Overhead posting into different period with KGI2

Hi,
We have an issue, that we missed to run the overhead posting (KGI2 - programme RKAZKGI4) for the last day in the last period (may).
Now we don't want to open the period again, but post the overheads into the actual period.
Does anybody know a way to realize this?
Thanks for any help.
Tobias

Will post it into correct Forum
Sorry

Similar Messages

  • SegregatingTable data into different bucket with equal numebr of

    Hi Guys,
    I wanted to process table data in chunks not all the rows at a time. How can we achieve this in oracle.
    Example :
    I have one table EMP which has ten thousands rows(10,000) rows. Now these ten thousands rows are joined with other tables to process data and it takes time. So I wanted to pass one thousands rows at a time as an input to the procedures so that processing should happen only with 1 thousands rows at a time. This table does not have any primary key. So it there any method in oracle using that I can segregating the tables data into different buckets with equal number of rows.
    I have used DBMS_PARALLEL_EXECUTE but its taking lots of time. Any help will be appreciated.

    I have one table EMP which has ten thousands rows(10,000) rows. Now these ten thousands rows are joined with other tables to process data and it takes time.
    OK... So this is your actual problem. And the solution you are trying to come up with does not sound promising. So lets take a step back and re-think our strategy here. First thing would be how about we see some code? Show us your code that you say is running slow. And we can take it from there. The number 10,000 is a very small number. And if that is causing performance issue then you are in some big trouble.
    And also it wouldn't hurt if you could read this Re: 3. How to  improve the performance of my query? / My query is running slow.

  • PGI & Billing documents posted into different reporting periods

    Hi guys
    The problem
    We have a situation where an Order was generated in January;
    3 deliveries/ Post Goods Issued (PGI'd) were processed for this order - 2 in January and 1 in February;
    And 1 billing document was created in February.
    This has caused some problems in accounting in that Cost of sales and Revenue is posted into two different periods (i.e. January & February)
    Customising
    The billing relevance for this order type has been customised via 'Define item category' to 'B - Relevant for order-related billing - status acc.to order qty'
    The order type is relevant for delivery; and
    The billing quantity via Copying control: Delivery document to Billing document config is 'B - Delivery quantity less invoiced quantity'.
    My question
    Since delivery could cut across several reporting periods and has to be completed before an ORDER-RELATED billing is done. Are there any settings that could be customised in config such that Revenue will be posted along with the Cost of Sales at the point of PGI?
    Many thanks in advance.
    Regards, Felix

    Can you please let me know whether the Actual GI Date in Delivery and Billing date differs in your case ??
    In normal circumstances, your Actual GI Date will be your Invoice date in which case, I feel your question is answered.
    thanks
    G. Lakshmipathi

  • CSTto be posted to different G/L

    Dear all,
    Currently the Non deductible CST is posted as under during MIGO
    <i>CL. stores & spares A/c Cr.  104
    GR/IR stores & spares A/c   Cr.        104 (G/L A/C 161230)</i>The requirement is:-
    <i>CL. stores & spares A/c Cr.  104
    GR/IR stores & spares A/c   Cr.        100 (G/L A/C 161230)
    GR/IR  CST a/c                   Cr.          04(G/L A/C  161052)</i>In short it is required top be posted into different G/L a/c .
    Seek your help,
    Regards,
    Ashish Pradhan.

    Hi Prasad,
    Referring to your message if it is not possible in Money Market, is it possible in Loans Management.  The requirement is exactly same.  Here the requirement is mainly to meet the reporting requirements. 
    Out of the total long term loan, the portion which is filling due within a period of one year need to be identified as current liability which is payable within one year and it is not about reclassification or something of that nature.  This is the reason I was trying to ask you the postings, how it can happen? 
    The initial posting has gone to Long term liability GL account based on the account determination.  Out of the total loan borrowed, the portion of installments which are becoming due within one year need to be shown as current liabililty/current maturity.  Can you please post if this can be handled with standard functionality. 
    thanks in advance for the update.
    Kumar

  • Why SAP looking into pervious period stock

    Dear All,
    Needs to change the profit center in material master.  For this they have removed the stock from current period, but its not possible to remove the stock from pervious period because this period is closed(that they don't want to open again).
    Why SAP is looking into pervious period stock while changing the profit center in masterial master?
    - Is it possible to change the profit center even if stock exists in pervious period with warning message.
    - Is it possible to change the profit center even if stock exists in current period with error message.
    regards,
    Venkatesan Anandan

    SAP is looking into previous period for stocks, as is in possible to post into previous period --> depending on settings made in MMRV transaction.
    I would not change the profit center while there is stock, as this creates an inconsistency in profit center accounting. if your accountants are okay with that, then you can try to do.
    A warning message will let you pass if you click enter, a error message wont.

