Overclocking 2.4 800FSB - Start to Finish

I've notice that the cheapest way to go for speed appears to be the following combo which i hear is getting quite popular with this MB. So i was hoping that everyone or anyone could help out with a guide for the beginner from scratch.
I will be builiding this system tommorrow and am happy to post all results which i hope should help other that have this or a similar setup....
Lets all chip in here
SYSTEM
MB: 865PE Neo2 FISR
CPU: Intel P4 2.4 800FSB (Intel Fan)
RAM: 2 x 512mb 3200 (Generic)
Video: Leadtek 5200 128mb
HDD: Maxtor Raptor 10000rpm
Case: Generic Midi Tower
COST: $700 US
Step 1: ?

A simple search would have found your answer : http://www.msi.com.tw/program/service/forum/index.php?threadid=29142&sid=

Similar Messages

  • I entered a new calendar event at I cloud on my laptop.  The enent showed up on my I Phone  4S but, the start and finish times on the entry in I cloud was different than the times shown on the I phone calendar.  How do I sync the time in my I Phone with

    I entered a new calender event using I cloud on my laptop. The enent transfered to my i Phone 5 S but, the start and finish times shown st i cloud on the laptop are different than the times shown on the i phone.  How do I sync the times on the i Phone with the times shown on the laptop i cloud calender?

    Turn off time zone support on the phone.

  • How to start and finish a transaction using EJB 3.0 in JDeveloper

    Hello everybody!
    Does anybody can explain how to start and finish a transaction using EJB 3.0. I need to start a transaction insert some information in some tables and if everything was fine commit the information.
    I put the annotation @TransactionManagement(TransactionManagementType.BEAN) in my session bean and @Resource SessionContext ejbContext; but I don't what anything else I have to do.
    Any help will be appreciate.

    I tryied to use in the client the statement EntityTransaction transaction = myBean.getTransact(); but I receive the EJBException: Cannot use resource level transactions with a container managed EntityManager
    I just need to start a transaction something like this: transaction.begin(); and finish the transaction, something like this: transaction.commit();
    Does anybody can help?

  • Why won't iTunes just PLAY an album, in order, from start to finish?!

    Very confused....I can't get an album to play through iTunes on my Mac anymore. It used to work just fine but now, no matter what I try, every time I try to play an album iTunes just picks one song at random from the album and plays that. It  won't move on to the next one, even if I try to press the button to skip to the next track. It always seems to play the same track and won't let me do anything!
    It's really annoying and I can't see what is different from before I downloaded the latest version of iTunes. Getting thoroughly disheartend with iTunes lately; wish I had never bothered downloading the latest version-it's horrible!
    Can anyone out there help with a straight forward and not-too-technical explanation to help me to be able to play an album, from start to finish , in the order it was made without having to mess about?  I am not used to the whole "Apple" way of working yet- previously had a PC with Windows Media Player which worked really easily. iTunes is infuriating me so far!
    Thanks!

    Open iTunes and go to View>Show Sidebar and View>Show Status Bar.  This will make the new version appear more like earlier versions.  Then go to the Controls menu at the top, choose Shuffle and click "Turn Off Shuffle" (if it shows this).

  • Any advantage in working in ProRes 422 start to finish

    Since it's possible to capture ProRes 422 via firewire now is there any advantage to working with it from start to finish? The workflow now has been capture and work in HDV and render to a ProRes Timeline when finished.
    I'd Like to hear some opinions on this subject. I know ProRess captured files are much larger than HDV captures so that's a consideration.
    Also Does ProRes run any smoother in FCP2 than HDV?

    I'm sure there are others, but two things come to mind right away:
    Since ProRes422 is 10-bit, it makes working in Color much more liberating.
    As best I can tell, rendering in in FCP is much quicker (even at the highest quality settings) with ProRes422 on a Mac Pro since it's a much more multi-thread friendly codec than HDV.

