Order's measurement points

Hi Experts,
I need to read measurement points asssigned to an order( it's functional location).
We tried RFC MEASUREM_DOCUM_READ_TO_ORDER but it returns measurement documents
(readings).
In Our requirenment, the order is newly created and no measurement documents exists.
we need to give all the measurement points (only) that exists against the order( it's functional location)..
Could you please help in this.
Please suggest any table/RFC.
Rohit

Hi Rohit,
The relevant table are:
IMPTT - for mesuring points
EQUI - for equipments
IFLO - for functional location
Using the Object Number for the Measuring Point Object in table IMPTT, you can link the object to technical objects (object no. from respective tables - EQUI and IFLO).
I hope it resolves your issue.
Regards
Amit

Similar Messages

  • Maintenance Order through Measuring Point

    Dear all,
    I want to know whether it is possible to create the maintenance order on the basis measuring point .
    I know how to create the order on the basis of measuring counter.
    Is there any procedure to create the maintenance Order through measuring point as done in case of counter?
    kindly provide the solution for Creation of Maintenance Order using Measuring Point..

    Really very thanks for the solution.
    I have one more query, we can create the measuring point using the t.code IK01.As you told we have to create the measuring point with upper and lower range.
    Is that we have to create 2 measuring point for upper as well as lower range or in one measuring point it is possible to accumulate both the upper and lower range.
    If it is possible to accumulate both the upper and lower range in one measuring point then kindly provide the procedure.
    Thanks in advance.

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.

  • Measuring point-service order

    Hi,
    I am using measuring point for air compressor for filter replacement after 500 hrs.
    I want system to create service order automatically, once measuring point reaches 500 hrs.
    Can you please suggest how to proceed.
    Thanks and regards
    Karthik

    i am closing the thread

  • Measurement points/documents against an Order

    In Plant Maintenence, an order has functional location assigned to it. Some Measurement points has been assigned to this Functional location against the order.
    Could anybody help me to know the BAPI/RFCs which could read this measurement point/measurement documents against the order and some BAPIs/RFCs that could add new readings for these measurement points.
    If anubody could suggest a logic how to do it. If someone can suggest any Tables ...
    Please advice

    CALL FUNCTION 'MEASUREM_DOCUM_DIALOG_LIST_1'
           EXPORTING
             ACTIVITY_TYPE                = '1'
             F11_ACTIVE                   = 'X'
             INDICATOR_INITIALIZE         = ' '
             DEFAULT_DATE                 = SY-DATUM
             DEFAULT_TIME                 = SY-UZEIT
             DEFAULT_READER               = SY-UNAME
             WORK_ORDER_OBJECTNR          = V_OBJNR
             WORK_ORDER_KEY_EXTERN        = ' '
             WORK_ORDER_OBJECTNR1         = ' '
             NO_DIALOG                    = 'X'
             PREPARE_UPDATE_IF_API        = 'X'
           IMPORTING
             INDICATOR_UPDATE             = ZINDICATOR_UPDATE
             LEFT_WITH_F15                = ZLEFT_WITH_F15
           TABLES
             DOCUMENTS_DEFAULT            = T_DOCUMENTS_DEFAULT
      DOCUMENTS_DEF_INS           =
             DOCUMENTS_INSERT             = T_DOCUMENTS_INSERT.
      DOCUMENTS_UPDATE             =
          CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
            EXPORTING
              WAIT = 'X'.

  • Triggering of Preventive Maintenance based on Measuring Point

    Hi,
    I have set measuring point & defined upper range limit and lower range limit. Now I want to trigger preventive maintenance, based on reading enter against measuring point specifically if measuring point reading is above or below defined upper range limit or lower range limit.
    Letu2019s say example, If 10 and 5 is upper range limit and lower range limit, now in this case creation of notification / main order if user has enter measuring point value more than 10 or less than 5.
    Regards,
    Dipen Shroff

    Hi,
        You can do it via Condition Based Maintenance ..
    IMRC0001- U can use this User exit
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a7/fa4c988f6611d29e8a0000e8323350/frameset.htm
    regards
    pushpa

