Phantom assembly

I want to understand phantom assembly concept..
I have gone through sdn and find this answer to be understandable..
Phantom Assembly:
A logical grouping of materials.
A phantom assembly is created in engineering to describe a number of components and manage them
as a whole. The components in a phantom assembly are immediately placed in the superior assembly.
Components in an assembly are first assembled to produce the header material. Then header material
is placed in the superior assembly.
Example
The phantom assembly "set of wheels" contains the components "front wheel" and "rear wheel." The front and rear wheels are immediately placed in the "bicycle" assembly. The "light" assembly contains the materials "bulb" and "reflector." The light components are first assembled and then the light is attached to the bicycle.
Settings to be done:
For configurations settings goto OPPQ for maintaining the values of special.key
Special procurement key value 50 must be set in the MRP2 view of the material master.
For the materials for which sp.procurement value 50 is set the system creates the planned orders and
purchase requisitions for the components of the phantom assembly.
Regards
Mangalraj.S
But can anybody tell me, In the above where should we maintain the sp prc key 50.. In the fron wheel or in the rear wheel...
Pls explain me..

Hi,
"In the above where should we maintain the sp prc key 50.. In the fron wheel or in the rear wheel..."
For this you need to create an logican assy new mat no in MMR.ex: xxxxx for which components are rear wheel  - Rxxx, front wheel  - Fxxx ..
Assign 50 in mrp 2 view of assy xxxxx material .
now this xxxxx material is phantom assy.
when you run MRP for FG this phantom assy will get explode and dependent req will be created for Rxxx and Fxxx directly with out creating planned order for xxxxx mat..
come back futher if you have any doubt.
regards
vinoth

Similar Messages

  • Problem with Phantom Assembly

    Hi expert,
    I have question with BOM and production process. In packaging industry, At start we have 8 components for finish goods. but recently, 2 component 0020 and 0030 (example bottle cap and sticker) will issue from warehouse for assembly process before return to warehouse. then re-issue to use for finish goods.
    usually component 0020 and 0030 will convert to another component or change to semi-finish goods.i must create this BOM , Routing , and Open Production Order.and change component in finish goods, 
    if i not create BOM , Routing , and open Production Order. but create new component as semi-finish goods for item from assembly process to use in finish goods BOM as phantom assembly.
    how is my resolution, possible or impossible? , will be any problem in the future. any advise is good.
    regards,
    kittisak.

    Hi,
    There are 2 possibilities in this case.
    If you do not want to make stock of your HALB then make this as Phantom and include the assembly operations (manufacturing operations) in the header level material so that the activities will be captured at the Time of FERT confirmations.
    If you want to make a track of the stock for re issue from Warehouse then no other way.
    You should maintain it as HALB with BOM nad Routing, Pl. Order and Production Order route to capture the stocks and issue it to FERT production.
    Hope this clarifies..
    Regards,
    Siva

  • Pull list for the component of the phantom assembly

    Hi
    I am in rem process. while doing the pull list for the fianl product using Entry with bom explosion.
    i did not get the components (level 3)for 1 assembly(level 2 ) which is phantom one under the final product (level 1) BOM.
    i also maintained the production stor loc for the components and the phantom assmy.
    i check the stock in the production storage location . no stock is there in the location.
    what is the problem . how to get the component of the phantom in the pull list.

    Dear Raj,
    If your FERT contains a HALB and inturn this HALB contains say HALB1 which is a phantom assembly
    and and another 2 raw materials means,when you execute MF60 For HALB,you will get the 2 raw
    materials along with the component's of phantom assembly.
    Check and revert back.
    Regards
    Mangalraj.S

  • Phantom Assembly Reporting Point Backflush - Not able to backflush

    We are unable to generate a backflush of the assembly components of a phantom assembly.  The backflush indicator in the operation have been activated and the components involved are production relevant.
    In the material master, i believe the REM Profile has been set correctly to allow for backflushing of the asseblies.
    Am I overlooking something to have this work properly? 
    Any thoughts are much appreciated!
    Thanks All!

