Organizational Structure Request

Dear Consultants;
i made an organizational structure using LSMW as follows:
-create org units (LSMW)
-create positions (LSMW)
-create relations between org units and relations (LSMW)
-assign company code, personnel area & subarea to org units (LSMW)
-assign groups & subgroup to positions (LSMW)
now i want to include this structure in a request to transfer it to production, how can i do this?
Regards;
Evan

Dear rkvarma;
Really thank you i tried the report you sent and it worked well with no problems at all, i don't know what are the mismatches you are talking about, anyway thanks a lot, i just want to know what are the switches TRSS CORR, TRSP CORR you are talking about.
Regards;
Evan

Similar Messages

  • Transport the organizational structure of PRD to QAS

    Good Morning.
    I have the following issue, I want Transport the organizational structure of PRD to QAS. I am using the report RHMOVE30 in PRD With the following entries.
    Variant of Plan Active
    Evaluation Path --->A003
    without Test.
    without With lock.
    In the field Request/Task, I create a Request. and run the report.
    However the system not generate object into the request, only is Request and Task and not have object into.
    can anyone help me?
    Regards

    Hi,
    I tried to use RHMOVE00 to transport the organization structure.
    In the transport request i  included one Organizational Unit , the Position within , and the Owners assgined to that position.
    Then when we got the request transported to QAS from our Dev server, I am seeing that Organization Unit and Position have been transported successfully. But the Owners assigned to the Position have not been tranported, because i guess we were not able to transport the relationship between the Owner and the Position, which we are struggling to find that how to transport the relationship.
    You have also mentioned about expert Mode. But could u please tell us or guide us to some documentation on how to access the object by Expert mode.
    Thanks for your help.
    rgrds,
    Randhir Soni

  • Urgent organizational structure

    hi frnds
    wish u happy new year.
    i have 2 headquarters,4 plants and 8 business areas. plz tell me organizational structure clearly .plz try to explain full.
    organizational structure means --operating concern,controlling area,company codes,credit control area,coa,business areas,profit centers n cost centers.ok
    but
    1. why should use operating concern (client) first,what is his role n functions?
    2.why should use controlling area n its functions?
    3.when should use the chart of account
    after comapny code or before company code? why should take like explain?(means one coa ,no. of company codes and one company code one coa)
    4.here one coa ,no.of company code what is uses and loses of this and in controlling area also?compare with 5?
    5.here one coa ,one company code what is the uses and loses of this and in co also compare with no.4?
    6.why should use business areas, only for internal reports,can we get financial statement p&l n balance sheet?what is disadvantage of business area? y bcz it is not in the ecc6.0 version?
    7.what is function of profit center?is it support to subledger? how can we do this subledger posting?
    8.no.of coa and no.of company code,when it is ,in the contrilling area how can we do ? how can we do consolidation? how can we get totals expenses and total revenue?how can we see the total in one a/c? in the real time which use, 1 to n(1:n) coa, or 1 to 1(1:1)coa?
    9.how many cost centers we can create ,based on which?
    i am requesting u plz explain clearly all this that too including explaining with my organizational structure
    thanks n regards
    nagesh

    Hi there
    Your question doesn't seem to have anything to do with OO ABAP.
    I suggest you post this question in a more appropriate forum.
    This Forum is for OO Abap.
    Your question is much more likely to get answered if posted to the correct forum.
    Not trying to be the proverbial "Grade A" but routing your posts to the most appropriate Forum will benefit everyone including you a lot.
    Cheers
    Jimbo

  • I need to transport the organizational structure in HR

    HI everybody!
    I need to transport the organizational structure in HR,
    I ordered the Tcode RE_RHMOVE30, the release without problems but when found in the tail of I transport the sample.
    Wanted whether data within the directory or file cofile the order and not displayed.
    Any help I can give will be welcome.
    Thank you

    go to transaction code STMS_IMPORT in your production system. Refresh the import queue. If you can not see the request, go to "Extras>Other Request->add".. Enter the request number and click ok.  If you still can not find the request that means there is no datafiles and cofiles for that request or you have to bring the data file and cofiles for that request manually. This depends on your transport settings.
    But I guess you have moved the request from DEV to QAS. isn't it?..that means ...datafiles and cofiles are there.
    Edited by: Anindya Bose on Aug 18, 2009 12:32 AM

