Orders scenario

Hi All,
I have a scenario like I need to fetch all SNP and PP/DS orders and these orders have to check from DMCP table wheather these orders are new or change.
1)     I am able to get all SNP and PPDS order using BAPI called BAPI_PPDSSRVAPS_GET_IO_NODES from Live cache. This BAPI fetching order id as key field.
2)     I need to fetch the data from DMCP table using this order id but there is no link with this order id with DMCP table.
3)     There is a field called GUID in DMCP table. I used one FM to convert order ids to GUIDs to get the data from DMCP table. All order ids got converted into GUID.
4)     Till here everything is good.
5)     But when I am trying to pull the data from DMCP table based on GUID, it is pulling only SNP orders not PP/DS orders.
6)     I have tried so many ways but I am getting SNP orders only.
7) I need SNP and PPDS orders
Can you help me on this?
Thanks in Advance.
Jay

Are you able to see any PPDS orders in /sapapo/c5 transaction or /sapapo/DMCP table direclty at all ? If not, I think there may be config setups missing to have PPDS active for change pointer related transfer. You may need to check the documentation on what is missing in terms of activating PPDS change pointers. Or some experts in this forum can enlighten.

Similar Messages

  • Accounting Entry getting passed in case of Make to Order Scenario

    Hi Experts,
    In Make to Order scenario, as per my knowledge, when the goods is recieved from Production Order the Accounting entry gets passed is Inventory A/c Debit and Cost of Goods Produced Credit.
    But how is Cost of Goods Produced, which is  an expense, gets crebited? I am confused, because the above entry will create a credit balance to an expense account. Can anybody clarify this please?
    Thanks and Regards,
    Sameer Joshi

    Thanks for the reply.
    Do you mean that at the time of PGI, when the entry is posted to COGS, the amount of COP will also get transferred to COGS and then the whole amount will be posted at PGI?
    Thanks and Regards,
    Sameer

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • Make to Order Scenario problem

    i want to configure a make-To-Order Scenario
    i have create an item category  ZTAK  (for Make to order items) ... and assigned it to my sales document type and the Material item category in sales view 2 is 0001 (Make to order)
    when creating the sales order i got the following message
    Transaction ZTAK PD  is not defined
    Message no. V1347
    Diagnosis
    This combination of item category ZTAK and MRP type for material PD is not allowed.
    System Response
    The system does not allow further processing of this item.
    could any one help

    Hi,
    Configuration steps:
     Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)
    In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable
    material
    Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:
    General/Plant tab.
     Go to VA01 and raise the sales order by specifying this material that we created in the previous step
    Item category is TAK
    Schedule line category = CP
    Requirement type = KE [Sales order Header  Procurement  Requirement field]
    KE = Individual customer order without consumption
    (For standard items item category group = NORM)
    System determines requirement type 041-order/delivery requirements. This requirement type points requirement
    class where we can control whether the system has to carryout TOR, Availability check, and Product allocation
    functions.
    NOTE: Make sure that controlling area and fiscal year defined and maintained.
     Save and Exit
     Go to MB1C to initialize the stock
    Movement type [561]
    Specify special stock [E]
    E = Receipt without purchase order in unrestricted sales order stock
    Specify the sales order number [ ] and item number [10]
    Specify the material with quantity
     Save and Exit
     Go to MMBE and check the stock balance
     Go to VL01N do the delivery
     Go to VF01 and raise the invoice
    Hope this helps.
    Regards

  • Purchase to Order Scenario - Partial Confirmation Issue

    Hello Team,
    We are using Item Category with Purchase to Order Scenario. When the Sales Order is booked, Purchase Requisition is Created. Sales Order Line is linked to the Purchase Requision/Purchase Order.
    In this scenario, we are getting confirmation on Sales Order through PR/PO Initially.
    Order Quantity     Confirmed Quantity
    10                         10
    Once we receive partial confirmation on PO let us say 7 system only confirms partially Sales Order.
    Order Quantity     Confirmed Quantity
    10                         7
    Issue happens when our team does partial delivery to customer before receiving full confirmation from the Supplier. System blocks further update of confirmation on the line and it becomes impossible to make delivery to Customer for Partial Quantity.
    I can think of two options...
    1. Somehow when we receive Partial Cofnirmation, our Availibility Check should confirm 7 on Confirmation recieved from the Supplier and 3 from Delivery Date of Purchase Order. So this issue won't happen.
    2. System should somehow allow Partial Confirmation even after Partial Delivery is done to the Customer.
    Do let me know if you need any more details from my side.
    Kaushal

    Hi Kaushal,
    i assume that you have special stock indicator in your sales order.
    if you do not use confiramtion then all quantities are confirmed at schedule line level.
    if you use confirmation e.x. 7 of 10 pieces then you will have confirmer 7 quantities in your schedule line.
    if you create another confirmation in PO of 2 pieces and lets say different date you will see another schedule line in your sales order.
    do your system works like this?
    Is your third party scenario require a googds receipt for PO to move on to delivery?
    Regards.