  • In Itunes store, song preview plays for only 5-10 seconds and then stops. Songs in my Itunes library play start to finish.

    In Itunes store, song preview plays for only 5-10 seconds and then stops. Songs in my Itunes library play entirely from start to finish.

    My Itunes previews have been playing fully now for the past few days. After trying every suggestion possible to fix the problem of 5-10 second previews, I took the advice on one feed to use OpenDNS for your network internet connection. There are internet sites that will instruct you how to do it. Just Google "opendns for (your operating system)". I have Windows XP and followed a video instruction at www.top-windows-tutorals.com/using-opendns.html. Afterward, close your browser and then flush the DNS Resolver cache; Start/Run, type CMD in the open field, click OK, in resulting window type ipconfig/flushdns, press return on keyboard. No guarantees, but my browser is faster and my Itunes previews are playing fully so far. But I still shudder every time I hit the preview button.

  • I want to create a "Play All" chapter marker that will play the video from start to finish in addition to the standard chapters I have-I guess I can auto start the DVD but would prefer a button-how and where would I put this "play all" marker??

    I want to create a "Play All" chapter marker that will play the video from start to finish in addition to the standard chapters I have…I guess I can auto start the DVD but would prefer a button…how and where would I put this "play all" marker?? Thanks..

    The start chapter button is a play the whole movie button regardless of how many other markers you have.
    Once a DVD starts playing it continues to the end.
    Chapters marker simply gives the viewer a place to start playback whether it be the start, middle or near the end.
    Al

  • MS Project - Start-to-Finish relationship with two successors

    Hi everybody,
    I do not manage to solve an issue and would highly appreciate any support.
    Issue:
    - I have fix milestones which I would like to use as fix points to tell me when activities are required to start (depending on their duration)
    - as a consequence, I have started backward scheduling through start-to-finish relationships starting at the milestones when the activities should be finished
    - as progress will be tracked only at the milestones, they are the most important dates when activities need to be finished, if they are moved, all tasks may generally be used (the plan is to rather display when activities must start then when they actually
    do start to give guidance to the employees in charge of the tasks)
    - some tasks have dependencies with a milestone (=deliverable) as well as other tasks
    Problem: No matter which relationship types I apply, I do not manage that the "constraints" given by all relationships are considered
    Example:
    - Milestone 1 is on June 30
    - Task A and B should be completed at milestone 1
    - Task B can only start when task A is completed
    - as explained above, I would like milestone 1 to be a fix date which if moves influences dates of task A and B accordingly
    Among others, I have tried the following solution:
    - Task A: in predecessors - task B (SF) and milestone 1 (SF)
    - Task B: in predecessors - milestone 1 (SF)
    - Result: Task A and Task B both finish with milestone 1 neglecting the condition of task A to be a predecessor to task B (in SF mode)
    - completion rate of all tasks is set to 0%, if I leave out the relationship between task A and milestone 1, task A finishes at it should just before task B needs to start to finish at milestone 1
    Thank you very much in advance!
    Best regards,
    Benjamin

    Hi Guillaume,
    thank you for your support. Unfortunately, this is not quite my issue. I have set up a general example in MS project to illustrate the issue, but unfortunately I am not allowed to post pics here.
    So I will explain what I have set up.
    - 2 tasks: task A, task B (only duration fix)
    - 2 milestones: milestone 1, milestone 2 (fix dates)
    - task A needs to finish before milestone 1, task B before milestone 2
    - also task A needs to finish before task B starts
    I would like to know when I need to start with task A and when with task B in order for these conditions to be met.
    (Issue: with relationship type SF, task A will start right before milestone 1, task B will start right before milestone 2, as a consequence, task A will NOT finish before task B starts)
    I could also send you the respective MS project file if I had your email address.
    Again, thank you very much!
    Ben