  • MSS within SAP Portal: Organizational Structure

    Hi!
    I would like to set up MSS within SAP Portal. 
    What are the customizing steps to set up the Team, Budget, Projects, Planning? 
    How to create/map the Organizational Structure?
    Thank you very much!
    regards
    Jürgen

    You just need to use the transaction PPome and see where his position maintained
    on organisation
    And for the spro
    Integration with Other mySAP.com Components ->
    Business Packages/Functional Packages -> Object and Data Provider
    -> Organizational Structure Views -> Group Organizational Structure vie
    MSS_LTV_EE (Team: Employee selection): the two organizational
    views MSS_LTV_EE_ALL and MSS_LTV_EE_DIR are assigned.
    MSS_LEA_EE (Leave Request: Employee Selection) the two
    organizational views MSS_LEA_EE_ALL and MSS_LEA_EE_DIR are assigned
    These organizational views are defined in IMG step #
    #define Organizational Structure views#:
    They have the following Object selections:
    MSS_LTV_EE_ALL:  MSS_LTV_EE_ALL (All Employees)
    MSS_LTV_EE_DIR: MSS_LTV_EE_DIR (Team: Direct Reports)
    MSS_LEA_EE_ALL: MSS_LEA_EE_ALL (All Employees)
    MSS_LEA_EE_DIR: MSS_LEA_EE_DIR (Absence: Directly Subordinate Employees)
    Then you have to check the IMG step # Object and Data Provider ->
    Object Provider -> Define Object selections:
    MSS_LTV_EE_ALL:
    Rule for Root Objects: MSS_LTV_RULE1 (Team: Employee's Organizational Un
    Rule for Target Objects:  MSS_LTV_RULE2 (All Employees)
    MSS_LTV_EE_DIR:
    Rule for Root Objects: MSS_LTV_RULE1 (Team: Employee's Organizational Un
    Rule for Target Objects:  MSS_LTV_RULE5 (Team: Employees in an Org. Unit
    MSS_LEA_EE_ALL:
    Rule for Root Objects: MSS_LEA_RULE1 (Absence: Employee's Organizational
    Rule for Target Objects:  MSS_LEA_RULE2 (All Employees)
    MSS_LEA_EE_DIR:
    Rule for Root Objects: MSS_LEA_RULE1 (Absence: Employee's Organizational
    Rule for Target Objects:  MSS_LEA_RULE5 (Absence: Employees in Org. Unit
    Then you can check the rules for object selection: IMG #Object provider
    define Rules for Object selection
    MSS_LTV_RULE1: evaluation path SAP_MANG
    MSS_LTV_RULE2: SBESX
    MSS_LTV_RULE5:  MSSDIREC
    MSS_LEA_RULE1: SAP_MANG
    MSS_LEA_RULE2: SBESX
    MSS_LEA_RULE5: MSSDIREC
    This is meant for Team calendar with respect, But this is more or less same with other views as well

  • PPOME organization structure missing. (please help)

