I have a following scenario pls go through and give valuable feed back
My FERT have two operation First operation start work center A and it will finish within 10 hour and my Second operation  from work center B on the same day need to start after 5 hour of my First operation and it will finish at after 5 hour,so both will finish at same time in the same day
To chive above pls see what i done in the routing
create first operation and select and click sequences>create new entries>
Alignment key as 2
Branch operation=0010
return operation=0010
After that click operation and enter all operation details for machining time as well as que time 5 hrs in std que time as well as min que time also
But after creating production order both operation starting at same time ,How it is happen as per my knowledge system  need schedule after 5 hour of first operation
Pls give valuable hints
Regards
Abu Fathima

HI Abu Fathima,
After studying your scenario, i think overlapping is sufficcient for your scenario. What i am suggesting is, goto your routing and goto the first operation detail. In that go to overlapping, click the required overlapping radio button and give the minimum overlap time as 5 hours. So that the second work center will start working after 5 hours from the start of first work center. The scheduling in the production order should also be scheduled for 10 hours.
Just try this and revert back
Regards,
Krishna Chandra

Similar Messages

  • Issue with parallel operation of SAP NW SSO 2.0 and SNC Client Encryption (Logon Groups)

    Hi!
    One of our customers is using the SNC Client Encryption solution to ensure encryption using SNC (based on Kerberos Technology) for their SAP GUI Dialog connections. They have lots of SAP backends DEV, QAS, PRD all with the SNC Client Encryption SNC Lib installed. The profile parameter snc/identity/as contains the following value: p:CN=SAP/<ServiceAccount>@<DOMAIN>.
    Example: p:CN=SAP/[email protected]
    The customer is using one AD Service Account "SNCServiceUser" with one registered SPN "SAP/SNCServiceUser" for all systems (yes, this is not recommended... but the case).
    Important: All users use group entries in the SAP Logon (saplogin.ini). Means, for SAP logon the SNC name can not be manually configured on the SAP Front End. With group logons, the application server's SNC name is dynamically requested by the message server each time a SAP GUI connection is started. The SNC Name is greyed out in this case as dynamically obtained from the applications servers profile parameter snc/identity/as.
    Now our customer implements SAP NetWeaver Single Sign-On 2.0 within his landscape. Based on the Secure Login Server 2.0 (SP3) he likes to use X.509 based authentication to his AS ABAP backends using SAP GUI SNC while others still use SNC Client Encryption.
    Replacing the SNC Library on the AS ABAP
    The Secure Login Library 2.0 (SP3) has been installed on one of the ABAP systems and the SNC Client Encryption SNC Library (which is based on SSO 1.0) is no longer used, thus we changed the parameter snc/gssapi_lib to point to the new SNC library. We removed the old PSE.ZIP containing the keytab and created the new SAPSNCSKERB.PSE incl. the keytab and proper credentials. To ensure parallel operation, we kept the snc/identity/as value as is =  p:CN=SAP/[email protected].
    After restarting the system with initialized Secure Login Library 2.0, still the SNC client encryption works fine for existing users.
    The problem
    We created on the Secure Login Server an SNC certificate for the AS ABAP which has the following X.509 Distinguised Name Fomat: CN=SAP/[email protected] This is to avoid having to change the snc/identity/as to an "real" X.509 DN which would lead to non-working SNC Client Encryption for all the other users using SAP GUI and logon groups.
    As soon as we install the PSE via STRUST on the system the SNC Client Encryption solution stops working with error „Server refuses kerberos key exchange“.
    As part of an pilot implementation we have installed Secure Login Client 2.0 (SP3) on some test PCs. The test PC with SLC is able to perform Single Sign-On with SNC based on X.509 (incl. Encryption) to the ABAP system.
    Seems the SAP System now only tries to do X.509 based authentication thus key exchange fails. The problem is, we cannot change the snc/identity/as value because of the logon groups. If we were able to do so, we would in any case set the server identity to X.509 DN and in addition create the SAPSNCSKERB.PSE incl. keytab. This should work, as confirmed by SAP see this post.  
    Any ideas how to solve this and have both solutions in parallel?
    Appreciate any help.
    Regards,
    Carsten

