Oreintation changing from XI to 2008

we have reports created from Crystal Reports XI and after upgrading to Crystal Reports 2008, those same reports show everything correct in page setup, and it displays correctly in the print preview, but it prints sideways when sending our label printers.
What changed in 2008 and what do I need to do to resolve this.  I know were not the only ones having this issue, it's all over the place when you google the issue.  But No where do i see a fix for the issue. 

I'm sorry I thought i made it clear that everything in the reports look correct.  I do not believe you read my whole post.
so let me try and explain this a different way.
Under page setup, where i see the printer being used, all the settings are correct.  Nothing has changed going from the older version of Crystal to 2008.
when printing directly from crystal, the print preview looks fine, but when it comes out on the label printer, the text has shifted 90 degrees.  The settings must stay landscape so that it's 4x3 but for some reason crystal wants to print the label sideways now.
if we print the same thing in the old environment, it prints just fine.  Something in Crystal reports 2008 is handling the report different through the print process.  Crystal shows how it will print through the print preview, but what comes out of the printer is sideways.
it's not the printer, that works fine with older versions.  there's something within the application doing this.
Were not the first to ever report anything like this.  I google the problem and there are a lot of people experiencing this but no where have i seen an actual answer to why it's happening. 

Similar Messages

  • Profit Center change from 2007 to 2008 in basic data of WBS elements??

    Dear all,
    I am quite desperate - we change the complete CO structure from 2007 to 2008 and I have to reallocate all projects (WBS elements and networks) to new profit centers.
    The profit centers are valid as of 1/1/2008 - the old one finish 31/12/2007.
    The problem is that the annual closing procedure is done with Actual Results Analysis since we are working with the POC-method for revenue recognition - and I will only do this transaction in 10 days.
    If I cannot limit the profit center allocation, I do not know how to avoid that either 2008 postings will be on 2007 profit centers for the first automatic MIGO bookings 2008 or the the last 2007 bookings will be on 2008 profit centers.
    Can anyone help on this? Please mail to [email protected]
    Thank you already!
    Bye
    Anne

    Hi,
    I would like to add few more lines on this. There can't be multiple controlling area in a project whereas there can be multiple company code for a project. To change controlling area at WBSE level, the controlling area of the project need to be changed. After financial posting into project, it will be difficult to change the controlling area / co code / plant etc. in project structure.
    Hope this will help you.
    Regards,
    Rakesh Pradhan

  • VAT rate changes in Ireland on goods from 1st December 2008

    Dear SAP Experts,
    The standard rate of VAT will be increased from 21% to 21.5% with effect from 1 December, 2008 in Ireland.
    This means all IT systems dealing with VAT should be able to cope with that change.
    My client is a retail organization and operates in Ireland as well. They have SAP as their main system. Any ideas what is the best way to achieve that in SAP i.e. modify the existing VAT code or create a new VAT code etc etc + implications...
    Any help would be much appreciated. If SAP has any recommended approach for dealing this type of situation, please share it.
    Thanks and Regards
    Sanjeev

    Hi,
    The recommended approach is to create a new code and not modifying the old one. You can read note 94636 for further info (it concerns Germany, but the concept is the same).
    Regards,
    Eli

  • Change validity period of cost center from 2009 to 2008

    Hi All
    I have created a cost center with validity period 01.04.2009 to 31.12.9999 which was supposed to be created from 01.04.2008 to 31.12.9999. when trying to change the validity period in Tcode KS02 I am getting the following message -
    "New analysis period must not exceed maximum period limit". In TCode -  OKEON the validity period button for that particular cost center is deactive. 
    In TCode KS13 when I generate report for that cost center with Parameters - Valid from 01.04.2008 to 31.12.999 I can see that the cost center is valid from 01.04.2008 to 31.12.9999.
    In TCode KS03 Display Cost Center the cost center is valid from 2009 which has to be valid from 2008. Please advise on how to change the validity period from 2009 to 2008.
    Regards

    Hi Eli
    Thanks for the reply and I have successfully created the cost center to be valid for the previous year as per the requirement.
    Thanks & Regards
    KIMKhan

  • Is changing from iMac OS 10.6.8 to Yosemite difficult?

