Oultook work hours forwarding in Lync forwarding settings

Hello Team,
1. Just wanted to find out if there is a way to administratively manage the Oultook work hours forwarding in Lync forwarding settings.
2. In Lync there is an option in forwarding setting which says "These settings will apply" all the time or outlook work hours.
3. But in SEFAUtil, we cannot see a parameter to set that for a particular forwarding scenario (delegation etc)
4. Have I missed something or is it only configurable using the Lync client ?
If it is only configurable using the lync client,
how do we manage EV migrations which requires customisation of outlook work hrs for migration groups. Asking users to perform these configuration is the only option??
Please advise. Many thanks.

Sry i might misunderstand your question,but i thought it was to forward calls after workhour.Link you refer to is transport rules,dont think that will help.
What i mean is to login to mail.domain.com/owa as user you wish to create the rule.
Go to options - settings- other - phone and you will see this option
you will have to play with settings to fit your need.
Another rule you can set can be read here: https://technet.microsoft.com/en-us/library/dd335138(v=exchg.150).aspx
and here : https://technet.microsoft.com/en-us/library/jj898495(v=exchg.150).aspx
Please mark as helpful if you find my contribution useful or as an answer if it does answer your question. That will encourage me - and others - to take time out to help you. Thank you! Off2work

Similar Messages

  • What's the meaning of Forward No Coverage at Call Forward and Call Pickup Settings

    hi All,
    Please, I have a CUCM and I need to understand the meaning of the follow configuratio at the line:
    Forward No Coverage Internal  
    Forward No Coverage External   
    Forward on CTI Failure   
    Could you explain to me by a easy way?????
    How can I do a test?
    Thanks a lot

    Actually the no coverage is not only for DNs in line groups. The way no coverage works is that you set a CF setting on any phone (doesn't need to be in a line group), and you send them to a hunt pilot. ie CFB to a hunt pilot
    In the hunt pilot for the Forward Hunt No Answer/Forward Hunt Busy you choose:
    Use Personal Preferences—Use this check box to enable the Call Forward No Coverage (CFNC) settings for the original called number that forwarded the call to this hunt pilot.
    So, after it rings your phone, rings thru all the hunt pilot/hunt list/line group members, it goes back to the phone that routed the call to that hunt pilot, looks at the no coverage setting and does as instructed. Send it to VM, another hunt pilot, your mobile, etc.
    HTH
    java
    If this helps, please rate
    www.cisco.com/go/pdihelpdesk

  • Firefox cannot load anything but the Inbox on gmail (it can neither reply, nor forward, nor load the Settings tab), but the xplorer can

    I have a very specific problem, only with the Gmail page. This problem only occurs on Firefox. I get the Inbox page and see my messages, but I cannot do anything other than that. I cannot reply, forward, or open the Settings tab. Whenever I try to do anything of the sort, it remains jammed on "Loading..." and never changes the page. I do not experience this problem with the Explorer, so I have to use Explorer to work with my Gmail web account.

    I have two yahoo accounts and I know as they 'improved' their servers I had periodic outages. It'd work fine on my webmail on  my computer, webmail on the iPad, but not via the mail app. And it was stuff on their end. It may be a case of wait and see and you may need to eventually remove/readd the account on your iPhone.
    When the issue is on their end, unfortunately there's not much for users to do beyond wait it out or find work arounds.

  • HT4623 I am upgrading my iPad to iOS 7 but the progress bar is at 1/4 position for two hours and not moving forward. Is there any problem with it? What should I do? Thanks.

    I am upgrading my iPad to iOS 7 but the progress bar is at 1/4 position for two hours and not moving forward. Is there any problem with it? What should I do? Thanks.

    This is a concern amoung many corporate users.  It's going to take somekind of policy change with apple.
    Enterprise support:
    Call enterprise support  (866) 752-7753  to create  a case ID number

  • I couldnt find call forwarding options in the settings, can somebody help me to rectify it

    i couldnt find call forwarding options in the settings, can somebody help me to rectify it

    Call forwarding is a carrier feature. Contact your carrier to see if such is available, & if so have such provisioned on your account.
    Note: If a CDMA iPhone, you won't have a setting for call forwarding, even if provisioned on your account.

