Order reservations
hi,
this is a urgent requirement plz give possible reply
An assembly in plant 0001 contains two components. Component 2 in plant 0001 has the special procurement key Withdrawal from alternative plant with the issuing plant 0002. This defines that this component is to be withdrawn from plant 0002. Therefore, when producing the assembly in plant 0001, component 2 is withdrawn from the plant 0002 but the other components are withdrawn from plant 0001.
i am getting dependend requirements in isuuing plant 0001and 0002 by mrp run
but when iam raising production order manually order reservations are not getting generated in plant002 .
why this happens ,whats the diiference between PIR ,dependent requirements and order reservations.
why only PIR dependent requirements are getting transferd and why order reservations are not getting transfered in plant 0002
plz suggest possible anwser
sasikanth
Hi sasiaknth,
Order reservation will be created in issuing plant for components if u create production order manually.
Plese check the "Plant"assigned in for the 2component in the "Component Overview" of the Prodution order.if it is 0002, order reservation will be created in at 0002 .
When u Run MRP Based "PIR" (Demand) for Header Material, Planned order will be created with net requirement qty for Header Material, and "Dependent requirements "will be created for BOM components.
If u convert the planned order to prod order , Dep requiremenst of component will be converted to "order reservation"
when convert planned order to prod order. issuing plant (0002) will be copied from planned order results in MRP.
Please try and comeback
Regards
Pradeep.
Similar Messages
-
Order reservation should not get planned in mrp run
Hello friends,
Actually for a finished material i have created one production order by CO01.Because of it for semi finished material system created order reservation.I dont have any stock of semi finished material.Now i want while running the mrp run system should not planned this Order reservation of semifinished material.For these in configuration of availability check (Scope of check T.C OPJJ), I made the settings that system should not consider reservation (i deactivated the tick for include reservation) and for include depend reservation , i selected Donot check.And all these settings i made in checking group 02 and checking rule PP.After doing all these settings than also system is considering the order reservation for semifinished material and generating the planned order for it.
Do i need to do any other configurations?
Thanking you guys in advance.Hi Jitendra,
Checking Control (OPJJ) has no relation with MRP.It is useful in the case of Plan and Production / Process Order only to find out Missing part.
Now come to MRP again.
You have a choice of only 3 type of stocks to include or exclude them during MRP run while rest of the things like (PO,PR,Reservation etc are consider by default)
Go to OPPQ and after selecting Plant go to Available Stock.You will find that options,
- Stock in Transfer
- Block Stock
- Restricted Stock.
And one more thing Reservation is not a available stock but its one kind requirement and if there is no stock then system will activate the Planning file entry and during next MRP run it will generate Planning proposal also.
Regards,
Dhaval -
MRP Planned order generation for Order reservation excluding Dependent Requirements
In our Project we have a requirement like for FG stage & SFG1 stage are M.T.O So after sales order are punched through MD50 we have created Planned orders against sales orders,But dependent stages like SFG2 & SFG3 which are pure M.T.S so only Dependent requirements will get generated.Suppose for SFG1 i have partially converted planned order to Production order then for component SFG2 we get Partial Quantity as order reservation.Now requirement is if i run MRP for SFG2 system need to generate demand only for order reservation excluding Dependent requirements.Is there any possibility where we can generate demand only for order reservation.As system will create Planned order for SFG2=Dependent requirement + Order reservation
Hi Uli,
Suppose i have Sales order--100 kgs for FG
B.O.M levels
1.FG-----M.T.O
2.SFG1---M.T.O
3.SFG2---M.T.S
4.SFG3---M.T.S
5.ROH
So if i run MRP via MD50 system would generate planned orders for FG & SFG1 level as they are M.T.O specific
Now my requirement list would be
FG-100kg planned order
SFG1-100kg planned order
SFG2-100kg dependent requirement.
Now suppose i have partially converted SFG1 planned order to production order
SFG1--100kg planned order to 30 kg production order
Now my requirement list would be
FG-100kg planned order
SFG1-70kg planned order & 30 kg production order
SFG2-70kg dependent requirement & 30kg order reservation.
Here my requirement is if i run MRP for SFG2 in MD02 as these stage is M.T.S system should provide 30 kg planned order & if we see down the line it would be like
Now my requirement list would be
FG-100kg planned order
SFG1-70kg planned order & 30 kg production order
SFG2-30kg planned order & 70kg dependent requirement.
SFG3-30kg planned order
ROH-30kg Purchase req
Client requirement is like these.. -
Link between maintainance order reservation and pur requisition
Dear Experts,
I need link between maintainance order reservation number against a materials and purchase requisition raised against it.