    What are the problems encountered in changing from iMac OS 10.6.8 to Yosemite?

    Depends. Be sure you do this first:
    Repair the Hard Drive and Permissions
    Boot from your Snow Leopard Installer disc. After the installer loads select your language and click on the Continue button. When the menu bar appears select Disk Utility from the Utilities menu. After DU loads select your hard drive entry (mfgr.'s ID and drive size) from the the left side list.  In the DU status area you will see an entry for the S.M.A.R.T. status of the hard drive.  If it does not say "Verified" then the hard drive is failing or failed. (SMART status is not reported on external Firewire or USB drives.) If the drive is "Verified" then select your OS X volume from the list on the left (sub-entry below the drive entry,) click on the First Aid tab, then click on the Repair Disk button. If DU reports any errors that have been fixed, then re-run Repair Disk until no errors are reported. If no errors are reported click on the Repair Permissions button. Wait until the operation completes, then quit DU and return to the installer.
    If DU reports errors it cannot fix, then you will need Disk Warrior and/or Tech Tool Pro to repair the drive. If you don't have either of them or if neither of them can fix the drive, then you will need to reformat the drive and reinstall OS X.
    Next, verify you can upgrade to Yosemite:
    Upgrading to Yosemite
    To upgrade to Yosemite you must have Snow Leopard 10.6.8 or Lion installed. Download Yosemite from the App Store. Sign in using your Apple ID. Yosemite is free. The file is quite large, over 5 GBs, so allow some time to download. It would be preferable to use Ethernet because it is nearly four times faster than wireless.
        OS X Mavericks/Yosemite- System Requirements
          Macs that can be upgraded to OS X Yosemite
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model Identifier 5,1 or later
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later
             7. Xserve (Early 2009) - Model Identifier 3,1 or later
    To find the model identifier open System Profiler in the Utilities folder. It's displayed in the panel on the right.
         Are my applications compatible?
             See App Compatibility Table - RoaringApps.
    Download the Yosemite installer and click on the Install button that will appear when it finishes downloading.

  • BED Change from 16% to 14%

    Hi All,
               We are using TAXINN. There is a PO created in February. Say for 100 Qty. For this ED was 16%. Now part qty say 50 delivered in February. Other 50 will be delivered in March where ED levied will be 14%.
    How to handle this situation. I created FV11 JMOP 14% validity starting from 01.03.2008. If i create new line item in same PO for rest of qty to be delivered the ED will be picked is 16% only not 14% as PO date is of February.
    How to handle such situation. New PO to be created?
    Reagrds
    Rohan

    HI,
    It is advisable to tick delivery completed indicator to all pending po of 16% and block them for migo. However if you want not to delivery complete the pending po's, what you have to do you have to change JMOP or JMIP To 14%. The excise duty will changed to 14%. But please check there is no miro pending on 29.2.2008 for 16% purchase orders, but if a transit material which has received by you in March, which has been sent by supplier in the month of feb, you have to maintain JMOP / JMIP to 16%.
    Choice is yours.
    Ishu

  • How do I migrate views from MS SQL 2008 to Oracle 11g through SQL Developer

    Is there any way to migrate the views from MS SQL 2008 to Oracle 11g through SQL Developer? Please give me some detail steps. Thanks for your help.
    Kevin

    Hi Kevin,
    user13531850 wrote:
    Hi Turloch,
    When I use migrate to oracle, I got a problem, the migrate tool create a new schema for me in my case (AZTECA_KSMMS), it migrates all the stuffs under that schema (AZTECA_KSMMS). However my application need the all the Oracle data under schema AZTECA instead of AZTECA_KSMMS. Is there any way to specify specific schema (AZTECA) for target oracle database? Schema remapping is available:
    First Capture (separately) then during right click convert on the captured model there is a Specify the conversion options with a Object Naming tab where the schema (and other) name changes are editable.
    I have not used this recently.
    Also during the migration process, when I choose repository, there is a check box for truncate to reset repository to empty state, Do I need to check that truncate Check Box so the repository will be cleared from last migration?The repository can hold multple migration attempts. Check truncate to get rid of previous attempts information. This cleans up the repository - not the destination database.
    There are also online database and offline database options during the migration process, what are the difference between these two choices? After I migrated to Oracle, all my views has a red cross icon next to it. Does that mean the view migration is failed or not? Please give me your comments. Thanks for your help.offline: for big (amount of data) databases with simple data types,
    uses bcp + files + scripts + sqlldr.
    online: for small (amount of data) databases (easier),
    uses (Java) jdbc.
    The view is likely to be broken - recompiling it may help.
    The Oracle schema is created using a .sql file - see under generated in the directory you gave originally in the wizard. There is a .out file that contains the result of running this script including any errors. During conversion there are also likely to be warnings displayed on the UI.
    There may be a single issue that is causing multiple issues - if viewa depends on functionb, and functionb is broken, viewa will also fail.
    >
    Kevin-Turloch
    SQLDeveloper Team

