Order type for conversion of planned order

Hi gurus,
I have configured 6 different order types for PPPI and not maintained any default order type for conversion of planned order into process order. But when I am trying to convert planned order into process order by branching out from MD04 to COR7 via the popup window, default order type PI01 gets selected which  cannot be changed. However, if I am converting the planned order into process order directly through COR7, then choice of order type is available.
Could you please tell me how to ensure choice of order type while branching from MD04 to COR7?
Regards,
Abhik

Hi Datta
The order type is selected as below
First it will look for any scheduling profile is maintained. If so it will select default from the profile.
Next if the profile is not there it will look for any scheduler is assigned in material master. Through the scheduler it will select the profile and default order order type.
Next it will look in plant parameter. With conversion from plan order to prod order  order type
Next it will look in MRP group conversion order type,  if you have mainted it in Material master.
This is the sequence. Please check have to maintained any of these.
Hope this is clear
Regards
J . Saravan

Similar Messages

  • Program PPBICO40 for conversion of planned orders to production order

    Hi,
    The program PPBICO40 is for conversion of planned orders to production orders in the background job.But while set up of variant it is asking me for peson who created error folder and recipient.I want to know the significance of these two fields and how these are useful.
    Please throw some light on this.
    Thanks in advance,
    Ravi

    Dear,
    PPBICO40 the non-convertible planned orders are put together in one batch input session and can be postprocessed with batch input tools. It is possible to create a separate error session for each MRP controller.
    Error folder for each MRP controller: creates a separate error folder for each MRP controller.
    Receive folder according to view: If the indicator is set, the error folder is not deleted after processing in batch input.
    Creator of the error folder: User who is entered as creator in the error folder .
    Send mail: Sends a mail to the respective MRP controllers during the creation of a batch input session. If the indicator 'Error folder per MRP controller' is not set, the mail is sent to 'Recipient (alternative)'.
    Express document: sends mail as an express document.
    Recipient (alternative): Recipient of the mail, if no recipient is specified in the material requirements planning master record of the MRP controller responsible .
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Order type while converting the planned order to prodcution order

    Hi All,
    While converting planned orders to production orders, it is always creating the production order with same order type. Can I change the order type?
    Is there any configuration settings for it??
    Thank you.
    Anil

    Anil,
    If you want to have different order types for different materials then you can define that in transaction OPPR for MRP Groups - Planned order conversion section and assign this MRP group to the relavant materials in Material Master MRP1 view.
    If you are looking at having different order types for a material based on MTS or MTO scenario, then please assign the different order types for the process in Production scheduling profile through transaction OPKP and then assign this profile to material master- work scheduling view.
    Regards,
    Prasobh

  • Conversion of planned orders to production orders

    Hi,
    we are doing mass conversion of planned orders to production orders and performing capacity availability check, how system will give log information based on these two things,
    when i perform availability check at time of order creation and will not allow to create if anything is missing (i selected user decides option in configuration), does it show any error log report and where can i see.
    When i perform availability check at time of release, if anything missing it will not allow to release and give a choice for a user to release in normal production order creation process, how it will work in mass conversion. is there any standard report to look at missing planned orders so that users will come to know and then decides whether to convert to production order or not.
    thanks in advance.

    Dear ,
    In SM38-Enter PPBICO40 -Execute -Here you need to Mark the Output log option with Erros only or Error Folder for each MRP controller  .Frist you do it in test mode and then remove test mode , mark the Output log option as per requured field and check the result .
    refer this useful thread : Program PPBICO40 for conversion of planned orders to production order
    Regards
    JH

  • Conversion of planned order to production oder.

    hello friends,
    we are making a project,in that we are facing a small problem.
    we made demand management,and mrp run.after we have go
    gone to md04,there we tried to convert planned order to process order, routing is not selected by production order.but if we go to co01,there production order is created.what are the configurations to be made for conversion of planned order to production order.pl help.
    reward points will be given for the best answer.
    regards
    seshagiri

    Dear Seshagiri,
    Tell me after MRP run,for your Finished product,are you able to see planned orders?
    IF so,copy the planned order number and display it in MD13 or directly in MD04 by double clicking on the planned order number and
    click on display button(Press F7).check whether you are able to see BOM components and Detailed.scheduling tab key assuming in
    MRP control parameter you have given value 2 for scheduling.
    IF present and during conversion are you facing the problem?
    Please clear these doubts.
    Regards
    Mangalraj.S

  • Change the order type for a sales document already created

    Hi gurus,
    please let me know if there is any possibility for changing the order type for sales document (sales order) already created,
    thank you

    Hi,
    Rambabu is correct. Check the  alternate sales document types which your current sales document type is having in VOV8 transaction. You can have the current sales document type replaced with the assigned alternate sales document type 1 or alternate sales document type 2 during run time in the during creation  or change mode  subject to the current sales order is not having any subsequent document. Re-pricing will happen accordingly and all the things of order will get redetermined.
    Hope this explains.

