Overview of AR Invoice and Safety Stock API

Hello experts,
I am new to oracle apps. Please send the me overview of AR Invoice and Safety stock API in inventory.
Thanks a ton in advance.
Kumar

Soni,
Please see (Note: 296559.1 - FAQ: Common Tracing Techniques within the Oracle Applications 11i/R12). Since you run the API from SQL*Plus/TOAD, follow the steps under "d. Note that a similar technique can be used for enabling trace with binds for a user in SQL*Plus" section to generate the trace file, and the steps under the TKPROF section to generate the TKPROF file.
Thanks,
Hussein

Similar Messages

  • Report on current stock and safety stock

    Hi,
    I want to have the report on current stock and safety stock.
    In MC.9 it gives wrong safety stock. When I go to cross check the safety stock in material master & in MC.9 I see differences.
    Thanks,
    Kiran

    You can user tcode MC.9 or MC.5 to know valuated stock available at given plant. Stock lying in Returns (MB52) will not be a part of this report as it non-valuated stock.
    The stock in the accounting view of the material master considers stock at plant level including stock in Transit (Intra & Inter plant stock trasnfers) & special stock like stock issued to vendor , consigment stock etc which is valuated at plant level.
    whereas and stock in the plant stock view of the material master does not consider such special stocks hence there will always difference in both veiws.
    For Physical stock as on particular date you can consider MB5B report with radio button "Storage location/Batch Stock" wherein you will get Quantity issued & Qunatity received in those SLOC along with Opening stock & Closing stock for the specified period.
    use tcode
    MBLB to know stock at vendor.
    MB54 - Consignment Stock.

  • Automatic reorder point and safety stock caluclation- MRP type:V2

    Hi,
    I want the system to calculate reorder point and safety stock. To simulate this i created one material with
    MRP type:V2, service level as 97%, Forecast model:D,Hist. period:12,Forecast periods:12, and I entered
    the historical value for past 12 months as 100 nos in material master.
    04.2009     100
    03.2009     100
    02.2009     100
    01.2009     100
    12.2008     100
    11.2008     100
    10.2008     100
    09.2008     100
    08.2008     100
    07.2008     100
    06.2008     100                 
    05.2008      100                
    Then I went to MP30 and executed the forcase.When I checkd the material master the system has calculated the reorder point as 14 nos. But there is no value updated in safety stock field.
    Now I have two questions.
    1) How the system has arrived the reorder point value as 14 nos.
    2) Why there is no safety stock updated in material master.
    Could u please clarify this.
    Thanks and Regards
    Purushothaman

    Hi,
    This is further to my preivous mail. I have changed the consumption values and now i am getting the safety stock.
    MRP type:V2, service level as 97%, Forecast model:D,Hist. period:12,Forecast periods:12, and I entered
    the historical value for past 12 months as.
    04.2009     100
    03.2009     80
    02.2009     110
    01.2009     85
    12.2008     90
    11.2008     95
    10.2008     125
    09.2008     90
    08.2008     90
    07.2008     92
    06.2008     101
    05.2008     100
    After executing the forecase the sytem has calculated the below parameter.
    Basic value:95.759
    MAD:11.448
    Safety stock:10.252
    Reorder point:23.658.
    Can anyone explain me how these calculation arrived.
    Thanks and regards
    Purushothaman

  • Static or Dynamic Reorder Point and Safety Stock

    Hi,
    In a retail scenario, what would be the advantages over the other of setting a static or dynamic reorder point and safety stock?
    The MRP type used is Time Phased Planning, but whether to let the system automatically set the reorder point and safety stock is the question. What should be considered in implementing this?
    Regards,
    Lee

    hi,
    As far as i know is static means manual entry of reorder point.
    The dynamic or automatic reorder point is used for Forecast based planning...
    the sysstem wii automatically calculate the reoder point evrytime there is the forecast run.
    So, it dependig on ur scenario , select either manual or automatic.
    First entry for both is always manual entry....
    hope u got this..
    Regards,
    Smitha

  • Exception message 10 and safety stock

    Hello
    When I have a ressource in the past (we have this case), and if the safety stock is not complet, the exception message is "10" (reschedulling in) without date.
    Normaly the result should be exception message "15" (rescheduling out) with a date.
    Why have I an exception message "10" without date ?
    Is it the custo, but I found nothing ?