  • Bapi Function call from Crystal reports 2008. import parameters syntax.

    Dear,
    I have an issue with calling a function directly from Crystal reports (2008) in the R3 system.
    (if this belongs in another thread , please add the link if moved !)
    I try to get data through function "BAPI_CLASS_GET_CLASSIFICATIONS".
    Till now all possible input parameters have no data-result.
    I already read other threads stating that 'for example' the Language key needs to be provided in a single character. 'E' in stead of 'EN'.
    I also already created a Z-wrap-function that fills out all input parameters 'hardcoded'. This works.
    clearly there are som syntax changes in passing the values to R3 when called from Crystal Reports.
    Can someone state which syntax has to be followed for numeric fields, for datefields etc. (so when i make these dynamical, I know which syntax should be the outcome of the formula)
    in my function that doesn't work I use these selections:
    (this function is called in a standard report only calling this function)
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.I_LANGU_ISO} = "E" and
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.I_LANGU_INT} = "E" and
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.T_CLASS_OBJECTS.OBJECT_TYPE} = "MARA" and
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.T_CLASS_OBJECTS.OBJECT_KEY} = "000000000000000085" and
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.I_CLASSNUM} = "DSWTEST" and
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.I_CLASSTYPE} = "001" and
    {BAPI_CLASS_GET_CLASSIFICATIONS_1.I_KEY_DATE} = Date (2011, 08, 05)
    I already tried other languages or the 'EN' as input.
    (I would like to know how the date is passed exaclty to R3.)
    The function is of course RFC enabled.
    when I call the my Z-function with predefined inputparameters in R3 it does give the wanted result.
    FUNCTION ZBAPI_CLASS_GET_CLASSIFICATION.
    ""Local Interface:
    *"  TABLES
    *"      OBJECT_CLASSIFICATION STRUCTURE  BAPI_OBJECT_VALUES
    *"      CLASS_OBJECTS STRUCTURE  BAPI_CLASS_OBJECTS
    data ZOBJECT_CLASSIFICATION type TABLE OF BAPI_OBJECT_VALUES.
    data ZCLASS_OBJECTS  type TABLE OF BAPI_CLASS_OBJECTS WITH HEADER LINE.
    ZCLASS_OBJECTS-OBJECT_KEY = '000000000000000085'.
    ZCLASS_OBJECTS-OBJECT_TYPE = 'MARA'.
    Append ZCLASS_OBJECTS.
    CALL FUNCTION 'BAPI_CLASS_GET_CLASSIFICATIONS'
      EXPORTING
        CLASSTYPE                    = '001'
        CLASSNUM                     = 'DSWTEST'
    *   KEY_DATE                     = SY-DATUM
    *   LANGU_ISO                    =
    *   LANGU_INT                    =
    *   CHARACTS_OF_CLASS_ONLY       =
    * IMPORTING
    *   RETURN                       =
      TABLES
        OBJECT_CLASSIFICATION        = ZOBJECT_CLASSIFICATION
        CLASS_OBJECTS                = ZCLASS_OBJECTS
    OBJECT_CLASSIFICATION[] = ZOBJECT_CLASSIFICATION[].
    ENDFUNCTION.
    please advise.
    once again if this should be moved to another forum , add the link please!