  • Load one text file with 12 periods' data into 12 different periods at once?

    Hi guys,
    In one swoop, can we load one .txt file with 12 periods of data into 12 different periods?
    The scenario:
    Budget data is required for monthly comparative reporting with actuals, so we have 12 periods in our Budget version.
    From a non-SAP system we get one .txt file containing 12 periods worth of budget data,
    - it is in the correct format (and we don't want to create risk by opening and editing it) so it is loaded into each period and the other 11 periods of irrelevant data are obviously ignored.
    Some extra tasks (such as validation, cashflow calculations) are then performed per period.
    Because this has to be repeated 12 times, this can be a time consuming process
    We now have multiperiod monitor functionality (from EHP2) and I see how it works for the automatic tasks (very well).
    I'm aware that the guide says that manual tasks will be ignored during the automatic run, this is true.
    However, if I remember correctly EC-CS used to allow it with upoad files, so i was expecting it in BCS 6.02
    - is there anyway to load a file containing 12 periods worth of data into 12 individual periods in all at once?
    (NB we still have an improvement to the previous situation, the user can scroll between periods more quickly and load the file 12 times, then go back to the start and run all auto tasks at once)..
    One thought was to use a file server location with a hardcoded filename but his would require work beyond my expertise.
    All suggestions welcome

    Hi
    I wil suggest mapping the path based on a common location is the best way and then map the same logically in the Upload method
    If you are using Citrix then it becomes all the more easy to have a commmon location
    Rgds
    Dheeraj

  • Remove Posting Period with transaction

    Hello everybody,
    How I can remove Posting Period that already have transaction
    If i create posting period and choose wrong sub period (example,choose year but correct is month)
    and post some transaction into period
    if i reverse all transaction in wrong period
    Can i remove posting period and create new postiong period with correct condition.
    sorry with my poor english
    Thank,Seang
    Edited by: Suthee Thurathanmanon on Oct 1, 2008 9:07 AM

    Hi,
    In the posting period window u can find 2 drop downs. Active and Locked. Try them to make the period inactive.
    Hope it helps,
    Vasu Natari.

  • AFAB Accidently posted into period 12.

    Hi Expert,
    My user accidently planned posting run into period 12 (which somehow the close coordinator open period 12).
    And now user cannot do planned posting run for period 01. Can i reverse the planned posting run period 12?
    This is the error message.
    Period 001 is already posted
    Message no. AAPO520
    Diagnosis
    You want to run the next planned run of the depreciation posting run in period 001. However, the last planned posting run was already performed for period 012.
    System Response
    The planned posting run cannot be performed. Processing terminates.
    Procedure
    You can either execute a repeat run in period 012, or a planned or unplanned run in a later period

    Here you can ask the usser to post an unplanned depriciation i.e ABAA, for what he posted for period 12. and ask him to run in unplanned AFAB run when he is running for period 12.

  • I have two different iCloud accounts. I can't sign into photo stream with my personal account and have tried deleting from my iPhone first, then the MacBook Pro. Still won't let me sign in with the personal account. Please help.

    I have two different iCloud accounts - business and personal. I can't sign into Photo Stream with my personal account because it says my business account is my primary account. They are separate but equal accounts. I have tried deleting the iCloud account from my iPhone, then my MacBook Pro and signing in again on both devices. The iPhone says that my primary account ismy personal account (which is good) but my MacBook Pro still will not sign into that account so I can use Photo Stream.
    Any suggestions? This iCloud stuff is getting annoying.

    you have a ps cs4 license for mac and you have some way of finding your serial number.
    if yes, download an install the installation file.  if you already have the installation file, what is its name and file extension?  (eg, if it's one file, it should be a dmg file.)
    if you need the installation file,
    Downloads available:
    Suites and Programs:  CC 2014 | CC | CS6 | CS5.5 | CS5 | CS4 | CS3
    Acrobat:  XI, X | 9,8 | 9 standard
    Premiere Elements:  13 | 12 | 11, 10 | 9, 8, 7 win | 8 mac | 7 mac
    Photoshop Elements:  13 |12 | 11, 10 | 9,8,7 win | 8 mac | 7 mac
    Lightroom:  5.6| 5 | 4 | 3
    Captivate:  8 | 7 | 6 | 5
    Contribute:  CS5 | CS4, CS3
    Download and installation help for Adobe links
    Download and installation help for Prodesigntools links are listed on most linked pages.  They are critical; especially steps 1, 2 and 3.  If you click a link that does not have those steps listed, open a second window using the Lightroom 3 link to see those 'Important Instructions'.

  • Why has mail on the ipad grouped several emails from different people with different subject matter into one thread?

    This is really annoying.
    The email initially started with me sending to one person. Which we then conversed several times without any issues.
    I then sent a separate email completely unrelated to someone on a completely different email address, but when they replied back somehow their reply joined the same thread as this other email i sent initially.
    Thinking that it might be a one of... I ignored it.
    However, just now, an email i created through the LinkedIn app, which i sent from LinkedIn to a contact, somehow joined that first thread, when the person on linked in replied back to me.
    Obviously i receive an email to my Mail account whenever someone messages me on linked in... But why on earth would that reply automatically get grouped into the completely different thread of emails?
    I NOW have emails to three different people who are completely unrelated with three completely unrelated subjects, that are appearing in one thread with no obvious way to separate these.
    Any solutions or suggestions? I've tried to move them, but it will only let me move the the messages into different folders, and not my inbox as separate messages.

    Hi Anya!
    Thanks for the response. Regarding your question, Yes, I have confirmed that people were receiving multiple copies.
    I've confirmed this as I had left a Gmail message open on my browser window and opened that same message from Mail: As I was writing the response from Mail, without sending anything, new notifications started to appear over the same message in the browser window, notifying me there were new messages from Myself! So when I started to open those "new replies", I came to the conclusion that as I was typing, a draft was being saved and sent as a new message at the same time, therefore sending a lot of emails until I finished to write the message without knowing...
    Hard to explain but hope I've made my point.
    Thanks!
    D

  • My iPhone is merging different contacts with the same firstname into one contact. How can i resolve this.

    My Bosses iPhone is merging different contacts with the same firstname into one contact. How can i resolve this? He seems very disturbed and thinks i don't know what i'm doing. I've set up all his devices to sync across and now its messed up on his iPad, and two iPhones.
    E.G Contacts with firstname 'Adams' and different numbers are synced into one account.
    Now i have no clue how many contacts are this way cos he has a huge number of contacts (he's the ceo).
    Please i need a suggestion on how to fix this.
    Thanks for the help.

    Janie Mac wrote:
    Cannot find settings to then go to general then about.
    How do I edit the device in iTunes?
    Double-click on the name.
    My screen shot shows both devices because I sync wirelessly.  Right now I can change the iPod name but not the iPad name because the iPod is idle while the iPad is syncing.  In another minute or two, I'll be able to change the iPad name.

  • Issue in service order billing- total cost is positive but negative cost exists in different periods

    Hello Experts,
    Need you advice/solutuin on the below scenario:
    In a service order the total accumulated cost is positive, (some material positings has been reversed in some other periods, so that is displayed as negative cost in the cost overveiw): but when we try to the billing in DP90. it is asking for credit memo request also. 
    In the DIP profile configuration following characteristics are maintained for generation of dynamic items:
    Activity type, Cost element, Material, Object number, Period, Posting row, Transaction Currency, Unit of Measure,
    As per my understanding negative cost is taken into consideration because of the "Period" characteristics maintained in the ODP1 tcode. And this is causing the creation of credit memo request due to cancelled postings in different period, as a result for that period total accumulated cost is not positive.
    My analysis may not be correct, Please let me know your understanding on this and how we can handle this situation if not want to create the credit memo request (because it will require extra configuration i.e. sales area mapping etc and may lead to change in interfaces etc..)
    Regards
    Pankaj verma

    Hello Experts,
    Please give your inputs.