    Hi all,
    we was able to fix the issue. It was an issue with the customers cluster configuration and the  $SECUDIR variable. This tricky issue leads to non working or sporadic working SNC Client Encryption...
    This was how the configuration looks before:
    Environment variable $SECUDIR is defined:
    "/ABCDEF<SID>/usr/sap/<SID>/DVEBMGSxx/sec“
    sapgenpse seclogin -l -v
    running seclogin with USER="<SID>adm"
    Credentials for username '<SID>adm':
    0 (LPS:OFF):
             (LPS:OFF): /ABCDEF<SID>/usr/sap/<SID>/DVEBMGSxx/sec/SAPSNCSKERB.pse
    1 (LPS:OFF):
             (LPS:OFF): /usr/sap/<SID>/DVEBMGSxx/sec/SAPSNCS.pse
    After changing the $SECUDIR to "/usr/sap/<SID>/DVEBMGSxx/sec“ and re-creating the credentials, it worked like a charm.
    As a result of this we can confirm, this configuration and SNC Client Encryption works with CommonCryptoLib in parallel to the SSO configuration.
    And Valerie was right with 2. SLC starting from V. 1.0 SP2 PL3 was able to convert the CN= part of the SNC Name into an SPN, was my mistake. In addition SNC Client Encryption starting from Version 1 SP1 PL1 does this also.. just to make this clear
    Thread closed hope this helps someone
    Carsten

  • How to create parallel operation in Routing

    Dear Sir,
    We have 4 operation involved  in manufacturing a component . The operation 10,20, 30,and 40 .   Operation 20 & 30 can go in parallel and rest are in a sequential manner .
    After going thru SDN , I followed the following steps :
      a) Created operation 10, 20 and 40
      b) in CA02 , clicked on Sequence and created a new sequence with parallel operation option selected . Here I mentioned branching operation as 10 and return operation 40 .
      c) Created operation 30 , under the parallel sequence option operation page .
    My problem is that now in CA02 , I am not able to see all operation 10,20,30,40 together .  The planning dept require that all operation should reflect together and there itself he should be able to know that  operation 20,30 will be in parallel and rest in sequencial .
    Moreover by selecting on "Operation Graphic" icon , again we are not able to see all operation 10,20,30,40 as per the given relationship .
    Kindly help us please.
    Regards
    Sonia Agarwala

    Srinivas,
    i think you are looking at an option were in you can confirm or do goods Issue for the order. If that was the requirement, then the control is in customizing transaction "OPK4".
    Here in this transaction you need to define "operation sequence is not checked" for the plant/order type combination.
    Hope this helps....Please let me know if your need is something else,
    Regards,
    Prasobh

  • WIP or scrap calculation for parallel operation sequences not possible

    hi,
    i want to calculate wip and scrap along with parallel sequence
    system prompts following mesage any suggetions plz send in higher priority
    Message no. KV161
    Diagnosis
    If the routing specifies a sequence of operations that are defined as a parallel sequence, this will have the following effects:
    The system cannot interpret the confirmed scrap quantities in cumulative and periodic settlement when it calculates the scrap.
    The system cannot calculate work in process at target costs for this order because it does not recognize the relevant operations.
    Procedure
    If you want to calculate scrap or WIP, do not define parallel sequences.
                                                                                vishnu

    Hi Robert
    Though I am seeing this msg for the 1st time - I can give you a some insight into this
    It seems you are in product cost by period (PCP) scenario ... In this scenario, WIP is calculated at target cost.... The mechanism of calculating WIP is Confirmed Qty at preceeding operation - Confirmed Qty of next operation..
    In your case, since you have parallel operations in your routing, system wont be able to calculate WIP... I am not sure how parallel ops are defined... You need to get in touch with your PP guy....
    But, one thing for sure , with parallel ops you wont be able to calculate WIP in PCP scenario
    Regards
    Ajay M

  • Parallel operations downgraded to serial - impact on resource ?