    Dear,
    I just debugged my Z-function, after adding all input parameters as in the standard BAPI function.
    All parameters seems to be passed correctly except from the table parameters from
    CLASS_OBJECTS
    So all I_parameters are passed :
    {ZBAPI_CLASS_GET_CLASSIFICATION.I_LANGU_INT} = "EN" and
    {ZBAPI_CLASS_GET_CLASSIFICATION.I_LANGU_ISO} = "EN" and
    {ZBAPI_CLASS_GET_CLASSIFICATION.I_KEY_DATE} = Date (2011, 08, 05) and
    {ZBAPI_CLASS_GET_CLASSIFICATION.I_CLASSNUM} = "DSWTEST" and
    {ZBAPI_CLASS_GET_CLASSIFICATION.I_CLASSTYPE} = "001" and
    {ZBAPI_CLASS_GET_CLASSIFICATION.I_CHARACTS_OF_CLASS_ONLY.BAPIFLAG} = ""
    but the table parameters aren't coming through:
    {ZBAPI_CLASS_GET_CLASSIFICATION.T_CLASS_OBJECTS.OBJECT_TYPE} = "MARA" and
    {ZBAPI_CLASS_GET_CLASSIFICATION.T_CLASS_OBJECTS.OBJECT_KEY} = "000000000000000085" and
    these are 'blanco' in the function.
    also after the function is executed and all data is retrieved, when passing the data back to Crystal reports, once again, the table result isn't passed to Crystal Reports.
    please advise

  • Migration from SQL SERVER 2008 to Oracle 10g issues.

    Hi ,
    I'm trying to migrate from SQL Server 2008 to Oracle 10g and I end up with some issues that I wanted to ask some info about it.
    First, I was following a tutorial
    http://st-curriculum.oracle.com/obe/db/hol08/sqldev_migration/mssqlserver/migrate_microsoft_sqlserver_otn.htm
    and and in the last version of Oracle SQL developer I downloaded, I didn't find the Load Database Capture Script Output option.
    My first question is how can I either add this option or is there a new way to load the capture script ?
    Then I use the migration wizard and after following everything, I had the migration complete message from the application.
    When I tried to open my connectionss, it tells me version 11.2 is required. Does that mean that Oracle SQL developper 3 only
    do the migration for oracle 11g? And if I tried the previous versions, it doesn't support SQL server 2008.
    What do I do in this case ?
    Thanks !

    Thank you for your reply.
    After using the wizard and made the offline migration script, in the Migration projects window I made a move data to the oracle connection I previously made and after when I tried to reopen the connection, I couldn't.
    Well I didn't retry it yet to see if I'll have the same behavior but basically this is what I think I did. When I tried to open the connection I made, it says, Oracle 11.2 is required.
    Now, I just generate target from the convert model and it says migration complete but how do I test it and I do I go to oracle and see change ?
    Do I had to create a special user in SQL Server to log to it first ? How do I logon to it ?
    Edited by: 873671 on Jul 20, 2011 7:03 AM
    Edited by: 873671 on Jul 20, 2011 7:19 AM

  • SSIS migrated from 2005 to 2008

    Hi,
    SSIS migrated from 2005 to 2008. The job ended successfully and text reports were created. However, in job history indicates the step still running. What did I miss during migrating SSIS process? Thanks.
    Chris

    Click on Refresh button changed nothing?
    Best Regards,Uri Dimant SQL Server MVP,
    http://sqlblog.com/blogs/uri_dimant/
    MS SQL optimization: MS SQL Development and Optimization
    MS SQL Consulting:
    Large scale of database and data cleansing
    Remote DBA Services:
    Improves MS SQL Database Performance
    SQL Server Integration Services:
    Business Intelligence

  • Reports can't be upgraded from 2005 to 2008

    I have converted all my rdl reports from 2005 to 2008 through BIDS conversion wizard.I have also converted the XSD file from 2005 to 2008.
    When I try to load the report locally(through dotnet code), I am getting below run time error.
    The report definition is not valid.  Details: The report definition has an invalid target namespace 'http://schemas.microsoft.com/sqlserver/reporting/2008/01/reportdefinition' which cannot be upgraded.
    Could you please help me to resolve this issue?.

