Parallel and Alternative sequence in routing

dear gurus,
please explain with examples what is meant by Alternative sequence and parallel sequence in routings and also what is group counter?
Thanks and Regards,
Jejesh

See the help file
http://help.sap.com/saphelp_47x200/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm
it is very clear in thsi web page

Similar Messages

  • Inbound Queue blocked: Parallel and alternative sequences are not supported

    Hi,
    Just now, I checked the Inbound Queue in SCM system through SMQ2 and found which was blocked by error message "Parallel and alternative sequences are not supported". Could you please tell me what does it mean? How to fix it?
    Thanks,
    Quanyin Su

    Hi Quanyin Su,
    Parallel and Alternative sequences are used in routing.
    I believe you are trying to CIF PPM/PDS from ECC to APO and you are getting this queue stuck at inbound of APO.
    Both the alternative and parallel sequences are supported in APO.
    Alternative sequence is used as alternative modes in APO.
    I can think of this as a master data issue.
    At least one of your work center used in either of the sequences is not available in APO or is not APO relevant.
    Could you please check your master data such as all the work centers used and make sure your parallel and alternative sequences are consistent.
    Once you made sure that master is available in ECC, you can CIF it to APO by using CURTO_CREATE transaction in ECC.
    Please see below link for Routing and its usage in APO:
    http://help.sap.com/saphelp_apo/helpdata/en/99/ed3a981d0f11d5b3fc0050dadf0791/content.htm
    You also need to activate a BADI in order to sent alternative sequences to APO.
    Below thread has all the details regarding this.
    Re: /SAPAPO/CURTO 103 : Mode .. is not assigned to an activity
    Regards,
    Abhay Kapase
    Edited by: AbhayKapase on Aug 5, 2011 2:24 PM

  • Alternative Sequence in Routing

    Dear All,
    I have a routing with 2 operations, and an alternative sequence branching in/out for operation 0020.
    Now I have created a Production order, finished operation number 0010, finished half of operation 0020 and confirmed half the quantity, now the machine stops and I want to use the alternative machine.
    How can I do that?
    It wouldn't allow me to use the alternative in confirmation, only allows me to choose it while creating the production order. How can I fix this issue?
    In my origional routing I have 1 standard sequence, and once the machine brakes, I go to CO02 and create a new alternative?
    However, in my original routing I dont want to state that I'll be manufacturing this production on 50% on machine 1 and 50% on machine 2.
    The problem only occurs if the workcenter I'm working in develops a downtime. Where can I list the other work center I will use respecting the capacity, etc..?
    Edited by: Rafik Wassef on May 21, 2009 12:01 PM

    Rafik,
    There are three types of sequences you can maintain in the routing, i.e. standard, alternative & parallel.
    As soon as the order is created in which this routing is the master data, any one sequence either standard or alternative sequence gets copied to the order.
    Parallel sequences will be copied to the order.
    That means the sequences which are alternative to each other never be a part of the order i.e. you can maintain those in the routing but while order creation only one out of them gets part of the order. Also you can not maintain alternative sequence in the order.
    Only parallel sequence can be maintained in the order.
    That's the reason I suggested you to maintain the same to tackle this issue..
    If the main work center is under maintenance then you can replace the work center with the desired work center in the order itself. Why secific need to maintain the another sequence?
    Hope this helps you.
    SmanS

  • Mac + parallels and https site test = router restarts

    Ok I have an interesting & very frustrating problem happening. I'm going to explain it the best I can.
    I work as a graphic designer & web designer on a mac and have a Comcast internet connection that comes through a Comcast branded router (SMC8014) which then ties into an Airport Extreme Base Station which runs my office network. I run OS 10.5.7 and also run Parallels 4.0.3 (running Windows XP) for testing websites in Internet Explorer and so on.
    Ok, so that the basic background. Here's my issue.
    I've been collaborating an ecommerce website with another designer/developer and when testing the site on the PC side we have started to run into some sort of network problem. The site is https if that matters at all I suspect it may. Basically when I run parallels for testing I am constantly having to restart the router in order to connect to the test site (it's hosted). Funny thing is I can access the rest of the internet fine, just not this site I'm working on until I restart the router (It's sorta like the site is timing out). This never happens when just running the Mac side of things. It only becomes an issue when Parallels is open and I am doing page refreshes while making css or HTML edits via something like Coda or CSS edit (connected to the hosting server via ftp). The real problem is that once the problem starts I only get about 2 or 3 page loads before I have to restart the router again. It's absolutely crippling. I cannot get any work done when I have to restart the router every couple of minutes.
    So, if you think this problem is isolated to me, the answer is no. The designer/developer I'm collaborating with has an office a couple miles away and experiences very similar problems under slightly different setup. He also has Comcast as his internet provider and connects his router to an Airport and primarily works on a mac. The main difference is that rather than using a visualizer like parallels to test the website on the PC he uses a real live PC that is on his network. Once he fire up the PC to do testing he runs into the same issue described above. After a couple of page refreshes in Internet Explorer or other browser on the PC the site becomes unresponsive and the router has to get restarted.
    Any thoughts on what is going on here would be greatly appreciated.
    Thanks in advance.

    Hello bigbobber,
    If  you have issue in using Windows 8.1 Pro in the software  parallels in MAC?
    About this issue, it is recommended to contact the related parallels support.
    About the license issue, please read the following article about Buyer’s Guide and Microsoft software license agreement windows 8.1.
    http://www.microsoft.com/licensing/about-licensing/windows8-1.aspx
    It is recommended to contact the phone support if you have license issue.
    Best regards,
    Fangzhou CHEN
    Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact [email protected]

  • Table and field for actual sequence of routing

    Dear guru ,
    i have a production order and i use alternative sequence in routing.
    I don’t know which field and table of production order that give me the actual  sequence
    Of the routing That I am using for this production order.
    Thanks in advance.

    Dear,
    there are two diferent tables AFVC and AFFL
    In AFVC we have sequence no field and AFFL also have sequece field it is called - PLNFL
    Hence it is the differenciating factor between 2 sequences
    AFFL output
    Routing no. op. Counter  Task list type Group    Group counter Sequence
    0000012610      00000001 N              50000007 01            000000 
    0000012610      00000002 N              50000007 01            000001 
    0000012610      00000003 N              50000007 01            000002 
    AFVC output
    Routing no. op. Counter  Sequence
    0000012610      00000001 000000 
    0000012610      00000002 000000 
    0000012610      00000003 000001 
    0000012610      00000004 000001 
    0000012610      00000005 000000 
    0000012610      00000006 000000 
    0000012610      00000007 000000 
    0000012610      00000008 000000 
    0000012610      00000009 000000 
    0000012610      00000010 000002 
    0000012610      00000011 000002 
    0000012610      00000012 000000       
    0000012610      00000013 000000
    I hope u got it.

  • Branch operation and return operation for routing in alternative sequence

    Hi all experts.
    I would like to ask which table and field store the value of branch operation and return operation for routing in the alternative sequence. I can only find them in structure (PLFLD-VORNR1 and PLFLD-VORNR2) but I want the table field of them. Would anyone please suggest a solution? Thank you.

    Hi,
    look in table AFFL, here the BKNT1 and BKNT2 refer to those vornr1 and vornr2 of the operation. For example in user-exit ZXCO1U01 you will find the values (BKNT1/2) in the sequence table, and when, for example, filling the LOIPRO01-Idoc, you can use the found VORNR for the E1AFFLL-segment.
    See coding for example on determining VORNR1/2 (sequence_table/operation_table as in user exit EXIT_SAPLCOBT_001):
    SORT operation_table BY vornr.
      LOOP AT sequence_table INTO l_sequence.
        MOVE-CORRESPONDING l_sequence TO l_affl.
    * Read the operation table to determine the vornr1 and vornr2
    *via the value of field BKNT1/2
        IF NOT l_sequence-bknt1 IS INITIAL.
          READ TABLE operation_table INTO l_operation
          WITH KEY aufpl = l_sequence-aufpl
                   aplzl = l_sequence-bknt1.
          IF sy-subrc = 0.
            l_affl-vornr1 = l_operation-vornr.
          ENDIF.
        ENDIF.
        IF NOT l_sequence-bknt2 IS INITIAL.
          READ TABLE operation_table INTO l_operation
          WITH KEY aufpl = l_sequence-aufpl
                   aplzl = l_sequence-bknt2.
          IF sy-subrc = 0.
            l_affl-vornr2 = l_operation-vornr.
          ENDIF.
        ENDIF.
    Cheers,
    S.

  • Parallel & alternative sequence-Routing

    Dear all,
    Can any one please send the document for how to process parallel & alternative sequence.
    I tried but during confirmation its not showing the operation which i created in sequence.
    Kindly let me know.
    Regards
    Rajasekaran

    See the help file
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm
    it is very clear in thsi web page

  • Scheduling of Parallel Sequence in Routing & Production Order

    Hello Friends,
    I have gone through sap library & many other threads related to maintaining & scheduling of parallel sequence in Routing as well as Production Order.
    For the example, I have 3 operations : 0010,0020 & 0030.
    I want to maintain 0020 & 0030 as Parallel Operations ( Parallel Sequence) i.e. for both operations I have maintained same lead times so that both should start & end at same time parallely.
    First of all, I have maintained all operations in standard sequence 0 all 0010,0020 & 0030 operations and also maintained tick in Required splitting check box.
    Same way , I have maintained operations 0020 & 0030 in Parallel sequence with branching operation as 0020 & Return operation as 0030. Ref. sequence i have maintained as 0 (Std. Sequence).
    Now when I am checking in Graphic it is not showing both operation 0020 & 0030 as parallely scheduled and hence same is not reflected in Production ORder as well.
    Kindly share your valuable views reg. what may be other settings for parallel sequence which I may be missing.
    Thanks in advance.
    Regards,
    Tejas

    Hi Abhijt,
    Thanks for your reply. I went through your thread & I followed same steps as mentioned by you in your suggested threads.
    I have removed Parallel sequence fully & maintained Required Overlapping for all my 3 operations : 0010,0020 & 0030
    I have maintained workcenters as below :
    0010 A  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    0020 B  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    0030 A  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    I checked scheduling in routing itself same way you suggested with start date today's date & forward scheduling it gives following results :
    0010 start time 07:00:00
    0020 start time 07:13:42
    0030 start time 09:14:39
    My concern is with mainly start time of operations 0010 & 0020 since for both of these are processed on different workcenters A & B respectively then why not starting exactly on same time on 07:00:00 AM only instead another operation is starting on 07:13:42AM. I am unable to find how this difference of 13mins 42 seconds is coming.
    Kindly provide your feedback. Also let me know if you need any more details.
    Regards,
    Tejas

  • Parallel sequence in routing

    Hi all,
    I have defined a parallel sequence in routing linked to standard sequence. i.e. 0
    Stand. seq. has one operation 0010 (work center L1)
    Parallel sequence has 3 operations 10, 20 and 30. I am trying to make 10 (work center L4) and 20( WC L5) as parallel operations.
    I have 2 quesries regarding this.
    1. I am putting branch operation as 10 and return operation as 20 but I am getting error,
    'The return operation is not defined'
    2. I want this sequence to get selected in production order automatically in as operations but system ia selecting main seq i.e. with operation with WC = L1.
    Let me know if I am missing something, concept wise or setting wise.
    Regards,
    Yogesh

    Hi,
    Your first question:
    You cannot have return operation as 20, as you standard sequence has only operation 10. So your branch operation and return operation has to be 10.
    Your Second Question:
    In the production order go to Sequence overview (Shift+F8) to select the sequence and then go to Operation Overview (F5) to look into the details of the operation.
    Regards
    Vinod

  • Windows 7 OEM parallels and Bootcamp, installation sequence?

    So ive got a 2013 macbook air and planning on using the OEM licence to firstly create a bootcamp partition, and the having parallels run off the bootcamp partition. Now I understand I might have to go through the whole phone activation the second time. My question is ...what sequence should I use to activate.Should I activate parallels first after the installation of parallel tools or can I just activate bootcamp first????

    Karim.Foad wrote:
    Ok wow that's cleared a lot up ....I've been researching this for the last few days , and getting mixed views with some saying windows will count the virtual machine as a separate computer and they have all sorts if activation problems .But for the second activation , in parallels , the long digit phone activation should be sufficient ?? Because I really don't look forward to explaining everything to a Microsoft Representative
    Over the phon haha!
    This is why I originally suggested that you read the activation directions on the Parallels and Fusion sites. They address the issue of Windows thinking that the VM installation is a second installation of Windows when in fact it is not. This is because you are not installing Windows in Parallels you are only pointing to your single Bootcamp installation of Windows. This is an issue that has been addressed by the VM manufacturers.

  • Alternative sequences cannot be released

    Operations in alternative sequences cannot be released
    Message no. CO224
    im getting error msg while realease alternate sequence operation .
    for my alternate sequence operation Branch operation 0020 and return operation 0030.
    as of now my first operation confirmed .
    im trying to release my aternate sequence operation (as a second operation)
    Not all operations were released (see log)
    Message no. C2038
    once i see the log it showing the first above msg
    wat will be the problem.???

    Prakash,
    You must be talking about parallel sequences. Alternative sequences are the part of routing only. While order creation, one of the alternate sequence gets copied.
    By the way if not all the parallel seuences are released, you can release them separately also at sequence level or at operation level.
    1. Go to sequence overview, select the desired sequence & click on the green flag.
    2. Go to operation overview of the desired sequence, select all the operation & click on the green flag in the bottom. Your problem will be solved.
    Hope this helps you
    SmanS

  • Alternative sequence - operations number

    Hi all,
    I've got an issue on the alternative sequence.
    The standard sequence is made by operation 10, 20 and 30.
    I try to add a new alternative sequence to substitute the operation 20 with 2 different operations: 20 and 25.
    The system give me an error on the routing: CP331 - Operation: date 28.04.2010: operation number incorrect.
    I tried the option to change the standard sequence to 10, 20 and 40,  but the error is the same. The system checks the return operation (20) and is not possible to add operations into the alternative sequence with operations number greater than return operation.
    It seems that is not possible to substitute 1 operation with 2 operations.
    Anyone has solved?
    Thanks, regards.

    Hi ,
    Okay, you want to create an alternaive sequence only.
    Standard sequence is   10  20 30
    Alternate Sequence:
    1.Branch operation : 10
    Number of the operation from which an alternative sequence is to replace the reference sequence.
    2. Return operation: 30
    (number of the operation up to which an alternative sequence is to replace the reference sequence)
    Operations: 20, 25
    This should work.
    Please check and confirm.
    Regards
    Datta

  • Alternative sequence

    hello,
    any body please give me idea. how to create alternative sequence of operation in recipe. i 10 - 50 sequential operation. if necessary as per customer i want to run 60th operation other wise i want to stop at 50th operation. so that i want to use alternative operation sequence. how to do this.
    thanks advance
    bhakta

    hI bhakta vatsalam
    you can do this by creating an alternate routing in CA01 for the 2nd sequence for 10 to 60 steps and another one for 10- 50 operations
    next after this you need make sure you create 2 different production versions 1 and 2 and assign alternate 1 and alternate routing  =2 so this is the different for each customer
    and in the config for order type dependant parameters, you need to maintain the setting for selection by production version and similarly in MRP-4 also for BOM Explosion by production versions
    so when you create a production order, then the system will prompt you to select which production version you want to use and for that customer, you can select the productiion version which contain the alternate routing with operations 10- 60 in it
    if helpful pls reward points
    thanks
    chakri

  • Alternative Sequences in Routings

    Hi Friends,
    I have a question for altenative sequnces in Shop Floor (Confirmation screen:CO11N).
    For a material I have a routing and it has two oprtaions (0010-0020). Operation 0010 has an alternative sequence. In standart sequence the work center ise A and in alternative sequence it is B.
    I created an production order.  Users confirm production with standart sequences. But if the machine ( Workcenter: A) breaks down they will go on producing with workcenter B. I dont want to create a new production order.
    But during confirmation via CO11N I get an error  : "Sequence 4 is not defined in order 4011105, check entry" (Message no. RU005)
    Infact I have a sequnce number 4 which is alternative to the standart operation.
    Where am I wrong? or how can I hanndle this kind of stiuations?
    Thanks for your answers.

    Dear ,
    Check the set up in Order Type Dependent parameters -OPL8 wether u have clicked Alternative Sequence in Impementation Tab  under Master Data Setting .Routing will copied to Production Order  based on the set up in Order Type Dependent Parametrs 
    Regards
    JH
    Edited by: Jiaul Haque on Feb 16, 2010 8:14 AM

  • Selection Of Alternative Sequence Automatically By Operation Quantity

    Dear All,
    We are Using Discrete Manufacturing Scenario, In That Scenario Routing Contains Six Operation and One or Two Operations having alternative Sequence , My client required during production Order Creation , If Operation quantity is more than 250
    system should select std sequence else system should select alternative sequence, But i am not getting to mantain lot size for std sequence for operation even I maintaining lot size for alternative sequence , system should not considering alternative sequence. Pls Suggest me how to Resolve Issue
    Thanks

    Vipin,
    It is not possible to control the  routing sequence selection based on lot size.
    As suggested by forum experts, create mulitple group counters for the same material routing group and you can use them based on lot size.
    You can also create production versions for different lot sizes.
    Check and revert,
    Santosh Sarda

Maybe you are looking for

  • How do I stop my MacBook removing all my icons from the desktop ?

    How do I stop my MacBook removing all my icons from the desktop ?

  • Aterm refuses to be transparent

    I know I post here a lot, but I'm still a newbie, so here's the problem: i installed fluxbox-devel with aterm. i set all the settings in .Xdefaults according to this and i always get the black screen with white text. even running aterm -tr -trsp -sh

  • I've Firefox 6.0.2 and Mac OS X Lion. I can't 'Pause' any download in 'Downloads' window..!

    Hi! My system is:- Mac Pro (Early 2009) 2 x 2.26 Ghz Quad-Core Intel Xeon Processors Memory: 6 GB 1066 MHz DDR3 ECC Graphics: NVIDIA GeForce GT 120 512 MB Operating System: Mac OS X Lion 10.7.1 I am using the latest firefox 6.0.2. Problem is that whi

  • Can not delete directory structure

    Hello, i have tryed very much but no luch. i want to delete directory structory. directory may contain n no of files and n no of sub directories. Please help me to correct this code. please give me solution it is very nessary in my project. Veru much

  • Premiere crashes on ExporterQuickTime.prm

    So I have a problem with starting up premiere. When I start up the computer, the first time I open Premiere it works fine. But then when I close it and try to repoen it, it freezes on ExporterQuickTime.prm. If I click on the window which whites out,