Passing parameters to the process chain

Hi friends,
I want to know ,how to pass parameters to the process chain. Suppose i want to pass parameter to my DTP in my process chain in order to filter the data and do the delta upload in my cube .

Hi,
I dont think there is any direct way to achieve this.
There is a work Around which can be achieved with help of abap.
You need to write ABAP routine to get the selection values from user and store them in the table TVARVC.
Then you need to write a routine in the DTP filter to fetch these values.
In the ABAP program where you get the values, you can trigger the process chain once the values are entered for the selections using an event,
Regds,
Shashank

Similar Messages

  • How to stop the process chain showing status as yellow but no process step

    Dear Friends,
    How to stop the process chain showing status as yellow but no process step is running in that process chain.
    We have manually triggered the process chain for sales it finished successfully till load data but the next step is create index and DB statistics. Both of this steps are in unscheduled position only and no background job for this.
    Please guide me.
    Thanking you in advance.
    Regards,
    Shubhangi

    Hi,
      At times even I have faced this situation.  During those times, running the Function module RSPC_PROCESS_FINISH by passing the right parameters came to my rescue.
    Regards,
    Raj

  • How can I pass parameters from one process flow to another process flow?

    How can I pass parameters from one process flow to another process flow (sub process) in warehouse builder? let me know the steps I have to do in warehouse builder.
    Thanks in advance,
    Kishan

    Hi Kishan,
    Please post this question to the Warehouse Builder forum:
    Warehouse Builder
    Thanks, Mark

  • How to finish ABAP program in the process chains

    Hello All,
    we have one ABAP program in the process chains which was created in the BW system only.
    this program we are using in the synchronous mode. according to my understanding we can not capture the failure of the ABAP program when it is in the synchronous mode.
    but i found a way through one this forum topic to capture the failure of the program through asynchrous mode by calling a function module RSPC_ABAP_FINISH but it was with the R/3 program in BW.
    can we use the same function module for BW program also.
    kindly let me know what steps we need to follow for the BW program in the process chains to capture the failure status.
    Regards,
    Ala.

    Hi Ala,
    we created an own processtype, look at this HowTo: https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/45d8a990-0201-0010-a290-f22083728179
    and than also an abap which can end red or green:
    PARAMETERS: red   RADIOBUTTON GROUP radi,
                green RADIOBUTTON GROUP radi.
    IF NOT green IS INITIAL.
      MESSAGE i162(00) WITH 'Status' 'Green'.
    ELSE.
      MESSAGE e162(00) WITH 'Status' 'Red'.
    ENDIF.
    with i-message process ends green, with e-message process ends red.
    /manfred

  • Program to activate the process chain in 3.5 version

    HI Experts,
    Like we are activatie jng the transfer strcturers_TRANSTRUC_ACTIVATE_ALL.
    I am having some problems ...I need the program to activate the process chain by using program in 3.5
    Could any respond on this ASAP.
    Thanks
    KK

    Hi,
    RSPC_CHAIN_EXECUTE_REMOTE  program runs the Process chain automatically.
    If  we want to change the status of the dependant chains and to run automatically we can execute RSPC_PROCESS_FINISH but we need to give the parameters like Variant name,logid,process type,Instance name .
    Thank you....,

  • How to put RSCRM_BAPI in the process chain?

    Dear All,
    I've used RSCRM_BAPI to extract data from a query into a table. These data in the table needs to be extracted again to the PSA in BW.
    So I need to run the  job defined in RSCRM_BAPI after the data has been  loaded into cube and run the infopackage to extract data after the job has finished.
    How can I put these actions in the process chain?
    Thanks.
    Bolun

    Hello Bolun,
    Yes you can schedule RSCRM_BAPI extracts in a process chain. You have to write a program that will invoke the RSCRM APIs. You can use the program below.
    data  error(50) type c.
    data  g_t_return    LIKE bapiret2 OCCURS 0.
    data: l_proc        like rscrmmon-processed.
    data: gv_batchid    like RSCRMMON-BATCHID,
          gv_jobname    like TBTCO-JOBNAME,
          gv_actstatus  like TBTCJOB-STATUS,
          gv_jobcount   like TBTCO-JOBCOUNT,
          gv_dbstatus   like TBTCJOB-STATUS,
          l_status      type RSCRMBSTAT,
          l_wait        type i.
    parameter: repuid TYPE rscrmrepuid obligatory.
    parameter: extrname TYPE tabname obligatory.
    parameter: repvar like RSCRMSTATUS-REPVAR.
    parameter: overwrt like RSCRMCONTXT-ACTIVE default 'X'.
    start-of-Selection.
    *Open Query
      CALL FUNCTION 'RSCRMBW_REPORT'
        EXPORTING
          i_mode      = 'OPEN'
          i_reportuid = repuid
        TABLES
          e_t_return  = g_t_return.
      if g_t_return is not initial.
        read table g_t_return TRANSPORTING NO FIELDS with key type = 'E'.
        if sy-subrc <> 0.
          concatenate 'Errors occurred when opening query' error into error.
          message error type 'E'.
          exit.
        endif.
      endif.
    *use this if you want pass a variant.
    *Get variable values
    *     CALL FUNCTION 'RSCRMBW_VARIABLE_POPUP'
    *         EXPORTING
    *               i_reportuid = repuid
    *               I_VARIANT = repvar
    *         TABLES
    *               e_t_return  = g_t_return.
    *Execute Report
      CALL FUNCTION 'RSCRMBW_REPORT'
        EXPORTING
          i_mode         = 'START'
          i_reportuid    = repuid
          i_execmode     = 'TABLE'
          i_extract      = extrname
          I_CLEAREXTRACT = overwrt
        IMPORTING
          E_BATCHID      = gv_batchid
          E_JOBNAME      = gv_jobname
          E_JOBCOUNT     = gv_jobcount
        TABLES
          e_t_return     = g_t_return.
      if g_t_return is not initial.
        read table g_t_return TRANSPORTING NO FIELDS with key type = 'E'.
        if sy-subrc <> 0.
          clear error.
          concatenate 'Errors occurred when executing query' error into error.
          message error type 'E'.
          exit.
        endif.
      endif.
      if sy-subrc = 0.
        WHILE ( L_STATUS NE 'SUCC' ).
          CALL FUNCTION 'RSCRMBW_BATCH_STATUS_CHECK'
            EXPORTING
              I_BATCHID       = gv_batchid
            IMPORTING
              E_STATUS        = l_status
            EXCEPTIONS
              NO_JOB_DATA     = 1
              INHERITED_ERROR = 2
              OTHERS          = 3.
          IF l_status = 'RUNN' or l_status = ' ' or l_status = 'SCHE'.
            WAIT UP TO 30 SECONDS.
          ENDIF.
        ENDWHILE.
        IF l_status = 'SUCC'.
          if sy-subrc = 0.
            write 'Query finished'.
          else.
            clear error.
            concatenate 'Job ' gv_batchid ' failed.' into error.
            Message error type 'E'.
          endif.
        ENDIF.
      endif.
    *Close report
      CALL FUNCTION 'RSCRMBW_REPORT'
        EXPORTING
          i_mode      = 'CLOSE'
          i_reportuid = repuid.
    end-of-selection.
    Use the ABAP Program process to execute this program. Create the data load processes so that they execute on successful finish of this program.
    I hope this makes things clear.
    Regards
    Arvind

  • Regarding "Delete Index" process in the process chain.

    Hi Gurus
    In the process chain, I have Delete Index -> Load Info pacakge -> Create Index process in the above order.
    I am loading few records, so no need to delete indexes everytime. Can i remove the "Delete Index" process from the Chain without deleting the Create Index process. Or do I have to delete both.
    Could you please clarify my doubt if possible in detail.
    Thanks,
    Regards,
    aarthi

    With the numbers you provided, you probably don't need to have the steps.  With Oracle (not sure about all the other DB flavors) there are some other considerations:
    Not having the indexes when loading the data can improve the load time since the bitmap indexes are not very efficient with respect to inserts/updates. The more dimensions you have, the more indexes there will be and the more noticable the impact of having the indexes present when loading.
    The drop index process only drops the F fact table indexes.  If you compress your cubes regularly so that you don't have many uncompressed requests, the index rebuild time will remain small, but if you have many uncompressed requests in your cube, the index rebuild time can begin to exceed whatever time you might save on the load with indexes deleted.
    With bitmap indexes present, you can also occasionally receive a ORA-0600 deadlock error during the load process, and that can be prevented by dropping the indexes before loading or chose the load option packet by packet so that two packets are not trying to update the same index block at the same time.
    Another concern in shops where reporting on the cube might occur during the load process - if you drop indexes prior to a load, any one trying to run a query on teh cube could have poor query performance since all the indexes will be missing onthe F fact table, this agina becomes more apparent the more data you have in the uncompressed fact table.
    So it really comes down to your environment, but certainly drop the indexes any time you have large loads.

  • Event is not getting triggered in the process chain

    Hi,
    We had a process chain which was triggered by an Event, and it was running fine until few days ago. So I removed the chain from schedule and re-scheduled it again with these details:
    File load: every 2 hrs
    Process chain setting
    Immediate tab: start immediately
    After event: "event name" and "parameter name" and periodic job: ticked
    I activated the chain and scheduled it. But the event is not triggered and the chain does not start. I even tried to trigger the process chain manually in sm64 but the process chain did not start.
    Can someone please tell me steps to automate the event triggering and also any setting that should be taken care off in the info package and the process chain.
    Thanks In advance.
    Ram

    Hello Ram, to start your Process Chain by an event, then you need to maintain the Start process of the process chain. 
    Select "Direct Scheduling".
    In the <b>Change Selections</b>, press <b>After Event</b>.  Put your event name and parameter (if any).  Also click on <b>Periodic job</b>.
    Press Save.  Then Activate and Schedule your process chain.  All your processes should turn green.
    To verify, right-click on the Start process and select <b><u>D</u>isplaying Scheduled Job(s)...</b>.  You should see a job called BI_PROCESS_TRIGGER in a <i>Released</i> status.  You can click on the job and look at the start conditions.
    When you go to trigger the event, use the same event name and parameter (if any) as in the start condition.  Your process chain will then execute.  To insure, use RSPC to view your process chain and press the <b>Logs</b> icon (last one at the top).
    Does this help?

  • To find the time required by the process chain to complete

    Hi Experts,
    I am calulating the average time required by the process chain to compete.
    Is there any way to find the time required by the process chain to complete..
    Thanks in advance.
    Regards,
    Ashwin

    Hi,
    There is a Tool provided by SAP to do the Process Chain Analysis.
    It is basically a ABAP Program /SSA/BWT which provides the following BW Tools:
    a)Process Chain Analysis : this tool is used to perform the Runtime analysis of the Process Chains. The analysis can be performed not only at Process Chain level but also at the Process Type level.
    b)Detailed Request Analysis
    c)Aggregate Toolset
    d)Infoprovider BPPO Analysis
    So you can go through the program and analyse the runtime of your Process Chains.
    Regards,
    Abhishek
    Edited by: Abhishek Dutta on Aug 13, 2008 7:13 AM

  • The 0co_om_opa_6 ip in the process chains takes long time to run

    Hi experts,
    The 0co_om_opa_6 ip in the process chains takes long time to run around 5 hours in production
    I have checked the note 382329,
    -> where the indexes 1 and 4 are active
    -> index 4 was not "Index does not exist in database system ORACLE"- i have assgined to " Indexes on all database systems and ran the delta load in development system, but guess there are not much data in dev it took 2-1/2 hrs to run as it was taking earlier. so didnt find much differnce in performance.
    As per the note Note 549552 - CO line item extractors: performance, i have checked in the table BWOM_SETTINGS these are the settings that are there in the ECC system.
    -> OLTPSOURCE -  is blank
       PARAM_NAME - OBJSELSIZE
       PARAM_VALUE- is blank
    -> OLTPSOURCE - is blank
       PARAM_NAME - NOTSSELECT
       PARAM_VALUE- is blank
    -> OLTPSOURCE- 0CO_OM_OPA_6
       PARAM_NAME - NOBLOCKING
       PARAM_VALUE- is blank.
    Could you please check if any other settings needs to be done .
    Also for the IP there is selction criteris for FISCALYEAR/PERIOD from 2004-2099, also an inti is done for the same period as a result it becoming difficult for me to load for a single year.
    Please suggest.