    Hi All,
    Please help me. First time i am using tcode PPOME  (organization structure). I got this error message when i transport to QAS. Last time there is no issue in QAS.
      Post-import methods for change/transport request: BGDK900817                                                                               
    Post-import method RH_ACTIVATE_PDOBJECT_AFTER_IMP started for PDST T, date and time: 20081106163250
      Post-processing taking place in client 200                                                         
      Start activation of object O 50000056 (client: 200) 163250                                         
      No activation of relationship to object O 50000088 in pl.version 50000088 (cl.200)                 
      End of activation of object O 50000056 (client: 200) 163250                                        
      Start activation of object S 50000063 (client: 200) 163250                                         
      End of activation of object S 50000063 (client: 200) 163251                                        
      Start activation of object WS 00300022 (client: 200) 163251                                        
      No activation of relationship to object S 50000065 in pl.version 50000065 (cl.200)                 
      End of activation of object WS 00300022 (client: 200) 163251                                       
      Errors occurred during post-handling RH_ACTIVATE_PDOBJECT_AFTER_IMP for PDST T                     
      The errors affect the following components:                                                        
         BC-BMT-OM (Organizational Management)                                                           
      Post-import methods of change/transport request BGDK900817 completed                               
           Start of subsequent processing ... 20081106163250                                             
           End of subsequent processing... 20081106163251                                                                               
    Execute reports for change/transport request: BGDK900817                                           
      Reports for change/transport request BGDK900817 have been executed                                 
           Start of................ 20081106163251                                                       
           End of.................. 20081106163251                                                       
      Execution of programs after import (XPRA)                                                          
      End date and time : 20081106163251                                                                 
      Ended with return code:  ===> 8 <===

    Hi,
    I tried already. I input in object type with O and correction number *. But there is nothing tasks not yet active. Is the issue because probably some one delete the organization structure in PPOME ?
    Plz help.
    Cheers,
    Nies
    Activation of Tasks not yet Active in Current Client    
    Activation log                                                                               
    Client:  200                                            
    Source plan version: .:                                 
    Target plan version: 01                                                                               
    No entries exist for activation

  • Transport of Organization Structure

    Hi friends,
    How can I transport Organization structure from one CRM system to another (eg: CRM Dev to CRM QA)?
    We are on CRM 2007
    Thanks,

    Hi Deepa,
    Yes, you can transport the Org. Model from one box to another box (eg: development to quality or quality to production) in CRM 2007. Unfortunately you can't tranport relationship between Org. Unit and business partner (employee). You have to create the relationship manually in each box.
    The following is the procedure to the transport the Org. Model from one box to another:
    SM30 -> Enter Program Name = RHMOVE30 -> Execute -> Plan Version = 1.0, Object Type = O, Object ID = select (F4) Org. Units to be transferred -> select transport objects -> task = select (F4) -> create request -> enter description -> save -> enter -> execute -> check all objects -> click on transport (in background process) -> SE09 -> select your transports -> release in background ->
    In TARGET CLIENT (eg: quality box) run the following reports:
    a) CRM_COM_ORGMAN_BUPA_INTEGRATE
    b) HRBCI_ATTRIBUTES_BUFFER_UPDATE
    c) HRALXSYNC
    Hope I have answered your question - if yes, please close the link and award the points...
    Cheers,
    Amber B.

  • Error while creating the Organization structure.

    Hi,
    I am trying to create an Organization structure in SRM 5 sytem, I have created a Root for the structure and when i try to click on the Attribute Inheritance or the Check tab below i am getting an error "Start program BBP_LOCATIONS_GET_ALL first (see note 563180 and long text)" but i have replicated one plant from the R/3 system using BBP_LOCATIONS_GET_SELECTED and the material groups and all the other relevant datas from R/3. I can see in the table BBP_LOCMAP the plant been associated with the relevant company code. I am now struck in creating the organization structure. I am not sure where i am going wrong while creating the Org model.Please give me your valuable inputs to overcome this error.
    Regards
    GGL

    Go to transaction SM30, table T77S0
    Add an X to the following entry:
    Group = EBP          
    Sem abbr. = LMIGR        
    Val. Abbr. = X       
    Description = Locations Successfully Migrated
    This tell the system that the locations have been replicated and the error indicating location get all needs be executed will go away.
    thanks,
    justin
    Edited by: Justin Farley on Feb 25, 2009 7:16 PM