Basically requirement is that i need a report in which i can c the purchase requisition against the materials of maintanace order..
Please help me out
Regards,
Vishalhey somebuddy will plz help me out ...
-
Production Order reservation(ETO) not deleting after PGI (VL01N)
Hi All,
Greetings!!!
A query, regarding ETO (Project system)
ETO scenario, For production, reservation will be create through WBS element. After production , If I do delivery and PGI, production order reservation is not deleting.
Same material If I do delivery(LP) through CNS0, then order reservation is going to delete after PGI. But Sales order price is not copying to Billing If I follow this process.
Is there any copy controls to flow the sales price to billing when delivery happens through CNS0. If not
Which requirement class and movement type I need to determine in Sales order.
Please do needful.
Very High,
Thanks,
Prasad.This is standard SAP
SAP process is to deliver project stock using project delivery , where in PGI happens against the reservation created & deletes RESERVATION.
wherein if you do PGI for order ( sale order or prod order ) , it happens against project stock ( spe stk Q - 281 movement ) i.e., against WBS element
I faced the same for sale order delivery of project stock .
we are selecting FINAL Issue indicator through user exit which triggers when PGI is clicked
This will delete RESERVATION from stock overview
hope this helps ...Let me know if you found any alternative -
Production Order reservation deletion.
Can I delete the production order resevration directly in the other than active version in apo ?
Hi,
You cannot delete the production order reservation using standard deletion transactions but a BAPI can be used for deleting the prod order reservation. Existing functionality enables deletion of planned orders.
Regards
Vinod -
Delete production order reservations
Hi SAP GURU,
we have reservations open for process order and the order is marked for deletion. We are not able to display that order, but we can veiw that order in table.
so can you please suggest how to cancel/ delete the order reservation.
Thanks,
SAP PQ....Dear SAP PQ,
Do you mean to say the order status is DLF and you are not able to see the process order using COR3?
If your query is for the deletion flag set process orders,still you are able to see the reservations at table level means,it's a normal
behaviour.But you cant perform any GI using this reservation number related to the process order.
In order to completely delete this data from the system means, the actual deletion process is then performed by a reorganization
program.
Check and revert
Regards
S Mangalraj -
Reg Order reservation not deleting after PGI (VL01N)
Hi All,
ETO scenario, For production, reservation will be create through WBS element. After production , If I do delivery and PGI, production order reservation is not deleting.
Same material If I do delivery(LP) through CNS0, then order reservation is going to delete after PGI. But Sales order price is not copying to Billing If I follow this process.
Is there any copy controls to flow the sales price to billing when delivery happens through CNS0. If not
Which requirement class and movement type I need to determine in Sales order.
With regards,
Prasad.
Edited by: SDGURU on Feb 9, 2011 10:50 AM
Edited by: SDGURU on Feb 9, 2011 10:51 AM
Edited by: SDGURU on Feb 9, 2011 11:14 AMHi All,
Please do need full.
Regards,
Prasad. -
Order Reservation Withdrawable (OrdRes(W)) in SNP
Hi Gurus,
I have this big question ... For one specific product the PPDS people can see order reservation withdrawable (OrdRes W), but I do not see the orders. When I run my optimization, the system considers the stock as available.
How should I consider this category? I'm using a planning attached to a planning area 9ASNP05
Best Regards
-Italo.
-
Link work order Reservation to a PR
Hi All,
I have a requirement,were in i have to create a PR from a work order reservation(IW32 components tab) using a custom program.As of now i am using the FM BAPI_PR_CREATE to that but i am not able to link the Reservation to the PR.
Please let me know if there is any BAPI to achive the same.
Thanks in advance.
Regards,
Ram.Hello Goldie,
you have to update field AFVC-TXTSP with the language in which you have created the text with SAVE_TEXT. Key of the AFVC are AUFPL and APLZL - the same you use to create the longtext. In IW37 only a "X" will be show, if a longtext has been maintained.
Best regards
Stephan -
SCE for Sales order reserved Stock
Hi Friends,
During the SCE in CK40N, it is working fine for all materials except Sales order reserved stock. It is not updating the prices of Sales order stock prices in accounting view and not making valuation on the basis of new prices in MB52 stock report.
Can you please provide me the solution so that we can get the valuation of Sales order reserved stock(MTO) updated by SCE run.
Rgds, Krishan RahejaDear Friends,
Requested for your kind help on the matter.
Rgds, Krishan Raheja -
Dependent requirement v/s order reservations
Dear Guru's,
Could you please explain me the difference between dependent rquirement & order reservations? As we check MD04 for any material we could see both for same material & both requirements are coming from upper or header material.
