Organizational structure from one plan variant to another

Hello,
We want to make a copy of an organizational structure from one plan variant to another. This copy should include all
     assignments like purchasing groups to organizational units made in PFOM . Can we do this?
Thanks

Hello,
Make sure that the plan number is established through the IMG. (And that it is not the active plan.)
     Go Human Resources -> Organizational Management Tools -> Plan version -> Copy.
     It runs RHCOPL00. All or any portion of the plan maybe copied and manipulated and then copied back in to the active
     plan.
Thanks

Similar Messages

  • How we can import an IDOC structure from one SAP system to another w/o ALE

    Hi Gurus,
    How we can import an IDOC structure from one SAP system to another? we're not able to use ALE tech, these two sap systems are isolated.
    Any response will be awarded!
    Thanks a lot.
    Samson

    hi,
    1.One is by change pointer concept i.e by executing the RBDMIDOC.We can generate the idoc and automatically to the inbound System.
    2.By executable program also like bd10 and bd11.
    Regards,
    SHIVA(reward if helpful).

  • How we can import an IDOC structure from one SAP system to another

    Hi Gurus,
    How we can import an IDOC structure from one SAP system to another? If we're using ALE, how can we do that? Please can someone give me the process and necessary t codes.
    Any response will be awarded!
    Thanks a lot.
    Samson

    hi!
    Define the logical system names in both the systems.
    Logical system names :SAP001
    SAP002
    SAP001 FOR 001 CLIENT
    SAP002 FOR 002 CLIENT
    These two logical system definitions should be present in both the systems.
    Assign the logical systems to the client. (in both the systems)
    Assign SAP001 to 001 CLIENT
    Assign SAP002 to 002 CLIENT
    you can See these in transaction SALE.
    After this define the rfc DESTINATION IN sm59. (in both the systems)
    In 001 client create the RFC destination name SAP002
    In the tab log on security, give the user name and password and client of the 002 client and save it.
    Similarly do the reverse in the 002 Client.
    In 001 client create the port.(Transaction WE21)
    Specify the RFC destination name as SAP002.
    Now you can define the ports, (both the systems)
    Create the partner profile for partner(ie gve logical system name of partner) , so give as SAP002.
    partner profile in both the systems.
    Now create the distribution model in BD64 and goto edit>model view>distribute.
    The same model view will be visible n distributed to the partner system also..which in this case is sap002.
    U may trigger the idoc from we19 and chk its status in we05.
    Please let me know if you need further info on this.

  • What's the RFC name for BPS to transfer data from one Plan-Area to another?

    I created a role for BPS planner.This include all authorization except the RFC authorization for transfering data from one plan-area to another.However, even I set the '*' to the RFC name. Am I missing something? Any suggestion is appreciated.
    Best regard,
    Gerald He

    Hi Vlad,
      Thanks for your reply. It's helpful.
      Finally, I found that this error message will be pop-up when the authorization is not right. For example, if you don't have right authorization to access the corrsponding InfoCube which the BPS is based on. Now, I find the root cause and fixed this issue.
    Best regard,
    Gerald

  • How to switch Organizer catalog from one hard drive to another?