    Hi Dikshan,
    As per my understanding, we can directly use Business Intelligence Development Studio (BIDS) Conversion Wizard to upgrade reports from 2005 to 2008. While in the upgrade process, we may run into the failed upgrade process, then we may receive the error message.
    Based on my research, the reason why this issue occurred is that there are some assembly still refer to 8.0.0.0 version, other than 9.0.0.0 version. So we should manual change the 8.0.0.0 version string with 9.0.0.0. For more details, please refer to the
    following blog post by Brian Hartman:
    http://blogs.msdn.com/b/brianhartman/archive/2010/06/07/upgrading-web-application-projects-to-vs-2010.aspx
    Hope this helps.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • Technology Changes from EBS R12.0.2 with EBS R12.0.2

    Are there any Major Technology Changes from EBS R12.0.2 with EBS R12.0.5
    Edited by: Arshad on Nov 14, 2008 7:02 PM

    I do not believe there are any major technology changes between the two. ML Doc 404152.1 documents the functional changes between the two releases
    HTH
    Srini

  • Is it possible change from OS X 10.6.8 to OS X Mavericks directly?

    is it possible change from OS X 10.6.8 to OS X Mavericks directly?

    Yes. You ust meet the system requirements:
         OS X Mountain Lion - System Requirements
           Macs that can be upgraded to OS X Mountain Lion
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model Identifier 5,1 or later
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later
             7. Xserve (Early 2009) - Model Identifier 3,1 or later
    System requirements for Mavericks ar the same as those for Mountain Lion.

  • [svn] 3872: init tracking on the asdoc/ mx folder so changes from trunk can be pulled down to here

    Revision: 3872
    Author: [email protected]
    Date: 2008-10-24 09:36:45 -0700 (Fri, 24 Oct 2008)
    Log Message:
    init tracking on the asdoc/mx folder so changes from trunk can be pulled down to here
    Property Changed:
    flex/sdk/branches/gumbo_alpha/

    Well, when I've done URL connections from an applet session and cookies seem to have sorted themselves out. I'm not sure how, but there seems to be some functionality for it in the URLConnection class.
    I haven't tried setting the method like this, I always cast to HttpURLConnection and call setMethod to select POST. Your way might be right as well though.
    Have you checked the server access logs?
    It may be that your URL is rejected by the security manager for not having the same form of the hostname as the original applet retrieval.
    You should be able to get a domain name and port from the "code source" of your code, which will reference the online jar it comes from. You can generally get at this as getClass().getProtectionDomain().getCodeSource().getLocation(), or less elegantly by requesting the current class file as a resource.

  • [svn] 3629: take trunk change from rev.3603

    Revision: 3629
    Author: [email protected]
    Date: 2008-10-14 11:55:28 -0700 (Tue, 14 Oct 2008)
    Log Message:
    take trunk change from rev.3603
    Removed check which trapped const initialized declaration within a loop (file FlowANalyzer.java:3337)
    In general, decidability of const'ness is a flow problem. In this case the error was being reported for
    a const initialized declaration which should have been allowed.
    fixes: SDK-16446
    Ticket Links:
    http://bugs.adobe.com/jira/browse/SDK-16446
    Modified Paths:
    flex/sdk/branches/3.0.x/modules/asc/src/java/macromedia/asc/semantics/FlowAnalyzer.java

    pressh wrote:to not duplicate work I've already created a python script some time ago which you can use to build e17 pacman packages using the community PKGBUILDs: http://dev.archlinux.org/~ronald/e17.html
    I may extend its usage if someone sees any use for it. Either way, just thought I should drop it here.
    is that script any different from a full build through makepkg/yaourt using AUR's Pkgbuilds?
    I tried to use it but i get a list of errors similar to
    cp: impossibile creare il file normale `eina-build/eina/.svn/prop-base/NEWS.svn-
    base': Permission denied
    but if i can use yaourt, why not?
    Edit: sorry, i looked at the python source and realized that it actually just syncs abs and then runs makepkg and namcap for each package. so i guess i'll use yaourt instead (or try to understand why makepkg exits with that error)
    Last edited by pikiweb (2009-06-19 08:48:46)

Maybe you are looking for