Personnel no in maintenance order confirmation screen.

Hi,all,
If I do not assign any personnel no to maintennace work center,is it possible to get the personnel no in IW41/IW42/IW44 screen in "personnel no" field.if possible, please explain how it can be done?thanks in advance.
rgds
rajib

Hi,
Could you tell me where you will assign personnel no in work center?
As per  I know this personnel number will be assigned by HR only.
The Confirmations from, PM interface supports the transfer of order confirmations from  Plant Maintenance (PM), Customer Service (CS), and Project System (PS) to the Personnel Time Management component in the Human Resources (HR) System. Performance-based payments are effected to employees on the basis of such order confirmations.
The Confirmations from  PM, CS, and PS interface is used for confirmations entered manually in the LO System, and for confirmations collected from a plant data collection system (PDC, communication channels 2, 3, 4, 5). You can enter the confirmations for  PM, CS, PS, and PI as time tickets (hours worked). You can also enter confirmations for PP and PI as time events (start of working time, end of working time).
Time ticket confirmations from PP and PI are posted as time tickets to the HR Incentive Wages component. Time ticket confirmations from PS, PM, and CS are posted as attendances to the HR Personnel Time Management component. Processing time tickets in HR has no effect on LO.
Procedure in HR
1.Call up the account list for the employee in question.
2.Choose account list  Assigned personnel No. u2013>Create assignment.
3.Specify a time period, in which a personnel number is assigned to the chosen account.
If a new validity period overlaps an existing period with the same personnel number, both periods join to become one entry.
4.Save your entries.
Regards
Srinivas

Similar Messages

  • Order Confirmation screen setting?

    Dear SAPIENTS,
    Where is the setting for order confirmation screen setting at the level of each user?
    Regards,
    Kaushal Rai

    If you are talking about the transaction IW42 and how to set each user's settings you would use menu path Extras -> Settings, choose the appropriate Confirmation profile, and Save.  Each user will have to perform this action in IW42 to set the default screen layout.  The confirmation profiles are set up under Set Screen Templates for Completion Confirmation in the IMG path Plant Maintenance and Customer Service -> Maintenance and Service Processing -> Completion Confirmations -> Set Screen Templates for Completion Confirmation.
    Not sure if this answers the specific question, but I hope it helps.
    Regards

  • In process order confirmation screen there should be 2 rows for down time.

    hi,
    We are using cor6n for process order confirmation, where we can put down time  with confirmation text at once,
    if there is two different down time, then user has to again  run cor6n with 0 yield  for put another down time, which gets more time.
    for this reason i have customised single screen entry profile by mentioning two down time & confirmation rows in screen.
    when i going for confirmation i put two different down time  after goods movemnt order get confirmed & settled.
    but when i see report in COOISPI  there is only one down time against order.
    system only considers last down time.
    hows the system consider down time?
    thanks in advance.
    regards
    sanjay.

    Hi,
    The report COOISPI considers only one line of the down time, it is not considering the 2nd row of the down time. You need to change the COOISPI program to read the 2 lines of the down time. You need to change the standard program to read the 2 down time lines.
    Thanks & Regards,
    V. Suresh

  • Maintenance Order Confirmation in Different units

    Dear all,
    my client needs to have order confirmation in different units. That is they need to enter how much work is finished in km, piece or m3 .
    Can i do that with iw41? i know thats time confirmation but from any similar screen?
    Thanks
    JMq

    John,
    The system is hard-coded to accept UoM of TIME only
    However, it is possible to confirm Km etc with a little manipulation of the system.
    What you need to do is:
    - Create a new UoM in the IMG. This UoM need to be time-based, but call it somthing like Kmt (travel kilometers)
    - Create a new activity type for your Kmt
    - Create a new cost via TCode KP26 for your cost centre and activity type
    - Repeat steps above for other UoM
    - Test in an order
    PeteA

  • Maintenance Order confirmed to WBS element

    Hi,
    We have an issue where in a maintenance orer was confirmed to a WBS element which is has a User Status Profile Active which does not allow "Actual Activity Allocation'', "Confirm Order" etc. but still user was able to confirm Maintenance work order. How is this possible, please reply.

    I think the business process  "Actual Activity Allocation'', "Confirm Order" controled by user status should work for the project objects like the network order and the activity under the network order, but the PM order has a indirect relation with the WBS-element so it will not controled by the user status in WBS-element.

  • Process Order Confirmation Screen

    In CORK, the Shift field is coming but in COR6N the shift field is not displaying.
    can anybody tell me that do I am missing anything in customization.
    Thanks
    SD

    Dear,
    I have faced the same problem in one of my project.
    This is because the you have not  activated the business function LOG_PP_SRN_CONF  completely because business function LOG_EAM_CI_2 does not provide the 'Shift reports and shift notes for technical objects' function. Take help from Basis person.
    Also check the setting of OPK4N.
    You have defined the Customizing settings for shift notes and shift reports for technical
    objects, under Plant Maintenance and Customer Service --- Maintenance and Service
    Processing --- Shift Reports and Shift Notes
    Regards,
    R.Brahmankar

  • Order Confirm screen Problems

    Dear
    We are suppressed the fileds no remaining work, clear open reservation, final confirmation, remaining work, forcast end time, Sub operation to avoid the time wasting and requirements.
    After all these configuration we are not able to find the actual start date, actaul end date. But we found the actual time field.
    Even These actual start date fields are not suppresed. What will be the reason ?

