Personal Telepresence endpoint and meeting scheduling
Hello,
I tried to look on the web but couldn't really find the answer to my question.
How does TMS meeting scheduling work for personal endpoints when the booking is done using Outlook through TMSXE ?
Here's the scenario:
A user who has an EX90 personal endpoint wants to have a meeting with 2 other meeting rooms. He/she creates an Outlook invite adding the two rooms. On TMSXE, those two rooms have their Outlook calendar synched with the TMS endpoint but the EX90 (although registered on the TMS) is not synched with the user mailbox. So in the current situation the TMS will schedule just a point to point meeting between the two rooms in the invite instead of a three-party meeting on the Telepresence Server.
The problem is that we don't want/can't synch on TMSXE employees mailboxes with their endpoints. TMSXE requires that all mailboxes are configured with same settings and that the TMS service account has full admin access to the mailbox. We can't and don't want to do that on employees mailboxes.
So then how can we still "sync" the calendars so that:
the employee can see the schedule on the endpoint touchscreen,
TMS knows that the employee has an endpoint that needs to be added in the meeting
the employee can use the one-button-to-push feature
Thanks in advance.
I thought about it but don't want to do this. I think that more than half of the users won't get it or forgot and it will increase support load.
It needs to be transparent and user friendly.
Similar Messages
-
TelePresence endpoints - call rate explanation needed
Hi,
I'm fairly new to TelePresence endpoints and I need some clarification regarding the call rate between endpoints.
I have a CUCM 10.5 with MX300 G2 endpoints registered and by default the call rate in all endpoints is 6000 kbps when placing a call. This will result in error when A calls B which has audio and video both ways but when A invites C for a conference there's only audio between A and C because all available bandwidth (6000 kbps.) was used between A and B.
The immediate solution is to reduce the call rate in the endpoint configuration to something lower say 1920 kbps. However if the endpoints is restarted or unregistered from the CUCM the call rate reverts back to 6000 kbps. I've tinkered with the location bandwidth settings in the CUCM but that doesn't appear what to have an influence on the call rate settings in the endpoints.
How do I permanently change the default call rate in the endpoints so it's remembered even when the endpoints are restarted or reregistered?
Thank you and have a nice day.
/Carsten"How do I permanently change the default call rate in the endpoints so it's remembered even when the endpoints are restarted or reregistered?"
Specify the rate in the codec itself which is found at
Configuration/System Configuration/Conference/DefaultCall\Rate
/jens
Please rate replies and mark question(s) as "answered" if applicable. -
I have Cisco TelePresence SX10 and content sharing is not working when I am dialing through the bridge, I can share the content if I drag and drop from RMX, but if schedule the call in Resource manager or manually dial in from device the content is not going to other hand, I have tried to turn off encryption as well but still same issue. can you please help me out with this. I am from Lion co and purchased sx 10 recently.
regards
HemangCan you please provide us with a little more information on your systems and configuration / topology, such as, what call control are you using (Cisco VCS, CUCM, other?). what type of "Bridge" are you using (is this a Cisco MCU, or Cisco TelePresence Server, or other device?), what versions of the software are on each of the devices, etc. The more information we have about your environment will help us assist you better. But saying that, if all your core equipment isn't Cisco, you may have more luck in the forums for the manufacturer of such equipment (ie Polycom's Support Community).
Wayne
Please remember to rate responses and to mark your question as answered if appropriate. -
Explain How delivery date is calculated using backward and forward schedul
How can anyone please explain how delivery date is calculated using forward and backward scheduling
I want to have it broken down into the following steps
for eg for delivery date calculation following dates are used
Material Availabilty Date
Material Staging Date
Pick/pack time
Transportation PLanning date
Loading date
Goods issue date
Transit Date
Delivery Date
Can some one please give me an example and explain wht these dates are
for eg customer needs delivery date on 11/20/2008
how would the system cacluate whether it can meet the delivery date using backward scheduling
and if it doesnt meet how does the system do the forward scheduling
also i am not clear with the following dates
material avaialibilty date
material staging date
transportation date
can some one please explain me all this in detail
ThanksHi,
Basically this is the CRSD(Customer requested ship date logic)logic in which system calculates the ship date depends upon the material availability. If material is available system calculates ship date on the basis of master data maintained in customisation.Master data is maintained in the following link.