  • Resource availability during Non-Working Hours and Weekends

    Hi Gurus,
    Aim: Make the Resource available during Non-Working Hours and Weekends
    Requirement: CRP functionality enabling
    In CRC2 I have selected capacity tab and in capacity header under 'Change Interval and Shifts' button. I have Inserted a new Interval period and given the validity from/to dates(Non-Working day - Saturday) and Saved.
    When i execute the Capacity Planning CM01, there is no change. The Resource availability still shows as "0"hrs for this particular date and for rest of the days it shows as 8hrs.
    I have checked the same even after executing the MRP, No change in Capacity Planning Overview - Still the available Capacity Showas as 0
    Please guide me, how can i use my resource during the holidays. Means make the system understand that the defined day is a working day though it is holiday as per factory calendar
    Please correct me whether am i missing any settings or i should follow some other logic
    Regards,
    Tam

    Hi Partha,
    In workdays i dont have any such option "2"
    As per standard list I could see only 3 entries in the possible values(F4) popup
    "Blank" - Working days according to factory calendar
    "0" - Non-Working days(Overrides factory Calendar)
    "1" - orking days(Overrides factory Calendar)
    I have even tried with option "0" and "1" its still the same, when i enter the period From and To date the fields for the entries Shift start and end date, workday, Shift Seq, Length of the shift, No.of shifts.........are jumping to the next line item.
    Because of which i understand that the entered values is not corresponds to the newly defined period
    Pls guide me to how to make the resource available during non working days
    Regards,
    TamNen

  • Project 2013, check working hours when assign tasks

    It maybe a foolish question. But I am really a new guy to use PWA. Please help me.
    while I set a task and assign it to user A for 4 hours , can system shown a alert or some tag if A's planing_working hours will be over 8. 
    I know Professional can do like this, can it be shown in PWA? 
    And is there a button to check resource's working hours not over 8 hours per day when I write down plan in PWA?
    /Jou Chen

    Hi Jou Chen,
    There is no foolish question about Project, don't worry!
    1- In Project Pro, you have the overallocated symbol ("red guy") in the indicator column, but there is no such thing in PWA. That being said, you could insert in the PWA view definition (PWA, server settings, manage views) the "overallocated"
    column (choose an assignment view such as assignment summary since the overallocation is a assignment level). Then you could see overallocated assignments and filter/group your assignment along this field.
    2-There is no such button, but as adived above, you could use the overallocated column as a filter to identify overallocated assignments.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Std report for viewing emp working hours

    Hi all,
    I want to know what is the standard report available in HR module to view the Employee aproved working hours and Unapproved working hours...?
    Regards,
    Shanthi

    Hello,
    maybe you can find this data, at the PT62, PT64, PT65, PT90_ATT and PT91_ATT TRANSACTION CODES.
    Regards

  • My iphone 4 wont connect to my wifi, it usualy works fine, when i go to settings it says its connected but on the home screen it still says 3g and is running at 3g speeds still, please help :)

    my iphone 4 wont connect to my wifi, it usualy works fine, when i go to settings it says its connected but on the home screen it still says 3g and is running at 3g speeds still? please help

    http://support.apple.com/kb/ts1398

  • In iCal, "Available Meeting Times" greys out working hours one day off, MS Exchange

    I am using iCal, accessing an MS Exchange server. When setting up a meeting, "Available Meeting Times" greys out the non-working hours of potential meeting participants. However, the days are one day off. E.g. the working hours of my collegues are displayed are Tuesday-Sunday instead of Monday-Friday. The dates and times of meetings are relayed correctly. Only the display of the working hours seems to be off.
    Needless to say that my collegues are using Windows Outlook, and everything works there.

    I still have the same issue. Had it ever since at least 2010 and meanwhile we switched Exchange-Servers and I'm on Mavericks, but still. Looks to me as if iCal requests something like "getWorkDays" from teh Server. The Server probably replies [2,3,4,5,6]. When the week starts on Sunday, this is perfectly fine. But if the Week starts on Monday, this will give you Tue-Sat as available Days. So it might be a bug in either Exchange or iCal to treat that information correctly, but I'm not obv. not sure about that.