    You have to keep the selection of Execution start date, time & execution end date, time .
    Then u will get the start date, finish date
    thenna

  • Remove Shiping Cost and Tax from Order Confirmation Screen

    Hi Gurus,
    Can anybody tell me if there is any setting to Remove Shipping Cost and Tax from Checkout Confirm Page , other than hiding from JSP page ? Also is it possible to add any other Criteria like the same with any setting ?
    Thanks and Regards,
    Tony Isaac

    Net = getHeaderValue()
    Total Freight = header.getFreightValue()
    Total Tax = header.getTaxValue()
    Gross = header.getGrossValue()
    The document header is used to get the price information and the fields are almost set in stone. Getting other pricing conditions is technically possible but need better business evaluation. Ask the question, if this is needed in a web environment.

  • Person responsible wise maintenance order

    Hi,
    In the maintenance order header screen,we maintain the person responsible (HR employee).
    I need a report to find number of orders per person responsible. I thought it would be available in IW38 but strange could not find.
    Kindly help.
    Regards,
    Smart

    I think you have it there (IW38)
    KJogeswaraRao

  • Using Manufacturer Part numbers (HERS) in Maintenance orders (IW32)

    We want to be able to allow our maintenance engineers to select the MPN's they want (material type HERS) from the maintenance order creation screen (Iw31/IW32) but we get the message CO010 Material nnnnnnnn not found in plant xxxx. Of course the HERS will not be created in MARC, however the end user should be able to select the HERS and generate a reservation for the "Firms own inventory managed material" (the ERSA).
    Any suggestions?

    We have the same problem; so far we think we have to create a custom search help and append the MAT1.
    I spent a long time searching for OSS notes but could not find any ...

  • Setting Order Confirmations via E-mail in web shop

    Hi Experts
    we have an issue, where we are able to create order from b2c application CRM 2007 , which can be accessed from CRM online. At the end of sales order creation process (Order confirmation screen), getting message "Thank you for your order. You will receive an e-mail confirmation soon."I am not receiving any email to BP. Where we have to customize weather in ECC or CRM.
    What are the configuration steps, please guide us how to create an E-mail Confirmation.
    Thanks in advance,
    Rawea

    [Check out this Wiki|https://wiki.sdn.sap.com/wiki/display/ERPLO/OutputDeterminationOverview] 
    If this isn't enough, search for Output Determination and read some of the other threads about it.

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • How to configure G/L accounts for maintenance order completion confirmation IW48.

    Hi Gurus
    When doing completion confirmation of a maintenance order material costs are being posted to Cost of goods sold account. How do I bypass the posting of material costs to this account because the same costs are being posted during settlement of order costs as well?
    Regards
    Joseph

    Hi Joseph,
    I'm not sure that Completion Confirmation if Maintenance Orders (MO) will generate FI Posting.
    Normally, Completion Confirmation will generate CO Document with Secondary Cost Element.
    But, at Settlement process of Maintenance Order (MO), it's possible to generate FI Posting depends on Settlement Rule.
    Please ensure about your inquiry.
    Thanks
    Adi

  • Reference Object Screen For Vehicle in Maintenance Order

    SAP Gurus,
    How could I display the reference object screen for vehicle specific data (O150) in my Maintenance Order. I have been able to display it in Maintenance Notification but how could the fields plate number etc defined in reference object screen for Fleet objects be displayed in Order.
    Regards,
    Muhammad Usman Kahoot

    Muhammad Usman Kahoot,
      When you create the Order from the notification, there shouldn't be a problem with the reference object screen, you should be able to see the Fleet object reference field, even if the screen reference object type for the order type is set to blank in config.
    If you are creating a order directly using transaction IW31,Make sure to assign the Equipment only reference object screen (0150) to the order type using transaction OIOA.This will bring in the fleet reference object field defined as well.
    Regards
    Narasimhan

  • Digital signature error while confirming maintenance order

    hi all,
    while i try to confirm maintenance order i m getting following error.
    "Unable to find strategy information about strategy
    Message no. SIG403
    Diagnosis
    Signature strategy has been allocated to the function you selected. However, signature strategy  has not been defined in the system. The individual signatures may be missing.
    The system does not carry out the function."
    I checked in SPRO but couldn't find any configuration related to  digital signature..
    Please suggest how to overcome this issue..
    Regards,
    Amit kushwaha

    Hi Pete,
    Digital signature is activated for the function  IW41.  AS per the SAP help i should maintain configuration  in
    " Maintenance and Service Processing >® Maintenance and Service Orders> ® Functions and Settings for Order Types --> -->Define Digital Signature for Order Types.
    I checked SPRO menu paths to locate above mentioned path. but it is not there
    Please suggest !
    Regards,
    Amit kushwaha

Maybe you are looking for

  • Apple ID password issue

    Hi everyone, Strange issue since couple of days. I have been using my apple ID for years without a single problem. last monday, suddendly on all my apple devices (iphone,ipad, imac), the password was not recognised any longer in any of the apps (iclo

  • How do I smooth out the graph?

    Hi I am using Component works version 1.1 with visual C++. I plot 3D data on CNiGraph3D control. My graph looks grainy. It looks like it's drawing a diamond at each plot point. So when the data between the adjacent points has a large delta, the color

  • Need to create 6 sub reports in Crystal Reports 2008 - Advise Required

    Hello All, I am trying to create a report with 6 sub reports in Crystal Reports 2008.Each sub-report is filtered by a filed called Error Status.Finally i need to parameterize the report based on Rec Date ( This is also i field in table from where i a

  • Wrong full-sized photos show up in "Publish to Folder" web site

    I just tried to add a new album to an iWeb-created photo albums site (hosted on my own server), but when I "Publish to a Folder...", the resulting site has some bugs. In particular, the newly-added album has two (of 16) photos in which the thumbnails

  • How do i temporalily dissable firefox to install adobe flash player

    i dont know how to TEMPORARY dissable my mozilla firefox so that i can install a flash player and then put it back so i can do things on my computer which i cand do otherewise do