Patch Worker status

Dear All,
during running patch 3480000. the patch stopped many times because Windows (Operating System) hangs after last time I change the status of all worker to be failed except worker 1= W and worker_id=0 as next
UPDATE fnd_install_processes SET status = 'F' WHERE worker_id between 2 and 24;
UPDATE fnd_install_processes SET status = 'W' WHERE worker_id =1;
but the patch can't complete and exit 2 times and this last of patch log:
Writing jobs to run to restart file.
Reading jobs from FND_INSTALL_PROCESSES table ...
Evaluating symbolic arguments for worker 2 ....
AutoPatch error:
Unable to find job when reading existing jobs.
No job in manager's jobs_ready list with:
product = fnd username = APPLSYS
filename = [FNDLOAD.exe]
phase = [87]
ign = [1]
arguments = [&ui_apps 0 Y UPLOAD @FND:patch/115/import/afdict.lct @XTR:patch/115/import/US/xtr115t.ldt]
actual_arguments = [APPS/APPS 0 Y UPLOAD @FND:patch/115/import/afdict.lct @XTR:patch/115/import/US/xtr115t.ldt]
Telling workers to quit...
23 workers have quit. Waiting for 1 more.
All workers have quit.
Error running SQL and EXEC commands in parallel
You should check the file
H:\oracle\prodappl\admin\PROD\log\3480000_050108pm_3.log
for errors.
Please help me to complete the patch
BR
Tarek

Please Hussein
I restarted the patch again and this part of log:
Evaluating symbolic arguments for worker 2 ....
AutoPatch error:
Unable to find job when reading existing jobs.
No job in manager's jobs_ready list with:
product = fnd username = APPLSYS
filename = [FNDLOAD.exe]
phase = [87]
ign = [1]
arguments = [&ui_apps 0 Y UPLOAD @FND:patch/115/import/afdict.lct @XTR:patch/115/import/US/xtr115t.ldt]
actual_arguments = [APPS/APPS 0 Y UPLOAD @FND:patch/115/import/afdict.lct @XTR:patch/115/import/US/xtr115t.ldt]
Telling workers to quit...
20 workers have quit. Waiting for 4 more.
21 workers have quit. Waiting for 3 more.
All workers have quit.
Error running SQL and EXEC commands in parallel
You should check the file
H:\oracle\prodappl\admin\PROD\log\3480000_0501830pm.log
for errors.
Please before rerun the patch again . I need to know if there is any thing to complete instead of start it from first . you know this patch more than 100,000 job and now I am in 37.000 only
Please advise
Tarek

Similar Messages

  • BPC 5.1 SP7 patch 3 - Work Status not updateable

    Hi All,
    We have just upgraded to SP7 and applied patch 3, and suddenly we cannot "roll-back" Work Status from eSubmit / Modify Work Status.
    Previously I (as Administrator) could change a status from Approved back to Submitted or Unlocked. Now, once something is Submitted it is greyed out (not able to be changed). (Both the "Include children in data region" and the Work Status dropdown are unavailable")
    I've searched SAPNotes and on the forums, but cannot find anything related.
    Any ideas?
    Regards,
    Peter Bellis

    Upgrade to SP 7 solved this issue.

  • Work Status Report Date and Time Setting

    Hi all
    We are running BPC10 on servers configured with Central European Time which is currently 2 hours ahead of GMT allowing for Daylight Savings Time.
    From what i can see in BPC10 date and times are now stored in GMT (Zulu time) in the Audit activity tables so when a user updates the work status at say 11:00AM local CET time then a value of 09:00AM GMT is stored in the Audit Activity Header table.
    We have a report in excel that uses the EVLCK formula and will return the correct value of 11:00 am however if we run the Work Status Audit report on the Planning and Consolidation home page with user preferences set to Central European Time +1 then the time is displayed as 10:00am suggesting that daylight savings time is not accounted for. We need to set the time to Eastern European time +2 hours to display the correct figure.
    Can anyone explain why this happens? Has DST been overlooked?
    Rgds
    Alan

    Hi Alan,
    probably it's a bug, I think it's better you open an OSS message to SAP.
    Regards
         Roberto

  • Work Status Report

    Hi,
    I was wondering if there is a work status report available in the system?  What I would like to see is a summary of which dimensions are locked in BPC so that I can monitor it to ensure that someone doesn't accidentally open something by mistake. 
    Currently I have to go through BPC Web and check the dimensions manually.  If there is no report can someone confirm where the work status data is stored so that I can have one built.
    Is this the table (where "finance" is the application)   -  [dbo].[tblFinanceLock]  ??
    thanks in advance.