    I am troubleshootiung a system and have noticed that 90% of parallel operations are being downgraded to serial.
    I would like to know what impact this would have on the machine resources (CPU, IO etc).
    Is the downgrade decision simply made in the optimizer with little overhead, or is the downgrade of parallel operations having a significant impact on machine resources?

    The downgrade itself is probably a good thing from a system-level. At the requested degree of parallelism, Oracle would probably be overwhelming the system. Whether the downgrade is a good thing for the processes requesting parallel operations, though, is potentially another matter. If you have some processeses that really require parallel operations, they may be taking longer than necessary, which may have ripple effects (i.e. batch processes exceeding their allotted window). On the other hand, you may have a bunch of procsses that have no business requesting parallel operations trying to run in parallel.
    Justin
    Distributed Database Consulting, Inc.
    http://www.ddbcinc.com/askDDBC

  • Parallel operations downgraded to serial

    Hello,
    I really like the information about parallel processing
    SQL> select name, value from v$sysstat where name like 'Parallel%';
    NAME VALUE
    Parallel operations not downgraded 1621
    Parallel operations downgraded to serial 1310
    Parallel operations downgraded 75 to 99 pct 136
    Parallel operations downgraded 50 to 75 pct 79
    Parallel operations downgraded 25 to 50 pct 141
    Parallel operations downgraded 1 to 25 pct 114
    Can anybody advise me how to figure out which SQL statements cause the downgrades to serial and what time they to happen?
    We are on 10g.
    Thanks for your appriciated help
    Brigitte

    hi,
    you can not see directly as I know. you should query V$PX_Session view and look for degree and req_degree fields. degree is actual degree, req_degree is requested degree. but you can use this view just only when the parallel query is currently running.

  • Parallel operations in Routing

    Dear All,
    is it possible that we can have two parallel operations in the routing.
    scenario is: ona production line every thing is same except one operation i.e, melting where there are two furnaces 1 and 2. 50 % of the material melts through furnace 1 and remaining 50 % through furnace 2. so how can we cater this in routing.

    Waiting

  • Does Oracle R12 support Parallel Operations functionality

    The example is more like the following:
    I have a job J1 with qty 5 made up of pieces x,y,z and operations 10,20,30,40,50.
    Piece X must be marked at operation 10, this cycle time is 1 shift
    Piece Y must be cut at operation 20, cycle time is 1/2 shift
    Piece Z must be washed at operation 30, cycle time is 1/2 shift
    Pieces x, y and z all come together to be assembled at operation 40
    The way oracle is currently set up, pieces x,y,z all have to go to operation 10 and then they have to go to operation 20 and then 30, which amounts to 2 shifts. While the quantity is at operation 10, pieces y and z are just sitting there and I'm not working on them and hence wasting time. I can't just move a quantity from 10 to 40 because I haven't completed operations 20 and 30 to pieces y and z which I need for 40. If I had parallel operations, I could do 10, 20 and 30 all at the same time and reduce my overall cycle time to 1 shift (the length of the longest operation).

    Hello rthome,
    that is a good news for me. Can you provide a "how to" guide about XE's AQ access via AQxmlServlet. I am interested in:
    1. On which Application Server AQxmlServlet was tested?
    2. Where can I get missing jars that are not shipped with Oracle XE? (ORACLE_HOME/JDBC/LIB/nls_charset12.jar, ORACLE_HOME/lib/http_client.jar, ORACLE_HOME/oc4j/j2ee/home/lib/javax-ssl-1_2.jar, ORACLE_HOME/lib/servlet.jar, ORACLE_HOME/lib/xmlparserv2.jar, ORACLE_HOME/lib/xsu12.jar, etc.)
    3. Which JDK, JDeveloper versions where you using?
    Can you visit my topic:
    Oracle XE Advanced Queuing
    and see if you could point me to an answer on my problem.
    Thanks in advance
    Message was edited by:
    Kichas

  • What version of Windows 7 should I use on my Macbook Pro to run parallel operating systems?  32 or 64 bit?

