Order not scheduled according to allocations

What does an order not scheduled according to allocations mean?
Edited by: Anurag87 on Dec 1, 2010 12:13 PM

hi,
as for as my understanding goes:
you have product allocation feature according to that,  against the sales order allocation is not happening ?
in standard scenario,  if once goods are release by PP consultant it will come and fall in UNRESTRICTED USE with that if i create a sales order first it wil get reserved against  the sales order & you can see the same in SCHEDULED FOR DELIVERY beside it.
basing on your query,
i think so product allocation has failed in alloting the material against the customer or region.
please check this and confirm
balajia

Similar Messages

  • Production and planned order not scheduling

    Dear Experts,
    Created new plant ,scheduling parameters,order type parameters ,confirmation parameters.
    Scheduling parameters: Detailed Scheduling ,Forward etc.
    created BOM, Routing,WC.
    Maintained Work center Scheduling Tab formulas entered,Routing Machine,setup time entered.
    System showing at the of creating production order Scheduling Start time and end time is same.
    scheduling not done in production order.
    Anyone explain process for scheduling
    Regards,
    Naresh Reddy.

    Hi Naresh,
               The problem is mainly due to the work center scheduling formulas only. Maintain the scheduling formulas as SAP001 for setup and SAP002 for machine. In OPU3 check the automatic scheduling check box, adjust dates as 'adjust basic dates , adjust basic requirements to operation date' and recreate the production order.
    Let me know if u are still facing the same problem after doing these settings.
    Regards,
    Krishna Chandra

  • Delivery schedule update in stock transfer order not works

    Hi All,
    Have the following problem:
    I have STO from plant A to B.
    Delivery Schedule tab contains information based on production orders in plant A. In case of production order was re-scheduled earlier, the respective update is not uploaded into Delivery Schedule tab in STO, while if the same production order re-scheduled to later date, then updated dates are uploaded to Delivery Schedule tab correctly.
    If anyone knows what settings or workaround exists to resolve such problem?
    thanks in advance,
    Regards,
    Andrey

    Hi, Harsh Panara ,
    1. Is this problem reproducible? If yes, you may need to create a message for it in service market place.
    2. If this is only a single case, you can re-create the EKBE (po history) entry via report ZCREA_EKBE. Please check SAP note  433505.
    3. Regarding the GR document and document flow, this is related with how you post the GR. If you post GR in MIGO with reference to the outbound delivery, it should be updated to the document flow. How did you post it?

  • Planned order does not schedule as per Recipe

    Hello,
    I am working on ECC 6.0 at client site & need your help.
    The recipe with all the relationship between various phases/ operations well defined has a total production time of around 2 months.
    As the client wants planned order to read recipe lead time rather than material master lead time, we are running lead time scheduling while running MRP.
    However it seems that system is not reading the Recipe relationship (sequencing) between operations. Have checked the config settings & they seem fine. So in the planner order all operations are starting on same date ( instead of 1 operation after another ) & lead time in planned order is around 2-3 days. The same planned order when converted to PRocess order does read recipe lead time & schedules for 2 months as per recipe. So do not see any issue with Recipe master.
    I remember that in earlier versions like R/3 4.7 at other clients, Planned order did schedule correctly.
    Can you please check in your SAP system if Planned orders read Recipe correctly & schedule correctly as per lead time( when MRP runs with lead time scheduling).  I am suspecting if it is a bug in ECC 6.0.
    Thanks in advance. Helpful answers will be awarded.
    Ram

    Hi,
    Cehck The scehduling formulas, and Relations ship which you are maintaining check the sequence.
    In Material master SMK, and inhouse production.
    These settings to be check.
    Thnks and regards
    E.Rambabu

  • Make to order production - schedule line not confirmed

    Hi,
    I created a  " make to order production " having few normal materials & few supersession materials.
    created PO, GR,invoice, all done.PO is updated in sales order.
    Schedule line is automatically confirmed for normal materials, but not confirmed for supersession materials.
    can anybody tell me , how schedule line can be automatically confirm for supersession materials.
    Thanks.

    Is your scenario a third party one? After you finished GR for the PO, have you checked inventory of those materials? But I still didn't understand what's difference between new material and "supersession" old one? New for what and old for what? Could you be more specific or any example will be helpful.

