Overheads not calculated in CK11N cost estimation

Hi all,
I have two issues
1. When i am executing CK11N,i am not able to get the overhead calculation in itemization,but its showing some ridiculess firgure in cost component structure.I am using dependency D020.
2 . when i am using  dependency D050 the system not calculating overheads.
We have single plant with two process Repetative and Process order.I want to calculate the overhead on the Order type basis but the system is not calculating the overhead.
So i changed the dependency to D050,now its showing the overhead figure in cost component structure but whic is not matching with the overhead rate i have given..
as my go live is 20 of this month .....its bit emergency
Revert
Regards
Pran

Hi all,
Thnx for your reply.
But i have maintained all the entries in the respective  area,even though  i am geeting the issue.
It was working fine for my previous repetative manufacturing ...i am using the single cost sheet for both  repetative and process order.
And one more thing is that i have a Semi finished goods which is the output of REIM  order and is included in process order of the finished good.
The system is calculating the overheads for the semi finished good too once again.
Eg,
Raw Material A and B produces Semi finish material C overheads and the utilities are calculated correctly in Repetative manufacturing.
The semi finished material C is used in producing the finished material D ....in which the system is not caculating the utilities.The big problem is that the figure(value) of  itemzation and the Cost component structure is showing two different values.
I am not sure and able to know how and why the system calculates and from where it gets these values  ......  totally  confussed and under pressure (may not be able to to explain properly).
Revert
Pran

Similar Messages

  • Overheads not calculated

    Hello Experts,
    After launching the KKS5, error messages for no calculation of the overheads on some materials.
    When launching KKF6N for June the Indirect Costs are there but it's not the case for the month of July.
    The costing variant planned for the materials is PREM.
    I would like to have more explanations about this issue.
    Thanks in advance,
    Edited by: Ferdaws ABID on Sep 19, 2011 3:57 PM

    Hello Tarek,
    I have checked the configuration of the overhead in the transaction KZZ2 as you mentionned but everything seems to be OK.
    The validity period is OK and the overhead rate is maintained correctly.
    Do you have other suggestions ?
    Regards,
    Ferdaws

  • Price for Cost Estimation - Info Records

    Hi All,
    We need a clarification on how  system picks the price for COST ESTIMATION with following setting in Valuation Variant.
    1.Valuation Price from USER EXIT
    2.Price from Purchasing Info Records
    3.M A P
    4. Planned Price 1
    Sub Stratergy.
    1.Effective Price from Purchase Order
    2. Net Quotation Price
    3. Gross Quotation Price.
    If we have 3 info records  with the same validity date  and different price in each for three vendor, what price will  system pick for calculating the stand cost estimation.
    We have activated Material Ledger and we in ECC 6.0.
    Do suggest.
    Regards,

    Hi ajai,
    I agree with your point,we have 3 info record for a material and 2 are valid as such. The price maintained in  two info records are as 7.5 & 1.0 respectively(valid info records).
    The last price in the purchase order (of the info those records) are 0.41(dated on 09.04.2010)  & 0.2(dated on 19.04.2010) respectively, but when we execute the cost estimation the system picks the price of 7.5  not the least price of 0.2(as its the latest purchased price).
    Do let us know why and of what logic the system picks the highest price.
    Do revert.
    Regard,

  • Planned overhead is calculating wrongly in CK11N run, it is just more than double

    Hi Gurus
    1) While running CK11N overhead cost is calculating wrongly on base (material price). In my case I have maintained 1% Overhead on raw material for Duty in cost sheet. In my case no routing, and my FG is getting produced by process order. My Raw material cost is showing Rs. 2,364.45 but my Duty is showing Rs. 48.73, When I run CK11N for Finished goods.
    When I Check the costing structure it is showing all the material for costing, if i drill down there it is calculating correctly for Raw materials. Say heavy furnace oil material cost is Rs. 36,140.16 /M.T and overhead is Rs. 361.40 and for all raw material it is calculating correct 1%. But for my finished goods it is just more than 2%.
    As per my understanding over head is calculating for RM once @ 1% and later material cost + overhead cost getting calculated by 1% again.
    Please see the attachment. I have furnished a statement for this also.
    2) Also Please tell me the T-Code for costing run as actual cost. and how can I show a comparison report on planned and actual report for a product costing.
    3) My scenario is this is a power generation Co. Not possible to maintain activity cost. What they want to do is. on the last day of a month they will take the trial balance for the plant/ business area and will set the percentage in cost sheet (Actual for current month / planned for next month) for admin, manpower and other costs based on raw material GL values.
    So I have created a cost sheet where I have maintained base and assigned those RM GL/ Cost elements and other costs I have maintained in cost sheet based on row No. 10 (base) and assigned secondary cost elements and percentages assigned as per overhead type and plant, in cost component structure I have maintained same cost elements as set earlier in cost sheet.
    Please find the file attached
    Please suggest me if I M wrong.
    Thanks & Regards
    Subrata

    Hi.
    In itemization of CK11N over head is showing correct. But the material cost for RM is already after charging overhead. I have checked the itemization of Process order there for the first material was Rs. 144.56, but in the itemization view of CK11N it is showing Rs.148.90/- That means exactly after adding 3% overhead which I maintained in cost sheet.
    Itemization of Ck11N
    Itemization of COR2
    Please Help
    Thanks & Regards
    Subrata

  • Target Cost in Process Order not calculated

    Hello,
    In Process order, after deliver of FG the target cost is not getting calculated,
    Could you please help me why the target cost is not calculated in process order.
    I have configured all setting for WIP and Variance

    Hi,
    Target costs are only calculated after goods movements have occured on the order, the Target Costs are then calculated during the Variance calculation.
    Target costs will only be calculated after the first goods receipt has been posted to the order. Also you have to ensure that the information to calculate target costs exists on the system in particular in OKV6.
    This estimation is based on the customizing for the Target cost version in transaction OKV6 as in turn will the "real" calculation of the Target costs via the variance calculation.
    So in OKV6 the Target cost will be based on preliminary costing on the order, an alternative cost estimate or the current standard cost estimate. Importantly if the choosen option is not fulfilled e.g. no current standard cost estimate, the target costs will not be predicted or calculated.
    regards
    Waman

  • Shipment cost not calculating on VT01N

    Hi Gurus,
    I have configured the shipment cost configuration in all the relevant areas of Transportation node but still Shipment Cost is not calculating in VT01N.
    Following configuration has been done:
      Define Routes
    Define Modes of Transport
    Define Shipment Types
    Define Transportation Connection Points
    Route Determination
    Define Routes and Stages
    Define Transportation Zones
    Shipments
    Maintain Transportation Relevance
    Define Shipment Types
    Shipment Costs
    Basic Functions
    Define Data Rules
    Define and Assign Tariff Zones
    Shipment Cost Document
    Shipment Cost Types and Item Categories
    Shipment Cost Relevance and Default for Shipment Cost Type
    Pricing
    Define Condition Types
    Define and Assign Pricing Procedure   --- here I am using the Standard Pricing Procedure
    SettlementAssign Purchasing Data
    I have maintained the condition record in TK11.
    Please let me know If I have missed any other steps.
    Also please let me know the sequence in which the pricing will be picked up.
    Quick action  Text Removed
    Regards
    Message was edited by: G Lakshmipathi
    Please dont add such text in your post

    Hi Moazzam
    Actually I am not a new member, just created a new ID. Unfortunately I have lost my old id .
    I did search Google and SCN from the last two days before posting this discussion in SCN. Some of the good links which helped me for the configuration are:
    Standard Shipment Process
    Shipment Cost Processing - Delta - TD - Transportation and Distribution - SAP Library
    Transportation Configuration and Process Flow - ERP Operations - SCN Wiki
    Shipment cost
    Shipment cost basic configuration...
    Transportation (LE-TRA) - SAP Library
    Shipment cost - VI01
    Net value is zero when creating shipment cost
    ETC...
    Currently get the SDTRA.PDF document which I am reading .....
    Infact after reading all the document I still unable to understand the proper technical flow required for shipment cost calculation.
    Please share me your concept, it will be helpful for me.
    Regards

  • TAX not Calculating for Unplanned Delivery cost in MIRO

    Dear All,
    I am having an issue with Unplanned delivery cost in MIRO,
    We have to do an accounting of a invoice/PO which contains in addition to actual Value the Unplanned Delivery cost also, and for which also the TAXes also applicable with ED 10% and ECess 2%,SHcess 1% ,
    Now in MIRO if i want to enter these Packing and forwarding chanrges in Unplanned delivery cost, but the TAX rates is not calculating for the same.
    The TAX rates are calculating only for the values other than Unplanned delivery cost.
    What i want TAX also need to be calculate based on the TAX code choosen in MIRO or as flow that of PO.
    I have checked in OMR2, there we have mentioned Default Unplanned delivery cost tax code as ED NIL.
    Can any where in the setting we can say by default the TAX rates should calculate as that of PO or whatever TAX codes we have choosen in MIRO.
    How to achive this, pl help.
    Regards,
    Nagaraj S

    hi
    the screen shot i sent is also of 4.7E
    now u can check OMR2 for default tax code for unplanned delivery cost
    can u show us the screen shot of the details tab of MIRO
    also check in SPR>MM>LIV>Configure How Unplanned Delivery Costs Are Posted
    here what value u have maintained  ,we are using 2 as (2     Different G/L line)
    regards
    kunal
    Edited by: Kunal Ingale on May 19, 2010 6:18 AM

  • System is not converting unit of measure ment while doing cost estimation.

    Hi All,
    System is not converting unit of measure ment while doing cost estimation.
    Now i am explaining system setting. based on this kindly help me.
    Our Base Unit of Measure Measuremnt in Material Master is M2 (meter square) and We have maintained Unit conversion in Master as  1 PC is <=>2.5 M2.
    We are running costing for 1 M2.
    Producion we are doing in Peaces (PC) .  and i maintained Std Value for for Machin and Labour for PC only. and we maintained charge quantity in phases also.
    While running cost estimation system is not converting std value of machin & labour into M2.instead it is showing full machin and labour time and value.
    System showing PC value for M2 Cost estimate.
    Can any one let me know where i am missing.
    Thanks in Advance.
    Regards,
    Sahil

    Hi,
    as per your explanation: 1 PC (piece) = 2,5 sqm (m2), standard values for "labour / machine" maintained per PC.
    I guess within T-code CUNI, the unit PC does not allow any decimal places (means there can be only 1 piece, 2 pieces, 2 pieces but not 1 and a half pieces, 2,63 pieces,...)
    Now if you are running plan cost estimate for quantity 1 sqm (m2) SAP picks the "labour / machine" values for 1 PC (and not for 1 / 2,5 = 0,4 pieces) as decimal places for unit pieces are not allowed so its up-rounding.
    Run cost estimate for 10 sqm (m2) which should be 4 PC and the result should be fine.
    Best regards, Christian

  • CK11N alert:"Costing item 00001 is not assigned to a cost component"

    Hi,
         When I use CK11N, fill in all the necessary field, there will appear a alert.
          The detail as follows:
    Costing item 00001 is not assigned to a cost component
    Message no. CK 334
    Diagnosis
    No cost component is assigned to costing item 00001.
    System Response
    The costs for the costing item are not shown.
    Procedure
    Go into Customizing for Product Cost Controlling and check the assignment of cost elements to cost components.
           I have used KA03,KL03,CR03 to checked previous datas, but I find no errors?
    What is the problem?

    Hi,
    Use OKTZ to create cost component structure.
    Check for some of these settings also
    Configuration:
    Define costing sheets
    OKTZ create cost component structure
    OKK4 Define valuation variant
    OKKN Define cost variant
    Master Data:
    KP26 setup activity rates
    CR01 setup work centers
    MM01 setup material masters
    CS01 setup Bill of Materials
    CA01 setup routings
    Regards,
    Murali

  • Error while doing Std.cost estimation.