    As far as a little background, i have just finished two high definition projects in Premiere Elements, the last one being 73 projects combined into 6 blu rays.  It had completely filled up my 1TB hard drive, so i have purchased an additional 2TB internal hard drive, in hopes of being able to switch all my photoshop to the larger internal hard drive.  I am also archiving the old stuff as i finish each project to an external hard drive to free up space. 
    But i am PETRIFIED at the possibility of trying to move my Elements Catalog because of all the stories i have heard about having the majority of the photos needed to 'reconnect' after switching it to an external hard drive and I assume the same thing will happen to me if i move it to another internal hard drive???????   I have had several computer smart gentleman who have often helped me out when i had a problem and one refused to even venture how to successfully move the catalog and other guy's suggestion is to backup the entire Catalog and then restore it on the new drive.   Steve Grisetti said this morning on his webpage that i should cut and paste the file from one drive to the other but not quite sure how easy that is going to be, because when i have searched out the "move' option, it does not allow me to do anything there.  Could that be because i have files that need to be 'reconnected' first before i could accomplish that 'move.'    Steve suggested i come over to this Forum to get some opinions, which is what i have done.  That sounds like being more complicated than just cutting and pasting one folder with 16,000 photos.  What is the safest way to accomplish this without losing anything, and avoiding the need to 'reconnect' 16,000 files which i am not looking forward to.
    So that is my first and foremost question about the Elements Organizer, but i do have some other related problems with the 'reconnect' problem, some of which i have figured out, but not completely.  After finally completing these two big projects, my next goal was to clean up my files, get things organized better, and i seem to be finding more and more problems to address.  The list of problems decreases with each project but i am still able to find new ones.  I am not a computer whiz, and probably shouldn't be trying to accomplish what i am doing with the basic Photoshop programs, something i know the majority of you would be using other more advanced Photoshop programs and much more easily, but i am starting to get this program down, and i don't need more challenges right now.
    So i have 3 additional concerns and questions if anyone can help me out to prevent future problems with the next high definition project for Premiere Elements to burn onto blu rays. 
    1.  Because i ran out of space totally on my old internal hard drive, i set up a temporary file on the new drive for the blu ray projects, and I was able to finish the remaining mpeg2s for the final 2 blu rays from Premiere Elements.  But when i finished, i started to clean up the files, and realized that the catalog was not recognizing any of the mpeg2 files that i had used to assemble the first 4 blu rays, which was the time i set up the new file on the new internal hard drive, and had copied and pasted my blu ray files.  It all seemed to go well, and i was able to finish the final 20 something projects and 2 final mpeg2s for the final blu rays which i prepared and burned on Sony DVD Architect.  . But when i went back and was looking at the final mpeg2 files for the previous 4 blu rays, they all needed to be 'reconnected', and i assume it was because the last 2 were on a different drive.  And after some effort, i was able to reconnect everything i think successfully.  And i am assuming that this will not continue to be a problem if i can get the entire Catalog on the same hard drive.  So write that one off to experience.
    2.  But i hadn't taken the time before doing the blu ray project to label my pictures completely, so the next project i started was renaming the filenames, which quickly presented a new problem, and that made for more 'reconnect' problems again for every picture that i renamed that was used in any of the Premiere Elements Project, so i was back to where i started but even worse off; however, the good news is that my photos were the best organized they ever have been.  So all the mpeg2's on the catalog once again asked for 'reconnect' and came to the conclusion that it must mean any name change in the 'filename' also makes it not recognizable.  With my first big Premiere Elements project which ended up with 4 blu rays, i made the very big mistake of organizing and moving files in windows, and that is problem #3.  So i have come to the conclusion that it doesn't matter, but lots of effort is not obtainable, but i guess i am wondering if it was really worth saving in working condition anyway??  The good news is that the individual photos are fine for the most part, but it is all the mpeg2 files that i combined the original photos into 73 projects, making a mpeg2 of each, then combining about 10-15 of the mpeg2s together and adding music to it, and forming the final mpeg2 which is what i then prepared to burn to blu ray in Sony Architect Studio.  The finished product is still present in the Sony Architect software, and i even burned a copy of them again to make sure that was possible,  So my gut feeling is just to delete all the mpeg2 files in my organizer, and forget they were ever there!  Does that make sense?????    I am not sure that i would ever use them again anyway, but what i am asking is obviously that something as simple as change in the filename screws up the catalog once again?????  Yes, i have learned my lesson, and they will all be finalized with the filename ever before i start the next project.  Just like with the first project, i learned to stay out of windows all together, and now i only use albums which i found no problems using at all. 
    3.  Last problem is the oldest one, but one i still cannot solve.  It was from the first blu ray project when i was doing stupid things like moving folders, and photos from one folder to another to make it better organized.  And that was super-organized, and there was absolutely no need to change filenames!!!!!  I have two separate problems.  Some of the 'reconnects' do not have a picture but the gray square and the ?.  I have been able to find most of the files that i had 'displaced' and have recovered them, and knew where they were, and were able to change file names, and it looks like they are back in the catalog.  There was also a big file of photos that i found in a file that was the original download file for a given date which is how i NOW download my photos into Photoshop in the first place.  But i have not been able to reconnect any of them successfully.  They are there and i have renamed them, but the catalog still does not recongize them as being in the Catalog.  The other group are photos where the picture shows in the catalog, but there is a ? to reconnect, but i cannot find the photos anywhere.  These are of a trip of a once in a life time variety, so i have refused to just press delete, and i thought i had perhaps somehow deleted them all, but i have either found them in another file or the photo is present but i can't rename, i can't reconnect, and for all practical purposes they don't seem to be there.  Any suggestions at all?  Do i have any other options other than just to delete those whole period of my trip? 
    I am longwinded, but i wanted to try and give enough background information.  The problem seems simple, but i just want to confirm the problems i have run into are for the reason i think they are, and any help on how to successfully move the catalog to the second internal hard drive will be greatly appreciated.  Thanks in advance for any comments and or suggestions.
    Ron