  • Coding with javascript in EDGE tutorials/samples from start to finish

    Hi
    I realize the forum is good sourc for javascript tips. But for us un-whiz kids that take advantage of all the gifts you geniuses at Adobe create, could there be a javascripting for Edge workshop? Coding from start to finish. If one does not know how to implement the code, that ONE is at a loss. I know that I could take EDge and fly with it visually but when it comes to the level of interactivity and animation, Istumble and come to an abrupt stop.
    Is the javascript workshop/tutorials a posibilty?
    Thanks so much,
    Angelique

    Hi Angelique!
    I am in something of the same boat as You. I have found this forum to be very informative & the knowledgeable folks here are very generous with their time... but the information is all over the place and lacks the collimated immediacy of a thorough (indexed!) manual. Ditto the very helpful Animate videos & tutorials on the Internet which, while valuable, are often time consumming to track down specific information.
    When learning a new discipline I do best with cogent printed manuals featuring a methodical presentation - which are also a snap to reference. Along these lines two books have caught my eye and I will be ordering... they might be of interest to You:
    Adobe Edge Animate: The Missing Manual by Chris Grover (O'Reilly Media) - Pages: 306
    Print: $24.99; e-Book: $19.99 (both for $27.49)
    http://shop.oreilly.com/product/0636920027553.do
    The Missing Manual series has always proved a provident guide for what ever program I was seeking to learn. This book looks like it follows suit. In the example on-line files I perused Chris struck me as an elegant scripter.
    Learning Adobe Edge Animate by Joseph Labrecque (Packt) - Pages: 368
    Print (eBook included in price) $44.99; eBook only $22.94
    http://www.packtpub.com/learning-to-create-engaging-motion-rich-interactivity-with-adobe-e dge/book
    Joseph pulls a few shifts on Adobe TV's Animate tutorials & is excerpted in the edge_animate_reference.pdf. I like how he writes (and~or has a great editor)... concise explanations.
    These books appear to offer info on a plethora of topics with valuable Javascript examples. Though no doubt there will be considerable overlap of subject matter I think these two books feature enough different material to make both worth purchasing.

  • Basic Start and Finish Date coming as default while Order Creation (IW31)

    Hi Members,
    I am in situation where in i am trying to cretae an order from IW31 but after the order creation basic start and basic finish date is being updated as default date which is the current date of creation.
    I have written my code in Include LCOINFNJ where basic start and basic finish date should get populated as per my written code .After debugging i found that the code is populating the dates in structure CAUFVD-GSTRP(basic start date)  and
    CAUFVD-GLTRP(basic end date) but whill posting at user command  SAVE the fields are getting updated back to default dates.
    Even after adding an enhancement point at the end of below given FM where in i am hardcoding the values still the issue remains the same .
    Function Module : CO_ZV_ORDER_POST is the FM responsible for posting.
    Please help regarding this issue .  
    Thanks and Regards.
    Gaurav Chopra

    Hi ,
          If you do not want start and finish date as current date then u can do it via config
    spro ->pm -->maintenance order processing -->Maintenance and service orders -->general data -->Activate default date for current date as basic date  here for a particular plant remove the tick mark in default current date , thus when u create MO on that plant then u will not get any default dates in basic start date and finish date ...
    regrds
    pushpa

  • Production order basic dates (start and finish) in past

    Hi,
    My clinet has got one requirement where in they want to create an production order with past date (Basic start and finish). I found one way to achieve this by selecting the scheduling type as "Only Capacity requirement", but the disadvantage is that the order will not get scheduled.
    Do you know any other method to achieve this functionality?
    Thanks and Regards
    Purushothaman Nagarajan

    Dear Friend,
    As i said, in Production order, under Production order - Setting - Scheduling maintain the number of days in past (says 100 days).
    Now in below select the scheduling type as backward scheduling and in Finish date give the date which is in past and now enter (or schedule the order). Because of this system will propose the start date which will also be in past.
    Regards,
    JItendra