  • Engineer to Order Scenario-Target Costs and Stock Valuation

    I have got a query  pertaining to Engineer to  Order Scenario. A production order has been created with WBS element as the account assignment .Its a valuated project stock scenario, with configurable material. As per SAP standard behaviour  and my limited knowledge, the Goods Receipt for FERT/HALB happens according to either of the four strategies:
    •     Standard Price ( if there exists one)
    •     Customer Exit COPCP002
    •     Sales Order Cost Estimate
    •     Preliminary Order Cost Estimate for prod order
    However ,I have come across a case where although a preliminary order cost estimate exists for the production order, the system is not able to determine target costs. As a result the entire variance is posted as remaining variance at the time doing a variance calculation on the production order. Moreover at the time of Goods Receipt for FERT material,the system passses an entry Price diff A/c -Debit to Cost of Production, instead of debiting Inventory  and crediting cost of production(Price Control is S, no standard price exists for the material)
    Thus my query is :
    1) In case of Engineer to Order Valuated Stock Scenario where prod order is created with reference to WBS element, how is the standard price (or target costs for version 0) determined
    2) Under what situation at the time of goods receipt ,will an entry " Price diff A/c Dr & cost of production-Credit will be posted, instead of  Inventory A/c being debited?
    Awaiting a reply
    -Regards
    Amit Kulkarni

    Hi Amit
    the easy answer first: The standard price is just taken out of the material segment without WBS assignment. That means if you maintain a standard price in the accounting view of the material master for the material number + plant that will be the fallback to be used. That will at least reuslt in a inventory posting, instead of pure price differences (against a price of zero)
    Why your production order cost estimate could not be derived I cannot say. But he first startegy will be to search for the cost estimate to the WBS. Is there not something in the project system to perform a project costing and save it? in that case that will be searched and used for the order target cost and inventory posting.
    best regards,
                      Udo

  • Consignment stock, make to order scenario

    Hi
    We have a material which produce make to stock and make to order also.
    In case of make to stock its fine. But when we are testing make to order then following is system behavour.
    Action     Mvt Type     Accounting Document               
    GR     101     No Accounting Document               
    Consignment     631     Finish Inventory     Dr      at Standard Price     
                        Consignment Inventory Change (VKA)     Cr
    PGI     633     COGS     Dr      at Standard Price     
                        Finish Inventory     Cr
    My question is why not accounting document is generated at the time of GR 101 in case of make to order scenario.

    Hi
    MTO has 3 scenarios in it. (I think you either fall in Scenario 1 or 2)
    1. Where the Qty of Prod order is tagged to sales order upon GR from prod order....
    The valuation in this case happens at the std cost (CK11N).... Every thiing remains same as in MTS... You get variance as well
    2. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Valuated stock)
    This is not recommended by SAP and should be chosen only in rare cases...
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate is done when sales order is created...
    GR is valuated at sales order cost estimate... Variances are calculated based on this cost and actual cost incurred..
    PGI and Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    3. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Non Valuated stock)
    This is recommended by SAP
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate can be done when sales order is created...
    GR is Non valuated... No Variances are calculated because GR is non valuated
    Production Order settles upon sales order.. hence, actual cost goes to sales order...
    PGI does not generate accounting doc because stock is Non Valuated
    Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    These are the 3 possible scenarios in MTO... There might be a slight variation in Consignment scenario.... I am nt sure if the "No Accounting doc" situation at GR is OK or not
    Regards
    Ajay M

  • Make to order Scenario...

    Hi Friends,
    I have maintained all required fields for make to order scenario.....
    In MRP 3, Strategy Group- 20
    in house production time-  2 days
    But when I punched sales order , in schedule line tab of order item .....order quantity in getting confirmed before proceeding to further process in make to order ( Production order , Material Planning and before production order is getting confirmed ).
    My problem is that in make to order scenario, sales order quantity is getting confirmed before proceedings further.
    So kindly advised as to be done to get rid of this problem
    Thanks in advance
    Shailesh

    Hi Shailesh,
    Please check the configuration settings in the IMG for Availability check.
    You check have maintaining availability checking group 01 or 02 in the Material master.
    Have you assigned Checking rule AE -SD order; make-to-order stock for checking group 01 or 02 in the IMG
    Spro>sales and distribution>Basic functions>Availability check and transfer of requirements>Availability check>Availability check with ATP logic/Against planning>Carry out control for availbility check.
    I hope it will help you,
    Regards,
    Murali.