    The problem was the index 4 was not active in the database level..it was recommended by the SAP team to activate it in se14..however while doing so we face few issues se14 is a very sensitive transaction should be handled carefully ... it should be activate not created.
    The OBJSELSIZE in the table BWOM_SETTINGS has to be Marked 'X' to improve the quality as well as the indexe 4 should be activate at the abap level i.e in the table COEP -> INDEXES-> INDEX 4 -> Select the  u201Cindex on all database systemu201D in place of u201CNo database indexu201D, once it is activated in the table abap level you can activate the same indexes in the database level.
    Be very carefull while you execute it in se14 best is to use db02 to do the same , basis tend to make less mistake there.
    Thanks Hope this helps ..

  • Error while running the process chain

    Hi, I am getting following error while running the process chain.
    "Lock NOT set for: Deleting the data completely from a data target"
    Please suggest.
    amit

    hi,
    This is due to a lock on the objects which is being used by ur load.
    Even if master data used by this would be in a lock by an attribute change run. wait till that attribute change run finishes and then repeat.
    If this target itself is locked by someother process like rollup , compression , this error would appear. In this case also repeat the step after those locking process finish.
    some general locks during loading:
    Sometimes parallel processing in DTP might lead to this, its better set the DTP and infopackage in serial processing. In this case change the settings and then repeat the process.
    There is a specific case in which the Serial DTP gets locked by itself, in this case repeat it untill it succeeds.
    You can identify the above scenario as below. This is applicable only if the DTPs processing mode is serial.
    if u see in SM 37 this load would have three DTP processes running.
    it should have only two.
    In this case cancel the process and repeat it untill u get it right.
    hope this helps u
    regard,
    ranjith
    Edited by: Ranjith  Kumar Murugesan on Sep 12, 2008 10:44 AM
    Edited by: Ranjith  Kumar Murugesan on Sep 12, 2008 10:46 AM

  • Error while designing the Process Chains

    Hi All,
    I have a issue on Process Chains.
    In my Project there are 2 ODS.
    ODS 1 : Status Header ODS (ZODS)
    ODS 2 : Service Order Header. (0CRM_PROH)
    In CRM, if any Service Order is created, it is available in delta Queue(RSA7) immediately.
    While loading the data to ODS 2(Service Order),it is checking the data from status ODS 1(Status ODS)
    For Example, I am loading the data of service Order 80001 to ODS 2(0CRM_PROH). Before loading to ODS 2, i am checking whether this service Order Number(80001) is available in ODS 1.
    If the service Order 80001 is there in ODS 1, it will update the data to ODS 2.
    If the service order 80001 is not there in ODS 1, it will not Update the data to ODS 2.
    Problem i am facing :
    1. First i am loading the data to ODS 1 (Status ODS). Early Morning 2.30AM and it completes the data load at 2.40AM. And document posting is happening on 2.37AM and ODS 1 doesnt pull the data of document posted.
    2. Once the ODS 1 is completed, by 2.41AM, the data loading will happen for ODS 2 (Service Order Header).It brings all the data including the document posted on 2.37AM.
    3.While loading all the data is available, and while loading to ODS 2, it is checking the status ODS. And it is checking for the document posted on 2.37AM and this document is not there in Status ODS 1 and the data(posted on 2.37AM) will not update in ODS 2.
    Because of this, some records are missing in ODS 2. And while loading, we cant stop the document posting also.
    How can i achieve this using the process Chain.
    Design i have tried in Process Chain :
    1. Start Variant.
    2. Load Infopackage to PSA only for ODS 2.
    3. Load Infopackage to PSA and activate ODS for ODS 1 (Status ODS)
    4. Read PSA (of ODS 2) to Load data to ODS 2.
    5. Activate the ODS.
    I tried, but i got a error message while designing the process Chains.
    No type "Activate DataStore Object Data" process can be in front of process "Read PSA and Update Data Target" variable PSA_SERVICE_ORDER in the chain
    Pls suggest how to recify this according to my design.
    Thanks & Regards,
    Ram.