  • Project 2013 - entering work hours at a monthly level

    Hi all, 
    Any help with this 'hopefully small' problem will be hugely appreciated. It's not so much a problem, but
    me still being new to Project - sorry! As a summary of what I am working with:
    I have entered a list of tasks (all set to Manually Scheduled).
    I have entered a number of resources into the Resource List. 
    I have also assigned relevant resources to the tasks. 
    Using the Task Usage view, I would now like to begin entering Work hours for the resources assigned to the
    tasks. We are planning at a monthly level, so I know how many hours each resource is expecting to be spending on each task over each month. 
    I have set the Timescale of my Task Usage screen to a monthly scale, thinking that this would allow me to
    enter total hours for each month. As an example, one of the resources assigned to a task is set for 15 hours of Work in April. It all seems to look OK on input. 
    My problem is however, I would like the Start and Finish fields to reflect this, and span over the months
    in which the Task's resources will be doing work. It doesn't seem to pick up the month accurately. Although I have entered the 15 hours in the column labelled April, the Start and Finish dates have come out as 30/04/14 and 30/05/14 respectively. I was hoping
    the Start and Finish times of that row to be 01/04/14 and 30/04/14 respectively, but they are a month out of line, and has show the work to be happening over May, not April. Is there y way I can change this?
    I hope this makes sense as a question? Any help at all would be brilliant. Please do let me know if I've
    missed any detail and you need some more info. I'll also continue looking through the forums to check if this has already been asked. 
    p.s. I tried to upload an annotated image, but my account needs to be verified first. Do I need to do anything to request this? I didn't receive any usual 'verification' links in MS's email on opening this account.
    Thanks very much, 
    ac18

    Hi John, Julie,
    Thank you both very much for the help! Yes good spot, I did post it on both forums (http://www.msofficeforums.com/project/21190-project-2013-entering-work-hours-monthly-level.html) - it's been years since I've used forums of any kind, and it's great to see
    experts being active across multiple sites! 
    I have given both suggestions a try, but unfortunately am still not quite there yet. 
    John, although your tip seems to work OK, I think I was hoping to find a way for the Start and Finish times to automatically span across the Work hours I have entered. If I was to then enter another 5 hours, but this time for March, the Start-Finish dates
    should auto update to be 01/03/14 - 30/04/14. I understand now that this may require me to be on an Automatically Scheduled project? 
    Julie, your screen shot on the msofficeforums.com website is exactly what I am looking to achieve! I would like to enter month-level Work data, and that looks to be exactly that. I did try entering a zero in the month immediately after the last month that
    had hours in it, but Project seemed to simply ignore it, with no visible change to the dates. 
    I have done some further investigating, and there does seem to be something different happening with my Project version (it's Proj Prof 2013). I have access to another computer with Project 2010 installed on it, and this doesn't seem to cause an issue. Note,
    I did need to have set the tasks as Auto Scheduled. 
    Essentially, if I try and exactly replicate Julie's example on both versions with the following steps, I get slightly different results:
    Tasks set to Auto-Scheduled. 
    Set Project Start Date to 01/01/14
    Enter some resources. 
    Switch to Task Usage view. 
    Set the Timescales on the right hand side to: Bottom tier=Months, Middle tier=Quarters. 
    Enter a task. 
    Assign resources to the task. At this point, by default 8 hours worth of work appears for each assigned resource. In 2010, these hours appear in the January 14 column. But on my 2013 laptop however, these hours appear under the December 2013 column. Strange?
    Anyway, in both cases I clear these default hours by entering zeros in their places.
    I now enter 15 hours under April 2014 for one of the resources on the task.
    In 2010, the Start and Finish dates of the assigned resource's row update to 01/04/14 - 30/04/14.
    In 2013 however, the Start and Finish dates update to 30/04/14 - 30/05/14. 
    I have a feeling that this discrepancy is perhaps at the heart of my problem? Is there a setting with the application that I am not making?
    Thanks again, 
    Arjun

  • How can i do a proper calculation of working hours?

    I have tried doing a calculation of my working hours using the ABS formula but it still gives me the wrong answer.
    5:00 PM
    1:00 AM
    16h
    the formula is =ABS(A1-A2)
    the resulte shoulb be 8h but it shows 16h....

    giltober wrote:
    Jerry,
    I start working at 5pm and finish in 1am which means i worked for 8 hours.
    the only way to get the correct answer is to enter the dates also?
    is there a formula that i can enter that will take in consideration that every time i work i start at the afternoon and finish after midnight?
    i have a cell that i enter the date..
    im still new to numbers and i dont know i to put that into consideration...
    thank you for your help
    Gil.
    That's right, my mistake on the detail. I must have been distracted. I stand by the rest of my post.
    Here's my approach to solving the problem:
    This will take care of the situation where you sometimes input both times on the same day even though they represent different days.
    Jerry

  • CRM 5.0 - IC WebClient - Due Date - Working Hours for Service Ticket

    Hi Gurus
    We're using a Service Ticket Transaction which has a Date Profile which provides a 48 Hour window for which the user must complete the Service Ticket Resolution.
    The issue is I want to tie this up to the Business working Hours. I just cannot figure out where I define the Business Working Hours.
    This is a Standalone CRM Implementation. Maximum points for the right answer.
    Many Thanks
    Panduranga

