Parallel currency valuation for material management

Dear all,
My comapny is maintaining parallel currency in company code in new GL, does this impact material management also.
Should we need to activate material ledger for parallel valuation in material management, but the company is not actually into production but it still require activation of material ledger.
Regards,

Hi Shilpa,
How I understand it using the U.S as my example:
In the first transaction code, in other words, F.05 or FAGL_FC_VAL  are used if the currency in the transaction is not the same as the local currency of the company.  For instance, U.S GAAP mandates companies to report their financial statements in local or functional currency.  So let's say the transaction currency for a U.S company code is/was GBP.  However, GBP is not the local currency of the U.S company code so you would to have perform foreign currency valuation with any of the above named transaction codes using the exchange rate of the key date specified at the time of the valuation.  This valuation will then give you a gain or loss as a result of differences between the original amount and the revaluated amount.
The second transaction code FAGL_FC_TRANS valuates the balances or additional currencies.  But to be able to run this second transaction code, you would first have to perform FAGL_FC_VAL or F.05 first (this is a prerequisite). 
So even if you are to perform currency translation, you will still need to run FAGL_FC_VAL first.
Regards,
Elias

Similar Messages

  • Foreign currency valuation for GR/IR clearing account is repeatedly posting

    While executing foreign currency valuation (program SAPF100) through T code F.05 the following fields are selected for the spotted rate valuation for currency type 10.
    A)     Valuate G/L account open items
    B)     Evaluate  GR/IR account (GR/IR clearing account is selected)
    C)     Valuate customer open items  
    After execution the valuation postings are repeated  in GR/IR FC valuation Balance sheet adj account while the postings in other accounts occur only once.
    GR/IR FC valuation Balance sheet adjustment account is configured in OB09 for GR/IR account for respective currency type and local currency.
    What could be the reason for repeated postings in FC valuation account?

    I think there is some issue with the process, normally vendor/customer reconciliation account or some liability assets related account which has impact due to foreign currency rate changes needs to be revaluated. I don't understand why you have set up foreign currency valuation for GR/IR account, these are intermediatory account which reflects in system between for example GR and IR.
    I also think that you need more information on foreign currency valuation, basically it happens on a particular key date and gets reversed on key date + 1, because revaluation is only required on a key date for reporting purposes. on the next day it get reversed and actual loss or profit on foreign currency only gets booked on realization.
    Hope this helps!!!
    Murlidhar Khatri

  • Company code set up for material management

    Experts,
    When I try to create sales order error is coming Comany code IN02 not set up for material management. In OMSY I have changed current and previous accordingly.
    Resolve this.
    Thanks & regards,
    Supriyo

    Mr. Naren,
    This is not a reply from an expert. I am practicing in IDES on my own in my house. I try to do all things in configuration on my own with the available study material.
    Whenever I get any error first I try myself whether it takes 2/3 days to get it resolved. Then I go to Google for further search help. Finally I go to SCN.
    Thanks & regards,
    Supriyo

  • How to setup a company code for material management

    Hi,
    While creating material in MM01, in sales org tab, when I gave plant XXXX, it is giving an error "Company code YYYY is not setup for material management".
    So can you help me , how to setup a company code for material management
    Help is appreciated
    thanks
    DIL

    Hello Sendil,
    You can maintain it with trns code OMSY or MMPI/MMPV.
    Hope this helps
    Regards
    Arif Mansuri

  • I need a bapi  for material management advance shipping notifications

    i need a bapi  for material management advance shipping notifications  for developing powls which includes below fields and some more fields.
    •     Inbound delivery number
    •     Due date (GR date)
    •     Vendor delivery number
    •     Material
    •     Name of material
    •     Quantity
    •     Vendor
    •     Name of vendor
    thanks and regards,
    jameer.p

    Hi Jameer,
    This is a hard one, my friend. I understand what you are trying to do.. Try BAPI_DELIVERYPROCESSING_EXEC. It is tricky though.
    Moreover you might want to use a FM to fill the IDOC data. something like IDOC_INPUT_**. this might be a better option.
    cheers,
    Hema.

  • Exact process flow  for   Material management  (MM)  and  UI  Tcodes.

    Hi  Gurus,
    Could  any one tel me Exact process flow  for   Material management  (MM)  and  UI  Tcodes.
    ALL   BAPIs  for   MM  module.
    Thanks in Advance.

    hi,
    Check the threads:
    MM  flow
    MM-Process
    For tcodes:
    TCODES IN MM
    TCODES IN MM
    Hope it helps..
    Regards
    Priyanka.P

  • No characteristics found for configuration valuation for material YYTESMAT-

    Hi
       in tcode PDN I am createing a filter and asing material yytesmat to it
    when i try to assing characteristic to it i am getting error
    'No characteristics found for configuration valuation for material YYTESMAT'
    pls help how to solve this error
    FYI :I have enter characteristic name in classifcation tab while creating material
    pls reply psl reply
    Edited by: pankesh betala on Jun 2, 2010 10:34 AM
    Edited by: pankesh betala on Jun 3, 2010 8:04 AM

    Hi,
    As you said there is no data in material master for this material. this may be the reason for this. Try loading this material master and perform attribute change run. This should solve the issue.
    thanks,
    JituK

  • Addon for material management

    Hi All,
    Is there an addon for material management ? this addon seems really helpful for otomotive sparepart, chemical and biochemical industry and pharmaceutical industry.
    Rajh

    Hi,
    there could possible another add on. Try to search in this link:
    http://sspcatalog.sap.com/catalog/results.jsp?ps=1&SME_Solutions_Lookup=R1
    Rgds,

  • Post foreign currency valuation for special G/L accounts

    Dear experts,
    Our client wants to evaluate the balance of down payment account after each partial clearing with invoice.As down payments are being posted by special G/L indicators, they are not able to post to the down payment account directly.
    and there is no possibility to post foreign currency valuation by SG/L indicators in F-05 and FBB1 transaction codes.
    Could you please tell me how we can evaluate a SG/L account directly?
    Best Regards,

    Hi Rezvan,
    That is not possible also this is not required.
    Because unrealized gain/loss we post to Balance sheet adjustment account and Fx gain/loss accounts.
    We don't post any differences directly to sub ledgers.
    you can use F.05 or FAGL_FC_VAL trasanction for Foreign currency valuation.
    where you can have option of valuate the Spl GL too in selection screen.
    Also
    When you select Vendor option in FAGL_FC_VAL, program valuates all the line items including special gl items.
    And this valuation difference can be posted to balance sheet adjustment account which you maintain in OB09.
    Regards
    Atul

  • Split valuation for  material with two different price indicator S and V

    Hello Gurus,
    Is it possible to maintain split valuation for same material with two different price indicator S and V.
    For Ex. Material A is manufactured can be manufactured in house ,  procured from outside vendor and can be purchased from subcontracting vendor by providing raw material.
    We want to keep  Price control V for same material " A"  which is procured from outside vendor.
    And price control S for inhouse produced same material " A".
    Besically this material is semifinished and having BOM for subcontracting.
    Please advice.

    Hi
    When the material is split valuated, you maintain the accounting view for the material 1st with valuation category, here the price control should be V.
    When you will extend the material to valuation type "Inhouse mfgd" maintain the price control as S, for valuation type "Procured form outside vendor" maintain it as V.
    Regards
    Prasad

  • Different Valuations for material under a Plant

    Dear experts,
    I have created the a plant & assigned different storage locations under the plant. Is it possible to have MAP (Valuation) at storage location level?
    Is it possible to have split valuation at a plant level or is it at the Company code level?
    If it is possible can you send the configuration to my ID vskrishna#gmail.com
    Useful answers shall be duly rewarded.
    Useful answers duly rewarded

    Hi,
    It is not possible to have split valuation activated at storage location level. But yes, it is possible to activate it at plant level.
    In Material Master Table, at the time of creation of master data, there is a field in Accounting-1 view. The field name is "Valuation Category".
    OMWC & OMW0 are t-codes for configuring & activating split valuation.
    Specify the valuation category (u can create user defined category also as per your requirement) when creating material at plant level and goto organizational level tab. Select valuation type created through above t-codes to split valuation of material.
    Also please note and ensure that if you want to have split valuation of a particular material then it has to have price indicator "V" at header level. And only at split level you can have indicator "S". Bocs if you put indicator "S" at header level you can not have split valuation activated.
    please revert in case of any doubt.

  • General Settings for Material Management

    Hi,
    under Material Management in SPRO under General Settings for Materials Management
    1. Set material block for goods movements Lock Exclusively and (ii) Late lock
    2. Set Up Material Block for Invoice Verification
    Set Up Material Block for Invoice Verification
    (ii) Set Up Material Block for Invoice Verification
    (iii) Set Up Material Block for Invoice Verification
    Pls tell me which option i should select in which case?

    Hi,
    Each option have some time advantage on the other one, when the subject material is blocked for other users, preventing them from carrying out any IM postings.
    For goods movement process, Exclusive block will hold the item code for longer time than Late block.
    It is better to go with the stadard settings of 'Exclusive block' for Goods movement and 'blocked at first read' for invoice verification.
    Jeeva.

  • Seperate valuation for material in different location/plant

    Dear Guru,
    According to our business process, we do have stor. loc at HQ (Malaysia) & Brunei. Even the stor. loc at different country, both falls under same plant & c/code. But HQ selling prod. to Brunei branch. So far they use SD consignment process to the  customer at brunei. Stock transfer from HQ to Brunei branch.
    Now, user wanted to have business process such below;
    EXP:
    Plant A u2013 HQ (this plant already exist with mat master)
    -     Mat 1 u2013 RM1 (material master u2013 acct. view 1)
    Plant B u2013 brunei ( so far dont have such plant, only stor loc. available at brunei but now we would like to create plant for brunei since user request business process as stated below)
    (both under same c/code)
    Now the business process they request is;
    Plant B raised PO to plant A
    -     Means plant A is vendor for plant B
    -     Here the price stated as rm2 & qty 1      
    Plant A raised SO (based on plant Bu2019s PO)
    -     Means plant B is customer for plant A
    -     SO price & qty based on PO (rm2 & qty1)
    - complete the SO & PO process (including material movement)
    - mat master for mat 1 at plant A u2013 shows 1 qty reduced (under mat cost rm1)
    - mat master for mat 1 at plant B u2013 shows 1 qty increase with mat cost rm2
    Beside this all other acct entry will take place such COGS (SO). User wanted both PO & SO process. User unlikely keen to do STO coz it only applies material cost. User wanted to see separate valuation for brunei branch & would have P & L report for HQ & brunei.
    - I guess split valuation is not a right choice to show the PO & SO process.
    What is the best solution for this business needsu2026
    Any idea?
    rgds,
    nanthakumar

    Hi Hammad Shahid,
    In SPRO (OPJJ) check which checking rule has the following setting storage location check - No storage loc check box is not active that combination of checking rule and checking group should be used .
    In OPJJ you can see the details of whether storage location stock to be considered or plant level stock to be considered.
    if you activate the check no storage loc insp then stock is considered as plant level, if you uncheck it stock will be considered for ATP @ stocrage loc level mainatined in the transaction during ATP check.
    Hope work for you.
    Regards,
    R.Brahmankar

  • Foreign Currency Valuation for G/L Balances

    Dear all,
    Iu2019m facing the following problem.
    Iu2019ve to execute the Foreign Currency Valuation (T-CODE: FAGL_FC_VAL) for the G/L Balances.
    I have two items:
    Item 1
    Currency: USD
    G/L Account: A483000006  
    New Difference after valuation: -100u20AC
    Item 2
    Currency: USD
    G/L Account: A483000006  
    New Difference after valuation: -120u20AC
    The result is : 1 postings with 4 items
    A483000006  -100u20AC
    Value Loss       100u20AC
    A483000006  -120u20AC
    Value Loss       120u20AC
    The problem is that I would that the foreign valuation posting for G/L Balances should be done for the Cumulative balance of the G/L Accounts (for the same currency) and not for every items (like for open items):
    A483000006  -220u20AC
    Value Loss      220u20AC
    Is it possible to modify the behaviour of the program?
    Thanks in advance
    Alberto

    Hi,
    Please check your valuation method settings, it has a option to do posting based on balance and disable/unselect post per line item.
    Table V_FAGL_T044A
    Regards
    K.R

  • Split Valuation For Material Having No Open PO & Stock

    Hi Experts,
    Will somebody throw light on split valuation where there is no any open PR, PO & Stock for that material but system does not allow to make material split valuated.
    System shows error meassge giving old PO nos list.
    (Logically all these POS whole business transcations/cycle is  completed )
    I want split valaution to be done to the material whose stock is nil also there is no any open PR,PO for that plant in the system.
    But I dont prefer to delete line items of the old PO for doing the split valuation.
    Please suggest solution
    Thanks in advance.
    Ramesh
    Edited by: RameshChandra  Soni on May 17, 2008 11:46 AM

    Hi,
    You can find severaé threads about this on this forum.
    Some hints:
    1. In MM02 try to set the split valuation > Save > SAP will give error message > Push the appearing 'Display errors' button > SAP will say what hinders you from being able to set the split valuation.
    2. As I remember stock has to be zero in current and previous period. (You can set your stock to zero in the previous period using MB1A201posting date in the past; after having set split valuation you can reset your stock level via MB1A+202).
    3. IMPORTANT: you have to archive all existing batch records.
    4. etc
    BR
    Csaba

Maybe you are looking for

  • Storage Location for NON valuated material in MIGO

    Hi friends , I have created a purchase order for NON-Valuated material (UNBW) with Account Assignment "K".I did check the material type UNBW configuration where only Value Update is checked for my Plant. Now at the time of MIGO , system is asking for

  • Can't installed itunes for window 7 32-bit

    i cant installed iTunes 10.5.2 for window 7 (32-bit)...i already use any browser but still cannot install.

  • Binary file techniques

    I have searched through many forums and faq's on this subject. Some say you can retrieve a blob from the database and display it on the screen some say you can't. I have been experimenting with this and I have a jsp page that is trying to do that job

  • Reg:- Cost in Maintenance orders

    Hi I have an issue with Maintenance Orders. in Customizing i have created value categories and assigned cost elements to them but when i am posting the material which was reserved from the maintenance order the cost is not updating  in the value cate

  • Query jump to Portal URL

    HI, ALL    http://....../sap/bc/gui/sap/its/webgui?sap-system-login-basic_auth=X&sap-client=500&sap-language=ZH&~transaction=s_pl0_86000030&U3_RBUKR-LOW=3100&FAGLFLEXS-POPER=001&FAGLFLEXS-RYEAR=2007&GLU3-RACCT=1002021100    As shown above,i can attra