Overhead key

Hello all PS guru
Can any one explain how overhead key is used in overheadcosting which is assigned to project profile.Actually when i m going to assign overhead key in overhead rates of costing sheet i m not getting the field overhead key to assign.The overhead key field is not displayed in costing sheet.
so how to assign
Is any dependency have to create
THANKS AND REGARDS
SHASHANK

Hello,
By using Overhead key, you can create multiple overhead percentages in costing sheet for the same fiscal year.
For example, if your project profile has costing sheet bcxxx, it can have multiple OH keys for fiscal year 2008- Normal with rate as 9% and Low with rate as 5%. You can use different keys to load different projects with the same costing sheet in the same fiscal year.
Overhead keys are define in separate t code in customzing under Controlling> Product cost controlling>Product cost planning> Product cost by period> Overhead
Once you define keys there, you can maintain rates for them in costing sheet maintenance.
Hope the above helps.
Sourabh

Similar Messages

  • Overhead calculation not happening after using Overhead key and orgin group

    overhead calculation not happening after using Overhead key and orgin group.
    There was a runtime error earlier related to u201Cdefine credit u201C IMG node under costing sheet component and we have applied SAP note 769946 and that error was gone out of the way
    We want to apply/add Overhead to SFG/FG materials.
    We are using PP order with PCC(product cost collector) as the cost object , i.e costing by period.(system ECC 6)
    But our problem is with material standard cost estimate process.
    We have assigned overhead keys to the percentage rates in costing sheet for material standard costing and assigned the origin groups to the credits of costing sheet. But after running the cost estimate overhead is not taking into account for standard cost calculation.
    In the define credit entry table key field is valid to date strangly and actually system should allow one than one entry with same valid to date and same sec.Cost element(type-41) for different cost centers.
    But if we without using overhead key and origin group, the entire cost in that supporting cost center will come to all materials (SFG/FG) and we can not distinguish between different product materials(SFG /FG).
    We have checked all things as mentined below.
    Firstly that the correct costing sheet is assigned to the valuation
    variant.
    That the costing sheet is entered for the appropriate material type:
    Finished and semi finished or material components.
    All of the above can be checked and verified via transaction OKKN.
    In addition make sure that the base value maintained is present in the
    costing, for example the base may include an Origin group, is that
    origin group part of the materials being costed?
    Similarly if the base is found and values exist how is the overhead
    rate of the costing sheet set up, is it valid etc.
    And finally do a similar check for the credit.
    we doubt this as a programm error...
    So, request all experts to have ur feedback..

    Dear,
    Check your origin group & material unit of mesaurement is same.
    some time in costing sheet origin group is maintain in different unit & for materail it's maitain in other unit of mesaurement.
    You can see unit of measure for material in Additional data - unit of measure.
    Check BOM component material unit also.
    Check same  unit of measure is maintain in KZS2
    I hope above will useful.
    GOPAN

  • Max no of overhead keys

    Hi all
    Can any one tell me what is the max no of over head keys that can be maintained in the product costing..
    awaitng your answers
    thanks and regards
    gkk

    Hi,
    I don't think there is any limit on creation of overhead keys, but too many should not be created. It should meet the Business requirements.
    Thanks
    Murali.

  • Overhead key in network order

    Hello,
    Does anyone have an idea how to import a default value to the field "Overhead key" when creating a network header?
    It is not a substitution field.
    Thanks in advance
    and best regards.
    Nir

    Hi Nir,
    Maintain Overhead Key in project profile in OPSA. and it will come by default for all networks created under any project with that Project profile.
    Hope this helps you !!
    Br,
    Hari.

  • Overhead keys at Work center Level

    Hi Experts,
    Our client needs to assign the Overhead keys at work center level.
    But what we know is, it possible only in Materail throghu overkead group. In simillar way is it possible to build a link to Workcenter.
    Regards
    Sham

    Hi Shyam,
          Ask abaper to insert a filed in document header which retrieves the data at work center level.
    Regards,
    Srinivas Muthyala

  • Overhead key for Finished goods

    Hi all,
    Guide on the following.....Depending upon the Costing Overhead Grp the Overhead will be applied , in our case Overhead % applied depending upon the Raw material consumption . So we have incorporated Over head key in all Semifinished material .
    Now , in all assembly all HALB material have Over head Key , but whether we should have Overhead Key to Finished material also?
    Do revert
    Regards

    Hi,
    It depends how you are arriving at the cost of Finished goods.  If all the consumption, activity and overheads are
    taken into account upto the top most level of the component, there there is no necessity of assigning a seperate
    overhead key.  If the company requires  packaging charges of the finished goods in batches, bar coding activities are to be added after the production, you can use an overhead key on FG.
    Regards,
    Sadashivan

  • Overhead group & overhead key

    Dear Co experts,
    Cant we assign different overhead keys to overhead group, while defining overhead rates. when iam trying to assign the second overhead key to the same overhead group system is flashing error message.
    Thanks in advance,
    Regards,
    Siva