    Hi,
    The response time of 48 Hours must be maintianed in response profile... right?
    Similarly there is a availability profile in which you maintain the business hours/ availablity of your resources.
    These both together make a service profile.
    The availability profile is maintained in SAP Easy Access> Service> Service Contracts and Service Plans --> CRMD_SERV_SLA - Maintain Availability and Response Times
    Hope this will help
    Regards
    Rekha Dadwal

  • Calculation of working hours

    Hi all,
    I need a function module for the calculation of working hours. supose in the selection screen if i give 01.02.2007 to 01.10.2007 i need the calculation of working hours in that given range depending upon the personal number. Suppose if the employee is absent for 3 or 4 days within particular period of theat given range that days needs to be eliminated and should calculate for the rest of the days. Please find the below code iam finding a problem in this piece of code. Please this issue is very urgent please reply ASAP.
      gv_day = sy-datum - 7.
      CALL FUNCTION 'HRWPC_BL_DATES_WEEK_INTERVAL'
        EXPORTING
          datum    = gv_day
          week_pst = 0
          week_ftr = 0
        IMPORTING
          begda    = gv_begda
          endda    = gv_endda.
      IF sy-subrc <> 0.
      ENDIF.
    *AT SELECTION-SCREEN OUTPUT.
      pnpbegda = gv_begda.
      pnpendda = gv_endda.
    START-OF-SELECTION.
      SELECT sachn
             usrid
        FROM t526 INTO TABLE git_tmadmin
       WHERE sachn NE space
         AND usrid NE space.
      IF sy-subrc EQ 0.
        SORT git_tmadmin BY usrid.
      ENDIF.
    GET pernr.
      rp-provide-from-last p0001 space pn-begda pn-endda.
      IF pnp-sw-found <> 1.
        REJECT.
      ELSE.
        IF p0001-kostl NOT IN s_cctr.
          REJECT.
        ELSE.
          rp-provide-from-last p0007 space pn-begda  pn-endda.
          IF pnp-sw-found = 1.
            MOVE p0007-wostd TO gs_empdtls-wostd.
          ENDIF.
          MOVE :  p0001-pernr TO gs_empdtls-pernr,
                  p0001-kostl TO gs_empdtls-kostl,
                  p0001-ename TO gs_empdtls-ename,
                  p0001-sachz TO gs_empdtls-sachz.
        Employee Position from PA0001
          MOVE: p0001-plans TO gs_empdtls-plans.
          APPEND gs_empdtls TO git_empdtls.
          CLEAR gs_empdtls.
        ENDIF.
      ENDIF.
    Regards
    Mahesh

    What error are you getting?

  • Hello, I have an iPod touch and it don't has light or brightness. I can see the icons and use it but can get it work properly. I went to settings and the brightness is adjusted tu full level. Any idea?

    Hello, I have an iPod touch and it don't has light or brightness. I can see the icons and use it but can get it work properly. I went to settings and the brightness is adjusted tu full level. Any idea?

    Try a system reset.  It cures many ills and it's quick, easy and harmless...
    Hold down the on/off switch and the Home button simultaneously until the screen blacks out or you see the Apple logo.  Ignore the "Slide to power off" text if it appears.  You will not lose any apps, data, music, movies, settings, etc.

Maybe you are looking for

  • Time Machine Backed Up to Host Computer

    Dilemma.  Settings in Time Machine were such that when it backed up....it backed up to computer rather than external drive. Now "backup" files are clogging my hard drive but can't find them. I know this because when I go to "about this mac", it indic

  • How do I change my settings for Device viewing?

    I am a first time user very new to everything related... How do i change the settings for what devices a published book (digital only) to be viewable on all devices??  right now it is only viewable on the iPad... please help 

  • Question about DHCP Active IP Table WRT54G v2

    I'm seeing something that I need to ask about. On my DHCP Active table, I should only be seeing 2 mac addresses which is mine and my kid's pc. I only connect wirelessly. I have WPA set. I've noticed other mac addresses show up. Although, the ip addre

  • Oracle Apex 4.0

    Hi All, i just installed oracle 10g express on windows and then installed oracle Apex 4.0. i installed it using this guide http://www.scribd.com/doc/5456221/Stepbystep-guide-to-install-Oracle-APEX-on-XE-on-Windows The i tried to login to application

  • Disconnected users in 9i

    I've developed a sales force application where the forms 6i application and the DB(8.1.7) are running Client/Server on a laptop. The user only connects to replicate data between their local database and a master database. How would I re-engineer this