  • 2LIS_04_P_MATNR Delta - Actual Start and Finish Dates

    My company is experiencing a problem with retrieving the actual start and finish dates and times from the 2LIS_04_P_MATNR data source with delta extraction. The R/3 source system is version 4.6C. The BI system is version 7.0. Specifically, the data source fields GETRI, GEUZI (finish), GSTRI, GSUZI (start) are sometimes never populated with data. These fields are often blank in the production data extracted. It was observed that the actual delivery date for the order (posting date of goods receipt from process order) was often an earlier date than the GETRI date. This scenario was tried in test systems, and it was found that if the final goods receipt for the process order was posted before the end of the last phase was confirmed, the actual finish date and time fields were not transferred to BI from R/3. In fact, it was noted that a new record was not created in the 2LIS_04_P_MATNR delta queue when the end of the last phase was confirmed. Regarding the actual start data, this is missing if a goods receipt from the process order is posted before the start of the first phase is confirmed.
    Has anyone else experienced this problem? How was it resolved?
    SAP Notes have been searched regarding this problem, and in fact, a customer message has been opened with SAP for this problem. However, we thought we would try asking the community as well, to see if any other users have experienced this, and how the problem was resolved. We also understand that it may be an unusual practice to post a goods receipt from the process order before the end of the last phase is confirmed. In a more general sense, has anyone else experienced that some of the data source fields are never populated if the R/3 information is entered after the posting of the final goods receipt against the process order? Our testing indicated that no more delta records are created for the 2LIS_04_P_MATNR data source after the final goods receipt was posted.
    Thank you,
    Chris Sopek

    Hello,
    we are experiencing your same problem! The only difference to your scenario is that wer are currently operating on SAP ECC 6.0.
    Did you receive any answer from SAP?
    We opened a request for the same topic.
    Thanks

  • HT1349 I downloaded the latest version of iTunes and now I cannot play the songs in order, they skip around randomly. The shuffle feature is off. All I really want to do is play an album from start to finish.

    I downloaded the latest version of iTunes and now I cannot play the songs in order. It will skip around or just stop playing the song currently playing when it is finished. I just want to play an album from start to finish. The shuffle feature is turned off.

    It is working now. I no longer get the message about the item not being available in the US and I can access the store.

  • Scheduled start and finish dates in the Work order.

    Hi Friends,
    I am facing peculiar issue that once the Work order has been released schedule start and finish dates should be derived from the control key and
    operation hours and work center capacity,infact in my case while releasing the Work order,these dates (scheduled start & finish) are not been
    populating in the Work order,(but SAP standard behavior is while releasing WO,the dates should be populated).
    though i have maintained proper configuration
    could you please light up some thing on it.
    Regards,
    Srinika

    Check Scheduling Parameters assignment to order type, Scheduling option in Control key.

  • Basic start and finish dates vs scheduled start and finish dates in work order

    Hi Friends,
    I have observed  that whenever releasing the work order,irresepective of number of operations in the work order, system generating scheduling start and finish dates are same, however after releasing the Work order and by adding another operation in the work order, immediately scheduling end date equaling to Basic finish date (i.e.: Basic start and finish dates are equal to Schedule start and finish dates).
    Can any body please explain why this is heppening
    Please find the screen shots.
    After adding one more operation in the operation list and save the Work order,then Basic start and finish dates are equal to schedule start and finish dates.
    Regards,
    Srinika

    Srinika
    There are many things that affect the order scheduling:
    IMG setting - scheduling parameters
    Work centre settings
    Operation values e.g. work, duration, operation control key settings
    Calendars
    Etc
    So one possible interpretation of the above data is that the initial order operations have no work assigned, or the operation control keys don't require scheduling, or the work centres arn't set up correctly.
    Then you add a new operation which does appear to work.
    Please supply a screen-shot of the operation tab.
    PeteA

Maybe you are looking for