    Hi,
    You're right, work status information are stored in "tbl<App>Lock".
    Concerning your first question, you can build a BPC for Excel report that retrieves work states.
    Having for example an expansion on all entities, you can use EVLCK function (from 5.1 version) or EVASV function (in CPM 4.2). You can then do whatever you would like to send it to others via distribution list or other.
    Hope this will help.
    Kind Regards,
    Patrick

  • Work status at application level

    Hi Team
    Can any one explain purpose of keeping dimension members in work status settings where dimensions are not relevent for work status at application level?

    Hi Miguel,
    You are comparing work status and the validation rules. However, these 2 are completely different functionalities.
    For maintaining validations, please take a look at the below links from help.sap:
    http://help.sap.com/saphelp_bpc75_nw/helpdata/en/72/027eddf803405eb131738b655408ce/content.htm
    http://help.sap.com/saphelp_bpc75_nw/helpdata/en/d9/7e49e5b686462a9f2a2d38c98b8446/content.htm
    For work status, please refer to the below links from help.sap:
    http://help.sap.com/saphelp_bpc75_nw/helpdata/en/f8/d51b881cfa4c5992de481ccfa05db3/content.htm
    http://help.sap.com/saphelp_bpc75_nw/helpdata/en/75/712b5c7be845cbb1e76cfe78650343/content.htm
    Hope this helps.

  • Issue with setting work status

    Hi Gurus,
    I am using the standard work status (copied from Appset), in the applications work status setting I have set entity as owner and time and category as yes for work status. In the entity dimension under owner and reviewer property I have keyed in the correct user ids. I am using one of the owner user id to perform the activity mentioned below
    The issue I am facing is when I select modify work status from Esubmit menu it takes me to the web interface for setting the Work status after selecting the value for the 3 dimensions mentioned above when I click on OK it pops up a message that you are not authorized to change the work status setting please contact system administrator. The owners have admin profiles for auth so they should be able to do pretty much everything.
    would appreciate help on this
    BPC 5.1 Support Pack 2
    Thanks

    Make sure all the members within the parent hierarchy you are using have owners assigned.
    In BPC terms; Managers are the owners of parents, owners are the owners of members.
    For example the owner might be a clerk entering forecast data for a single/set of entities, (base level members). The manager owns the parent.
    Also, when testing, make sure you login to the system/server/domain/network, (whatever) with the userid you will be testing with and then login to BPC. (Just to be sure.)
    This should do it if you have everything else laid out!
    Good Luck!

  • Work status custom report

    Hi Gurus,
    I have built a work status custom report. The user was able to change status. When i run my custom EVDRE report no values are retrived for status, user and date/time stamp columns. I am using simple
    EVLCK function. I think something is blocking/filtering retrival of data.
    Best Regards,
    Suresh.

    Hi Suresh,
    I am looking for the functionality in which we can display the current work status in our BPC excel sheet.
    Do you mean the same when u tell work status custom report.
    My actual idea is to display the current work status to the user. If you are meaning the same... can you please let me know how have you built the custom report?
    Regards,
    Swetha

  • E-mail Notification of Work Status Change

    Hi Experts, I configured and triggered a BPC e-mail notification for Work Status change. However, there are few areas I would like to improve on. Please help. A sample notification message is attached below. Areas highlighted in red are the areas I would like to improve on.
    Subject: You have received an automated message from %PRODUCT2%
    The work status code of Entity has been changed by RCHU:
    This is to inform you that RCHU has updated the work status to Submitted on 01/09/2012 16:21 UTC.
    Category:C_Actual
    Entity:E_1211
    Time:2007.FEB
    New Status:Submitted
    Date/Time:01/09/2012 16:21 UTC
    Here are my questions.
    1. Subject line - Where do I configure the variable %PRODUCT2% ?
    2. Entity - How can I display the description of the Entity?
    3. Date/Time - How can I display local time instead of UTC?
    Thank you in advance for your help. We are running the Microsoft version of BPC.
    Edited by: Raymond Chu on Jan 12, 2012 8:17 AM
    Edited by: Raymond Chu on Jan 12, 2012 8:18 AM

    The periodic scripts or launchd would have to send the email. I don't think you have to do anything to send mail, just receive it, you can check that from the command line:
    mail [email protected]
    When you finish your message put a period on a blank line and hit return, that indiecates the end of the message.
    The one butt biter is that Apple puts a .forward file in all home directories that says to direct all mail to /dev/null , essentially it sends it to a black hole. You'll need to edit this file and put in your email address (if you want the email to go there) or the mails (should) wait for the user to run the mail command to read their messages.
    The mail command has a fairly extensive man page:
    man mail
    Roger

  • Does MI client Patch work For meRepMeta.xml file.

