text but cannot show it on prod order long text tab page. And cannot save it because the production order does not have a number yet.
    How should this be done? If I copy the text to clipboard can it be pasted to production order long text somehow? Or is there a long text object in production order which I could call and insert the text in it? Or what?

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

  • Updating Sales Order no in Production Order

    we have csenario for Sales Order :  Inquery - Quotation - Sales Order .
    In PP we have MTO scenarion . when i run MRP and convert the plan order to Production Order , in place of Sales Order it was updatin Quotation in Production Order .
    we have checked SD config for sales doc Item category =TAC and in Material Master we will used Item Category = NORM
    Please suggest is there any other setting for updating Sales Order no in Production Order .
    Thnx.

    Hi,
    I assume that you are using the strategy 20 (MTO). Go to OVZG here select the class 040 Indiv.cust.w/o cons., keep BLANK for account assignment consumption and rerun the whole cycle and check.
    Thanks
    Hrishi

  • Transfer Order number for Production order

    Hi,
    what is the best way to get the transfer order number (LTAK-TANUM) for picking for a production order?
    Picking can occur first in IM (via MB1A for example) or in WM (via LP10). Requirement Tracking Number cannot be used as it has only a length of 10 characters (production order number up to 12 characters).
    Reservation number (LTAK-RSNUM) is only filled in case picking is done from IM first.
    Cheers
    Mathias

    Hi,
    how are other companies handling this if they want to pick from the warehouse (e.g. using CO27) for a production order and the production order number has 12 characters? The bin (LTAP-VLPLA) and the requirement number (LTAK-BENUM) only have up to 10 characters.
    Is there a standard way in SAP to print out the complete 12 character number on the picking list? I could not find another field where the production order number appears.
    P.S. There are already some production order types in use that have a number range with 12 characters.
    Cheers
    Mathias

  • Sales order field in production order

    Hi Gurus,
    I see there is a field sales order assigned to production order. In my scenario when we create a sales order production order gets created automatically in background due to the strategy group. So in production order, i see a field sales order and also i can see the sales order number in that field which is fine.
    But when we create a sales order with reference to quote, then in production order i see the quote number displayed in sales order field in the production order.
    My client wanted to have sales order number rather quote.
    Please suggest.
    Thanks,
    Quantum.

    Hi,
    Please note that if sales order stock has already been assigned to a quotation, the stock of the resulting orders is also managed under the quotation number.
    If you require to tag the sale order no to the production order then define the requirement type not as the make to order. This you can control at item category level also. While for sales order make requirement type make to order related.
    While doing so please note that you have to use the special rule to determine the requirement type which will based on the item category and mrp type.
    Hope this will help you.
    Thanks and regards,
    Atul