  • Make to order scenario (GR Nonvaluated indicator is on by default)

    Hello Friends,
    I am working on make to order scenario. I have assigned  planning strategy 20 to the material. Against this material i created one sales order. Now with reference to this sales order i am creating the production order by transaction CO08. While doing these when i am checking under goods receipt tab, i am finding that GR Nonvaluated indicator is on by default. Because of this when i am doing the GR against these production order, system is not generating any accounting documents.
    I am unable to find how the GR Nonvaluated indicator under Goods Receipt tab in production order is on by default, in make to order scenario.
    Kindly share your valuable input on these.
    Thanks and Regards,
    Jitendra Chauhan

    Check
    Re: GR nonvaluated flagged automatically

  • Which fields of material maintain in make to order scenario through bdc

    HELLO  !!!!!
    GURUS !!!
    I am working on make to order scenario.
    Here is batch management.
    I am giving data for uploading so for that which fields must be filled from
    basic data to costing .
    Could you give me some ref. on this topic.
    Regards,
    Nitin

    Hi,
    Its like I have given for the Raw Material what are all the required fields and this is as per the scenerio which we follow and i think this helps you..
    MBRSH     Industry Sector
    MTART     Material Type
    DYTXT     
    WERKS     Plant
    LGORT     Storage location
    MAKTX     Material Description
    MEINS     Base unit of measure
    MATKL     Material Group     
    SPART     Division
    BSTME     Order Unit
    EKGRP     Purchasing Group
    KAUTB     Automatic PO
    XCHPF      Batch MAnagement
    EKWSL     Purchasing valu key
    WEBAZ     GR Processing Time
    USEQU     Quota arrangement Usage
    DISMM     MRP Type
    DISPO     MRP Controller
    DISLS     Lot Size
    BESKZ     Procurement type     
    LGFSB     S.Loc for Ep
    PLIFZ     Scheduling margin key
    FHORI     Planned Delivery Time
    RWPRO     Coverage Profile
    STRGR     Strategy Group
    VRMOD     Consumption mode
    VINT1     Backward Consumption Period
    VINT2     Forward Consumption Period
    MTVFP     Availability Check
    SBDKZ     Individual/Collective     
    BKLAS     Valuation Class
    VPRSV     Price Control Indicator
    VERPR     Value/Price
    EKALR     With Qty Structure
    Hope This Helps you.. is it clear
    Regards,
    Sravanthi
    Edited by: sravanthi nemani on Dec 29, 2008 1:38 PM

  • How to show the internal batch number for order in make to order scenario

    Hi !!!
    Gurus!!
    I am working on make to order scenario .For delivery of order may I see the batch no.of esch order.
    How system will get the internal number batch.
    I have config. batch management.
    What should be the next process.
    Regards,
    Nitin

    Hi,
    QI am working on make to order scenario .For delivery of order may I see the batch no.of esch order.
    A. Yes you can see batch number for each order
    QHow system will get the internal number batch.
    A. there are two possiblities assign you batch number at production order before release or assign batch or each GR at the time of executing GR transaction.
    QI have config. batch management.
    A.In Material master you also have to tick for batch managemnt relevency
    QWhat should be the next process.
    A. Consult again if any thing missing
    Regards,
    Syed

  • Reg:Import Purchase Order Scenario

    Hi All,
        In the Import Purchase Order Scenario SVB load will come, which will display in MIRO after the PO creation
        i have an requirement that in the MIGO transaction i just want to make the SVB load to 0,because if the SVB load comes it just adds to the inventory(i.e material cost which is wrong), could you please say how can i prevent the SVB load addition to the inventory or how can i make the SVB load to 0.