    Thanks for your suggestions, i knew i had overdone it when i wrote the entire story.  Just a couple direct questions based on your response!!
    Just a couple of questions, i am assuming all the reconnection problems have to be taken care of either by connecting or deleting before the catalog can be moved.  Correct? 
    The reconnect problems i have were not renamed outside of Photoshop, and the renaming does not seem to be an issue except for mpeg2s that are in the catalog that were used to generate the blu rays but i think it was me screwing things up when i didn't know better and was moving folders and photos in folders (Window type) .   Since the blu rays are in the Sony software complete and ready to reburn easily, i assume it would be okay to delete all those that are in the catalog, that need to be reconnected for whatever reason.  Plus the individual photos of most of them are just fine.  I am talking 376 'reconnect problems' counting all those mpeg2 files which are at least the majority of the 376.  Probably would be nice to have, but is there any reason i have to keep them since the photos are okay and the blu rays are burned and still in the Sony Architect program intact?  
    What i don't understand is the important photos that are worth trying to save seem to be in the proper folder, which is what is stated in properties, but the photo is in the catalog, but with the ? and cannot do anything with it at all, without just going to reconnection, and when i try to identify the folder, it says it is empty, which those are NOT.   If it takes 'forever', then albeit, at least for these few pictures.  I really don't want to delete those!
    And is it possible to do what my computer tech is telling me that it will all transfer accurately and completely if we backup the entire catalog and then restore it to the new drive?.  It seems like after i complete the reconnects one way or another, it might be an easier process that can be completed totally within Element?    Since the catalog is on c drive, i guess i can't do what you suggested buy why? 
    I kept to those tips you gave me.  It seems like an impossibility to save these pictures, but these were from my very first efforts with Premiere Elements and blu rays.  Other than the renaming the changing and affecting the Premiere Elements projects in the second one, i have no other problems, and have no recconect problems.  So i guess i am moving in the right direction.  I just don't need to keep finding ways to make more problems for myself.
    Ron

  • Mass user movement from one org. unit to another in SRM org. structure

    Hi,
    Is there any way by which i can move mass users from one organisational unit to another in SRM org. structure..
    there is a thread available in SDN but it is not conclusive. it talks abt using a FM: BBP_USER_CHANGE_ORG
    BR
    Bharat M

    Bharat-
    I am assuming that your requirement is to move mass users from One Org node to another. Ex One Plant Org node to Another plant Org node.
    If my assumption is correct then, please follow the below steps.
    1) Go in to the change mode of Org Plan using T-code PPOMA_BBP
    2) Using shift key, select all the users that you need to move.
    3) Drag and Drop the selected users to the desired Org node.
    If the user IDs are not in sequence then you can use Ctrl key to select the relevant user ID.
    Let me know if you have any questions.
    If the answer is helpful, please reward points.
    Regards,
    Upendra.

  • How do I move my storage plan from one Apple ID to another

    How do I move my icloud storage plan from one Apple ID to another??

    Welcome to the Apple Community.
    Unfortunately, it is not possible to move your storage plan from one Apple ID to another.

  • Assigning data from one Table type to another structure

    Hi every one,
    I have a table type X sent from one function module to another Proxy generated method which has the parameter defined as a structure.
    I have declared a variable Y as a LINE TYPE OF X.
    Then I have this statement which fills up the data.
    READ TABLE X INTO Y INDEX 1.
    The data is transferred from X to Y.
    Now i need to send this to the proxy generated Function module which has a structure Z.
    Now when i say MOVE-CORRESPONDING Y to a variable of type Z, it says it cannot be converted.
    The structure in proxy generated FM has different data type but the same domain as that of standard one.
    Everywhere it is prefixed with YY.
    And also has one additional Controller tab inserted,
    Can you guys tell me how to move the data from this table type to the structure.
    - Venkat

    Hi,
    Declare a variable of line type Z.
    Move corresponding values from variable X to this variable.
    Append this variable to the table Z.
    Try this.
    Regards,
    R.Nagarajan.

  • Copy billing plan lines from one sales document to another

    HI,
    we want to copy the open billing plan lines from one sales document to another, which routine should we use in the copy control in configuration?
    we tried to use,401 and 402 but with no success..
    it's should'nt be a standard process with out any development?
    Best Regards
    Yehudit

    Hi,
    Check where you entering this routine
    If your billing plan at header then enter it at header in copy control, if billing plan is item level then maintain at Item level in copy control
    Kapil

  • How to change  XML  Structure from one form to another form using OO ABAP.

    Hi Experts,
    In my Scenario, i need to do ABAP Mapping in order to change Incoming structure from one form to another.
    My Input to ABAP Mapping (OO ABAP Program)would be :
         <A>..........</A>
         <B>..........</B>
         <C> .........</C>
         <D>..........</D>
         <E>..........</E>
         <F>..........</F>
    OO ABAP Program need to read this input and change the XML Structure into below form:
         <A>..........</A>
         <B>..........</B>
         <C> .........</C>
          <X>
                <D>..........</D>
                <E>..........</E>
          <F>...............<F>
    Please provide inputs (sample Code) to solve this issue.
    Thanks,
    Kish.
    Edited by: Kishore Reddy Thamma on Jan 22, 2008 2:51 PM
    Edited by: Kishore Reddy Thamma on Jan 22, 2008 2:52 PM

    Hi,
    Please provide sample code or Material for converting XML Structure from one form to another using OO ABAP and
    Steps for ABAP MAPPING.
    Thanks,
    Kish.

  • Reposting of Planned Line Items from One Cost Ctr to another

    Hello SAP Gurus,
    Can you tell me the process hoe We can repost planned line items from one coct center to another ?

    Hi,
    You can use Transaction code KP06 to update the changes to the plan data for the Cost Centers. There is no separate transaction code to repost plan data for Cost Centers.
    Thanks
    Murali.

  • Migration of Planned Orders from one SAP system to another one

    Hi,
    A quick help needed.
    We are migrating SAP data from one SAP system to other due to business split. Regarding PP data, can Planned orders be migrated as it is from one SAP System to another? What is the impact if we do so?
    Appreciate your response.
    Kind Regards,
    tanuji

    hi ,
    As suggested , you can propose to migrate only Firmed Planned orders from SAP  to SAP system .
    How to acheive it ?
    You can use below BAPI to extract details of planned order from Table PLAF and upload in TARGET SYSTEM
    BAPI_PLANNEDORDER_CREATE
    Please note  newly created Planned order in Target system would not have BOM EXPLOSION and Scheduling .
    If need , Make a BDC recording as a add on step to explode Bom and Schedule by clicking those icons in Planned order .
    Technical Team can do this .