    Hi,
    You can try this..
      .......................................... Start  ...................................................
    Load data to PSA (ODS 2) ..................................... Load data to PSA (ODS 1)         
    ..................................................................................Load data to ODS 1
    ...................................................................................Activate ODS 1
      ........................................... AND ..........................................................
      ........................................ Load data to ODS 2 .............................................
       .......................................... Activate ODS 2 ...........................................
    Regards,
    Anup.
    Edited by: Anup ShankarBS on Sep 3, 2009 4:56 PM

  • Warning Error message while scheduling the Process Chain

    Dear All,
    I have created the meta Chain, which contains 7 Local Chains. I have tested this chain in BI Development and Quality. It was working fine. I have moved this Meta Chain to production. While i am trying to schedule this chain, i got the warning message.
    Too many parallel processes for chosen server BICI
    Message no. RSPC118
    Diagnosis
    On the server TVSBICI you have chosen, there are only 0 batch processes available. The process chain has been designed in such as way that 3 processes must be processed parallel.
    System Response
    Only 0 processes can be processed parallel. Note also that to be able to start sub-chains, AT LEAST TWO free batch processes must be available. Otherwise a lock situation may arise.
    For more information, see SAP Note 621400.
    Procedure
    Reduce the number of parallel processes in the chain or include sub- chains. This warning applies to all relevant processes.
    Procedure for System Administration
    Increase the number of batch processes available. You should note however that it makes no sense to set up more batch processes than there are CPUs on server BICI.
    Pls help on this issue.
    Thanks,
    Siva.
    Edited by: Siva Kumar on Jun 15, 2009 9:16 AM

    I have Ignored this warning and now process Chain is working fine.
    Thanks,
    Siva.

  • Error while collecting the process chain in a transport request

    Hi Gurus,
    I am getting an error while collecting my process chain in a tranpsort request.I have to transport the request from DEV to QA system.
    When in RSA1--->transport connection i drag & drop the chain from left to right side pane then the Error occurs.
    1.Object 'REQUDELZPAK_48RZW8GZX87CNEH7S897TFQSD' (RSPV) of type 'Process Variants' is not available in version 'A'
    Sap help given
    You wanted to generate an object with the name 'ZPAK_48RZW8GZX87CNEH7S897TFQSD' (in transport request RSPT) of type 'Process Chain Starter' (TLOGO). This is, however, not available in the BW Repository database. It does not exist in the requested version A. If the version is 'D' then it is possible that an error arose during the delivery or installation. If the version is 'A' then the Object was either not created or not activated.
    2.Object 'ZPAK_48RZW8GZX87CNEH7S897TFQSD' (RSPT) of type 'Process Chain Starter' is not available in version 'A'
    Sap help given
    You wanted to generate an object with the name 'REQUDEL   ZPAK_48RZW8GZX87CNEH7S897TFQSD' (in transport request RSPV) of type 'Process Variants' (TLOGO). This is, however, not available in the BW Repository database. It does not exist in the requested version A. If the version is 'D' then it is possible that an error arose during the delivery or installation. If the version is 'A' then the Object was either not created or not activated.
    From one of the threads:
    (https://forums.sdn.sap.com/click.jspasearchID=10081153&messageID=4623856)
    i though it was the problem of patch level sap note(966131).
    Accordingly i tried collecting process chain in the request where the patch level is high(24).But same error is seen.
    I have activated chain again & then tried collecting the request i the process chain.But did not solve the error.
    I have to collect Process chain in a transport request.Can you help me out to solve the problem?
    Thanks in advance!
    Regards,
    Pallavi

    Hi,
    take a look:
    Data Warehousing
    "Errors occurred during post-handling RS_AFTER_IMPORT for MPRO L "
    Errors occurred during post-handling RS_AFTER_IMPORT for ROUT L
    Try to set the Process Chain Start to Immediate(background jobs) in the schedule, because this will trigger the process chain once tranported and may cause similar errors.
    Regards
    Andreas

  • Error while executing the Process chain

    Hi Friends,
    The process chain that I scheduled is getting failed at the Infopackage loading stage.
    On checking the diplay message, I found the following log:
    Cannot stage requested data for datasource
    Error in source system
    I activated the datasource in source system, then replicated the same and tried to load data.
    But the issue remains the same.
    I checked in RSA7. The status corresponding to this datasource is in yellow status.
    Can I delete this entry and try again?
    Please suggest.
    Thanks in advance.
    Surjit P

