Penryns, Wolfdales and Yorkfields batch #'s. Oh my...

Let's compile some batch numbers for the 45nm processor and the setting we've used to overclock them.  The more detailed the information the better.  It'll really help people in the future I think.  Let's see what would be good information.  You can actually include the Kentsfields too.  The Q6600 seems like a great overclocker.  A screenshot would be nice too.  4 hours into Orthos or Prime95 is fine I think.  This is for the Intel 45nm processors.  But the 9850 Phenom is welcome too. 
1)  Name of processor (E8400, E8500, Q9300...)
2)  Batch number
3)  Pack date for your processor
4)  Overclocked processor speed
5)  Vcore (The actual vcore in windows when the processor is idle and not when you're running Orthos or Prime95 when the vcore drops down)
6)  NB setting
7)  SB setting
8)  FSB Termination voltage (If you had to set it that is)  (Be careful with this one.  Remember for the Penryns the absolute max is 1.45v)
9)  GTLREF (If you don't know what this is...  http://www.thetechrepository.com/showthread.php?t=87)
10)  Any other voltages you messed with
11)  Memory brand
12)  Memory timings and Mhz
13)  Memory voltage
14)  Operating system
15)  Power supply
16)  Which MSI motherboard did you use?  (I assume you wouldn't be here without one )
17)  Temperatures of your processor
18)  Version of the BIOS you're using
19)  CPU cooling solution you used
20)  And anything else you think would be helpful.  Like if you dance some sort of rain dance to get your processor to POST. 
You don't need to post all this information, but if you have them, might as well.  It would help.  And you don't have to do it in order either.  These are just to help remind you.
I hope I didn't miss anything.    Let me explain the Intel batch numbers.  It'll go something like Q807A125.  The Q8 means that the processor was defused in 2008.  Like the whole dry lithography processor thing...  The 07 after the Q8 means that it was the 7th week of 2008. That means sometime in the third week of February.
The A125 part means that this was the 125th batch of that particular week.  Some people report that the lower the number after the A, the better.  I guess a simple explanation would be human nature.  Nobody wants to be working on Fridays so people get sloppy. 
Anyways, I'm not entirely sure that the patch number alone is enough.  Because processor that are on the outer edges of a particular wafer aren't as good as processors that are at the center of the wafer.  At least that's the way it used to be.  So two processor from the same wafer (A125 for example) might have completely different results.
We would need quite a lot of batch numbers to really know if there is a bad batch out there that you should avoid at all costs. 
I'll edit this first entry in this thread to include the cpu name, batch number, cpu speed and vcore of all the entries.  Or someone else with moderator privileges can do it for me.  :-D
LOL I forgot the batch #'s
Some numbers:
1)  Q807A125:  E8400 with VID of 1.10 volts overclocked to 4.0ghz with vcore of 1.325 volts, northbridge 1.450 volts, southbridge 1.6 volts, 2x2GB ram at 2.0 volts and 889mhz
2)  L803A756:  Xeon X3350 overclocked to 3.3GHz (8x412.5) with vcore of 1.192 volts, northbridge 1.25 volts, southbridge auto, FSB termination 1.230 volts, ram at 825MHz @ 5-5-5-15 2T with voltage of 2.1 volts.
Note:  Setting your FSB termation voltage higher than your vcore effectively disables an Intel stability feature.  Not a biggie I don't think.  I'll post a link to what exactly.
Quote
http://edgeofstability.com/articles/dfi_p35/gtl/gtl3.html
Another issue that most users are unaware of is the relationship between VCORE and VTT. To reduce the amount of ringing at the driver, Intel has added a weak pull-up device to the output buffer as mentioned above. This device turns on at the beginning of a low-to-high signal transition, substantially reducing the impedance mismatch between the output buffer and the transmission line. As a result, the amount of overshoot and ringback is significantly reduced. The source terminal of the pull-up device is connected to the core voltage supply. This causes the logic high voltage to rise above the GTL termination voltage for one cycle. After one bus cycle, the pull-up device is turned-off and the output will stabilize at VTT if the output remains in the logic high state. But when we raise VTT above VCORE we have effectively removed the pull-up device from the circuit.
3)  q802a594:  E8400 overclocked to 4.005ghz (FSB 445MHz x 9 Multiplier) with a vcore of 1.376 idle, northbridge setting of 1.36 volts, southbridge voltage of 1.56 volts, front side bus termination voltage of 1.375 volts, ram at 2.1 volts running at  5-5-5-15 and 445MHz (890mhz effectively)
Hope this give you future overclocking pioneers out there some idea about where to start.
4)  Q748A123:  E8400 overclocked to 3.75 GHz, vcore 1.256 volts (setting of 1.2625 in BIOS), northbridge 1.38 volts, southbridge 1.68 volts, Memory timings and Mhz = 1670 MHz @ 7-7-7-20, Memory voltage = 1.88v, using MSI X38 Diamond

I'm still only half an hour into Orthos, but this seems to be stable...  *Knock on wood three times*  I'm using the 1.0 BIOS too.   
1)  Processor name:  E8400
2)  Patch number:  Q807A125
3)  Pack date:  04/02/08
4)  4.0 ghz at multiplier 9 times 444.4 mhz system bus (I actually just set the FSB to 1778 mhz)
5)  Vcore:  1.296 volts idle actual
6)  Northbridge:  1.35 volts (seriously...)  It hasn't crashed yet...  *Knock on wood*
7)  Southbridge:  auto
8)  FSB Term:  auto
9)  GTLREF:  auto
10)  all other voltages except for ram left on auto
11)  4 sticks of 1GB Patriot PC2 6400 rated at 4-4-4-12 at 2.2v
12)  4-4-4-12 at 2.3 volts running at 889 Mhz  (what can I say?  It was $30 ram... )
13)  2.3 volts
14)  Vista Home Premium 64 Bits
15)  Antec Neopower 650 Blue.  3 12-volt rails each rated at 19 amps each with no over currect protection apparently.    All the rails come from the same place I think.  So they're just one 12 volt rail with their own circuitry.  Defective circuitry at that...
16)  P7N Diamond nVidia 780i chipset
17)  At full load:  Tcase is 43, Tj core0 is 58, Tj core1 is 54.  (yeah...  The difference between the Tcase and Tjunction is way too high *Shrug*)
18)  1.0 BIOS 
19)  Thermalright Ultra-120 eXtreme (Air cooling)
I think that's it.  I'm only an hour into Orthos.  Haha, it was 30 minutes when I started this...  I'll post a screenshot as soon as I figure out HOW to post a screenshot.
Daloona's suggestion about how to overclock really helped:
Quote
The first you seek the highest cpu speed without upping Vcore, leave it on 0.000 or auto, pref 0.000 if available.
Stress cpu, small fft's for at least 8 hrs to be sure.
Then try to reach the cpu speed you want to , by upping Vcore.
Stress cpu, small fft's for at least 8 hrs to be sure.
then go further and try to get sytem stable at wanted speed with tweaking NB ans SB and fsb vtt, starting with NB and maybe fsb vtt.
Stress cpu and ram, blend for at least 8 hrs to be sure.
Leave your mem on standard settings or according to vendor specs, but do not oc them.
If system is stable, note the settings and start all over again from stock, only this time try to oc mem with it to keep a 1:1, or other (see below) fsb:dram ratio.
But dont forget oc-ing mem means upping Vdimm .
Mine is warrantied to 2.2V, but be sure you do not overvolt them, the highest is best @2.1Vdimm or lower, unlesss, like me, you cool your mem
On a certain point your gonna loose mem speed eventually due to looser timings and undervolting, so search for the optimum between your mem and cpu at a good fsb:dram ratio. ( I like fsb:dram @1:1, but 3:5, 5:6 and 8:9 are good also)
This is how I did it, and it took a long time but its running great and I enjoyed the work.
Dont forget to test a lot and long with Orthos/Prime95 blend and small fft's and watch those temps with HWmonitor, Everest or CoreTemp.
It really helps to isolate each thing so you can test what voltages you actually need to increase.  Wish me luck that I'll actually hit 4 or 8 hours with Orthos. 
http://i256.photobucket.com/albums/hh196/heleniumautumnale/Screenshot40ghz275hour.jpg

Similar Messages

  • Automatic and manual batch determination at the time of Goods receipt

    hi,
    where i can have the settings for automatic and manual batch determination at the time of Goods receipt and goods issue..
    E.g.: If i am receiving material from vendor then my requirement is system will generate batch automatically...
    Where  we can get this setting?
    Tx
    Uts

    Dear,
    You assign the batch number either
    Manually
    Automatically, using internal batch number assignment, refer to Customizing for Batch Management under Internal batch number assignment.
    Internal batch number assignment is activated for the complete client, unless you exempt individual plants or materials using a customer exit (see Configure customer exits for intern. batch number assignment in Customizing for Batch Management).
    The R/3 System informs you that the internal batch number assignment is active. You are however only informed once per transaction, for example, when you enter the first item on the multiple-entry screen.
    Please refer: http://help.sap.com/saphelp_45b/helpdata/en/25/283cb44f7811d18a150000e816ae6e/frameset.htm
    Regards,
    Syed Hussain.

  • Vendor Material No. and Vendor Batch field in MIGO for GR against Order

    HI,
      I received a very specific requirment for one of our client: Client need the field Vendor Material No. and Vendor Batch in the detail data --> material and batch tab in MIGO transcation for A01 (Goods receipt ) against R08 (Order), this is for good receipt against Process Order, Here though the vendor does not come in picture , these field are required. These field are appearing in GR(A01 against Purchase order(R01)
    Regards
    Rahul

    Hi,
    First of all, why do you want Vendor Batch no & material no while doing receipt against process order.  You can enter the same while doing a GR against Purchase order & same can be tracked using some reports.
    As you said, since you are doing a receipt against the Process order, vendor doesn't come in picture. Hence the vendor batch no: or vendor material no: wont be populated as per Std.SAP.  You can check for some enhancements/BAdi's in MIGO transaction to populate the same.
    Thanks & Regards,

  • Sales of same material with and without batch

    Hello Experts,
    One of my requirement is
    To sell single material from same plant
    1)with batches and
    2)Without batches
    Will this be possible in R/3 and how?
    Please suggest.
    NVS

    Hi Nikhil
    It Depends on where did you activate the Batch management. If its activated at Plant level, then yes, its possible to maintain the batch for a single material in one plant and no batch in another plant.
    But if you activated batch management at material level. then its not possible to have batch assignment in one plant and not in another.
    If you have batch activated at material level. what you can do is create a dummy batch in the other plant and the actual batch in the original plant.
    Hope this helps..
    Thanks
    Srini

  • Urgent ! delivery items and its batch split items

    Exports:
        How to find relationship between delivery items and its batch split items. Thanks alot.

    Talk to functional guy -
    List of tables which contains CHSPL
    VBAP
    LIPS
    KNVV
    KNMT

  • Creating an Action and then Batch Process

    Need some help creating an action and then batch processing a file using that action. I was able to do it in previous versions of PS (wish I had kept the action!). For some reason its not working. Keeps creating the same file over and over again. Here goes:
    Action:
    Open up a PDF (separate PDFs of a PowerPoint Pres, may contain 80-100 pages); convert to grayscale; reduce to 43.2%; save as a TIF and close file.
    Batch:
    Use this action on all files.
    When I create the action it just recognizes the first file that I use as a sample and saves over the result over and over again.
    Thanks in advance.
    Tom

    You probably recorded a save as command in it and changed the name of the file. This change is also recorded and after playing the action it just overwrites the same filename over and over again.
    Always leave the filename untouched when recording actions.

  • "cgpdftops quit unexpectedly" when drag-and-drop/batch printing in Yosemite

    I have an annoying little frustration when printing certain PDF documents in Yosemite. It happens when I drag and drop documents from Finder onto an installed printer--i.e., dragging the document file onto the printer icon that has been copied to the desktop (essentially batch printing). Whenever this happens, I get a "Stopped - 'Filter' failed" error message, along with a "cgpdftops quit unexpectedly" lengthy problem report. After tinkering around for a while, I discovered that this only happens when the document is in landscape mode--if I drag and drop a document in portrait mode, it prints just fine this way. Furthermore, if I actually open the PDF document in Adobe Reader--even the landscape ones--I can print them all perfectly fine that way. It ONLY happens on LANDSCAPE documents when using the drag-and-drop print method. VERY STRANGE!
    A little background--I found this out when one of my users was attempting to do this with her newly-upgraded iMac and started receiving this message. She does a lot of batch printing because of the number of files she has to routinely deal with, and this saves her a lot of time over opening each file individually. She says she never had an issue with this when she was on Mavericks, and it only started when she upgraded to Yosemite. I ended up trying this on my own Macbook Pro running Yosemite and was able to replicate the problem on it. I've also replicated the problem on more than one printer of different brands, so I can eliminate that being the source. My user ends up sending the files to her coworker, who is running Mavericks, and is able to batch print the files successfully.
    I have been able to whittle it down to the issue simply being printing any PDF file in landscape mode to any printer from any Mac running Yosemite using the drag-and-drop/batch printing method. Numerous Google searches have gotten me nowhere with this. Some point to similar issues which throw this error message, but none specifically point to this particular issue. Certainly I can't be the only person who has tried this...
    Does anyone have any ideas?? I'm all out...

    How much storage space is left on the boot drive of the Yosemite iMac where the CUPS cgpdftops filter croaks? Are the printer drivers for the problematic printers current for Yosemite. Have you removed and reinstalled current printer drivers for the associated printers?

  • IQ09 - Different process for material with bacth Split and no Batch

    Hello,
    i want to know if IQ09 treats material with batch number and no batch in the same way for fetching the serial number.
    view V_EQUI_EQBS_SML is used to fetch the serial numbers.
    i just need to confirm if the process is same in case a material has batch & no Batch together.
    Thanks
    Renu

    Hi,
    We faced the same problem and went back to option:
    Cont.Ins Lot creation (QMAT-CHG) = "For each Material Document item
    This solves the problem and was in our case the solution for receipts from production. But at goods receipt for purchase orders we still use the option for each material document, batch and SL.
    There we pick up the materials in WM by hand by scanning the bar codes on the pallets (printed at GR). The transfer order creates a negative quant in unrestricted use that is later filled by the automatic usage decision that moves the stock from quality to unrestricted in the same bin.
    Hope this helps.....
    Arno

  • Create and approve batch record first. message: EBR015

    HI All,
                         when i am doing UD for Early inspection lot (04 inspection type) i getting the error message "create and approve batch record first. message: EBR015"
    PLEASE HELP ME,
    Regards,
    sbabu

    PLease refer:
    Short Text
    Create and approve batch record first
    Diagnosis
    You can only carry out the following functions for the batch you have selected when an approved batch record exists (see material master record, Work scheduling view):
    Making a usage decision for an inspection lot of origin Goods receipt from production
    Changing the batch status from Restricted to Unrestricted
    However, no batch record has been created for the batch you have selected. Therefore, the system does not carry out the function.
    Procedure
    Create and approve the batch record.
    For more information, see the SAP Library, section Basis Services / Communication Interfaces -> SAP ArchiveLink -> SAP ArchiveLink - Scenarios in Applications -> Storage Scenarios PP -> Optical Archiving of Batch Records (PP-PI).

  • Batch number format setup and auto batch creation during first GR

    Dear all,
    This is a batch question.
    I know that both the master batch and the stock data for the batch are created automatically during the first goods receipt. Thus, I do not need to create this data manually.
    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    Thanks.

    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    ==> Yes - See IMG activity 'Define batch creation for Goods Movements'
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    ==> See exit EXIT_SAPLV01Z_003
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    [[> See IMG activity 'Activate Batch Classification for Goods Movements in IM"

  • Transporting a business function: lock out users and suspend batch?

    Hi gurus,
    SAP advises in help.sap.com to lock out all users and suspend batch jobs before activating a business function in development.  I did that in development, activated the business function, and saved it to a transport.  Does the same recommendation to lock out users and suspend batch jobs hold true in the QA and Production systems when the transport is moved in? ... or is it ok to transport it during a time when there is user and batch activity going on?
    Warm Regards,
    CM

    You do have to lock out users and suspend batch, even using a transport.  There is a pdf called
    SAP Enhancement Packages Selecting and Activating Business Functions,  In it, it says to lock out users and stop batch activity in all systems,

  • WIP and Documentary Batch

    Hello,
    I want to know the difference between WIP Batch and Documentary Batch?
    Regards,
    Gulshan

    Refer these,
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/47/3ae15bf9961a41e10000000a1553f7/frameset.htm
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/0019ae49-f6ce-2910-8fbd-dcb5ae86a0a7?overridelayout=true
    Regards,
    Ravi

  • Batch ID and sub-batch ID concept

    Hi,
    Can anyone tell me that in ODI Batch ID and sub-batch ID concept is availabe. If avaiable then, how we will perform.

    Hi,
    What do you mean with BATCH ID and sub-batch ID?

  • Auto batch split and auto batch determination

    Hi Experts,
    I want to know what are the settings for automatic batch splitting and automatic batch determination?
    Thanks in advance,
    Jyoti

    For automtatic batch determination assign the search strategy with batch check indicator in OPL8 transaction for order types. And in transaction OPJ2 enable the indicator BD (batch determination) for order type.
    Batch splits can only be triggered manually in the production order. For this the material master record of the material must specify that the material is managed in batches and batches must exist for the material. You can split the batches in order from change mode by selecting the opeartions and go to split the batch..you will get the pop-up for all existing batches then here you can assign the quantities for the operation from batches and save.
    No automatic batch splits in production orders.
    If helps rewards points.
    Regards
    TAJUDDIN

  • How to setup batch management in sap and how batch work?

    Hi
    I hope to check how batch managment work in sap?
    If we setup batch management in mm03 for one matieral,
    Will the batch number be created automatically or the number should be created first then we scan it?
    when we do goods movement for this mateiral, will system automatically select which batch number is smallest then move that one, or we select one mateiral and scan its batch?
    How batch management control the first in and fisrt out (FIFO) ?
    Thanks
    alice

    Hi
    I think that you have had your question answered so if you are happy with this can you please award points if you want to but mainly can you please mark your question as answered so that it is easier to navigate around the open questions in the forum as the number of pages are growing and growing and it takes too long to go through everything especially if a satisfactory answer has already been given and people like me who want to help will give up and so some people may not get any help.
    Thanks for this
    Frenchy.

Maybe you are looking for

  • How to connect my mini-dv camcorder to new imac with no firewire

    I have a Sony Mini-DV camcorder (Handycam) and used to connect it via firewire to my last iMac. My new iMac doesn't have firewire - just thunderbolt & usb. Is there a way I can use this camcorder on my new iMac? Are there adaptors, etc.? Thanks.

  • RCA to iphone cable question.

    I'm looking for anyone who might have any advice on this item: http://cgi.ebay.com/ws/eBayISAPI.dll?ViewItem&ssPageName=STRK:MEWAX:IT&item=2703 23357361 I have aux input for my car's stereo and would like to use the cable for charger and stereo input

  • Win98 se problems/jdk1.2.2

    I installed jdk1.2.2 and when i want to compile, i gotta type all the paths like: cd C:\jdk1.2.2\bin\ javac C:\Java\java.java and its getting me mad. people say to change the PATH in autoexec.bat, but i cant find it on my computer. i can only find au

  • Custom page VO not getting refreshed.

    Hi, I developed a custom page where the user can update the details. Everything works fine and even the updates are done correctly but unless i logout and login, i don't see the changes in the fields the user has done. Why is it happening? Please upd

  • Selecting type time

    Hi experts, I need to create a report, in the query designer or in the web, that must to allow to select the time type (daily, weekly, monthly, quaterly, annually), that is, in the variable screen if I select daily, the report is daily; or I select w