    HI There,
    Define a seperate condition type for SVB in M/06 make the condition category as delivery cost. Mantain this seperate condition type for SVB load value in PO, in pricing procedure for the SVB condition type mantain an account key. Then in OBYC for this account key mantain the GL account in which you want to record the debit SVB amount.
    Now when you will do GR the SVB value will not get loaded in material.
    Regards,
    Sujoy

  • Make to Order Scenario Process Flow

    Hi Friends -
    I am looking for simple Make to Order scenario with BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    Pls correct me if I my process flow is wrong or requires modification.
    I will appreciate if you can validate the above process flow and guide me to execute the same in the system.
    Pls help me on configuring the system and setting up the materials and related master data for the same.
    Thanks in advance
    Purnendu

    Dear GSL - Pls check the following details
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - 0004, and General Item Category group as 0004 ( Make to Order / Assembly).
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6 When I try to create a Sales Order for the finished material it is giving message
    Configuration not possible for material 747 : Reason 3 --> Help
    Message no. V1360
    Diagnosis
    This may have been caused by one of the following:
    1. The configuration profile for the material allows or requires the bill of materials to be exploded during order processing. However, a plant has not been specified in the item.
    2. The configuration profile of the material allows or requires the bill of materials to be exploded during order processing, but the order quantity in the item must be greater than 0.
    3. A configuration profile has not been maintained
    or
    A configuration is not permitted for the material
    or
    4. The configuration profile of the material allows or requires the bill ofmaterials to be exploded during order processing. However, the system could not determine a date because important data is missing from the item (see incompletion log).
    This message is also coming in the Incompletion log f the sales order.
    I have not checked the Configurable Indicator for the material in the Basic Data 2 view of the materials master, but still the message related to Configuration is coming.
    Pls help e on this.
    Thanks and warm regards
    Purnendu

  • Made to Order Scenario

    Hi All,
    Q1)What customisation settings are needed for a made to order scenario.
    Q2) What do you mean by the terms Requirement Class and Req Type  please do not  give me notes from  SAP help menu. Do explain in Simple language and with good examples since i have read sap help F1 and still could not follow.
    Good anwers would be rewarded with points.
    Regards
    Atul Keshav

    Hi Atul,
    Hi,
    Make-to-order:
    Make-to-order processing takes place when inventory is not generally stoked but instead the firm wants until an order hass been placed and then produces just what has been ordered.
    Ex: In this case, a deluxe motorcycle gas tank that must be produced form an unpainted tank, paint and gas cap. These are two processes that must be completed in the production -
    paint the tank and when tank is dry, attach the gas cap.
    The BOM are needed to create a given product. The routing information gives what processes need to be carried out in what order and even how long each process should take. All this information together can be used to determine what the total cost of the product and determining the profitability of the product.
    A—Creation of materials:---
    T code: MM01
    Ex; 1400-7—1xx
    Enter material, ind. Sector and material type.
    Select the org. levels plant, stor. Location, sales org, DC, Warehoused no, storage type.
    Repeat the same process for all components.
    B—Creation of BOM:--
    T code: CS01
    C—Set up routing:--
    T code: CA02
    D—pricing conditions:--
    T code: VK11
    E—purchasing materials:--
    Create a purchasing order req. for components from vendor.
    Create PO: ME21
    F—Receiving materials:--
    GR:- MIGO
    Go through MMBE then u will get stock available or not.
    Process:
    1. creating a sales order for product not kept in the inventory. This will atomically generated the relevant production order.
    2. we assume production is done ahead of \schedule. After production is completed you will confirm production order as fully completed .
    3. Newly determine the availability of sales order.
    4. shipment
    5. TO for delivery
    6. Billing
    7. Payments
    Req. Class: Its a global control parameter for avalability check. It controls rerq. consumption strategy and req. planning strategy.
       11-- order req.
       21--  delivery req.
       41-- order/delivery req.
    Req. type:- It specifies features of require,ment class. It is one of the controling feature in TOR
      In TOR we can assign req. type to req. class.
    Reward points if u helpful.
    Cheers
    Govind.

  • Third-Party Order scenario

    Hi
    In the third-party order scenario (TPO), how can the business user communicate to the customer that the delivery of the goods / shipment of the goods has been done. How does the user update the SAP database that the shipment of the goods has taken place.
    If the vendor sends the business user an ASN which automatically creates the inbound delivery in the user's SAP system, then could the inbound delivery create an outbound delivery to the customer stating that the goods have been shipped to the specified address ??
    Thanks
    Maruthi Ram

    There is no standard SAP solution for this requirement.
    You can trigger output from inbound delivery document to generate EDI output and send delivery information to customer.
    You will require to define custom output type , partner profile and link with custom fucntion module.
    FM should have logic to pick information from 3rd party sales order and inbound ASN and generate IDOC
    Hope this solution will work for your requirement

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps