PEC in Investment Orders and WBS

Dear Experts ;  
Why some of investment orders and WBS issue errors of two hundered pecrcent amounts to be posted to Asset Under Constructions in period end closing ? How to solve this problems ?
Thanks : VYN

Plan data for Statistical wbs elements are not eligible for assesments/distributions and settlements.
In actuals , orders can be set as senders and receivers. Use trans KCAU to customize yur assesments.
I hope it helps.
Pan

Similar Messages

  • [new-GL]How can I make "order" and "WBS" field visible in KSV7 or KSU7?

    Hi,
    I found that sender/reciever screen of KSV7 or KSU7 is different from that of KSV1 or KSU1. There were no fields to enter order and wbs in KSV7 and KSU7.
    How can I add those field in KSV7 and KSU7?
    I tried t-code GCA6 but couldn't find what to do. Hel~~~~~~~~~p me plz.
    thanks

    Goto SPRO ..for IMG .. Controlling --> General Controlling --> Organization --> Maintain Versions. Select the version and then select the Controlling Area settings..Again select the version within and click on settings by fiscal year from the left hand side panel under Controlling Area Settings. Highlight the year you are considering for plan. and then enable the checkbox under Orders/projects named Integrated planning with cost centers/bus.processes. Then try KSU or KSV7

  • Service order and WBS Element

    Hello Experts,
    I have a question regarding WIP service order costs. Can we post the costs of a WIP service order to a WBS element? IF so where do we link the service order and project/WBS Element? How do we post the costs to WBS elements?
    Appreciate your help and time in this regard.....
    Thanks,
    Harish R

    My problem scenario is like this.
    We have two plants A and B of the same Co.Cd. We are physically closing plant A and moving everything into B. Now the open service order costs from plant A have to be moved to plant B. How do we do this?
    Do we have to create a new service order/WBS element for all old open service order/wbs element?
    Also where do we connect the service order and wbs element?
    Appreciate your help and time.
    Thanks,
    Harish R

  • Sales Order and WBS transaction

    Hi,
    I am working on an automatic process for billing, RRB (Resource Related Billings), this process involves billing in T-code DP91 using a Sales Order. The amounts in the SO gets added by uploading costs in the WBS. There is a direct link between the SO and WBS, once the WBS is created it automatically generates the SO and copies all the details from it ( profit center, customer, vendor etc)
    Is there a T-code where I can see what is the WBS for each SO or the other way around but in mass, displaying them all together not individual, or maybe a table to see this link?
    Thanks a lot

    We have standard TCode to get this CN54N(Sales Doc) & CN55N(Sales Doc Item). For table, if WBS is assigned at Sales Doc Header and Item, then check field PS_PSP_PNR in tables VBAK and VBAP, respectively.
    Thanks, JP

  • Assessments expenses and revenues / orders and wbs elements

    Hello gurus,
    I have created two different structures:
    - Statistical WBS Elements for allocating all the planing data.
    - Internal Orders assigned to the WBS Elements for allocating all the actual data (expenses and reveues: item category of cost elements is 1).
    The issue is that periodically i need to distribute these things:
    - Plan data from one Statistical WBS element to others Statistical WBS elements. As the WBS Elements are statstical i really do not know how i can distribute those plan costs, i mean, how i can create the assessment cycle? which steps i must follow up? which transactions allow me to do this?
    - Actual data from internal orders to others internal orders. Exactly the same questions that in the paragraph before... The problem here is that i know how to create assessment cycles using cost centres as senders, but the transaction (KSV5, KSU5) do not allow me put order as a sender
    Thanks in advance for your help.

