Output determination: Dispatch time for Outline Agreements

Hi gurus,
I have an issue, when I am creating an outline agreement, by defaul the output message type: NEU is showed, and, it is fine, but, the dispatch time is always = 1 - Send with periodically schedule job.
In the customising of the output NEU, I have:
General data:
Access sequence = 0001
Check box active = Access conditions
Check box active = Multiple issuing
Print parameter = Purchasing group
In the fine-tuned control, the "Update Print-Related data" is not active.
And, I do not have defined any message schema for this output.
And, then, I customised the dispatch time for NEU with the value = 4 - Print immediately, but, still is appearing the dispatch time "1".
Then, I created 1 condition record with POrg, Doctype and Vendor, but, still is appearing the dispatch time "1".
Could you help me with this, please?
Kind regards,
Sandra PF

Hi Biju,
The point is that this output message type does not have a "Message schema determination", for that reason, if I am creating the condition record, it will be never updated. I was doing a testing and saw it.
But, if my message type NEU does not have any schema and according to SAP, by default will define the message type NEU, why the dispatch time is still = 1 if in the customising of NEU I have defined the dispatch time = 4?
More ideas?
Kind regards,
Sandra PF

Similar Messages

  • Output Determination Configuration Setting for GoodsIssue(Transfer Posting)

    Hello Gurus,
    Can any one give the details for Output Determination Configuration Setting for Goods Issue(Transfer Posting).
    Thanks N Regards,
    Venu MG

    hi,
    PRINT OUT OF MATERIAL DOCUMENT AT GI/Transfer posting:
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensured in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Pr Det by Pl/StoLoc, maintain the Output device for all your Plants
    7. In MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.(Condition records)
    8. While doing MIGO, ensured that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    Now go to MB90 entered the output type as WE01, Tr m as 1, Sort or. 01, Pro.mode as 01, and executed. Sytem outputted all the material documents that has to be taken print out.
    Regards
    Priyanka.P

  • Process the output with dispatch time 3

    Dear experts!
    Thank you for your attention!
    I ues output type BA00 to print order confirmation and set the dispatch time 3
    after i save the order, where can i process the output?
    as in delivery output, we can use VL71 to process outbound delivery.
    which t-code could i use to process the order output with dispatch time 3  ???
    Best regard!
    Tangdark

    is there anyone can help???
    please~~~

  • Delivery date for outline agreement requisition

    Hi all,
    When I create a purchase requisition (ME51N) for a non stock material, for example, using req type NB or FO, the delivery date defaults to the current date. If I create a req with the same information but using type RV (outline agreement) the delivery date defaults to blank. I found out that in the IMG, under the req doc type config, the type RV is associated with the "Control indicator for purchasing document type" = R (Purchase requisition for outline agreement). If I clear this field, the delivery date starts defaulting to the current date. I created 2 reqs side by side (one with the indicator "R" and the other without) and I did not find any difference except for the delivery date. Does anyone know what the impact is to clear field V_T161-BSAKZ for doc type RV?
    Thanks.

    Hi
    The control indicator "R" determines Filed selection. ie Which requires mandatory or optional. For Doc types RV field selection groups is RVB , in that Delivery date is not a Required/optional/Dsiplay field., this works in conjunction with control indicator "R".
    Hence when you try to create with Doc type RV and control indiactor "R" it is not propsoding the current date. When you remove Control indicator "R" the field selcetion groups becomes NBB , in that Delviery date is Required filed, so the system proposes the current date .
    The impact of removal of control indicator "R" is nothing.
    Regards
    DRN
    Give points if ok

  • Unable to prevent Price change for Outline Agreement

    Dear Experts,
    Once Outline Agreement is generated in SAP, I do not want to allow users to change the price.
    I have tried with " Field Selection at Document level" using ME32-Change outline agreement field selection.
    I select "Quantity and Price" and select check box Display for  "Price and Price Unit",Price Date", "Condition Group".
    This will not allow price change at item details level (field grayed out) but user can still select Item condition (for Example PB00) and change the price there.
    Is there any solution for this ?
    Ideally I want to do this for a particular Document type of Outline Agreement only.
    Thanks and Best Regards,
    Raju

    Hi Ramki,
    Thnka s for you reply.
    This is not the desired solution. I can not ask Client to change to create different uses for create and change .
    In the buinsess process , mostly create an change users are same for outline agreements.
    I do not wna to restrict by User Authorization either as this is also not a 100% solution.
    Still  looking at configuration level only to restrict changes in Pricing for outline agreements.
    Regards,
    Mitesh Desai

  • Report for outline agreement

    Hi Guys:
    I`m wondering on R/3, is there some transaction code or dynamic selection i can use to run a report for outline agreement. i am looking for one report that will generate following information: Outline agreements that has not been used since August 2007 till now, which means no Purchase orders drawn off the outline agreement.
    In other word, Outline agreement with Purchase order but has not been used since a particular date.
    Much appreicate your help indeed.
    Forrest

    Hi Manish:
    Thanks a lot.
    If i specify document date from 01.08.2007 to 14.05.2009, meanwhile, input RAHM into Scope of list. Then i will get one report including all the outline agreement created in this period, with filter, i think i can pick up outline agreement is not used until now.
    I have another concern, how about the outline agreement created before 01.08.2007, but these outline agreement has not been used from 01.08.2007 to 14.05.2009.
    Waiting for your solution.
    Forrest

  • Exit for role determination via exit for scheduling agreement and contract?