    What version of Windows 7 should I use on my Macbook Pro to run parallel operating systems?  32 or 64 bit?

    64 bit.

  • CM21, parallel operations!

    Hello SAP GURUS,
    I have a problem when I am dispatching the operations to the work center. I have two parallel operations with the exact time of production, but when I am dispatching these operations, they dont start at the same time.
    In the stratagy of the CM21 I have the following parameters:
       - SAP___T001
       - SAPSFCSS31
    I want these parallel operations to be dispatched for the same time.
    The dates and times in the production order for these parallel operations, are the same!!!
    Can someone help me with this?
    Thanks in advance,
    Adelmo Silva
    Edited by: Adelmo Silva on Jan 21, 2010 7:38 PM

    Waiting

  • What's the meaning of "Parallel Operating System" and "Parallel Desktop"?

    What's the meaning of "Parallel Operating System" and "Parallel Desktop"?
    Also, what is Boot camp? Are they all the same?

    Boot Camp installs Windows directly on your Mac so you reboot your system to switch between OS X (the "Mac" experience) and Windows if you need to use it for any reason.
    The problem with boot camp is that you cannot use your Mac applications along with any that require Windows, so companies like Parallels have developed "virtualization" programs that allow you to install Microsoft Windows within OS X and run Windows inside of your Mac instead of "next" to it as is the case with Boot Camp. You open the program and boot a Windows installation that loads in a separate window, all while you have Safari, the OS X Finder, Mail, Calendar, and other programs on your Mac still running in the background.
    In this regard, the benefit of Parallels Desktop and similar applications is that they allow you to run a Windows program alongside those for OS X so you do not interrupt your workflow in order to reboot to Windows and use them.

  • Difference between parallel sequence and parallel operation in a routing.

    Hi Experts,
    Can any one explain me with example the difference between parallel sequence and parallel operation in a routing? wHEN CAN WE USE PARALLEL OPEARTION AND PARALLEL SEQUNCE WITH COMPONENT ALLOCATION.
    Regards
    Deepak sharma

    I think u need to modify ur quest... i think u r asking about Parallel sequence and alternate seq. Below are the details from SAP site.
    A parallel sequence enables you to process several operations at the same time.
    You use an alternative sequence for example, if
    --The production flow is different for certain lot-size ranges
    For instance you can machine a work piece on conventional machine or on NC machines. A NC machine has a longer set-up time than a conventional machine. However the machining costs are considerably less. Therefore whether you use NC machines will depend on the lot size.
    ---The production flow changes under certain business conditions.
    For instance, if you have a capacity problem, you have some production steps performed externally by a vendor.

  • Parallel operation qty.

    Dear SAP Friends,
    I have one std seq.with operation no.10,20,30.
    & one parallel seq.with the same std.seq.with operation no.10 & 20.
    I used the parallel seq only for 5 routing out of 80 routings.
    In OPK4 I had set the terminaation when operation seq.is not adhered to.
    Its my requirement.
    I create a production order of 1000 qty.
    At the time of confirmation,I confirmed 500 qty at operation 10 & 20 at std.& parallel seq.
    As per me practicaly I had confirmed 1000 qty.
    When I go for confirmation at operation no.30 it shows only 500 qty can be confirm out of 1000 qty.
    How can I get sum qty at operation 30 without disturbing the OPK4 setting?
    If any setting required please reply?
    Please Reply.
    Regards,
    Chandra.