  • ASCP not Scheduling Orders

    Hi All,
    ASCP is not scheduling order on Customer request date though we have ample of supplies. ASCP is scheduling order on the 91st  day and not on the Customer Request date.
    We checked ATP Flags, Calendars, Sourcing Rules etc are correct.
    Pls suggest what can be the issue.
    Regards,
    Ankit Gupta

    Hi,
    Can you check the value infinite supply time fence in the ATP Rule tagged to the item and also check the demands if they already consumed this supply and now you are experiencing ITF scheduling.
    Thanks,
    Abhishek Sharma

  • 3rd party order not appearing in billing due list

    Any 3rd party sales order is not appearing in VF04. all the copy control configuration is standard.
    i checked many SAP notes. we are able to update the status by using SDVBUK00 program but that cannot be run for all the days. any idea if there is any other root cause?
    when we check the status of the field VBUK-FKSAK it is blank. when we run the program SDVBUK00 it changes it to the desired value of A.
    Edited by: Nimit Kaul on Nov 8, 2010 1:44 PM

    Did you check the below OSS notes? Also check the allied notes in it.
    1)  Note 210500 - Billing status of a third-party item
    2) Note 210561 - When is a third-party item displayed in VF04?
    Per this notes, check the item relevance for billing in t.code VOV7 and set the value as B - order related in accordance with order quantity or value as F-order-related in accordance with invoice receipt quantity and check.
    Regards,

  • SNP Planned order not following resource bucket capacity/factory calendar

    Hi gurus,
    SCM 5.0
    I am running SNP heuristics for a product and expecting planned orders for it.  It has corresponding production data structure and multimixed resource.  The resource has an assignd factory calendar and SNP bucket capacity.  The bucket capactiy availablity dates of the resouce is consistent with the factory calendar workdays/holidays.  Using simple lot for lot strategy, I am expecting heuristics to schedule the planned orders on the dates of the demand in compliance with teh SNP bucket capacity availability of the resource.  APO does not schedule on holidays consistent with bucket capactiy.  This is true until...
    We have a public holiday in factory calendar that needs to become a workday. To remedy this, we put a special rule for the factory calendar and explicitly made that holiday into a workday.  The changes were synchronized with APO, and this is also reflected in the bucket capacity of the resourc: former holiday now has bucket capacity after the calendar change.  However, when running heuristics, it still does not create SNP planned order on that former holiday that has been changed into workday.  Even if it is a public holiday, there is already a special rule for the factory calendar and the resource bucket capacity reflects this correctly. But SNP heuristics seems not to follow this change.
    Any ideas on this? looks like a bug.

    Hi Edgar,
    Yes, when your resource reflects the addional capacity of the holiday turned working day, then it is expected to be considered for the SNP planned order.
    Instead of SNP heuristics, you may try to check interactively in SNP planning book, if manual order creation in the bucket works out.
    Since this is a mutlimix  resource , it can also be checked if in PPDS planned order can be created on the day.
    The above checking may not solve your problem , but will get to know if at least manully the bucket is being considered or not.
    regards
    Datta

  • Sales order not reflecting in the stock reqmt list

    we have a MTO scenario.after the sales order is created we are not able to see the sales order in the stock requirement list.kindly please help.

    Hi
    following are the reason
    1) Check requirement type in sale order and strategy group in material master.
    2)if reason for rejection is activated  in sales order.
    3) cancel the sale order
    4) schedule line category should be  CP in sales order
    Edited by: surendra patil on Dec 29, 2008 7:30 AM
    Edited by: surendra patil on Dec 29, 2008 7:33 AM

  • Purchase Order not subject to release strategy for contract rel. strategy

    Hello, I am trying to set release strategy for contracts (TCODE: ME31K). I have created characteristic, which use table CEKKO and field name BSTYP in Addnl data tab. I have checked values, and they are correct. Then I have assigned in release strategies in classification view value contract. But when I try to check release strategy in ME31K with green flag, it display error: Purchase Order not subject to release strategy. (I have tried to do the same strategy in purchase order, of course with value Purchase order, and it works nice).
    So I have checked this release strategy with this codes:
    CL24N ok,
    CT04 ok,
    CL30N ok,
    CL20N ok,
    Release simulation in release strategy works,
    Then I found out that I should check SE38, SE37 but I do not understand how to use them (according: Purchasing Document Not Subject to Release Strategy).
    Thank you for your help in advance.

    I haven't said to use EKPO table in characteristics. You have to use CEKKO - BSTYP in characteristics.
    I've just said the compare the value which you have given in Release strategy - Classification and EKPO table for the particular contract.
    Also compare your release strategy settings with many existing documents in SCN.
    Check your Classification should be like that.
    You may see the error message in ME31K. Just save the contract then go to ME32K/ME33K or ME35K you can see the release strategy will effect for the contract.