  • Problems assigning BP to a position in the organizational structure

    I tried to assign a bp to a position in the organizational structure,
    but I receive this message "Object cannot be assigned to object CliC
    Agent in the period 21.12.2006 - 31.12.9999".
    Also, I notice that in the screen, the checkbox where i can select for
    the business partner is missing.
    However, I can assign a user to the org structure.
    Before upgrading, it was working. This is the support packages that it was in.
    SAP_ABAP: Level 9
    SAP_BASIS: Level 9
    PI_BASIS: Level 9
    SAP_AP: Level 6
    BBPCRM: Level 6
    After the upgrade to the following,
    SAP_ABAP: Level 10
    SAP_BASIS: Level 10
    PI_BASIS: Level 10
    SAP_AP: Level 7
    BBPCRM: Level 7
    The assigning of business partner to a position no longer works.

    Hi,
    we're facing exactly the same problem, it was all going well until we went on production.... we applied note 997009 which results in a different error... did you manage to find a solution yet ?
    Regards,
    Jacob.

  • FI organizational structure in ECC 6.0

    Dear all,
    I would like to know what is the suggested organizational structure in FI in ECC 6.0. For example, whether it supports multiple company code or single company code. If a company code is situated out of India, how the taxation and all will be consolidated etc. etc.
    Kindly can any one provide me documents on the above subject related to Finance Module.
    It will be very helpful If anyone sends the required documents
    Email id : [email protected]
    Thanking you in advance
    Vijaya

    Hi Vijayalaxmi,
    SAP 6.0 ECC is supports what data you doing in previous versions like 4.7 or 5.0 etc
    you can set company in india or out of india and  taxation also same what you doing in previous versions
    differece is ECC 6.0 is some extra functions is added on advance purpose
    Organizational Units and Basic Settings
    Definition
    Elements of the SAP System logical structure, important for Financial Accounting.
    Organizational units are used to structure business functions and for reporting. The organizational units of Financial Accounting are used for external reporting purposes, that is, they fulfil requirements that your business is subject to from external parties, for example, legal regulations. The financial statements for example, are created based on the organizational units of Financial Accounting.
    Basic settings in Financial Accounting are Customizing settings that you have to make in order to be able to carry out processes in Financial Accounting.
    Use
    You create your company-specific organizational structure in the SAP System by defining the organizational units and making the basic settings. Defining organizational units for Financial Accounting is obligatory, that is, you have to define these units in order to be able to implement the Financial Accounting component.
    Organizational unit
    Definition
    Client
    Obligatory
    Company
    Optional
    Company code
    Obligatory
    Business area
    Optional
    Basic setting
    Chart of accounts
    Obligatory
    Fiscal year
    Obligatory
    Currencies
    Obligatory
    Integration
    In the SAP System, you define the relevant organizational units for each component that you are implementing. For example, for Sales and Distribution, you define sales organizations, distribution channels, and divisions (product groups). Similarly, for Purchasing, you define purchasing organizations, evaluation levels, plants, and storage locations. The organizational units are independent of one another at this stage.
    Components and Organizational Units
    Component
    Organizational unit
    Sales and Distribution
    Sales organization, ...
    Logistics
    Purchasing organization, ...
    Financial Accounting
    Company code, ...
    Controlling
    Controlling area, ...
    Human Resources
    Employee groups, ...
    To transfer data between the individual components, you have to assign the organizational units to each other. You only need to make these assignments once in the system. Whenever you enter data subsequently, it is automatically transferred.
    For example, invoices that are posted in SD are transferred to FI.
    Below link will give total structure of organisational structure
    http://help.sap.com/saphelp_470/helpdata/en/e5/0779ee4acd11d182b90000e829fbfe/frameset.htm
    Hope this infirmation will helps you
    Prem

  • ALE: e-recruiting organizational structure transfer

    Hi friends,
    I want to transfer the organization structure or the organization plan with O,S,C object types from one SAP system to another SAP system.
    I have done the ALE configuration and using PAFL transaction to do the same.
    I would like to know that model view i should use for the distribution also i would want to know the screen parameters in PAFL transaction.
    I am doing the same for E-recruiting separate instance.
    Regards,
    Divya
    Points would be given