If material is not available then system takes into consideration vendor delivery date & then calculate customer ship date.
Please go through the link in SPRO
LE-Shipping -Basic shipping functions-Scheduling -Delivery scheduling & Transportation scheduling-Maintain duration.
In customisation following data is maintained
Material Availabilty Date
Material Staging Date
Pick/pack time
Transportation PLanning date
Loading date
Goods issue date
Transit Date
Delivery Date
Hope you got the idea of CRSD calculation
Regards,
Prashant. -
Error in IE on cisco WebEx 2.5 meeting scheduling
Hi.
We have updated our CWMS from 1.5 to 2.5 version. After that we get error in IE browser (any version, java and security settings) on meeting scheduling after clicking "Schedule it!"
SCRIPT438: Object does not support property or method "trim"
scheduler.js, string 889 symbol 3
In Firefox all works excellent
Have anyone the same issue?
Best regards,
ViktorHi Viktor,
Do you have CWMS 2.5.1.3009 deployed? If yes, there is a regression bug: CSCut48520 "Schedule It" button fails to work on Internet explorer. This bug is fixed with a hotfix 1 for CWMS 2.5 MR3, and the fix will be resolved in 2.5 MR4 that is coming out on 04/24.
If you can't wait until MR4 is out and want to get a hotfix, please reach out to TAC.
-Dejan -
Can MeetingPlace Express make conference calls with just meeting ID and meeting password?
Hi,
We have MeetingPlace Express version 2.1.1.2. It is working fine and everything but we need to change the way it works.
For audio only conference calls, we need the users to be able to initiate meetings without having to enter their profile ID and profile password.
For example when a caller dials the MPE number and presses 1 to start a meeting, he has to enter his PIN code to be authorized to start a meeting, we want to exclude this feature, so that any one who dials the number and wants to start a meeting, he will get a meeting ID and meeting password directly.
Is this possible in MPE 2 ? Appreciate your help please, thanks in advance.I poked around a system I have nearby and can't find a setting that is an obvious choice for this one. I experience the same behavior at the 30 minute mark.
One alternate approach you may try is called a continuous meeting. The viability of this approach depends on how this is being used:
This likely will NOT work if you have lazy users who can't manage their time.
The reason is a continuous meeting always consumes the licenses for itself, even if there are not participants currently in it.
This may work if you have defined groups of users who repeatedly meet as a group in an ongoing manner.
A continuous meeting is a scheduled meeting that reserves ports and a meeting ID indefinitely, so that
participants may join the meeting at any time on any day. Nevertheless, a continuous meeting is in
session only when at least one participant is in the meeting.
I searched high-and-low for documentation on this and the only two items that I can turn up are these:
http://www.ciscosystems.org/en/US/docs/voice_ip_comm/meetingplace_express/1_1/english/administration/guide/bagmtgs.pdf (page five)
http://docwiki.cisco.com/wiki/Cisco_Unified_MeetingPlace_Express,_Release_2.x_--_How_to_Configure_Scheduled_and_Reservationless_Meetings#Enabling_Users_to_Schedule_Continuous_Meetings
One downer though: I cannot get the Continuous option to appear on my MPE 2.1.1.2 hotfix 36 (last release) system. Either I'm missing an option myself or something is wrong in this version. -
Delivery and Shipment Scheduling with CPS
Dear Experts,
I am tryijng to explore configurable process scheudling in APO to realize a business need of scheduling based on means of transport which in itself is conditional upon a couple of things..one of which is difference between RDD and order date. The purpose is to schedule "fast" or "slow" depending on certain criteria like order priority.. rather than having to live with a static TRANSIT times. Transit times itself can be highly variable talking of ocean shipments with transhipments etc being common and thats where the emphasis lies. I am not talking here of what if product is not available etc at this point (ATP) I am only interested in determining the material availability date and hence the ability to derive a more realistic unloading date given that I have some extenal feed of transit times.expected and actual (post facto)
Quesiton:
- Does this sound possible with configurable process scheduling
- If so... pointers would be appreciated.
Regards,
LoknathLoknath
The condition table technique within CPS is almost exactly similar to the basic condition technique for transportation and shipment scheduling within GATP.
The only difference is that CPS is a lot more flexible - Instead of fixed activities for PICK/TRAN/etc, you can add more activities (HOLD/etc). In addition to duration determination, CPS can also do calendar determination/ time zone determination/ location determination using the condition technique.
So in either case, you still have the same limitations of condition tables - you cant have 'nested' logic and nor can the system pick the 'best' option.
TP/VS offers dynamic route determination. I believe this is still within the GATP check, but I could be wrong. See if it meets your requirement.
Rishi -
Difference mpr controller and production scheduling profile (exact)
hi gurus
wht is difference between mrp contoller and production scheduling profile. and which will come first at the time of planning.
thanks in adavance
avinash.pegarlawarHi,
MRP controller
MRP Controller is the person responsible for a group of materials in MRP in a plant or company.
Material that takes part in material requirements planning must be assigned to an MRP controller.
Production scheduler
Scheduler responsible for a material in production activity control.
Example
The production scheduler determines how capacity requirements are calculated for a material during a scheduling run.
MRP Controller comes into Planning first which you need to assign in MRP-1 View in material master while production scheduler you need to assign iin Work Scheduling View in Material Master.
Hope this helps clearing your doutb.
Revert if still any query.
Regards,
Tejas -
Firefox is bogged and does not reload right.. Firefox Persona's is missing..
iGoogle when down nearly 2 weeks ago and my iGoogle homepage went missing in action, all gadgets gone, just a blank page, NOTHING worked, all steps did NOT restore it, AND the help forum had some rude employees. The help forum details page is totally and utterly disabled and all you can do is type in the subject line your query and hope they answer, But you cannot type in the box when it asks for details so I had to type that issue also in the subject line, then one female told me from Google and rudely "funny I'm not having a problem with the help forum pages, nobody else is either" something like that but snappy... And rude, NOT helpful at all..
I'm wondering if Google knows their employees do this because frankly I buy goods and services quite often, its enough to cause me to go somewhere else and even spend a little more for nicer helpers... Anyway... I did all steps over there, Nothing restored my gadgets.. Nobody helped over there EXCEPT to say its all Firefox's fault.
So that is why I am here... To get help.. no settings over at Google or Firefox have I changed.. But Google did go down nearly 2 weeks ago with ALL blogs, many hundreds lost some important posts. After I spoke with the female it was after blogger came back online.... Then today my settings on myblogger was changed, one minute they are fine, the next they are different colored texts.. The type of background I use there, you have to manually go in to change the background FIRST before you change the text color, both of which I never did and yet someone went in there today to do this.
sorry for venting, very frustrated with service there.. It only stands to reason that if blogger went down and it happens to be exactly when I lost all gadgets etc, that they need not blame firefox for it... YET though blogger came back up the issue with the gadgets and entire iGoogle homepage is utterly still at hand, so I thought to write to their help forum but to get SLAMMED by a female that would be better off doing a boxing match in an amateur event rather then being impeccably a customer service agent that cares about customers and people.
I wanted to upgrade to firefox 4 BUT I heard there were some glitches not worked out yet, and I was worried not knowing if since I'm already having a glitch problem if it would make it worse to upgrade.
so firefox is not loading right, it is also not showing Persona.. And iGoogle is not working right either, not sure if Google and you have a connection but they keep saying its all Firefox's fault.
can you help me? I hope so... I love firefox and I had to use Opera today only because it was so bad that I had no choice.. Opera works fine but its firefox that I want..
take care,I wish it were that but a long time ago when I had a problem with the gadgets with iGoogle back 6 months ago thereabouts I was asked to disable it then and I did and I just went to re-check and it is still not enabled, however, it will not let me un-install it though.. It only gives me an option to enable or disable.. Any advice ? So I'm wondering if it is something else still or is there a problem with the avast still ?
thanks again for your help. Mind you that this all started when blogger went down ..
take care -
BAPI to read and change schedule lines in APO
Hello experts,
We want to firm schedule lines inside the firm zone of the APO procurement scheduling agreements with a daily job. For this we are trying to use BAPI BAPI_POSRVAPS_GETLIST3 and BAPI_POSRVAPS_SAVEMULTI3. The getlist one does not return schedule lines, it returns purchase orders and purchase requisitions. Are these the right bapis to read and change schedule lines in APO? or is there anyother one we can use?
Thanks and regards,
ErgulHi,
You can use the below code to read the schedule lines.
Checking a session exists
CALL FUNCTION '/SAPAPO/RRP_SIMSESSION_GET'
IMPORTING
ev_simsession = gv_sims
es_gen_params = gv_params.
If not create a new session and read it
IF gv_sims IS INITIAL.
CALL FUNCTION '/SAPAPO/RRP_SIMSESSION_CREATE'
IMPORTING
ev_simsession = gv_sims.
CALL FUNCTION '/SAPAPO/RRP_SIMSESSION_GET'
IMPORTING
ev_simsession = gv_sims
es_gen_params = gv_params.
g_cre_chk = 'X'.
ENDIF.
CALL FUNCTION '/SAPAPO/CMDS_TPSRC_GET'
EXPORTING
iv_ebeln = p_l_t_acknh_ebeln
iv_ebelp = p_l_t_acknh_ebelp
TABLES
et_tpsrc_all = lt_tpsrc
EXCEPTIONS
matid_not_found = 1
locfrom_not_found = 2
locto_not_found = 3
scheduling_agreement_not_found = 4
error_selecting_schedagreement = 5
OTHERS = 6.
IF sy-subrc = 0.
reading the scheduling agreement records
READ TABLE lt_tpsrc INTO ls_tpsrc INDEX 1.
CALL FUNCTION '/SAPAPO/PWB_BZQID_GET_ORDER'
EXPORTING
iv_simid = '000'
iv_bzqid = ls_tpsrc-bzqid
IMPORTING
ev_ordid = lv_iordid
EXCEPTIONS
lc_connect_failed = 1
no_elements = 2
unit_conversion_failed = 3
OTHERS = 4.
IF sy-subrc = 0.
CALL FUNCTION '/SAPAPO/PWB_GET_RELATED_ORDERS'
EXPORTING
iv_ordid = lv_iordid
iv_order_type = '16'
iv_simid = '000'
IMPORTING
ev_ordid = lv_eordid
EXCEPTIONS
order_not_found = 1
lc_connect_failed = 2
no_elements = 3
OTHERS = 4.
IF sy-subrc = 0.
APPEND lv_eordid TO lt_ordid.
CALL FUNCTION '/SAPAPO/DM_PO_READ'
EXPORTING
iv_simsession = gv_sims
is_gen_params = gv_params
it_ordid = lt_ordid
IMPORTING
et_schedule = p_lt_sched
EXCEPTIONS
lc_connect_failed = 1
lc_com_error = 2
lc_appl_error = 3
OTHERS = 4.
ENDIF.
ENDIF.
ENDIF.
Use '/SAPAPO/CMDS_SNP_MM_ORD_MODIFY' function module to change the schedule lines (Pass '16' to iv_order_type parameter).
Let me know if u have any issues.
Regards,
Siva. -
Global outline agreement and Delivery schedule
Hi experts.
I am in SRM 5.5, ECC 5.0 as backend in ECS.
I would like to have some information about relation between Global outline agreement and Delivery schedule of ECC.
Can I create GOAs and replicate to ECC as Delivery schedule for automatic generation of schedule lines?
The schedule lines generated afted MRP run goes to SRM or only goes to SUS if required?
Thanks
NilsonHi Nilson,
The data contained within the global outline agreement is distributed as purchasing contracts or scheduling agreements to the backend systems of the release-authorized purchasing organizations of the relevant corporate group. These purchasing organizations can then use the purchasing contracts or scheduling agreements according to the terms agreed centrally within the global outline agreement.
For more details.
http://help.sap.com/saphelp_srm50/helpdata/en/42/f93dfd975f3ee6e10000000a1553f7/frameset.htm
Nishant -
Difference between Scheduling lines and Delivery schedule
Hi SD Experts
can u say me the clear difference between Scheduling lines and Delivery schedule.
where we will maintain deliver schedule. whether delivery schedule is automatically created along scheduling agreements..
with regards
JamesHi James,
Schedule Lines: Has basically information realted to delivery scheduling in Sales Order level.