  • Process order - Forward scheduling

    Hi,
    I need a clarification on scheduling in process orders for below mentioned scenario:
    SO is created for a future date
    MRP run
    Planned order is created (scheduling for planned order not done)
    Planned order converted to Process Order
    My query is how the dates of process order will differ in case of forward schduling.
    whether start date of process order will be as per basic start date of planned order or the start date of process order will be current date?
    regards,
    Mohit

    Dear Mohit
    Converting a Planned Order into a Production Order
    If material requirements planning has already created a planned order for producing the material, the basic dates are copied from the planned order and the order start and finish dates are determined in a new scheduling run. If necessary, reduction measures are carried out.
    Creating a Production Order Manually
    If no planned order exists and you create the production order manually, the scheduling type determines which basic dates you have to enter.
    If you enter both basic dates, the system tries to adhere to these dates when carrying out forwards or backwards scheduling. If necessary, the system also carries out reduction measures.
    Regards
    Sachin

  • Stock tranport order with scheduling agreement

    Hi All
    i am trying to do Stock transport order with Scheduling agreement within company between two plants like 1) 2008 2) 2009
    2008 :--- supplying plant
    2009:---- recieving plant
    maintain same material in both plants & created Scheduling agreement with document as LPU. i would like to get 1000 qty material every month so trying to run MRP for same material so where i can release my STO from receiving plant (2009) & send STO order to plant 2008.  while running MD03 getting error as :
    for  material ( 1008 ) not maintained automatic MRP
    please tell me what do next step to solve error
    thanks n advance

    Did you maintain the MRP data in the material master for this mateiral and special procurement key needs to be maintained for this mateiral in MRP 2 view (from plant)

  • Change in  item category  and  settlement of  old sales order not possible

    Hi
    I   have to settle   sales orders  in VA88 and  transfer data to COPA.   I  want to do   directly  without  result  analysis. So, in the  item category, I  removed the result analysis key.   And  the  settlement  goes thru.
    My issue is that  there are  orders in  July 2010  which  have to be settled,  but  it  does not work since the  changes in  item category has  happened  this month in Aug 2010 and  the  July  sales order are also  invoiced.
    Pl  suggest a  solution  to  settle  the  July  sales order  to COPA.
    Thanks
    kamala

    Hi Kamala
    I see only one possibility... The old sales order consists of some GL accounts posted in it which is not mapped in the allocation structure...
    Alloc Str has 2 parts - i.e. One, it consists of a group of cost elements it has to handle and Two, it consists of the valid settlement receivers like PSG, CTR, etc
    You say, this alloc str works well with new sales orders.... The 2nd part of alloc structure (i.e. valid receivers) applies equally to all sales orders.. But what can really differentiate the 2 sales orders is the cost elements posted on it...
    I dont foresee any other posslbe reason
    Regards
    Ajay M

  • Error during scheduling in product allocation

    Hi ,
        I am trying to do product allocation in ECC and i  most of the steps, when we try to do sales order it give me an error " Error during scheduling in Product allocation"
    Please let me know
    Thanks in Advance
    Regards,
    Kumar

    Go through this thread
    [Re: Process Product Allocation |Process Product Allocation;
    thanks
    G. Lakshmipathi

  • "difference between sales order and scheduling agreement "

    hi, 
    i want to know difference between sales order and scheduling agreement and where use scheduling agreement & where sales order ?
    please help
    amit

    Hi Amit,
    Its not hard to find this info at help.sap.com
    Sales Order
    Definition: Request from a customer to a company to deliver a defined quantity of products or provide a service at a certain time. The sales area that accepts the inquiry is responsible for completing the agreement.
    Scheduling Agreements
    Purpose
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity. The following graphic shows the document flow for scheduling agreements.
    Integration
    You would use this component if you had outline agreements with the customer that contained future delivery quantities of materials that would be sent at certain times within a fixed time period.
    If you work with scheduling agreements for the component supplier industry you also need to choose the "Electronic Data Interchange" (EDI) component.

Maybe you are looking for

  • Husband updated my iphone to iOS 5 and now I have lost all contacts, photos, texts, everything.  How do I restore them?

    Husband updated my iphone 4 to iOS 5 and now I have nothing, no contacts, no calendar, no photos, no texts , How do I get them back?  I am lost without them.  Feel like my phone is now just a phone.

  • Getting help text to show on fillable form

    Hi all, This might be really simple but I've created a few forms in FormCentral and I've included the 'help text' on a few fields. When I save the form as a PDF and open with Adobe reader, I get the purple bar across the top stating 'Please fill out

  • Check for older version of GUI

    Hi Gurus, I created the SAP GUI installation server using NWCreateInstServer.exe. And I created SAP GUI Package with NWSAPSetupAdmin.exe. So far, everything works fine. We are planning to push this self installer with the windows patches in the netwo

  • How to check against which no GR done??

    We allow IR to be done without GR. But this way, many PO accumulate in which no GR is appearing but IR is already done. We have no tracking mechnism to identify such POs. We look manually in each PO whether GR has been done or not. Is their any stand

  • DW CS3 - open browser window issue

    I've set up some text links to open a new browser window and it's working fine. But - the original page (from where the link opened the new window) is also loading the same page as the new window. I want the original page to remain unchanged. What am