    Hi Christian,
    I've seen this myself, and believe that it happens only if you allow start in the past and have got insufficient coverage for safety stock.
    I guess it doesn't have a date because of the start in the past, which will set availability date even today. Try to change the "start in the past" indicator, and see what happens.
    Regards,
    Mario

  • How to use forecast and safety stock

    Hi
    We have below business case for MRP case  and scenarios , please guide me how to use safety stock in this case.
    Requirement : System should always raise PR for quantity of forecast only , if forecast in not available then for the safety stock 
    Planning cycle
    100 (Monday)
    Deliver cycle
    500(Friday)
    Forecast model
    S
    Lead time
    4
    Safety stock
    10

    Hi
    Did anyone have idea how to use safety stock with forecast in such a way that System should always raise PR for quantity of forecast only , if forecast in not available or less then the safety stock quantity PR will be raise with safety stock quantity

  • How much to order , reorder point and Safety stock calculation in SAP?

    Existing Client is Distribution company , the Challenge is how much order , when to order and how much safety stock we need to keep for Material in SAP?
    Limitations with Client System:
    u2022The existing system does not enable purchasing to have visibility to firm (open sales orders) and planned (customer forecasted) demand for a material.
    u2022If a sales order is placed that consumes all of the inventory available, the purchasing department is not notified automatically to replenish the stock
    u2022The system in place currently does not enable the organization to maintain a level of safety stock.
    u2022If inventory is logically allocated to a priority customer based on their forecast, there is no way to ensure that inventory is reserved for the priority customeru2019s orders u2013 other sales orders often consume it.
    u2022If a material is backordered with several sales orders waiting for parts, the sales orders are allocated based on earliest requested delivery date upon receipt of the part; there is no way currently to allocate the stock across the open sales orders if it is determined that is the appropriate course of action.
    Thanks
    Sweth

    Sweth, you are asking for consulting, and in my opinion it is way beyond what can or should be reasonable to achieve in such a forum. You are asking complex questions, that most probable have more than one possible answer.
    I suggest that you get on-site help from a knowledgeable and experienced consultant. These are crucial business issues, and should be dealt seriously.

  • ASCP and Safety Stock Pegging

    Hi,
    in our ASCP plan, currently we have items with Safety Stock values manually inserted valid over all planning horizon.
    Therefore all the safety stock is NON-TRANSIENT.
    Actually we have Priority Based pegging with:
    MSC: Include Safety Stocks in Priority based Pegging: YES.
    What is appening is that ASCP peg On Hand quantities to FORECAST DEMAND, then pegs other supply type to SAFETY STOCK Demand.
    I would like ASCP to peg OH to Safety Stock Demand (DUE on the plan start date) before Forecast demand (due in the future).
    Someone knows how to obtain this "feature"?
    Thanks in advance.
    Giacomo

    Giacomo,
    I'll give you a few pointers, but this may be difficult to achieve. Try this as a test.
    I assume you have a constrained ASCP plan. This question wouldn't be as relevant in an unconstrained plan because the demands would just be calculated and priority pegging isn't that useful. .Is that correct, you have a constrained plan?
    The key point is that you mentioned is that you have NON-TRANSIENT safety stocks. This means that you are setting a value due today for 100 units and at the end of the plan, you still want to have 100 units of safety stock planned.
    ASCP priority pegging logic has these rules:
    1. Any supply quantity that pegs to NON-TRANSIENT safety stock CANNOT be used at a future date to peg to real demands. [It's not going to happen]
    2. Any Supply quantity that pegs to transient safety stock CAN be used at a future date (when the corresponding dip in safety stock occurs) to meet demands. [This means that it can release the supply and re-peg to a future demand].
    Independent Demands have a seeded demand priority by default. The first two below are set by a profile option, safety stock is always the lowest priority ( a number something like 99999 where the higher value is lower priority)
    1. Sales Order = 10,000*
    2. Forecast = 100,000*
    3. Safety Stock = 999,999 (not sure of this internal value)
    Set by a profile with a name like msc: default sales order priority
    For priority pegging setup instructions, please see the ascp user guide. The basics would be the use of two profiles mso: demand window size and mso supply window size. This determines how ascp will select and sort your supplies and demands for pegging. It starts at the first demand date or supply date and selects that many future days of demand and supply to sort and then peg.
    You also setup a priority rule that determines how ascp calculates priorities for pegging. To accomplish what you want to do, you would have a rule like
    1. MDS & Sales Order priority
    2. Schedule Date
    This is a commonly used example. The pegging process will the select the number of days you have chosen and sort the demands based on their prioirty.
    Sales orders are more important (to you) than safety stocks, but not forecasts. You want the safety stock to peg the on hand, not a future forecast. This can only happen because you have mso: demand window size set to a number of days where pegging sees the future demand in the same sort. I haven't seen this requirement (SS higher priority than forecast), so you'll need to test my suggestion.
    Set the value of MSC: Default forecast priority = A huge number (higher than 999999).
    The intent is to make the demand priority the SAME as a safety stock demand. In this case, with the priority rule I suggested, the schedule date will determine the pegging order.
    I think this will get you close. You can view the internal proirity calculated by ASCP for the independent demand by selecting that order in the pegging details and then rightclicking to select the properties. The pegging details wil show you the priority value that was used.
    Hope this helps.
    Kevin
    www.inspirage.com