    Hallo gurus,
    I am facing one problem while doing Std.Cost estimation.
    Let me explain in detailed..
    I am doing costing estimation for a Product. This product contains both Bought out Material and Customer Supplied Products.But both are coming as Material class as Raw material.
    But Overheads to be calculated differently for those means for Bought out product - 1.5% and for Customer supplied Products-5%.
    So i have created one Overhead Key and the same is attached to Overhead
    Group and this overhead group is attached to a respective material.
    In Costing sheet for overhead i have selected Dependency D010 and maintained the same along with Overhead key..
    But while executing CK11N, system is not calculating the same.
    Pls through some light on this....
    Advance Thanks..
    Regds,
    Janardhan.

    Did you attached the costing sheet in costing variant?

  • Freight Calculation in Standard cost Run

    Hi,
    The requirement is while doing the standard cost calculation through CK11N / CK40N system should show seperately how much is freight plan cost &; how much is duty plan cost.e.g.
    100 is material price as per condition PB00 Cost element 355100
    10 is freight cost (ZFR1 10%) Cost element 363170
    5 is duty cost (Zduty lets say 0.5%) Cost element 363171
    So taotal cost will be 115
    I wanted to get this in cost component wise. Client does not want manual intervention so do not want to go for additive cost method
    I had tried through Purchasing info record. I have maintained the valuation variant accordingly. Assigned correct sub strategy to it & also maintained delivery cost button in the same screen to assign conditions to origin group.
    Also I had maintained purchasing info record through me11 ; mainteined conditions there.
    These above mentioned cost elements are mapped in cost component  structure in T code OKTZ. Seperately for material ,freight &; duty
    Now when I make a PO, system is showing correct calculation as per the conditions.When I do the GR the Freight &; duty is getting posted &; these GLs are having above mentioned primary cost elements . .So the primary cost element is also getting posted correctly.
    Now the problem is
    While doing the cost run system shows me Seperate cost for material as 100 , seperate for freight 10 & seperate for duty 5, but to the same cost element i.e. 355100. So all the cost is shown as material cost ; nothing is displayed as freight or duty
    If I see the cost element report the corresponding value is flown to the corresponding cost element. But  it is not reflecting in proper cost component in cost run
    .Please guide me why this is happening. How can I resolve this
    Regards,
    Abhijit

    Hi Ajay,
    I was waiting for your reply.
    As mentioned by you, I have mapped my cost component structure like Raw material, Freigh, Duty & assigned the corresponding cost elements to it.. But still in itemisation view it shows three values
    consumption cost element 355100 - 100
    consumption cost element 355100 - 10  (which should go to freight component where I have assigned the Freight cost element)
    consumption cost element 355100  -5   (which should go to Duty component where I have assigned the Duty cost element)
    FI entries are getting posted correctly. Values are flown to coresponding cost elements.
    For the time being We will keep duty part side. We are discussing with client on this.
    But, what could be the reason of this problem. How I can achieve the below mentioned result.
    Cost component view
    Raw material -100
    Freight  - 10
    Duty - 5

  • Shipment Cost Estimation Report

    Hi Experts,
    There is an existing report which is very helpful regarding most transportation details. You can pull information at the delivery or item level of all types of shipments in one place. We use this to review what shipments we need to process to cost documents and transport POs.
    Another report shows all of the information except information on what the actual cost calculations have been. A report is available which details the cost calculations but this report is not available until after the cost document has been created which is too late to assist in the shipment costing process. This T code is VI12  and it shows each cost type separated out based on the calculated rate.
    Using  T code VT02N from the shipment cost estimation button, this is the information we need to merge it in the existing report.
    Please can anyone advise on this situation how to do this enhancement.
    Do we need any other information from the client for this issue.
    Thanks for your help.
    With Regards,
    Ruby.