    Hi,
      If you want to carry the production with two different work centers , first you need to split the operation qty.
    For this in the order type dependent parameters OPL8
    in the controlling tab page enable the indicator Cost collector
    and set the default rule as PP2.
      Create a Product cost collector with KKF6N.
       Now in the production order , select the operation and choose functions--->>> split.
       Now enter the operation split quantity and execute.
       Now in MD04 you can see two production order.
       In the second production order change the work center in the operation overview as desired and save.
      Regards,
    nandha

  • Parallel Operations

    Hello,
    We are on SCM 5.1 and ECC 6.0. Our scenario is as below:
    We produce product at our factory, say the order qty is 3000. We run this in parallel on three machines on one order. At the moment we have one operation on the order. Ideally we want a setup as below:
    Order qty 3000 KG
    order is processed on three machines:
    1. Operation 0010 -
    1000KG
    2. Operation 0020 -
    1000Kg
    3.Operation 0030 -
    1000 kg
    is there a way we can model in APO. We are using discrete manufacturing with production orders.
    Cheers,
    Sandeep

    Hi Sandeep,
    Take a look at Quota Arragement, there is an Heuristic to define the quantity of the order you want to produce for each resource assigned.
    You can find something here:
    http://help.sap.com/saphelp_scm50/helpdata/en/45/417239b2b1ea20e10000000a114084/frameset.htm
    Also try the heuristic SAP_PP_Q001  /SAPAPO/HEU_PLAN_QUOTA for production planning.
    Hope this help.
    Regards,
    Fernando

  • How do i create two Examples in Parallel operation

    Cont Acq&Graph Voltage-Ext Clk.vi
    Measure Angular Position.vi
    How do i make these two example program in a Parallel execution mode?
    Joe
    Using Ver. 8.0

    I done this in the following way.
    Encoder output is connected to PFI0 and CTR0_SOURCE.
    AI is getting triggered by PFI0 and  Counter Input is configured for Counter Edge.
    Once this over this datas are logging into a file.
    Problem is... as per the flow once i finished the loop i.e pulse count *0.144( which is the angle for each pulse, because i am using 2500PPR Encoder) reaches 70, pulse count will be 486 and the same time if you check the file , we wont have 486 datas in it, we will missing some 50-100 data on that.
    this encoder movement is manual and speed varies always.
    this missing data in file will happen only if the speed of encoder movement increased.
    can we make this independent  of speed ???
    pls refer the attached file for program flow.
    Joe
    Using Ver. 8.0
    Attachments:
    vi.JPG ‏223 KB

Maybe you are looking for

  • Transferring apps from one itunes account to another

    I bought the original IPad from a family member, so it was set up with there ITunes account and all of the apps that are on it. I would like to transfer everything that is currently on the IPad over to my computer with my ITunes account, without havi

  • Bug: Create New Document From Current State (Win 7 HomePremium SP1)

    1. Open a new document, any size you want, any bit mode you want 2. Click on the Text tool and write something 3. Add a new layer mask do the text layer and fill it black or something else. Just something you can visualize if you'd took it off. 4. Un

  • Video Files in.m4v format

    I am trying to send my client some .m4v files to load into WIndows iTunes and onto an iPod and the cant get it to work...we are in different towns. I sent the .zip file (containing an little 3 minute .m4v movie) up to my FTP server. They have no FTP

  • ATT: Creative Firmware Engineering....Request for Last 10 Playlist Supp

    I have just purchased the Zen Xtra 30gb. Very Nice. I like it a lot. Installed only the MS Explorer drivers on my PC and use the drag-n-drop. I listen to music as well as books. Please forgive if any of these requests are already featured on the play

  • Getting error "IntelliSense: cannot open source file "Environ.h"

    Hi, I have a VC++ project which adds tool bar to arobat reader. But when i build this project using VS 2010 it's giving a error "IntelliSense: cannot open source file "Environ.h" and some other header files. Please suggest me to resolve this issue. T