  • One asset value to be transferred into different new asset codes

    Hello,
    I have one asset which has to be transferred into different new asset values. The instance as below:
    Old Asset: 1000
    Value: Rs. 10000
    Transferred into
    New asset code: 1100
    Value: Rs. 3000
    New Asset: 1200
    Value: Rs. 2000
    New Asset: 1300
    Value: Rs. 5000
    How to proceed? I have tried in ABUMN with partial Transfer but unable to get the result. Need help.
    JK

    Hi,
    This can be done through ABUMN only.
    You have to post 3 transactions individually to that old asset.
    For the first ABUMN transaction choode partial transfer and choose amount specification and enter 3000
    For the second ABUMN transaction choode partial transfer and choose amount specification and enter 2000
    For the last ABUMN transaction choode Complete retiremnet.(So the balance of 5000 will be transfered to the third new asset)
    Please check.
    Thanks,
    Srinu

  • Copying COA between different localisations with SDK

    Hi,
    I am trying to setup some extra companies on a different server with different localizations.
    One of the main task that I want to achieve is to copy COA to all these new companies.
    With a bit of codeing with SDK I have successfully post one account on the new companies.
    I just wanted to know if there is any known issues/compatibility issue before I go ahead and copy complete COA list.
    Any help will be highly appreciated.
    Regards

    Hi,
    I think there is no issue except the professional user component license. Is the new database located in the same license server ?
    As an info, you could use COA DTW template to import the COA into new different localisation database. The other is using addon copy express.
    Rgds,

  • Derived depr. area to post into GL (past values)

    Hello, here I describe my situation:
    I have created 2 new asset depreciation areas: one of them is to store paralell values for fixed assets (12) and the other (13) is a derived area which will be used to post differences between area 12 and area 01, is a derived area but it is configured to post into GL .
    New values are going to be set up for area 12 using transaction AS92 but the transfer date for these values is in the past (date 12.31.2007). After uploading the values I need to post also in the new area the retirement and transfer movements that were posted in area 01 during years 2008-2010 and also the depreciation posted in area 01 during these years. The thing is that we don´t want these transactions from a fiscal year in the past to be posted in an already closed fiscal year, but manually in fiscal year 2010.
    Is it possible to configure area 13 not to post into GL and then once the retirements and depreciations of year 2008, 2009 and 2010 (up to present period) are posted change the configuration of depr. Area into u201CPost assets periodically in General Ledgeru201D and the system starts posting depreciations and other transactions into GL for the new area from June 2010 forward? If so, Can I obtain depreciations posted in area 13 from 01.01.2008 to 30.06.2010.
    Thanks in advance for your help

    Hello
    Please go to customizing:
    -Asset Accounting
    -Integration with the General Ledger
      -Post APC Values Periodically to the General Ledger
       -Maintain Posting Rules for Parallel Accounting Principles
    and maintain area 11 for the company code.
    please also ensure that the flag "area for reporting purposes only" in OADB,
    depr area 11.
    regards
    Ray

Maybe you are looking for

  • Action link help OBIEE 11g

    When I change the Column Properties --> Interaction --> Values to "Action Link", and choose a detail level report within the "Navigate to BI" the link does not work properly in the analysis. For example, one team will show 3 records. When I click on

  • Goods posting without PO

    Dear All, In our company client requires a goods receipt (with RF scanner ) for Non PO. It means material unknown, vendor unknow but still he want goods receipt How can we map in SAP Regards subhash

  • Shared iCloud photostream link doesn't work

    Dear friends Could you please help me. I'm trying to share my photo in iPhoto using icloud photo stream. After I upload all photos I click on a link "Visit Site" and get an error "icloud can`t find this page" What`s the issue? Thank you

  • Re: how can i transmit live video that is captured by a usb webcam with rtp

    oh,my oicq number is:282987147 Anyone can leave a message to me. Thanks a lot !

  • Can't adjust recording volume?!

    Every program I've ever used (including the older versions of Captivate) had the ability to adjust the microphone level. I'm using Captivate 3 and cannot adjust this level. Any recording I make has clipping because the input level is set too high. Th