    Hi..
    I have a requirement to fetch the agents in run-time for PO,PR,SCHEDULE AGREEMENT, CONTRACT..
    For PO i am using EXIT : - M06E0005
    For PR release i am using EXIT :- M06B0001
    By using above 2 exits i am getting the agents at run-time...
    Same way i need the EXIT for SCHEDULE AGREEMENT and CONTRACT..
    if there is any EXIT for this please share with me..
    Regards,
    Imtiaz Khan

    Hi Imtiaz,
    Ideally you should have your agent determination logic in workflow itself instead of determinining them in EXIT.
    Can you tell me why you are determining agents in exit and how you are making use of it ?
    Also let us know how your workflows are getting trigger for all these documents.
    Regards,
    Ibrahim

  • Function Module for outline agreement

    Dear Sir,
    I want to know the function module for contract/outline agreement from where I can fetch the details of release orders against the given contract.
    Regards
    Amit Agarwal

    Hi
    Go to SE37 enter the Outline agreement and press F4
    you can see the function module
    (or) Post the same message in  SAP ABAP forum
    G.Ganesh Kumar

  • Output Determination Procedure ME0001 for Material Movements

    Output determination procedure ME0001 is used for inventory management output.  I know where it is maintained.  Where is this assigned in the IMG?  I can not find the assignment and am starting to think everyone has to use ME0001.

    Found some SAP documentation on MM output management.
    ME0001 "is a program constant and cannot be changed by the customer.".  New custom output types can be added to ME0001, but a custom procedure cannot be used.

  • RED light in Output determination in VA02 for Custom SAP Script

    Hi,
    Am trying to get Order Acknowledgement output from VA02 as a preview. We have custom Script, custom print prog. So, I went to VA02>Extras>Output>Header>Output.....but, here am seeing the associated OUTPUT TYPE ZB00 as RED light!!
    So, pls. let me know that,
    1 - Why am gettign RED light? Wht culd b the reasons?
    2 - How to fix it to get it GREEN?

    Hi,
    Did you try debugging the print program? Also check the output determination analysis.
    Follow below path. Once you are in outputs edit screen...
    Select your output, menu=>Goto=>Determination analysis(or ctrl+f1).
    Here you can see what went right and wrong for all the outputs allowed for that order. You can see there might be some routines which has not been satidfied. Check this analysis for your output and see what is wrong.
    Condition records might also be missing. Check with your functional for this.
    Thanks,
    Vinod.

  • Output Determination using Requirement for Shipment

    I created a new output requirement, 909,  to handle two different formats for shipment bills of lading.  The new requirement prevents a NAST record for format B from being created if a NAST record for format A exists.  It works in the development environment and was transported to the QA environment.  It does not work in the QA environment.  It appears the requirement is not being check.  Output determination procedure, access sequence, and output types are the same.  The condition records created via VV73 are the same.  What could cause a requirement to not be used?  Thanks for your help.

    Needed to execute RV80HGEN.

  • Output determination in SNC for order confirmation

    e want to use output determination to update SNC replenishment order when changes are done in R/3 sales order. We are not using new doc type. So no option left but to use 'Created by' as an option to trigger an output determination but it's not working as dezired. What could be best to use for output detrmination.
    thx

    Hi Vaibhav
    As far as i understood you have created
    Output type assignment to partner functions under spro-s&d-basic func-output control-maintain output deter for sales doc
    -assign output type to partner function-
    Output Type: XX
    Medimu : 6
    Funtion: $$
    Name :Created by
    Under  spro-s&d-basic func-Partner determination-setup partner determination-Set Up Partner Determination for Sales Document Header
    for each sales doc type a partner determination procedure is assgined under Partner Determination Procedure Assignment node
    Under Partner Functions, can you try using partner type as customer or logical system instead of user???
    and assign teh same partner type to ur Partner Determination Procedures under Partner Functions in Procedure node
    And try to check,
    Best Regards
    Vinod
    Edited by: Vinod Kumar Pedapati on Feb 14, 2011 1:19 PM

  • Find condition record for outline agreement

    I want to know how I can find the condition record for an outline agreement.  The condition number is not stored in EKKO and within the ME33K transaction I can view the condition by drilling into the item level (EKPO), but I canot find anyway of linking the agreemtn to the condition table KONP.
    The reason for the qeustion is we want to outpu all agreements that have a certain condition. Any ideas.