  • Reg : Order type for Planned order

    Hi ,
    After MRP when i checked planned ordre created in the order type it is showing " VP " instead of " LA "     ordertype
    My pegged requirement is PIR where i need to check for this . My planning strategy group is " 52 " Planning without
    Final assembly without MTO. More over i am not getting any PR for component parts
    Please suggest me where I need to check for this .
    Regards,
    jaya Vimal

    Hi Prasobh ,
    I  am happy to see you again in SDN forum after long , 
    Yes you are correct the requirements are not convertible on receiving STO in Planning Plant only it will consume PIR
    and I am using Strategy group 52 with  requirement type is VSE.
    In this how can I test for a complete production cycle I am unable to convert planned order manually in to Production Order.
    to complete testing . Why system showing PIR order type VP instaed of LA order type. Marks will be awarded further more for
    further answer. Further marks will be awarded for further Answer. I checked there is no component for this planned order is
    only for FERT and Halb part .
    Regards,
    Jaya Vimal
    Edited by: jaya vimal on Jun 11, 2010 11:15 AM

  • Order type for planned order in repetitive manufacturing

    hi
    In repetitive manufaturing there is no prodcutiion order
    planned order only. so i want know what is order type  for repetitive manufacturing
    In configuration order type for  reptitive is required or not   if  yes  then how will define order type ,where
    In Discrete order type will define to control  prodution order
    like that i want know details about order type in repetive manufature
    ravikumar

    HI
    Planned order in REM is of PE type thar s non convertible in PO and also these planned orders are assigned to PVs thru Planning table and the Confirmation is done agianst these planned orders.
    check these links:
    Re: order type in repetitive manufacturing
    http://www.sapfunctional.com/PP/REM/page1.htm
    Regards
    Anupam Sharma

  • Creation of production order from manual or conversion from Planned Order

    Hello Guru,
    i would like to know why does the production finish date differ when we do manual and conversion of planned order into a production order?
    Thanks

    Ryan,
    When a planned order is created it just uses the Inhouse production time defined to derive the dates, whereas incase of production orders, it would try to schedule the operation and based on that the scheduled dates are derived. The other possibility is the different scheduling types are used for Planned order and Production order. Check transaction OPU5 and OPU3
    Regards,
    Prasobh

  • BUG in  Conversion of Planned order to Production Order.

    Dear all,
    I got an error while conversion of planned order to production order are as follows,
    No Default values maintained for op.generation for order type ZFT1(matlPILSF002).
    Can anyone please guide me to proceed further.
    Kumar.

    Hi,
    Root cause behind this problem is, no Routing found.
    First complete below settings.
    - Go to OPJG And create defult Operation creation in case of no Routing found.This setting will generate the default Operation incase of no routing found during Order creation.
    - In T.code OPJF Create automatic selection parameters (Selection ID) for Routing.
    - In T.Code OPL8 Maintain Selection ID for Routing and also maintain type of Routing selection (3 - Automatic Routing selection)
    Regards,
    Dhaval

  • Conversion of planned orders to prod orders in background

    hi All
    Is there any program for mass conversion of planned orders in production orders which we can schedule in background.
    Amit

    Hi Amit,
    Try below method
    TCode: COHV (tab selection --- plant and etc...,, tab mass processing --- function - conveted planned order, order type - PP01, collective orders - do not collective orders)
    after Menu -- Program --- Excute in background -- set properties -- to set send SAP spooler --- click button immediate then check box periodic job and periodic values after save
    to monitor and get spool request bcackground this job
    TCode SM37
    or
    you can create background job using TCode SM36
    pls create varient for COHV
    PRG: PPIO_ENTRY with Varient
    Regards,
    Sankaran