  • Auto Update of measuring point/document

    Dear all,
    I have one issue over here.Measuring point/document is not updating automatically after productiuon order confirmation . I tried with following steps
    1) Created the equipment as test equipment -->created measuring point as a counter ---> maintain the usage value formula SAPF02 in the PRT tab . Unit of measurement for the characteristics and base unit of measure of material are same
    2) Then i have assigned this eqipment as a PRT in the routing of material .
    Which steps i am missing
    Thanks

    Hi
    I had faced the same problem  when I used SAPF02 then I did following changes.
    Created formula like SAP_09 * PRTSTD / SAP_08
    SAP_09 : Operation Qty
    PRTSTD : PRT Standard Value
    SAP_08:   Base Qty.
    Also make sure the measuring point category should me T in IK02( PRT life counter)
    Regards,
    Raj

  • Measuring Points are Not displaying in mobile devices(SAP WM 6.1)

    Hi Experts,
    In mobile devices the measuring pints for work order not displaying. When we select the "record point" option for particular work order it should display the measuring points for that WO. But it displaying '0 measuring points'. As shown in screen shot below.
    But in SAP Bach end Measuring Documents are defined for Work Order.
    can any one explain :To display measuring points in mobile devices, need any extra configuration in back end? or
    What functionality need to activate? How to enable this?
    Thanks
    Chigari

    Hi Chigari
    Measuring Points assigned as PRT's in backend application (SAP ECC) should be displayed in Agentry Work Manager 6.1 by standard, if their corresponding technical objects are assigned to either the Work Order header or one of the operations.
    Please check if this requirement is fulfilled in your case.
    There is no need to modify anything in the Configuration Portal (as far as I know).
    The modification we have made is only regarding Measuring Points belonging to other Technical Objects (and still assigned as PRTs).
    Søren Hansen

  • Propose Measuring point automatically in IW42

    Hi,
    I have assigned a measuring point as PRT to the operation of an Order. During confirmation in IW42, after entering the order number system proposes the operation details and I need to click button meas.points Inspn planning to display the measuring point assigned to the operation. But now my requirement is, system should propose the measuring point automatically, along with operation details, when I enter the order number in IW42 as user will forget to click button meas.points Inspn planning.
    Could anybody suggest how this requirement can be met?
    Thanks and regards,
    Basavaraj

    Hi James,
    Thanks for your reply.
    Yes, I have configured confirmation profile and same has been selected in IW42. I can see screen area for measurement document in IW42. Now my requirement is, I want the system to display the measuring point automatically, which is assigned to operation as PRT, when I enter the order number in IW42 ans press enter.
    Thanks and regards,
    Basavaraj.

  • Measuring Point History

    Hi! Experts
    We are working with MAM25 SR5 and we have the following quastion regarding measure point history:
    Currently we can see only one history document on the PDA. It is the last one that was registered on the system. But my  users want to see at least the last 3 ones if they already exist on the backend system. Is it possible ?? how can we show it ??
    Backend:
    The perform general setting
    Measuring Points:
    Variant:   XXXXXXX
    Vianta:    YYYYYY
    We did active the ckeck box Last Meas. Document in order to get it on the history parton the PDA.
    My questions are:
    1. Should I take that check box out in order to get more than one historic information ???
    2. Where should I control how many historic documents I want to see on the PDA ??
    Thank you very much
    Xiomara Aramendiz

    Hi Xiomara,
    have a look into SPRO - there you should see the question if you want the history or not. And related to that you can enter how many you like to see.
    If that is not the case in your system, then simply enhance the GETDETAIL handler for this object to return more then the last history.
    Hope this helps.
    Regards,
    Oliver

  • Measuring Point Description Change-MassChange

    I have several (hundreds of ) Measuring points which i need to change .The fields to be changed include the Measuring position    and measuring descriptions. Since its a time consuming process to change individual record, can some one suggest any mass change transaction in PM with which i can achieve this changes without much time as in case of individual changes.
    Please suggest some direct method in order to avoid any BDC or LSMW.
    Thanks
    Murad Shaikh

    HI  Murad
    As such there is no standard T code for carrying out mass changes for measuring points except list editing (IK08) through which you can do it by selecting one by one. Since the fields you wants to change are free text type & will vary from one measuring points to other its not logical also. Better to do it through LSMW using recording IK02 its very easy & will take 10min to create one LSMW.
    Shakti

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • Measuring Point Counter Overflow reading

    Dear Masters,
    I want to know whether there is any standard method by which i can create a notification in the system whenever any measuring point reading reaches its counter overflow reading?
    Can I do the same with the range valued measuring points? That if the measuring point reading is out of the range defined in a measuring point, it should create a notification
    Thanks in advance for your valuable time and answers.