    Hello,
    We are still having a problem with failing iDocs everytime we pass over IT0105 Sty 1 records from our SAP system to E-Recruiting.
    Would anyone happen to know where I should start looking to troubleshoot this error message?
    "Password is not long enough (minimum length: 6 characters)"
    Currently both systems require that your password be at least 6 characters long, which makes this message even more perplexing.
    Having a better understanding of how RBDAPP01 processes inbound IDOCS in status 64 would help.  We are using message type HRMD_ABA.  Our data filter looks like....
    Infotype: 1000
    Object Type: C, O, S
    Infotype: 1001
    Object Type: C, O, S
    Subtypes: A002, A007, A008, A012, B002, B007, B008, B012
    Infotype: 1001
    Object Type: O, S
    Subtypes: A003, B003
    Infotypes: 0000, 0001, 0002
    Object Type: P
    Infotype: 0006
    Object Type: P
    Subtype: 1
    Infotype: 0105
    Object Type: P
    Subtypes: 0001, 0010   
    So the question is how is IT0105 Sty 1 being processed when RBDAPP01 runs?
    Thank you for your help!
    Ryan
    Edited by: Ryan Hubbell on Mar 31, 2009 7:00 PM
    Edited by: Ryan Hubbell on Mar 31, 2009 7:47 PM

  • Calculation of minority interest in matrix organization structure

    Hello-
    We are currently implementing sem-bcs and have a matrix organization structure in place. We use company code and profit center as consolidation units. Company code being the currency carrying unit.
    We are facing an issue in minority calculation-
    Let us take the following example -
    Investee A - books equity in pc A
    Holding entity B books investments in pc B
    The above information were entered in AFD and was also pulled in BCS as RFD..
    The first consolidation happens as per our expectations.
    For subsequent consolidation, the retained earnings account (additions movement) could have multiple profit centers. The system calculates minority interest correctly for combination of retained earnings addition @ PC A. However for all other combinations (I.e retained earnings for PC other than A), the system treats the entire amount as minority interest (even though that's not the case)..
    Kindly advise.
    Thanks!

    Hi,
    Thanks for your reply...
    The PC hierarchy is already in place..I maintained Additional Financial Data for the other combinations (of Cons Unit and PC) with 100% share and zero value. The system considered that and calculated minority interest correctly.
    I wish to know if the above approach is ok..
    Thanks

  • Organization structure in extended classic scenario

    Hi All
    I  am trying to configure extended classic scenario on SAP SRM 7.0.  I have made the following settings for the same:
    1. In SPRO->SRM Server-> Technical Basic Settings -> Define backend system from product category, I have specified target system as SRM system and not ECD system
    2. In SPRO->SRM Server->Cross Application Basic Settings-> Activate Extended Classic Scenario, I have selected all the options including "Back end purchasing group responsible"
    I have a few doubts.
    1. In organization Structure (PPOMA_BBP) Comapny code is corresponding to company code in back end but do I have to create local purchasing organization and local purchasing group i.e. in Functions-> Corresponds  I'll have to leave blank. plz suggest
    2. Also is IPC configuration mandatory for extended classic scenario
    Plz give your suggestion on above mentioned issue
    Regards
    Pawan Keshwani
    Edited by: pawankeshwani on Mar 18, 2011 8:33 AM

    Hi Pawan,
    No you should mention Purch Org & Purch Grp also wrt your backend (ECC).
    IPC need not be configured separately from SRM 5.0 onwards. To ascertain if IPC is working fine just run the report : RSVMCRT_HEALTH_CHECK. You should see 4 success messages. Else get in touch with Basis to enable Virtual Machine Container (VMC)
    Regards,
    Nikhil