    Hello,
    Would VI11 answer your question, there are also additional fields in the ALV catalogue that can be added to the layout?
    Regards
    Waza

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • Table for Valuation Price from USER EXIT - Cost Estimation

    Hi All,
    Can you let us know from where the system picks the price for VALUATION PRICE from USER EXIT when we have following setting in valuation variant
    1.Valuation Price from USER EXIT
    2.Price from Purchasing Info Records
    3. Planned Price 1
    Sub Stratergy.
    1.Effective Price from Purchase Order
    2. Net Quotation Price
    3. Gross Quotation Price.
    Now when we execute CK11N for a material, the system displays a cost price as 316 Euro/ unit.
    But Standard price is 290 euros, info record price is 294 euros & planned price 304 euros.
    Our previous cost estimation ( period 1, current period is 5) was 316 euro/unit (which was not correct), so deleted the cost estimation with CKR1 and try to rerun the cost estimation to update the value (new price), but still the system is picking the old price.
    Can you let us know from where does(transaction code & table) the system is picking the old values.
    In CK11N Material valuation (Valuation tab) its showing as Valuation Price from USER EXIT.
    We have activated Material Ledger with price control "s"and we in ECC 6.0.
    Do suggest.

    Hi,
    Where & how can i find the exit.
    Do suggest.
    Regards,

  • How to create Quotation from Ad hoc cost estimation of cProjects?

    Hi Guruu2019s
    Please help me in resolving the issue given below. I am able to get ad hoc cost estimation results in accounting screen, but not able to create a Quotation from Ad hoc cost estimation of cProjects.
    I am here with providing necessary steps to be followed. But these buttons are not available in my accounting screen.
    Prerequisites
    A reference quotation has been linked to the project under Structure  Object Links. An ad hoc cost estimate has been created for the project.
    Procedure
    1.     Choose the Accounting tab.
    2.     Choose link Ad Hoc Cost Estimate.
    3.     Enter client, user and password to log on to SAP ECC.
    The client, user and password must be entered if Single Sign On is not activated
    4.     On the Ad Hoc Cost Estimate screen, choose  .
    5.     On the Easy Cost Planning screen, choose  .
    6.     Choose  .
    7.     Choose Yes when you are prompted with u201CDo you really want to create the quotation?u201D
    8.     Write down the Quotation number :_______________
    9.     Choose  .
    Result
    Quotation in SAP ERP has been created.
    Please respond to this at the earliest. Points are given for your reply. I would be great if any one provides step by step procedure for IMG activities.  Thanks in advance.
    Thanks & Regards
    Suresh. J

    Hi Suresh,
    maybe you find the following link also useful:
    [http://help.sap.com/saphelp_ppm400/helpdata/en/index.htm]
    Navigation: Collaboration Projects -> Accounting Integration -> Preliminary Costing and Quotation Creation -> Ad Hoc Cost Estimate for cProjects  or Sales Pricing for cProjects
    From the page:
    The cost planning function is executed by Easy Cost Planning (ECP). The cost estimate is always created at project level and is always single-level. The organizational data relevant to costing (controlling area, company code, and master cost center for the derivation of the activity type under which the allocation is reported) is derived from the HR organizational unit specified in the project definition. The costs are calculated based on the rates for the resource, project role, or task. For more information, see Costing Logic.
    The revenues are calculated automatically if you have selected the option Use Cost/Revenue Rates from cProjects or Use Sales Pricing in SAP ERP as the revenue calculation type for the project type that you are using for the project. You make this selection in Customizing for Collaboration Projects, by choosing Connection to External Systems -> Accounting Integration -> Make General Settings. With the last option, the revenues are calculated with the dynamic item processor (DIP). For more information, see Sales Pricing for cProjects. Then you can also call up sales pricing from within the ad hoc cost estimate.
    You can archive the ad hoc cost estimate in SAP ECC (archiving object CO_ECP) if the project has the status To Be Archived.
    Technically, the ad hoc cost estimate is saved in SAP ECC with reference to the cProjects project number. When the project is transferred, it is recosted and the cost estimate stored for the account assignment object.
    Hoping this helps...
    Best regards,
    Thomas