    Hi,
    Try any of these User Exits.
    IMRC0001 MeasPoint/MeasDoc: Exit before update (after COMMIT WORK)
    IMRC0003 MeasDoc: Menu exit for customer-specific function
    To create the Notification, use the FM BAPI_ALM_NOTIF_CREATE.
    [Check this link as well|BAPI needed for Notification & Work order;
    Regards,
    Maheswaran.

  • Measuring point/document is not updating

    Dear all,
    I am  new in PM. I have one issue over here.Measuring point/document is not updating automatically after production order confirmation via co11n . I tried with following steps
    1) Created the equipment as (P)Production resources/tools -->created measuring point as a counter ---> maintain the usage value formula SAPF02 in the PRT tab . Unit of measurement for the characteristics and base unit of measure of material are same
    2) Then i have assigned this equipment as a PRT in the routing of material .
    3) Production order confirmation via co11n  Each unit
    Which steps i am missing. if u give me steps by steps procedure to me for counter based maintenance, its helpful for me.
    STILL not answered and no reply.
    I am waiting for reply.
    Thanks
    tarun
    Edited by: tarun on Oct 5, 2010 5:06 PM

    Hello,
    Have look this thread [Re: Auto Update of measuring point/document;
    Regards,
    Rakesh

  • Measuring Point & Counter

    Hi PM Gurus,
    Can you tell me about the performance based maitenance :
    1. Measuring Point (M.P.)
    2.Counter
    What are the characterstic units come under the Measuring Point.is it right that only we can give upper and lower limit in M.P not in counters.Also User exit is only created for MP not for counter.
    What are the basic difference between Measuring Point & Counter.
    In both the cases is it necessary to select counter tick mark or only in case of counter ?Is there is any difference while generating the plan
    Regards,
    RC

    Hi Raju,
    You can do this through,
    IMG - Maintenance Plan,work center, task list & PRTS - Maintenance Plan - Set maintenance plan catagories.
    Here in call object column you can define which type of call object you want for your maintenance order based on this you will get the order or notification as a call object.
    And rest of the things measuring point & counter that already defined in this thread.
    Regards,
    Rip

Maybe you are looking for

  • SAP Clustering on HP-UX(SGe integration) with DB2 9.1

    Hi i have install ecc6.0 sr3 on hp ux 11.31 databse db1 9.2 installtion done in unix cluter enviroment node A = ci installed NodeB - db installed after this i have done  disturbuted installation for sap . when i switch node A (ci ) to NODE B (db)  sy

  • IMac crashing after 10.8.2 update

    Since I updated to 10.8.2 on my iMac if I leave it on and it slees it is crashing while sleeping. It restarts and says when I login that the system had a error This is the logs from the last crash anyone have any ideas or have this problem? Mon Oct 

  • HT201272 Is there an easy to visualize all the content I have downloaded on my Apple ID?

    I need to to change the country of my Apple ID. The problem is that if I do so all the content that I have downloaded won't show up anymore on the "purchased tab", which is very annoying, so I was wondering if there is a quick way to visualize all th

  • PURCHASE  RETURNS TO VENDOR

    HI SAP GURUS, I HAVE AN PURCHASE RETURNS SCENARIO : 1) MATERIAL IS PROCURED FROM VENDOR. MIGO IS DONE. 2) SYSTEM SETTINGS ARE SUCH THAT AT THE TIME OF MIGO EXCISE INVOICE IS  CREATED, CAPTURED & POSTED. EXCISE REGISTERS ARE ALSO UPDATED. MIRO IS NOT

  • Record to both CF AND SD cards on 5Dm3

    Can we record to both the CF and the SD cards at the same time on our 5D3 cameras? I thought we could, and I set up the camera's menu to: Record Func. = Rec to multiple Playback = [2] But when I record a clip, it ONLY seems to record to where I have