  • BPS Copy plan data from one cost center to another using vairables

    Hi experts,
    I am trying to copy the planning data from one cost center to another in BPS.
    I have just done it using a copy function and in the parameter group entering the costs centers for source and destinations.
    What I am trying now it is to let the user select what this destination cost center could be.
    I don`t know if this can be done using a variable. What I am thinking is; when the user enters executes the parameter group a pop-up appear that let him select the cost center for the destination.
    May be this is not possible. Can you suggest me other ways of doing this?
    Thanks in advance

    Hi,
    u can achieve this by creating a variable with the replacement type as  'User Defined Values'. You also need to enable the check box 'Input Allowed by user'. And at the planning level, in the 'Selection' tab, you should map the charecteristic (Cost Center) with the created variable. Same thing should be done at the planning package level.
    Then, when you execute the parameter group, a pop-up comes asking for the value of the costcenter.
    Regards,
    Srinivas Kamireddy.

  • Hyperion Planning Employee move from one cost center to another

    Hello,
    I need to move employee from once cost center to another, is there anyway beside alternate hierarchy, please let me know is there any other way. I am using 11.1.2 EPM version.
    Thank you,
    TKhan

    Are you using out of box functionality of Workforce?
    You can use the transfer functionality to transfer employee from one Cost Center to another? If Cost Center is not your entity dimension then you need to customize the out of box rules a bit.
    How will alternate hierarchy help you in this case? Employee and Cost Centers are seperate dimensions or are they clubbed in one.
    I think it should be the former case, isnt it?

  • Employee data migration from one company code to another company code

    Hi Experts,
    Can some throw some light on how can we migrate employee master data from one company code to another company code in the same client and different clients. what are the other areas we need to take care  during migration like interfaces etc.,.
    secondly can we copy part of org structure or total org structcture to new org plan. if we need to create new org structure which interface is advisable and why?
    i request experts opinions on this.
    thanks in advance
    vara prasad.

    Hi have to repeat the previous Michael's post:
    <b>What made you post this question in this thread?</b>
    Please read the forum guidlines:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/fe6cf0c7-0501-0010-dda5-f3a89106ee84

Maybe you are looking for

  • Rolling forecase for Actual and Plan

    Hi Iam working on Rolling Forecast for Actual and Plan report.. My Planning here is Quaterly based so for example say we plan it on April so the months after april (May - Dec) would be Planning. So when my month keeps on moving the forecase also move

  • How to minimize the file size of a file with drawing markups

    Scenario: I need to turn a sample of a report into a report template, so I am deleting as many objects as I can with the Tools>Content>Edit Object.  For text that I cannot delete that way, I am covering it up with a white box (Comment>Drawing Markups

  • Leopard forgets color profiles when waking from sleep on MBP Santa Rosa

    I have a 15" MBP Santa Rosa with a 22" Samsung external monitor. I performed a clean (erase and) install on my machine. Upon waking from sleep, the computer seems to have forgotten the color profiles loaded for the displays. To correct this, I open s

  • Dynamic table for infotype 2010 in HCM form

    Hi, I have a project requirement for a form that has got me stuck for days now, so I was wondering if anyone could help. The form in question is a statement of allowances (recording overtime), which ideally will allow the user to enter in any overtim

  • Windows or Mac ? How to check this out ??

    HI, I just restored for the third time my new IPod. I use a G4 and my Ipod was always ejecting itself without me doing anything. I phoned the Apple people and they told me it was because my Ipod was set up for Windows. Now the question is: How can I