    Plan data for Statistical wbs elements are not eligible for assesments/distributions and settlements.
    In actuals , orders can be set as senders and receivers. Use trans KCAU to customize yur assesments.
    I hope it helps.
    Pan

  • Sales Order and WBS

    Dear Experts,
    Any way to validate the WBS element at Account Assignment( profit Segment) for each line item in an SO?
    Please comment on the above question. Please tell if it is programatically or functionally possible to solve the above problem.
    I want to validate that if WBS for each line item is not maintained at account assignment ( profit segment level), I want to throw a warning message saying something like 'WBS not maintained'.
    Moderator edited subject title of the discussion.
    Don't your question in subject line.
    Please use effective & precise subject line to represent your discussion.
    Message was edited by: Jyoti Prakash

    Hi Suman,
    Thats what !! the WBS element that we are maintaining at the line item does not get replicated in the Profit Segment with the current customizing settings that Iam having. I am an ABAPer so I dnt know much about customization. One strange thing is that even if we maintain the WBS element in Profit Centre , I am not able to get it in any of the enhancements
    Really donno what to do 

  • WBS Element vs investment order

    Good Day,
    Please can someone explain the following..................
    I have CO objects a WBS element and an investment order and I have posted budgeted values to these CO Objects.  I have posted actual values to these Co object via the MM and FI-AA module. 
    When I display the budgeted values for the WBS Element and the invesment order for the fields BPJA-WTJHR the vaules are positive.  Once the actual values are posted to the WBS Element and investment order the values are displayed differently on the table COSP-(WTG001-WTG016).
    For the WBS Element the values are dispalyed as negative on table COSP -(WTG001-WTG016) and for the investment order the values are displayed as postive but both values for the different CO objects are expenditure which has occured via the MM and FI-AA modules  Therefore can someone please explain to me why these values are displayed differently yet the budgeted values are displayed the same.
    Your soonest response would be appreciated.
    Kind Regards
    Ropetra

    Hi
    please gop through this notes it may be help full for you...............
    Planning and Budgeting Measures
    Use
    Using this function, you can plan and budget investment measures, even if they are not already assigned to an investment program.
    Integration
    All of the planning and budgeting functions of orders or projects are at your disposal for the corresponding measures. For more information, see the documentation for the R/3 components,  Internal Orders (CO-OM-OPA) and  Project System (PS) .
    Orders or WBS elements that are assigned to investment programs cannot receive their overall budget by means of the budgeting functions in CO and PS, when the Budget distribution indicator is set in the program position to which they are assigned. Instead, they are limited to receiving their overall budget only by means of the budgeting functions in Investment Management.
    Prerequisites
    Certain restrictions apply when an investment program type is entered in the budget profile of an order or WBS element. When this is the case, the order or WBS element cannot receive overall budget unless you assign it (or a higher-level WBS element ) to an investment program position. Until you make this assignment to a program position, the fields for the overall budget and/or annual budget for orders or WBS elements are not ready for input and cannot be changed.
    Activities
    To plan or budget orders, choose Internal orders ® Planning ® Overall values ® Change or Budget ® Original budget ® Change.
    To plan or budget WBS elements, choose Investment projects ® Planning ® Total costs ® Change or Budgeting ® Original budget ® Change.

  • Investment order settlement?

    hi
       can anyone tell me why we settle investment order on AUC and not on cost centre.
                                                                                    regards
                                                                                    sanjay nanda

    Hi,
    COST CENTER--->The costs that arise from processing an order (for example, costs for material, personnel or external services) have the individual technical objects (equipment, functional locations) as a reference object.
    The costs are initially collected on the order. They are then transferred to the settlement receiver specified in the settlement rule. The receiver of the costs is independent of the reference object, which merely provides a proposal.
    AUC--->>Special order that settles the costs of an investment measure to an asset under construction (AuC).
    Investment measures are used to create new assets or maintain existing assets to increase their value, which you must then capitalize.
    You can settle the costs that have been collected on an investment order to an AuC. In this case, the system automatically generates a settlement rule for the AuC when the costs are first settled. If some of the costs collected on the order are to go into the costs settlement, then you can create another settlement rule (preliminary settlement) manually for these costs.
    You can test particular settlements to find out which type of settlement is most suitable for you. To simulate depreciation for an order, choose the tab page Investment in the investment order and then Depreciation simulation. The system saves the data from the depreciation simulation. The order subsequently receives a corresponding status.
    As soon as the fixed asset is completed, you can create and process your data from the order. In the case of full settlement, the system posts the values that were originally on the AuC to the completed fixed asset.
    Regards,
    Rakesh

  • Investment order settlement- assignment field with order number in GL code

    We are settling the investment order to the concerned asset and in reco account of the concerned asset it has to update assignment field with Investment order number from which order settlement was happend.
    For example I am booking all the expences to 1000 GL account code for investment order and I am settling to 2000 GL code.
    Investment order number is coming in 1000 GL code in fbl3n and for 2000 asset class (Reco 2000 GL code) it it not showing IO number.
    We want IO number in 2000 GL code line item.
    Do the the need full.  It is very urgent..........
    Edited by: sudhakara reddy jakku on May 31, 2008 8:09 AM

    hi
    when u are seeing gl line item .onse u enterd inthat screen change layout screen tab will be ther u plz see the  IO filed and select that . to next saide it will give urs IO no.also

  • Investment order reporting does not match with AM

    Hello,
    We are exectuing two reports 1) internal order report( for investment order) and asset history sheet.
    Both the report figures should match. but due to some reason the internal order report shows less value than asset history sheet.
    What can be the possible reason for the differences.
    BR,
    Zulfikar

    Hi
    Check whether the sales order creation date and actually when you created the delivery ? if say u created the sales order yesterday with yesterday date as delivery date and carried out delivery process to day means. The delivery date in the delivery process will be today date in that case delivery date wont match with sales order. This is one case like that so many cases are there.
    Material might not be confirmed etc....
    Regards,
    Mullai

  • Investment order (PM07)

    Hi
    Can any one explain me the PM07 order type.
    Also explain the config of PM07 order type.
    How it is integrated to AUC.
    Thanks in advance for your valuable inputs

    Investment Order is created to execute tasks that will be capitalised (Settled to Assets)
    Configuration Involved:
    1.Indicate Order Types for Investment Measures
    Here you tag the Order type as Investment Order and mention the Investment profile.
    2. Define Investment Profiles
    Here you define the Investment Profile which contains asset class of AuC and other settings
    (There settings are from PM alone, also you need to have settlement profile,allocation structure etc to be in place for settlement to work. Asset configuration is also involved)
    On releasing the Order, AuC is automatically created and costs periodically get settled to AuC (FXA-Asset). On completion of the work completed asset is created from the order and this automatically creates a settlement rule i.e., settlement to a completed asset.
    Regards
    Sreenivas

  • WBS element in Asset master & investment order

    hi,
    till now we are using the capital investment order for capitalising assets, but now the client is asking for settling wbs element on to auc, can we have both WBS elment and investment order for a single asset. does any one have img document for wbs element related config.

    Hi Sai,
    I think I can answer part of your question.  If a posting is being made to wbs element and internal order (both are real).  The real posting goes to wbs element and statistical posting goes to internal order.
    In this case, you will be settling the wbs element to the AUC rather than Internal Order.
    Coming to the configuration, most of the configuration settings are same on Internal Orders / WBS elements.
    I am sorry, I do not have any documentation.
    Regards,
    Sreeni

  • Basics: Appropriation Requests and WBS elements (3/3)

    Hi,
    Last question I promise!
    1) Is it possible for more than one appropriation request to point at the same existing project without creating new different project.
    As a solution, I though to create empty projects from AR in order to use the values of the program position they are linked to. Is this correct or are there other solutions?
    With regards to the link reported below, am I right in assuming that not even the top WBS element (namely InfoSys, refer to graph in link) can be related to a program position in order to exploit the function.. or is it that only the WBS elements directly above and below it (refer to WBS:"software", in the graph) in the hierarchy should not be assigned to a program position to use the function.
    Investment Management (IM) - SAP Library
    This question refers to <<SAP IM ECC 6.0 SP 16>>
    Grazie!
    Jessica