Delivery Scheduling: Is a process using which system will determine what are the different activities which need to be performed and time taken for each activitiy only after which the material can be delivered to the customer.
Delievry scheduling will be started only from the material availability date i.e., system will first determine the material avail date and then do scheduling. By default Standard SAP system does Backward Scheduling in case material availability falls beyond the required delivery date system will do forward schedluing
Delivery Scheduling consists of the following Basic activities:
We give deatils while creating order:
Order Creation Date
Required Delivery Date
Order date - Material availability date - Transportation Planning Date - Loading date - Goods Issue Date - Required Delivery Date
Time Between GI Date and required Delivery Date is called Transit Time
Time Between LoadingDate and GI Date is called Loading time
Time Between Material Availability Date and Loading Date consists of 2 components - Pick / PackTime and Transportation Planning Time
System has to calculate all this before it determines the confirmed delivery date.
Give your mail Id I have some Presentation I will send you across.
REWARD POINTS IF IT HELPS
Regards
Srini -
Read the job Z_JOB from SM37 and re-schedule dynamically
Hi All,
I have one requirement where I need to schedule a job in background. The job Z_JOB has 10 steps in it and each step itu2019s calling different program with a variant. Now I need write a Z program to re-schedule the Z_JOB dynamically.
I know how to schedule the job with multiple steps through program. (JOB_OPEN, Submit Statement, JOB_CLOSE). But my question is there any other way to read the job Z_JOB from SM37 and re-schedule dynamically. So that I can avoid this 10 SUBMIT programu2026??
Thanks in Advance,
Raghu.Hello Raghu ,
JOB_OPEN ( Opens a BG job )
JOB_SUBMIT ( Insert a background Task)
JOB_CLOSE (Closes a BG job)
Are the 3 function module by with you can create a have a bg job sheduled programatically...!
Hope it helps
Edited by: Anup Deshmukh on May 3, 2010 12:36 PM -
I have a .mac family account, a personal .mac account and separate iTunes id I use for my work iPhone and the associated apps. How do I keep them separate in the iCloud change?
Welcome to the Apple community.
Could you tell us a little more about what you want to do. Bear in mind that iTunes has nothing to do with your iCloud account. -
If I have two email accounts, one personal hotmail account and one MS Exchange work account on my iPhone 4s, How can I setup individual notifications for each account? Fore example, if I get a work email, I want to hear a DING, DING....If I get a personal email, I want to hear a BEEP, BEEP. Right now, any email from any account has the same notification. I want work incoming email notification to be different than personal incoming notification. The only semi-workaround I've seen is just disable any notification for the Hotmail account, so only work emails would notify. But then I don't know when I get a personal email. Even the lowely Blackberry Torch 9800 has this feature..not iPhone 4s??
ThanksSorry you get only one notification sound for all email accounts. you can send a suggestion to apple here http://www.apple.com/feedback/
Maybe you are looking for
-
IPhone 5s will not show in Itunes 11.3 after update
Hi Folks, Updated iTunes to 11.3.0.54 and restarted my machine (running win 8.1). Now when I dock the IPhone (5s running 7.1.2) it shows the 'Trust' prompt and when accepted, sounds a tone, then does nothing. ITunes does not show any phone connecte
-
Magic Mouse Can't connect to my Macbook Air mid 2013
Hello, Can anyone help me please? Well, I have Macbook Air 13 inch Mid 2013 and it is connected to the internet by thunderbolt to Ethernet cable, i have also iphone 6 plus and i'm sharing internet from my macbook, however, recent days it does not con
-
Unabe to start coreapplication_obips1 componenet in OBIEE 11g
This was working yesterday.. I did something today that is causing it to no longer start.. I don't know what, I have double checked the config files and nothing was changed.. Only thing I did was set up Proxy Act As.. which was working before I reboo
-
Non -OCI compatible XML to OCI compatible XML : External Punchout
Hi All, We are doing external punchout to around 60 different sites. No our problem is that more than half of them will not be able to send the data back in OCI compatible format. But they will sending us the data in the same format i.e. same for for
-
PowerPoint with Sound into iMovie
I have Power Point presentations I made with voice over recordings. If I save to QT, I lose the sound. I don't really want to have to record these presentations yet again. (I started with Keynote but the timing was off so I changed to recording with