    Dear suntevea,
    Generally Production confirmation is not made for phantom assemblies either in Discrete or REM scenario.
    So once when you do the confirmation for the upper level assembly where this phantom assembly is used
    as a component,then at this point the good's issue(backflush) will be happening for the component's of the
    phantom assembly.
    Eg : Material A is a phantom assembly which is made up of components say B & C.
    Again material A is a component for making another assembly say X,so when you do the backflushing in
    MFBF for material X,you can see the components B & C are getting issued,which means Good's issue will
    be happening for B & C,261 movement.
    I hope you will be clear with the concept.
    Revert back if you need any further assistance.
    Regards
    Mangalraj.S

  • Planning at Phantom Assembly Level 59- Mixed MRP

    Dear Gurus/Friends
    For strategy 59 Planning at Phantom Assembly Level
    What Mixed MRP selection we have to make
    1 or 2 or 3
    Prabakaran K

    thanks iam closing the thread
    Prabakaran K

  • Phantom, Assembly, Reference Operation Set

    Hi All,
            I am always having a little confusion with follwoings, so could you please help me to understand clearly will be grateful.
    What is Phantom ?
    What is Assembly ?
    What is the difference between Phantom & Assembly ?
    What is Reference Operation Set ?
    What is the difference between Routing and Reference Operation Set ?
    At which situation Reference Operation Set is used instead of Routing in SAP?
    Thanks in Advance

    Hi Madhan,
    Phantom
    Phantom assembly is a logical grouping of material.
    Design point of view it is assembled.
    Physically not assembled, but logically it is assembled.
    Ex: CAR
    BOM Header: CAR
    Item: ENGINE
    For ENGINE: Items are cylinder, piston, crankshaft....Here engine is phantom... while manufacturing car, engine is mandatory so if u assign engine as phantom it won't create planned order for engine. We can direct issue the materials (such as cylinder, Piston, CS) to car; by that time it reduces the work of issue and receiving goods to engine assembly.
    But if u want engine as spare parts that time u can create planned independent requirement for engine and u can stock as ordinary processes...
    In material master of MRP 2 view spl. procurement key - 50.
    or Assign in BOM item - make tick mark in phantom assmbly.
    If you create in material master wherever the material, system consider as a phantom.
    If you mark in BOM, only that particular BOM, system consider as a phantom.
    There is no stocking of phantom material
    Routing and Reference Operation Set
    Refer below link
    Routing & Reference Operation Set
    Regards,
    Sankaran

  • Question regarding Phantom assembly

    Hi
    I need to raise a rpoduction order for a material A . I need to supply B and C to produce A which in turn are In House produced materials.Do I make B and C as phantom assembly and instead of raising 3 production orders i can only raise 1
    Regards,
    PradeepM.

    >
    pradeep19842010 wrote:
    > Hi
    >
    > I need to raise a rpoduction order for a material A . I need to supply B and C to produce A which in turn are In House produced materials.Do I make B and C as phantom assembly and instead of raising 3 production orders i can only raise 1
    >
    > Regards,
    > PradeepM.
    1. Hi In your case you cannot make the same since B&C are not phantom,
    2. The are real materials -  you need to procure them or prodcue them to have the C produced.
    For example - in case before you make A you assemble B + C as X and then you do some operation to get A..
    in such case your X becomes a logical grouping so you can make X as phantmo material . So when you create the demand for A the requirement will be directly passed on to B and C.
    3. Only in such condition you need to make phantom..
    i have the strucuture below.
    Parent -Mat A
    intemittennt =X
    comp1=MatB
    Comp2=MatC
    thanks andreg
    Dsk

  • Unable to View low level items for Phantom Assembly - Order created in APO

    Hi All,
    I am unable to view the sub items when I create planned orders in APO and production orders in ECC. But when the order for the same material is created in ECC, I can see all the sub items. I see that this issue is only for Phantom Assemblies.
    And I cannot say that all the items in the Phantom do not appear, actually some of them do appear in BOM explosion.
    For example:
    Pld Ord is created for A in APO
    Prd Ord for A is created in ECC
    A has B, C and F as requirements
    and  B is phantom
    B has D and F as requirements
    Then my BOM explosion shows
    ..1 B
    ..2 D
    ..1 C
    ..2 D
    ..2 E
    ..1 F (This only gives the quantity required to make A)
    But it should also list how much of F (..2 F) is required to make B.
    Where as it comes up in ECC.
    Do I need to change the material settings for Phantom or is it just the UOM that is creating an issue?