    Hi All,
    Every time I create a patch it works fine for JSP & Contollers but it dont replace Views, images & properties files.
    Now a new change cameup it happened to make changes to lot of view files including meRepMeta.xml file as there are changes in Sync BO itself.
    Can some body advice, does the patch work to replace this or not, else a feasable solution as we cannot reconfigure all the Devices on site.
    Your help is much appriciated.
    Thanks & Regards,
    Sai Krishna. K

    Dear Sai Krishna,
    It is normal, not an issue. It sometimes depends on different factors. Generally 2-3syncs are required to get the full data after client data reset.
    Regards,
    Veera
    Additional Non-Conslusive Info for understanding:
    Though there is no official wording, and just general recommendation of 2-3 syncs, we can derive (though I cannot term for sure) the general way of working of the sync mechanism from the default value of the below parameter setting. This setting comes when you "Allowing the Creation of Setup Packages" in your server":
    Parameter: NO_OF_SYNC_TO_GET_MASTER_DATA
    Description:
    Optional. Number of synchronization
    processes required to download the
    initial master data.
    Determine the number required by
    setting up a test device and checking
    the number of synchronizations
    necessary for all the data to be
    visible following the two initial
    synchronization runs (see
    Synchronizing for the First Time
    ). As part of the two initial
    synchronization runs, the device ID is
    assigned and the application is
    transferred. Do not include these
    initial synchronization runs in your
    calculation. Only take those runs into
    account that are used to transfer the
    data.
    Possible values: Positive integers
    Default: 3
    Note: I have just copied the table values above from the configuration guide in help.sap.com.

  • BPC 7.5 - Multiple Usernames in the owner property for Work Status Update

    Good Day,
    We have an issue in our BPC system, where our organisation dimension(entity) has an owner property which is maintained with multiple usernames. The issues comes in when we have to update the Work status for locking. The system recognises the first username as the owner property and only that first username can change or update the workstatus in BPC. We have a problem with that because we have a team of people that manages process.
    The error that we get when one of the usernames other than the first one tries to update the work status is - "User not a Manager/Owner, Work status cannot be updated".
    Please advise of the solution we are BPC 7.5 SP17
    Thanks,
    Themba

    Hi Themba,
    We are combining Team and multiple users without issues:
    Vadim

  • Work Status and Script Logic

    Hello, gurus!
    Explain please situation with a script logic and work status of data.
    I have the script logic file, with code, for example:
    *XDIM_MEMBERSET UNIT = 19
    *XDIM_MEMBERSET AP_TR_SA = COMMON
    *XDIM_MEMBERSET C_DATASRC = MANUAL
    *XDIM_MEMBERSET RPTCURRENCY = USD
    *XDIM_MEMBERSET CATEGORY = PLAN,ACTUAL
    *XDIM_MEMBERSET ENTITY = C1113,C1111
    *XDIM_MEMBERSET TIME = 201007
    [#CF0700]=([AP_TR_ACCOUNT].[CF0612])-([AP_TR_ACCOUNT].[CF0611])
    *COMMIT
    Work status is established for (ENTITY=C1113; CATEGORY=ACTUAL,PLAN;TIME=201007) as Approved (data is locked).
    Will execute this logic for (ENTITY=C1111;CATEGORY=ACTUAL,PLAN;TIME=201007)? Should I divide this script logic for C1111 and C1113?

    I have 2 entities (companies) - C1111 and C1113.
    I have the script logic for calculation keyfigures for this entities (it is automatic chain).
    C1113  has entered the data and has locked it. When the C1113 will enter the data, the script logic will not been executed.
    I have tested it and I have received that:
    the script logic has broke when system has tried to write data into database after "Error Work Status check".
    If I change the line of script logic as
    *XDIM_MEMBERSET ENTITY = C1111,C1113
    calculation for C1111 is executed.
    Best Regards,
    Svetlana.
    Edited by: Svetlana Kazaneva on Sep 6, 2010 1:17 PM

  • Error changing work status in EPM Addin

        Hi all,
        I'm trying to change the working status for a category and a specific period.
        However in doing so the system is generating error
        Failed in checking status in control
        Failed or unexecuted control sets exist in your data region
        I'm doing this from Excel client, option EPM tab, save data, change work status.
        Working state has already configured in the Web Administrator
        That I can do to fix this error?
        Thank you for your help
        Regards,
        Guillermo