    Hi
    No, it is not possible to assign many overhead keys to overhead group. It is one to one only.
    Regards,
    Suraj

  • Overhead key description issue

    Hi Team,
    I copied COGM Costing sheet and i added new OH keys with "Z" description as labour, machine hour, production cost etc..
    i have give credits as E00, E01, E02 etc..
    While define credit description as "Cr raw material, Cr raw material, Cr raw material".  while running CK11N i am getting different description as " OHS Ram Material, OHS Other Material, OHS Personnel".
    I want to change the description like Labour, Machine hour, Production cost, etc..
    Pls help me how can i change the description.
    Regards,
    Nagaraju.

    Hi Nagaraju
    CK11N would show the description of the Secondary cost element (Category 41) involved in the costing sheet
    So, if you want some other description, you will have to do it in KA02
    Regards
    Ajay M

  • Overhead is not getting updated in the production order

    Hi all,
    I am running actual overhead calculation with KGI2.
    But the overheads are not getting updated in the order.
    Order contains relevant overhead key also.
    What could be the possible causes?
    SmanS

    Arun/ Suleman,
    Thank you for your reply.
    I have maintained the % in the costing sheet against the 'Overhead rate' but I didn't get the secondary cost element.
    Request you to elaborate it further & explain me how to maintain the same.
    Also I will be thankful to you, if you could explain me the exact process of loading the overhead on the order i.e. how it loads the overhead form the cost center to order? What happens to the total cost which was lying on the cost center etc, in details.
    Mean while I had maintained the required values in costing sheet in KZS2.
    Maintained the % against material overhead rate as well as manufacturing overhead rate.
    Maintained the credit values for the overhead rate.
    Maintained the calculation base values also.
    Now while overhead calculation with KGI2, I am getting two errors as follows,
    1. S:K5:162 E02 20090831
    2. Error CREDIT_SEGMENTS_ADD COIOB NOT FOUND for object
    I can not figure out the reason.
    SmanS
    Edited by: SAP PP Consultant on Aug 10, 2009 6:47 AM

  • Overhead calculation not happening after using orgin group.

    overhead calculation not happening after using orgin group.
    There was a runtime error earlier related to u201Cdefine credit u201C IMG node under costing sheet component and we have applied SAP note 769946 and that error was gone out of the way
    We want to apply/add Overhead to SFG/FG materials.
    We are using PP order with PCC(product cost collector) as the cost object , i.e costing by period.(system ECC 6)
    But our problem is with material standard cost estimate process.
    We have assigned overhead keys to the percentage rates in costing sheet for material standard costing and assigned the origin groups to the credits of costing sheet. But after running the cost estimate overhead is not taking into account for standard cost calculation.
    In the define credit entry table key field is valid to date strangly and actually system should allow one than one entry with same valid to date and same sec.Cost element(type-41) for different cost centers.
    But if we without using overhead key and origin group, the entire cost in that supporting cost center will come to all materials (SFG/FG) and we can not distinguish between different product materials(SFG /FG).
    We have checked all things as mentined below.
    Firstly that the correct costing sheet is assigned to the valuation
    variant.
    That the costing sheet is entered for the appropriate material type:
    Finished and semi finished or material components.
    All of the above can be checked and verified via transaction OKKN.
    In addition make sure that the base value maintained is present in the
    costing, for example the base may include an Origin group, is that
    origin group part of the materials being costed?
    Similarly if the base is found and values exist how is the overhead
    rate of the costing sheet set up, is it valid etc.
    And finally do a similar check for the credit.
    we doubt this as a programm error...
    So, request all experts to have ur feedback..

    Dear,
    Check your origin group & material unit of mesaurement is same.
    some time in costing sheet origin group is maintain in different unit & for materail it's maitain in other unit of mesaurement.
    You can see unit of measure for material in Additional data - unit of measure.
    Check BOM component material unit also.
    Check same  unit of measure is maintain in KZS2
    I hope above will useful.
    GOPAN

  • Cost estimate (CK11N)is not picking the overhead cost for some of the mat

    Hi all,
    we are facing a problem. The overhead key is defined. the calculation base is defined in the cost sheet. But the overhead cost is not picking  for some of the materials
    Bad Material 5019-0581 via CK11n.
    As you can see in the itemization, only the material and the routing are listed.  No amounts from the OH of ZPTA ( .10).  It should show a line #5 with an amount of (28 quantity  x .10) = $2.80 added to the Total value.
    first three line items it is picked from material and fourth line item from the internal activity.
    the fifth item from G overhead is not picked.