Reservations are done against production order & dependent requirement is generated due to the requirement at header material. Please explain in detail.
Regards,
SAP CONSHi,
Dependent req. are generated by o planned order (for its components), whereas order reservation are ceated by production orders (for its components).
One sets the other off, as planned orders are converted into production orders.
You see both in MD04, since you may have both planned and production order for the upper level material at the same time.
Regards,
Mario -
Order reservation cancellation
Dear All,
How to cancel the order reservations collectively.
Regards,
AnilHi Anil,
You can try the correction program
Go to SE38
give program name :RM06C020
Give the reservation numbers
click check bom select reservation
check direct database update and execute.
This will delete the reservations from the database.
THIS SHOULD BE DONE CAREFULLY and test in your test system and proceed
I have done PR deletion . but i have not done for reservations
Regards
Ranga -
Daily distribution of Order Reservations
How do I get order reservations distributed to daily requirements instead of total requirement at the start of a production order?
Hi,
For Internal Orders another mechanism of allocation, called 'settlement' is applied. You cannot include IO in your cycles as a sender (only as a receiver). You can read more about settlement here:
http://help.sap.com/saphelp_47x200/helpdata/en/a9/ab7f68414111d182b10000e829fbfe/frameset.htm
Regards,
Eli -
Problem Delivery order & Reservation
Dear Guru,
I have problem about Delivery order & Reservation.
I've opened Delivery order using TCode VL01N and will goods issue on another day.
After that I am creating reservation(MB21) which I can be goods issue before the Delivery order.
So, Stock is not enough for the Delivery order.
I'd like system to check stock before goods issue by reservation.
Anyway, I try to config using TCode OMB1 (Movement type 201 -> Dynamic avail. check = B ).
System will be alert error message when I have determine batch both Delivery Order and Reservation.
In case stock is not enough for the reservation include to prevent stock for the delivery order , I'd like system show message everytime although I don't detemine batch both delivery order and reservation. I mean that system 'll protect stock for delivery order after that reservation can be goods issue.
Please sugguest me how to solve this problem.
Best Regards,
Horoda
Edited by: nrokarad on Aug 13, 2010 4:51 AMDesign Time Package name prefixes are normally in the form com.mycompany. They are used to restrict the Java package names that can be used.
You can find these in the Development Configuration perspective: Browse your DC: DC Metadata -> DC Definition -> Package Names.
Are you using a local Web project or a Web Module DC? -
Questions About Pre-Ordering/Reserving the iPhone 4?
I know on June 15th you can pre-order/reserving an iPhone 4. I am a bit unfamiliar with the pre-ordering process.
If you can pre-order and pick it up in the stores, does that only mean it guarantees you one on launch day? Also on launch date will there be a separate lines for pre-orders and non-preorders? (So pre-orders go in the store first?)
And if you reserve the iPhone 4 in store pick-up, do you have to pay the whole thing, or just put a certain amount down?
I doubt if anyone knows this question.
What time do Apple Stores open when the new iPhone 4 comes out? I bought my iPhone 3GS last year at launch at AT&T and they opened at around 7 I think, which I read is the same this year.
I'd rather deal with Apple. Do they open around 7 A.M to too?rather not deal with the crazies and people, id order online and get it shipped to my front door. check with your local Apple store for business hours. i remember att opening a little earlier on launch day for the 3GS, idk about Apple though? id asume both will run it alot smoother for everyone.
Maybe you are looking for
-
When I went to the website suggested in the forum to download the older 3.6 version of Firefox, there was nowhere I could click to download this older version. Firefox recommends and had a place to click on downloading 4.0. How can I get the best of
-
I have Mac with Leopard 10.5 and want to connect my iphone 5 but it needs to have version 10.7 of itunes. I cant install itunes because the latest mountain Lion software 10.8.2 wont install and I dont know where to find 10.8. What am I doing wrong
-
When I put the following code and run it in a browser it works without issue var monthstart = '05'; var monthend = '06'; var daystart = '1'; var dayend = '25'; var monthweeks = new Array('4.43','4','4.43','4.3','4.43','4.3','4.43','4.43','4.3','4.43'
-
Illustrator CS6 Mirror or resize -100% messes up my offset path gradient stroke.
When I try to mirror a graphic using offset path to a gradient stroke(I use offset path so I can use "Apply Gradient Across Stroke" option) or use resize and type -100% to have it flip, it messes up my stroke. Here is an image of what is happening wh
-
Inbound remittance advices from customers.
Sap Gurus We receive remittance advices from customers in an excel format. The cash appliers would like the cash to be applied automatically. Similar to inbound EDI 820 idoc process, is there a function module/BAPI to apply the cash by uploading the