    Hi All,
    I am unable to view the sub items when I create planned orders in APO and production orders in ECC. But when the order for the same material is created in ECC, I can see all the sub items. I see that this issue is only for Phantom Assemblies.
    And I cannot say that all the items in the Phantom do not appear, actually some of them do appear in BOM explosion.
    For example:
    Pld Ord is created for A in APO
    Prd Ord for A is created in ECC
    A has B, C and F as requirements
    and  B is phantom
    B has D and F as requirements
    Then my BOM explosion shows
    ..1 B
    ..2 D
    ..1 C
    ..2 D
    ..2 E
    ..1 F (This only gives the quantity required to make A)
    But it should also list how much of F (..2 F) is required to make B.
    Where as it comes up in ECC.
    Do I need to change the material settings for Phantom or is it just the UOM that is creating an issue?

  • Removing Phantom assemblies from Demand (Ord Res/ Dep Req) & CO24

    Issue 1) I have the issue that I want to maintain Phantom Assemblies with sp procurement key 50 but I want the components in the Phantom assemblies to show as Ord Res / dep req directly to the Top level item and not to his Phantom?
    Is there any way of ignoring the phantoms in the stock requirements list.  The business wish to see demand for the procured items coming straight (or linked) to the Top level assembly.
    Issue 2) Can anyone show me how get the Sales order on the Missing parts list CO24? It is a field to be used but when I select and it comes on the layout the data is blank ?
    Cheers Milton

  • Planning at Phantom Assembly Level (59)

    SAP help says that backflush of components should be enabled and flushed together.e.g in 1st operation.
    What about serialized components?
    The backflush indicator will not be turned on and it may not be flushed together with other components.

    Dear
    Please Follow this Link as they Have Elobrated Nicely with One Senario
    Sample Senario with requirements
    [http://help.sap.com/saphelp_46c/helpdata/en/1a/c2ba89935011d1801000c04fadcb73/content.htm]
    Planning at Phantom Assembly Level (59)
    [http://help.sap.com/saphelp_46c/helpdata/en/ca/72d91b941b11d1801200c04fadcb73/content.htm]
    With Regards
    Pushpalas

  • Phantom assembly backflush

    If my header material is phantom assembly then can we backflush the phantom aeembly , not the components of that specific assembly?

    Hi,
    Why this situation arises?
    If the header material is directly flowing into the next level asembly then we can go with Phantom Material concept. The convrsion activities can be included in the higher level assembly for the phantom.
    If you want to backflush the Phantom then you need to keep the stock of it..
    If that is the case then, it is not a Phantom.
    One more thing is it is not logical to have Routing for the Phatom Matrial.
    But, in SAP, you can do what you want..(either with Customizing or source code change).
    I hope the implications are clear to you..
    Regards,
    Siva

  • Collective Orders with Phantom assembly

    HI experts,
    Required clarity on following scenario urgently.
    Material                                                Proc Type                             Special Proc
    A                                                                 E
    B(BOM item for A)                                       E                                             52
    C(BOM item for B)                                        E                                              50(phantom)
    C1(BOM item for c)                                        E                                             52
    When we are creating the production order for A,respective production orders for B and C1 is genrated.
    Now when we are confirming the production order for C1,GI of c1 to B is happening and also for C! production order it is giving the DLV status.Up to this the scenario working fine.
    But when we are confirming the production order for B,the GI for production order A and DLV status for production order B has to happen,BUt it is not happening.
    Can anyone throw some light on this. Expecting reply at the earliest.
    Thanks in advance.
    Regards
    LN

    Hi
    ritesh,
    It is not the question of control key.
    But the error is coming at the time of goods movement,we can see the description of it in "cogi".
    "ERROR IN DEPENDENT GOODS MOVEMENT."
    Because For 'c1',After confirming the order for 'C1',it will do the GR for 'C1'and GI of 'C1'to 'B' production order.
    Up to this it is working fine.But the same when I am trying for 'B'production order,After confirmation the GR for'B'is not happning And the Issue of B to 'A' production order is not happening.
    And in COGI the above error is coming.
    I want to know weather this problem occuring because of phantom assembly with collective order.
    Hope this will clear the problem understanding.
    Regards
    LN