  • Auto conversion of planned order to production orders

    Hi Gurus,
    Few days back I posted a question on; Auto conversion of planned order to production orders.
    http://forums.sdn.sap.com/thread.jspa?threadID=2135568&tstart=0
    There is standard SAP Transaction to run a batch job. no need to use - user exit or a BAPI
    Follow this procedure:
    TCode: COHV
    on the initial screen; select "CHECK BOX" for planned orders and deselect production orders.
    select mass processing tab.
    Function: 210 Convert planned orders.
    On Menu-Programs-Execute in background
    Thanks

    HI Alok,
    I was looking at CO41 and there is only one small problem with that. You have to give an 'Order Type' as a input. And I don't see 'Execute in the background' anywhere. I think I have to create a job using wizard in SM36.
    Please correct me if I'm wrong.
    Thanks

  • Set new Required Field for MD14 and MD15 for conver from Planned order to P

    Dear all,
    I would like to set new required field (Purchasing Organization)  in T-CODE MD14 and MD15 for convert from Planned Order to PR. What's should I do?
    Please help, I 'm new for MRP.
    Best Regards,
    Kate

    Hi Kate,
    You are not on the right track; MD14 and 15 will choose the PLANNED ORDER population for the conversion. In planned orders there's NO PURCHASING ORGANIZATION DATA (normally)!
    So even if you managed to put the field on the screen, it will not do anything that makes sense.

  • Default PR Type when convert from Planned Order

    Hi all,
    How can I default my PR Type when convert from Planned Order after MRP run. This can done via MRP Group control but how to go about controlling via Planned Order profile?
    Which planned object type and planned order profile to be used? assuming that i need my planned to be output at LA type and convert to NB1 PR type instead of the default NB PR type?
    Thanks.
    Regards,
    Andrew

    Hi,
    The system determines the document type from the stettings u are making in "planned order Profile" in Customising for MRP. There u define the order type, the procurement key and the special procurement key and also the account assignment category. So based on the procurement key and the special procurement key maintained in the Marterial master, the document type is selected.
    Production > Materials Requirement Planning > Procurement Proposals > Planned Order > Define order profile
    Choose the planned order type - NB1 Within this you specify the P req doc type to be used.
    Through MRP group and the different PR document type for MRP generated PR is possible only if you assign the document type to MRP group in the MRP configuration.
    Please try and come back.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Aug 28, 2008 10:54 AM

  • Automatic conversion of planned orders

    Hi PP Gurus,
    I have a requirement to convert planned orders to production orders automatically. I believe SAP standard does not offer this functionality.
    The possible solution seems to be writing new program which could be a copy of C041 transaction code.
    Did someone ever worked on this functionality?
    Request to share your experience and possibilities on this - Thanks
    Regards
    Seshu

    Dear Seshu,
    In my understanding there is no T Code for making the conversion of planned order into a production order as an automatic
    process.
    But you can use the T code CO41 for converting a list of planned order's into production orders.
    In many cases the planned order is only a proposal and only after converting it into a production order and releasing it then the
    exact shop floor activities starts like Good's issue.This activity is done by a production scheduler.So in case if you develop a
    program to convert automatically,then reservation gets generated for all the production orders, which is not recommended.
    Also check this link,
    http://www.sap-img.com/production/automatic-conversion-to-production-orders.htm
    Check and revert back.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Aug 11, 2009 10:04 PM

Maybe you are looking for

  • Reducing the topics in default table of contents

    Hello- This one should be easy, but I can't figure it out. How do I reduce the number of topics in the default table of contents. For example, I want to get rid of all the level 2 subjects. For example: Summary 1 Highlights 1 Sub Highlights 1 I'd lik

  • BO 4.0 save as csv file format issue

    Hi All, We are using BO 4.0 Webi for reporting on SAP BW 7.3 system. Some of our reports have to be scheduled to bring the output in CSV file format. When I schedule the report in CSV format, the final output has data in two sets. The first set has t

  • Pf status related problem

    Hi all, When I have called a modal dialog box screen, I want to set a pf status called STLI ,however I could not succeed it. Where am I doing the error? My code is like following: MODULE STATUS_0200 OUTPUT.   IF SY-UCOMM = 'RW'.     SET SCREEN 0.    

  • Lost photos in Events

    I lost all photos downloaded in the last 2 events downloaded. These events had the same date, bu they were downloaded on separate days. I still see the events in iPhoto, but none of the images are available. Is there anyway to retieve these images? U

  • Very slow/non-existant connection and crackling no...

    Hi, I am using Homehub option 2 (if I remember correctly, where can I check this?) and as the title says I am getting a very slow and sometimes no connection at all from my boardband, as well as crackling noises from the phone itself for 2 weeks. The