    Hi Jessica,
    Can you point different AR to same project If its the same WBS answer is NO. if these are two separate WBS within the project Yes you can.
    so assume you have two Level 1 WBS A and B within project XYZ. Then A can point to AR 1 and B can point to AR2.
    But WBS A cannot point to AR1 and AR2.  Hope it clears your doubt on 1st Question.
    Why you want to do that? Whats the business rationale behind it? Usually AR is used to approve a business investment plan and it will be associated with that particular project. So the best practice in SAP is to have a one to one relationship between AR and SAP Investment Project. 
    On your understanding of the Graph. You are 100% correct. Neither Inf. Sys  nor Software can be assigned to a Program Position ID as the WBS Application is already assigned to a Program position ID.
    Hope it helps..
    Regards
    Sammar

  • Investment order?

    hi
    why we use intenal order budgeting in investment order(order type-pm07)not wbs budgeting.
    investment order is like when we do erection and commisioning of an equipment which i think
    is investment of money in a project(erection and commissioning).
                                                                                    regards
                                                                                    sanjay

    Hi,
    We can trace through investment program by assigning it to order.after that we can assign budget in IM52.
    Regards
    Satish

  • Error while doing investment order settlement

    Dear all,
    My client has not settled certain line items in the
    previous year for some Investment orders. Now when he
    is carrying out settlement (KO88), for the current
    period, he is getting error message " AW 624"(first
    settle items from the previous year in the previous
    year). How can he settle previous years item in the
    current year since FI & CO periods are all closed for
    prev. year.
    The settlement rule is AUC in this case.
    Thanks in adv.
    Vijaya

    Hi
    As per note 82514:
    If you simply want to settle the unsettled values from the previous year    
    in the current year, proceed as described in Notes 425601 and 819197. If    
    settlement for the previous year is no longer possible, due to concluded    
    fiscal years in FI and CO, or the reporting problems described above        
    have to be avoided due to settlement in the previous year, settlement in    
    the current fiscal year is then particularly necessary.                     
    As far as I know, if note 425601 is fully implemented, AW624 should        
    become editable in OBA5. Could you please check if the coding has been     
    correctly applied? Especially below steps need to be done manually:                                                                               
    As a prerequisite for Transaction OBA5, you must first of all implement    
    the program corrections of note 425601 and insert  the following           
    table entries :                                                                               
    o  As of Release 4.6: Use Transaction SM31 to include application      
           area 'AW' into table V_T100SA.                                                                               
    o  Start Transaction SM31 to include the following entry in table      
           T100S:                                                              
           'Application area    MsgNo    Allowed      Standard   Switch off'   
            AW                  624      EWI          E           'X'                                                                               
    Regards
    Javier Reviriego

Maybe you are looking for

  • OS X 10.8.3, TM & Spotlight Issue

    I just upgraded to OS X 10.8.3 and my TM is no longer backing up. This appears to be a Spotlight issue as all I get is Estimating Index Time when I open Spotlight.  I tried the trick of making my HD private in Spotlight then public again - same resul

  • Links in photo album not working

    Hi, I created a prototype Web Site using  DW CS4 and used Fireworks for a photo album.  I used the command in Dreamweaver "create web photo album" which ran successfully.   When I created the album I told Dreamweaver to put navigation links on the pa

  • Device event from within a semantic event

    Is there a way through which, in an event listener for a Java semantic event, we could get basic properties informations on the raw physical event from the device, e.g. mouse, that had triggered the semantic event? I know Component#getMousePosition()

  • ABAP & Java Preview install done. Need Post install steps for XI.

    Hi Please excuse for the most basic question. From the trial downloads, I've installed the ABAP and Java and would like to know the post-install steps for activating and configuring the Exchange Infrastructure component and subsequent configuration I

  • Studdering

    Hi all. I'm not too sure if this is a FCP, Compressor or DVDSP problem. I have the latest in all 3 programs. When I export my 1hr44min movie through compressor & burn it to DVD, much of my footage that has movement is very studdery. I shot w/ a DVX10