  • PP - Phantom Assembly Alt Item in BOM not loaded in Planned Order

    Hi all,
    I have a scenario where in my finished product, I have several components organized in Alternate Group, and for each group, I define a component as Prime (100% usage) and others as Alternate (0% utilization). Among these there are some components that are configured as Phantom (Special Procurement 50), and these Phantom items, when they are Alternate in the BOM, ie, 0% Probability of Use in Alternate Item Group, it is not loaded in the list of components in Planned Order. Only the Phantom that is as Prime in BOM is showed in the Planned Order, together with their subcomponents.
    The other components that are not phantom, usually appear within the Planned Order, those that have 100% utilization, and those who have 0% utilization set in the BOM. Obviously, all requirement is pointed in the Prime Item, but I can change according to availability of material in MDVP or manually in CO02.
    When the Production Order is created directly by CO01, without conversion of planned order, the list of components typically brings all the Phantoms, independently of the Probability Use %.
    Someone tell me if there is some kind of configuration to allow the Phantoms Optional also be uploaded to the component list of planned orders without having to change the percentage of use in BOM.
    Thanks in advance.

    Hello MCantos,
    When you have maintained the usage probability as 0% for a alternative component, that means you do not want that partular material to be planned further. In short this is just an Engineering Relevant Material (is not required in Production activity).
    When this alternate material with usage probability 0% is phantom material, you want its components to be proposed. But you yourself have answered that this phantom material has usage probability 0% and this means it is not required in Production and thus its components as well are not required. Thus system is not exploding the BOM and proposing the material at the time of Production activity.
    Hope I answered your query. Please check your usage probability for phantom assembly part and if required correct the same so that you can achive what you want.
    Thanks,
    Rahul.

  • Mrp for phantom assembly

    Dear Gurus
    My main item is a phantom assembly the sales order comes for the phantom assembly only.I have got a multilevel bom for this phantom assembly .The bom of the phantom assembly contains the semifinished item. And the bom of the semifinished item contain raw materials.Now while running MRP I dont want any planned orders to be generated for phantom assembly the system should create planned order for semifinished item and purchase requisition for raw material.How can it be done.
    Regards
    Sandip Sarkar

    Hi,
    Check the Planning Stratgy: [Planning with Planning MAterial without MTO|http://help.sap.com/saphelp_erp60_sp/helpdata/en/a2/4e799a927d11d1800f00c04fadcb73/content.htm]..
    It seems relevant to you Business..
    Phantom will carry altogether different meening..
    How will you handle the Stocks??
    Regards,
    Siva

  • Component allocation of phantom assembly

    I have a phantom assembly "X" with its components as A, B, C, D. During component allocation in routing do I need to allocate Phantom Assembly "X" to an operation as well.
    Please specify the reason for YES and NO?

    Hi
    Check the following:
    Material components in a BOM that are not assigned to an operation in the routing are automatically assigned to the first operation when you create a production order.
    If you have assigned a phantom assembly to an operation in a routing, the system automatically assigns all of the material components in the phantom assembly to the same operation as the phantom assembly when you create a production order.
    If you have assigned individual material components from the phantom assembly to various operations without also allocating the phantom assembly, the system assigns the material components that have not been assigned and the phantom assembly to the beginning of the first operation when you create a production order.
    Thanks

Maybe you are looking for

  • Should I buy a macbook air wid i7 and 8gb ram or macbook pro with 2.4ghz i5 and 8gb ram

    Hii.i am planning 2 buy a macbook and i am confused between pro and air so should I buy a macbook air wid i7 and 8gb ram or macbook pro with 2.4ghz i5 and 8gb ram..I want it to be fast and my use is onli web surfing , word & excel, watching movies an

  • I have a WRT54g question

    I want to know what is the best firmware for my router? I use utorrent and limewire alot. I already know about, that your router can hang when using and p2p software since it stores connection information, which p2p programs does alot. My pc connects

  • How to reinstall old GB 1.0 (Yes, 1.0), or a workaround

    I know this is gonna sound nuts, but I'm resurrecting my son's old G3 laptop just for GB use. Original iLife install disc is damaged, and GB keeps crashing on launch.  (System is 10.5.8.) I went to Apple Downloads and did all the 1.X updates, but it

  • Shuttle example using JClient

    I need to develop a shuttle screen moving data between two view objects. I looked at the Shuttle example using UIX, but I am not sure how to duplicate that functionality in JClient. I am using jdev 10.1.2.0.0. Any help would be greatly appreciated. T

  • I'm so frustrated-Unable to download from ITunes and my entire library-GONE

    Just upgraded last night and am so mad, my entire library is gone! I also am unable to preview/download anything from the ITunes Store. I can only play ITunes radio-anyone know what to do??????