    try this code
    REPORT zpwtest .
    TABLES : ekko ,  ekpo , lfa1 , komk , komp , t001 , t001w , komv .
    DATA : tkomv  TYPE TABLE OF komv  .
    PARAMETER : p_ebeln TYPE ekpo-ebeln ,
                p_ebelp TYPE ekpo-ebelp .
    SELECT SINGLE *
      FROM ekko
    WHERE ebeln = p_ebeln .
    SELECT SINGLE *
      FROM ekpo
    WHERE ebeln = p_ebeln
      AND ebelp = p_ebelp.
    SELECT SINGLE *
      FROM lfa1
    WHERE lifnr = ekko-lifnr .
    SELECT SINGLE *
      FROM t001
    WHERE bukrs = ekko-bukrs .
    SELECT SINGLE *
      FROM t001w
    WHERE werks = ekpo-werks .
    CALL FUNCTION 'ME_FILL_KOMK_PO'
      EXPORTING
        i_ekko  = ekko
        i_ekpo  = ekpo
        i_lfa1  = lfa1
        i_t001w = t001w
        i_t001  = t001
        i_kalsm = ekko-kalsm
        i_kappl = 'M'
        i_kvorg = '02'             "Preissimulation
      IMPORTING
        e_komk  = komk.
    IF komk-prsdt EQ 0.
      komk-prsdt = sy-datlo.
    ENDIF.
    komk-fbuda = sy-datlo.
    CALL FUNCTION 'ME_FILL_KOMP_PO'
         EXPORTING
              i_ekpo  = ekpo
              i_t001w = t001w
              i_ekko  = ekko
              i_komk  = komk
    *              I_MT06E = MT06E
    *              I_EINA  = EINA           "hier nicht gefüllt
         IMPORTING
              e_komp  = komp.
    CALL FUNCTION 'PRICING'
      EXPORTING
        calculation_type = 'B'
        comm_head_i      = komk
        comm_item_i      = komp
      IMPORTING
        comm_head_e      = komk
        comm_item_e      = komp
      TABLES
        tkomv            = tkomv.
    LOOP AT tkomv INTO komv .
      WRITE : / komv-kschl , komv-kbetr CURRENCY komv-waers , komv-waers .
    ENDLOOP.

  • Output determination (print out) for service entry sheet

    All SAP Gurus,
    What are the steps involved in determining the output (print out) for service entry sheet?
    Regards,

    Hai,
    Goto NACE select the Application ES, out type NEU and maintain the program SAPFM11, Formroutine ENTRY_NEW, form ML_SERVICE_ENTRY aganist medium printout and maintain the condition records for printout to VN.
    take print in ML83
    Regards,
    eswaramanu...
    Edited by: eswar manu on Oct 21, 2008 8:37 AM

  • Output Determination - Goods receipt for Subcon PO

    Hi experts,
    I have configured output for Goods receipt for PO. Its working fine for standard PO.
    But not working for Goods receipt for Subcon PO.
    In MN21 - i maintained condition record -
    Trans / Event Type  - WO
    Print Version - 3
    Could you help me to resolve this issue.
    Regards,
    Jackie

    Hi,In MN21 you need to do the settings for Output types 'WLB1' for Individual Slip or 'WLB3' for Collective Slip for the Subcontracting Mat Doc. for 541,
    Similarly for 101 you need to do the settings for output type WA01, also check in MIGO the 101 document in display, the tick is marked for getting the output. without that tick you will not be able to see & print the Mat. Doc. in MB90.

Maybe you are looking for

  • Hi experts pls help me with this materialized view refresh time!!!

    Hi Expeerts , Please clarify my doubt about this materialized view code [\n] CREATE MATERIALIZED VIEW SCHEMANAME.products_mv REFRESH WITH ROWID AS SELECT * from VIEW_TABLE@DATAOPPB; [n] Here i am creating a materialized view named products_mv of the

  • Deploying a JSP application into Oracle8i

    Hi, I developed my application using JSP and Servlet on Tomcat Server 4.0.1. Now i want to finally deploy my application on Oracle8i Servlet Engine. How can i deploy there? Thanks, Imran

  • Upgrading Oracle XML Parser for Java v9.0.4 with Oracle Applications 11i

    Guys, I applied ATG.PF.H.RUP4. In postinstall steps it is mentioned,Upgrading Oracle XML Parser for Java v9.0.4 with Oracle Applications 11i(doc-271148.1) which says after applying patch 4038964 do the following-- AUTOCONFIG ENABLED APPLICATIONS ENVI

  • IDCS5: How to access selected layers in layer panel

    It seems the way to access the selected layers in layer panel has been changed in CS5. Here is a link to the code that worked with CS4, but it is not working on CS5. http://forums.adobe.com/message/1304622#1304622 Is there some way to find out how it

  • My iphone 4s turned off and will not turn back on

    i have since turned my iphone back on by : 1. holding down both home button and lock button 2. held for 15-20 seconds 3. released i am just wondering why my iphone 4s turned off in the first place so i can prevent it next time any answers thanks in a