  • Organization structure in CRM 7.0 from ECC and HR

    Hi,
    We are trying to download Org structures from ECC and HR. (CRM 7.0, HR & R/3 ECC 6.0)
    From HR
    The ALE distribution is set across the systems CRM and HR and I did the PFAL run as per the best practices BB C05. There are about 100,000 Idocs inbound to CRM system and out of which about 15K are in 51 status and the rest are in 53 status.
    Observations:
    The Organization structure from HR is not totally mapped in CRM but only a part of it is displayed in PPOMA_CRM.
    The remaining Org units are found in 'non-related objects' selection.
    All the Idocs in failure are in error "Error in subroutine read_namtb for structure  of infotype  ". When I go to the long text
    Message no. 5-109
    Diagnosis
    An error has occurred in subroutine read_namtb for structure  of infotype .
    Procedure
    Check the entry for infotype  in table T777D (structure, IDoc segment, expanded structure) and the corresponding structures.
    I am not sure which infotype needs to be checked in T777D.
    From ECC
    The CRM - ECC connectivity is set. Downloaded all the required customizing objects successfully. Switched the org model to "enhanced backend integration version " and then followed on to SPRO->CRM->Master Data->Organizational Management->Data transfer->Copy SAP ECC structure and selected all the available R/3 Organization assignments available and then selected the "generate selected lines".
    Observations:
    All the generated org units are in GREEN in SPRO but there are no assignments found in PPOMA_CRM not even in the unrelated objects
    Checked tables HRP1000 and HRP1001 from the CRM Sales org unit IDs (ex: O 5000012) created here and they are not found but the generation is in GREEN.
    I will appreciate any assistance I get here.
    << Moderator message - Everyone's problem is important >>
    Regards,
    DT
    Edited by: Rob Burbank on Oct 20, 2010 4:25 PM

    Hello DT,
    Could you please let me know the process how the problem is solved..
    even we are having the same issue like, we have downloaded the Org Model form HR to CRM system, till here it was fine.
    when we are trying to download the ECC sales structure(CRMC_R3_ORG_GENERATE) to CRM system, i have selected all the items and triggered the Gerenerated Selectd Lines, but after all the items are generating in a error with RED.
    Could you please share you knowledge, so that it will help me in figuring out the issue.
    Thanks in Advance DT. Hope you reply back.
    Regards,
    Ven

  • Regarding workflow  organization structure

    hi Gurs.
    How to create Organization Structure, Create Workflow with Multiple Approval based on Organization Structure.
    this is my requirement i dont no how to create  organization  structure in which tcode  i have to build and what all steps.
    pl help me.
    Regards
    vijay

    Hi,
    Your thread has had no response since it's creation over
    2 weeks ago, therefore, I recommend that you either:
    - Rephrase the question.
    - Provide additional Information to prompt a response.
    - Close the thread if the answer is already known.
    Thank you for your compliance in this regard.
    Kind regards,
    Siobhan

Maybe you are looking for

  • NPE when selected side left empty in Ordered Shuttle

    When all the entries from the shuttle we have created are moved from the Selected Side to the Available Side...and when we try to save it using a button, the following error is shot: "ADF_FACES-60097: Server Exception during PPR, #2" and the log entr

  • Ipad can't see videos on SDHC card

    I recently bought a Samsung HMX-F90 video camera.  My ipad can see the still pictures that i've taken but can't see the videos that I've taken when I put the SDHC card in my card reader.

  • Acrobat 7 document goes blank after digital signature

    Secretary creates document on network drive. When a manager digitally signs the document it goes blank. Acrobat Pro 7.1.4. After multiple tries the document will work. Can automatic saving be disabled during the signing procedure so that the document

  • Memory Management, Crit Structure Corrupt, Bad Pool Caller, ntfs file system error

    So after freshly installing Win 8.1 I was happy, untill I started to play some games that I previously played on Win 7, I've started to get a whole heap of errors, I did have more written down but have lost the bit of paper they were written on.  Her

  • Kind of SUM.IF in Crystal  XI

    Hello, I've an special requirement to sum a field based on  it's ID number (invoice number). To be simple, I've 3 groups: customer, advance payment and application of advace payment, respectively. Some of the invoices can be applied  from many advanc