    Hi all,
    According to what the 1795953 note says and thread sent by Dinesh,
    the problem is some of the Entity members are not part of the Group selection on Ownership settings. This is the configuration that I have for the entity
        I'm trying to change the work status for the item Org_so, who is the parent of the other.
        I have another question, what is the relationship between the controls and work status,
        if controls have not been executed you can not change work status?
        Best regards,
        Guillermo

  • Multiple hierarchies in Work Status settings

    Hi,
    I have datasouce dimension with more than one hierarchy and  I need to set work status using multiple hierarchies but Work Status Settings in Admin console allow to specify only one hierarchy in Base Hierarchy.
    A possible solution could be to create a new hierarchy that includes the others but I don't like.
    Do you have any other idea?
    I'm working on SAP BPC 10 MS
    Many thanks
    Dina

    Hi Dina,
    as per note 1339135 - How to set dimension hierarchy on work status settings
    <If you set "Base Hierarchy" to 2 for a dimension has 3 hierarchies, you cannot set work status for members included in hierarchy 1 and 3 on BPC for Web. Only you can set work status for members of hierarchy 2.>
    so I think the only solution is yours.
    Regards
         Roberto

  • Bypassing work status lock in FX Restatement

    Hi,
    We have a requirement to bypass the work status lock when we run an FX Restatement as part of our budgeting process.  I was hoping to achieve this by writing my own BPC Process Type and piggy-backing off standard code.  However, hereu2019s my problem:
    1.  The currency conversion is part of the main consolidation program logic.
    2.  This program calls the main WRITE BACK logic to write the data back to the application once the conversions have been performed.
    3.  The WRITE BACK logic (method cl_ujr_write_back->write_back_int) has a parameter (I_BYPASS_LOCK) which, when set to TRUE, allows the work status locks to be bypassed.
    4.  However, the consolidation program calls the WRITE_BACK in such a way that the parameter is not set, which means the default value is taken, which is FALSE, which means the locks are respected:
    So, from what I can see, my only options are:
    A.  Implement the WRITE_BACK BAdI and use it to bypass the lock in the special circumstance that a currency conversion is being performed (Iu2019m not even sure this is possible u2013 will need to check).
    B.  Create my own version of the Consolidation and Currency Conversion program by inheriting from CL_UJP_CURR_CONVERSION (annoyingly itu2019s a FINAL class) and redefining the method that calls the write back.  The problem with this will be how to get the script logic parser to call my class, instead of the standard class.
    Has anyone faced the same problem and found a solution?
    Thanks,
    Tristan

    Hi Tristan,
    I may be confirming what you already know that it is not possible to bypass the work status in NW version. At one of our implementations, where the customer had OLS 4.2, had a keyword which is used then in a script logic to check the work status code along with the script.
    We had a solution which worked in our case as we have opened up the DM method in work status code 'Submitted' where the managers could run the packages. Not sure if this would also be applicable in your scenario.
    Thanks,
    Sreeni

  • Format according Work Status BPC 10.0 NW

        Hi experts,
    I wonder if there is a way to read the work status of the selection and set the dynamic formatting according to the work status?
    Any ideas are welcome.
    Kind regards,
    Denis

    Hi Denis,
    To read the workstatus of a combination of dimension members, you can use the function EPMWorkStatus.
    Then, you can use conditional formatting to achieve the desired formatting depending on the work status retrieved.  Hope this helps.
    Best regards,
    Vijay

Maybe you are looking for

  • Is possible to pass array/list as parameter in TopLink StoredProcedureCall?

    Hi, We need to pass an array/List/Vector of values (each value is a 10 character string) into TopLink's StoredProcedureCall. The maximum number of elements on the list is 3,000 (3,000 * 10 = 30,000 characters). This exposed two questions: 1. Is it po

  • No document flow updated in Service Order regarding MM flow i.e. PR, PO, GR

    Hello, On creating a service order in CRM, the purchase requisition is created automatically in R/3 for the spare parts entered. But this PR information is not getting updated in the service order's document flow in CRM. I analysed the flow and found

  • First Mac

    Hi I am going to buy a Mac with my own money, although I know my parents will help me if the price gets to high. I am going to be using some photo editing and video editing programs and iWork. I also want to be able to play minecraft and portal 2 fla

  • Is Forté UDS version 5.1.3 supported on Oracle 10?

    Hi, in the company I work in we've got applications developed in Forté UDS 5.1.3 and we've got Oracle 8.1.7 We're going to change Oracle version and we'd like to upgrade towards Oracle 10. Someone has told me Forté UDS 5.1.3 is only supported on Orac

  • MC+Q Report Update

    Dear all, Please tell me how to update MC+Q report so that i can get all updated data for sale of material analysis. Thanks & Regards Amit Karalkar