    Hi,
    Check whether u have assigned the cost sheet in u r costing variant which is being used in CK11N.
    Regards
    SudhakarReddy

  • Percentage based overhead based on target cost of actual production

    Hello,
    I'm trying to calculate percentage overhead (overhead as a % of total cost of production) using the usual overhead group, overhead key ,costing sheet, etc.
    Also put the overhead group in the material master.
    Although I am getting it correctly as part of product cost planning, when it comes to calculating this overhead on a production order, it does it based on 'total actual costs' posted to the order. I want it to calculate the % overhead based on the standard cost of actual production (the target cost).
    I would really appreciate some help on this.

    Hi
    If that's the requirement, you can achieve through template allocation. Refer the doc contributed by arturo senosain
    I use a workaround for such cases. Add an activity type in routing with activity quantity same as base qty of routing.. Say, 1 PC
    Maintain the activity price as .15. And you are done
    Br. Ajay M

  • PLANT OVERHEAD TO BE ADDED

    We have finished material down the level semi finished material and we wanted to apply plant overhead only for finished material not for semi finished.Please suggest solution .

    Hi,
    You can use the overhead group in the material master for this purpose. Create an overhead group and enter it in the material master for FGs. Also create an overhead key and assign it to the overhead group. In the costing sheet, pick an overhead rate whose dependency includes overhead key. This will allow you to specify overhead rates for the overhead key you created. The system will now calculate OH for FGs only.
    Harish Toppae

  • Raw Material Costing with Overhead, Product Cost Planning

    Hi,
    I have an issue applying overhead to purchased raw materials. We need to apply this overhead for only a certain materials. So, I have defined a overhead key/overhead Group, and assigned the group in the material master of the raw material. The overhead is 2% freight on raw material costs.
    In the std.costing variant, I have assigned the costing sheet under Overhead on material components tab of the corresponding valuation variant. I have also included the Freight OH in the cost component structure.
    However, when I run the costing with CK11N for the raw material, it is showing only the raw material cost, not the overhead.
    What could be the problem?
    I appreciate your help.
    Thanks,
    Ram

    Is the overhead rate a percentage type or quantity based?
    Have you maintained both actual and plan rates (1 & 2) under define % based OH rates or Qty based OH rates accordingly?
    Does the validity date (in define OH rates )cover the date of costing?
    Is the Costing sheet assigned to the valuation variant at plant level?
    Is the OH base in the costing sheet includes the cost element of the raw material?

  • Fixed base overhead calculation on output quantity

    Dear Guru's
    I want to calculate the overhead @ fixed rate on the basis of output quantity of finished goods.
    For the said purpose, I am using quantity based overhead calculation in SPRO. The overhead rate "C110" is being used with dependency D010 (Overhead Type/Overhead Key). Here i have maintained the fixed amount per tonne basis with overhead key "SAP1".
    I have maintained the overhead key SAP1 in material master's. But still it's not calculating and not displaying anything in the line items. Also to my surprise, no error is displayed at the time of production order and standard cost estimate.
    Please help me on the above issue.
    A detailed help stating what possible errors I may have done would be helpful.
    Thanks,
    Sumit

    Hi
    Lets assume you choose Output (KG) to absorb the overhead
    1. You need to create an Activity Type called PRDOVH and assign it in the PP Work center... Assign the cost element of this act type to a separate cost component in OKTZ
    2. While creating the Routing, the Activity Qty = Operation Qty for this Act Type... i.e. If you are creating routing for 100 Units, specify the Act Qty for PRDOVH as 100...
    3. The Formula in the work center will be fully variable for this Act Type.. i.e. the Act Qty should change in proportion to the Qty Confirmed....
    4. The PP Guys will confirm the operation in PP... This Act Type will also get confirmed along with it
    5. Now calculate Act Price KSII as usual and run revaluation... From this point onwards, follow the normla procedure which you follow in month end
    br, Ajay M

Maybe you are looking for

  • Can I transfer calendar data from one Apple ID to another?

    Just realized that my calendars and email were all sharing one Apple ID with my husband which is problematic because I want my own devices syncing up properly. I've set up my own Apple ID, but before I activate it on my devices I want to be sure I do

  • 4:3 aspect woes.  Curse that "widescreen preview"!!

    I searched this subject before posting and couldn't find an answer. I created a slideshow -- with NO audio -- using "Photo-to-Movie" in 4:3. I exported it to iDVD using the program's settings, choosing 4:3 when prompted in iDVD. Even chose a really o

  • Screen lights up

    Hi, since a week ago, my macbooks screen give a white screen or about half a second when I start it up (so before the apple logo comes on) or when I get it out of the hybernate. Is that normal? Thanx!

  • C-stored procedure in Oracle

    Dear Friends, I have a lot of c-stored procedures for DB2, now,I want to use these c-stored procedures in Oracle directly without any changes. I'm not sure whether this method is right. Please help me. Guang

  • Xsql: merging data with include-xml

    Is there any way for the data returned from <xsql:include-xml> to include a primary key so that the stylesheet can merge the data in. In my situation, I have a primary result set from xsql:query but it has two fields in varchar2's that include xml co