  • One purchase requision for PIR and safety stock

    Dear All,
    We have following scenario:-
    We have maintained safety stock of 50 Pc for A material.
    planned delivery time is 5  days.
    PIR of 100 Pc with date 15/9/10
    Lot size maintained in material master is MB
    Now when I take MRP run  on 20/8/10 system creates two PR
    50 pc on 21/8/10
    100 pc on 15/9/10
    Our requirement is to create one PR instead of two.
    pls suggest.
    with regards,
    pradeep

    Hi,
    Lot size is MB, the demands are in 2 different months & hence system is creating 2 different PR's.
    If you want it to be under same PR, then you might consider moving the demand in september to august if its possible or think of having a custom Lot size which is bi-monthly.
    Regards,
    Vivek

  • Is there any bapi returns dynamic value of reorder point and safety stock

    Hi all,
    Is there any bapi returns the runtime value of ROP and SS by passing changenr/objectid taken from CDPOS.
    if exists please send me with code.
    Thanks
    PRR R

    hi,
    As far as i know is static means manual entry of reorder point.
    The dynamic or automatic reorder point is used for Forecast based planning...
    the sysstem wii automatically calculate the reoder point evrytime there is the forecast run.
    So, it dependig on ur scenario , select either manual or automatic.
    First entry for both is always manual entry....
    hope u got this..
    Regards,
    Smitha

  • MRP with reorder point and safety stock and planning calender issue

    Hi,
    We are using currently MRP type PD and using Scheduling agreements and after the demand management changes when ran MRP the delivery quantities are fluctating in higher range and vendor complains about it so to avoid this we are constantly changing GR Processing days in material master? how can we avoid the drastic changes on the order quantites on scheduling agreements with out changing GR processing days.
    For example : we constantly manufacter 480 vehciles per week and some time because of holidays it will be 320 or 560 per week then the forward scheduling agreement quantites instead of 480 parts week(twice a week delivery) goes up and down and vendor needs a at least a range for his prodcution?
    I was thinking to use Reorder point but when i changed the MRP type VB then i cannot see forward scheduling agreements at MD04? does MRP type VB or V1 will allow forward scheduling also like 120 days ahead of planning?
    Appreciates everyone time and help.
    Thanks and Regards,
    Siva

    you can use MRP time fence to restrict the changes in planning data for specified horizon. For example If MRP time fence = 30 days, no changes in planning data will be allowed for coming 3o days unless you manually intervene.if any new requirements came in this period , they will be planned automatically at the end of this period only.

  • Safety stock and safety period

    Can anybody help me in understanding the effect of safety period in MRP..
    CAn anybody give me an explanation with numbers so that i could test and understand..
    Please help me out..

    Dear
    There are plenty of earlier posting on Safety stock and safety periods .
    Safety Stock : This is one kind of Un-restricted stock which will be used to full fill the un-expected damand for any material apart from the normal stock .Safety Stock calcuation depends on requireiment .It can be pre-defined ( manual safety stock -MRP3 view-Safety Stock ) or Automatic Safety Stock based on the MRP Type set up in OMDQ.If you want automatic safety stock , then it will calcuated based on Forecasting view parametrs , forcast model , MAD, BASIC value calcualted wheil excuting Forecasting collectively or individually .
    Safety Stock Calcualtion happend based on following CONDITION :
    1.MRP type should be Forecast Base MRP -VV,VB,VS,V1,V2.Here MRP type calculates the Automatic Safety stock based on the Forcasting View Maintained in MM02 with proper Consumption History .( 261,501 etc update control in MMR through OMJJ set up --Please check MMR Forcasting View -Cosnumption Histry at least 6 months are there or not ?)
    2.In MRP Type -SPRO-MRP-Check MRP Type -Select any one of the MRP Type like VV , you will find that Calcualtion of Reo-Order Point and Safety Stock Check Box Ticked .Based this set up and above Forcasting view , safety Stock will be calcualted with certain formaul .Here in the Material Master MRP3 view u need to maintain Service Level Percentage of that Material whcih will be consideredr as Service level factor to calcvualte the Safety Stock automatically based on the MAD and Basic Values calcualtion in Forcating View Individually (MM02) or collectively in MP38 .
    Hope this above facts will help you to understand the calcualtrion of Safety Stock .
    Formula : Safety Stock = R x Sq.rt. W x MAD
    Safety Stock = R x W x MAD
    Refer our earlier posting on the similar issues :
    Automatic reorder point calculation
    safety stock and min safety stock
    Hope it clarifies
    Regards
    JH
    Edited by: Jiaul Haque on Feb 21, 2011 10:31 AM