    Hi,
    /people/mona.kapur/blog/2008/01/14/process-chain-errors
    Deadlock
    http://help.sap.com/saphelp_nw04s/helpdata/en/2e/44934257a5c86ae10000000a155106/frameset.htm
    Dead Locks
    2. Error in unit conversion
    Units of measure
    3.Error 1 in update
    When Src file is already open or not accessible.
    4.Processing no data
    theres no data selected after extraction
    5.Caller 70 missing
    "• This error normally occurs whenever BW encounters error and is not able to classify them. There could be multiple reasons for the same
    1) Whenever we are loading the Master Data for the first time, it creates SID’s. If system is unable to create SIDs for the records in the Data packet, we can get this error message.
    2) If the Indexes of the cube are not deleted, then it may happen that the system may give the caller 70 error.
    3)Whenever we are trying to load the Transactional data which has master data as one of the Characteristics and the value does not exist in Master Data table we get this error. System can have difficultly in creating SIDs for the Master Data and also load the transactional data.
    4) If ODS activation is taking place and at the same time there is another ODS activation running parallel then in that case it may happen that the system may classify the error as caller 70. As there were no processes free for that ODS Activation.
    5) It also occurs whenever there is a Read/Write occurring in the Active Data Table of ODS. For example if activation is happening for an ODS and at the same time the data loading is also taking place to the same ODS, then system may classify the error as caller 70.
    6) It is a system error which can be seen under
    the “Status” tab in the Job Over View.
    solution:
    "• If the Master Data is getting loaded for the first time then in that case we can reduce the Data Package size and load the Info Package. Processing sometimes is based on the size of Data Package. Hence we can reduce the data package size and then reload the data again. We can also try to split the data load into different data loads
    • If the error occurs in the cube load then we can try to delete the indexes of the cube and then reload the data again.
    • If we are trying to load the Transactional and Master Data together and this error occurs then we can reduce the size of the Data Package and try reloading, as system may be finding it difficult to create SID’s and load data at the same time. Or we can load the Master Data first and then load Tranactional Data
    • If the error is happening while ODS activation cause of no processes free, or available for processing the ODS activation, then we can define processes in the T Code RSCUSTA2.
    • If error is occurring due to Read/Write in ODS then we need to make changes in the schedule time of the data loading.
    • Once we are sure that the data has not been extracted completely, we can then go ahead and delete the red request from the manage tab in the InfoProvider. Re-trigger the InfoPackage again.
    • Monitor the load for successful completion, and complete the further loads if any in the Process Chain.
    6.Idoc not processed completely.
    Here the request remains yellow (in process) and with the same details (as seen in the details tab of the monitor) for an abnormally long time. Many-a-times, the port for communication is not open and re-starting the load helps. For long running jobs, it may not be advisable to restart the extraction
    Contact the BASIS administrator to push the IDOC.
    look into these links:
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    For common data load errors check this link:
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    Majority of the issues will be based on these things only..
    Hope the following links will give u a clear idea about process chains and clear ur doubts.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
    Business Intelligence Old Forum (Read Only Archive)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Siggi's weblogs for data load error and how to restart process chain
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Hope this helps.
    pls award me some points
    thanks.
    Thanks

Maybe you are looking for

  • Pension and mid-month hiring

    Dear Experts, A person was hired in mid-month, the 15th. Payable earnings is 4480 The schema is referencing the correct wage type /103 in payroll  the amount  for the pension of 2480.85 x 6.9% = 171.18. But it should be 309.12 a pcr was created for s

  • How can I create a new layer that is a gradient?

    Hi, i'm very new to photoshop scripting and am having some trouble. I'm looking for a way to take an image i have and set it to have a gradient opacity as it approaches the middle, my thought on how to do that was to just create a layer that is a gra

  • Subscription

    I bought a Skype subscription bit it says my number is not active.

  • How can I confirm the automatic updater of revoked certificates is working?

    There is a Microsoft security advisory from a few weeks ago about fraudulent certificates. In the advisory it says it is revoking India's NIC authority certificate and for systems running Windows 7 that are using the automatic updater of certificates

  • Why do I get a error saying mail was unable to find your reply. You may have deleted message.

    when sending email, I sometimes get an error stating: Mail was unable to find your reply to:  You may have deleted message. This does not happen with every sent message but it is doing it more and more. The reply is no where to be found.