  • Safety stock alesrt

    If total stock of a material goes below safety stock user can get a message at inbox as an safety stock alert...
    How can be the scenario configured????????
    Please suggest mmmmmme.......

    Hi,
    If the stock goes below the safety stock system wont allow you to draw the material and message come.
    But for your requirement you can have a Z-report run in back ground checking the exisitng stock and safety stock periodically and it will send a report to respective user in box. With the help of ABAP it is possible.
    Hope your requirement has been addressed.
    regards
    Venkat

  • ROP & safety Stock

    I created a MRP Type to calculate ROP & Safety Stock automatically.
    Now I wanted to create my own formula for creating ROP & Safety Stock.
    Can any one plz tell me that where I can define this formula.
    Also in SPRO where I can define new forecasting mode.
    Thanks
    SAP Cons

    Hi,
    I find the following defintion in the SAP standard document:
    Automatic Reorder Point Planning
    In automatic reorder point planning, both the reorder level and the safety stock level are
    determined by the integrated forecasting program.
    The system uses past consumption data (historical data) to forecast future requirements. The
    system then uses these forecast values to calculate the reorder level and the safety stock level,
    taking the service level, which is specified by the MRP controller, and the material's
    replenishment lead time into account, and transfers them to the material master.
    If I understand, you can control the Automatic ROP and Safety Stock through  the Service Level only!!
    you can find the entire document here :
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPMRP/PPMRP.pdf
    regards

  • Safety stock & Reorderpoint

    HI SAP Folks,
          Any one tell me what is the difference between Safety stock and reorderpoint and what is their role in SAP?
    Thanx in advance AND will be rewarded points.
    Regards,
    mnsr

    Hi,
    Safety stock you can define to cover for any unwanted demand and delay from vendor for the consignment during the lead time of replinishment.
    For example your reorder level is 500 and safety stock is 50. When the reorder falls below the point then procurement proposal will come for the maximum stock. after this your purchase cycle will start but production will cover by stock which is betwwen 50 to 500. Now you must get the delivery of the proposal till this stock touch to 50.
    If suppose you didn't get this because of any delay in transportation from vendor or suppose you get some unwanted consumption (scrap) then you can use this safety stock to avoid any stoppage of production due to material unavailability.
    Safety stock you can define with calculation of average daily consumption with respect to the demand and lead time for procurement. It is not must...if you wish you can maintain.
    If helpful rewards your points.
    Regards
    TAJUDDIN

Maybe you are looking for

  • New Airport Network - issues with some specific features

    Hello, I have just changed my wifi system for an Airport Network, with one AirPort Extreme and 2 AirPort Express. The goal was to extend the wifi network to the entire house. Everything is fine, all my computers are able to connect to the network and

  • Indesign cs4 not resonding correctly ?

    Using Windows 7 home premium 4gig ram cpu 3.20 Strange things are going on. Maybe someone else has had thease problems. Indesign won't let me select the select arrow tool at the top of the tool box, I have to use the keyboard shortcut.  Plus there ar

  • Mapping parameters of third party plug ins

    Is Mainstage supposed to map the parameters of third party plug ins? I'm trying to map a start stop button to the play button in idrum but it doesn't work. Tried buttons on a korg polysix and that's the same. I can get it to work with apples own inst

  • Safari crashing frequently_OS X 10.8.4

    Hi I am using Macbook Pro 13 inch 2012 model and have started experiencing this problem suddenly.  Safari Browser just started crashing very frequently.  It is very annoying.   I am running OSX 10.8.4 Please see the crash report below. Please suggest

  • Where to find my apps downloaded from icloud to my macbook

    Wanted to use apps which were downloaded on my iphone and ipad. I've downloaded them from my macbook through itunes icloud, but I do not see them anywhere on the macbook. Lookin at the app store it shows that they are all downloaded. New to using a M