PI charactersitics in Master Recipe gets disabled.

Hi,
I would like to update the Process Instruction characteristics in a Master Recipe using Change Master (CC01) via  BDC.Now when there is a change in one of the PI characteristics, my program updates the PI characteristics in the Master Recipe via BDC by creating a new Change Master, but in case the user again runs the same program after updating the PI characterestics using  a different Change Master, all the the relevant rows are getting disabled, thereby not making it possible to either enter or modify any values in future.
Could you please let me know why this happens and how to over ride this problem ??
Thanks in Advance.
Lakshmi.

Hi
To activate ECN for Master recipe u need to set the Following
1) In OPN0 - Default values for Master recipe choose the Profile with which u want to create the Master recipe and Click on details > In the Change Parameters at bottom select "with Change Number" for Change Rule and SAVE
2) In OP5A - Select the Screen Group PP/PI/QM task lists: header screens and tick *Req * for the field Change Number (PLKOD-AENNR) and SAVE
Now when u Creating New Master recipe system will give Error if no change no assigned
Pl refer the link for more details
[http://help.sap.com/saphelp_dimp50/helpdata/en/89/a4200b461e11d182b50000e829fbfe/content.htm]
Regards
Brahmaji

Similar Messages

  • CIF Master recipe get the message Invalid BOM

    Dear All,
    I am CIFing up the master recipe,  but problem is that the CIF keep telling me that I have an in-valid BoM (Message U9107) all the BoM item are APO relevant . MRP type X0 and So on
    Help please
    Cheers,
    Kittichai

    Hi Senthil,
    All the criteria you mention are there in my master recipe,
    1. BoM Status and all the Components, based Quantity are there
    2. Comonent item are with the flow ID (APO) 4, Put product in container at start of activities
    3 all materials have work scheduling screen
    I can get the operation and header material up to APO with no problem, but all the raw materials are not possible to go up, CIF keep reporting that I get the in-valid BOM
    Any thing that i missed. ( additional information, for the PP Bom and routing, i have no problem to do the CIF)
    Thanks,
    Kittichai

  • Master recipes operations not getting transfered in SNP PDS to APO from R3

    Hello APO Gurus,
    I am trying to transfer SNP PDS for master receipes from R3 to APO.
    Issue description::
    The operation is not getting transfered correctly , some system default operation "010 generated Operation (from Planned Delive)" is getting generated in APO, also activity and resource capacity is not getting transfered. This situation exist for one plant 1000, for other plant 1100 the SNP PDS created correctly.
    i have following points:
    1. Is there some customizing setting missing on R3 or APO side  for plant 1000 tbefore SNP PDS transfer
    2. What need to be checked on master recipes data in R3,
    i have checked on below points
    1. FG Materials and all the Component Material to be in APO in a Active Integration Model.
    2. BOM & Routing and Production Version setup correctly.
    3. The Routing Operations have to Relevant to 'SCHEDULING'.
    4. Try deleting the existing Integration model for materials & re-create new IM & activate.
    Please help me to send SNP PDS correctly to APO to take heuristic run.
    Regards
    Gajendra
    Edited by: Gajendra_APO on Aug 23, 2011 1:14 PM

    Hi,
    It is good that you have given your already checked points.
    Please check the following things also and try to retransfer the PDS.
    1. Check your resource in ECC, whether you have maintained the Process formula.
    2. Check you have maintained some values in Master Recipe for processing time
    3. Check whether the resource has been transferred for your plant 1000 to APO and an active IM exists.
    4. Also check the type of the resource transferred to APO. It should be a single-mixed/ multi-mixed or bucket resource.
    Hope this will help you to solve the issue.
    Regards,
    Manimaran M.

  • How we can disable access to BOM via the Display Master Recipe (C203)?

    Hi Gurus,
    How we can disable access to BOM via the Display Master Recipe (C203)?
    Thanks!

    Hi Mae Baraquio  
    Have you tried screen variant to make it as display mode.
    please refer below document for your reference.
    Learning SHD0 with Example
    if you find any query kindly revert back.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • PI characteristics in Master Recipe

    Hi,
    I would like to update the Process Instruction characteristics in a Master Recipe using Change Master (CC01) via BDC.Now when there is a change in one of the PI characteristics, my program updates the PI characteristics in the Master Recipe via BDC by creating a new Change Master, but in case the user again runs the same program after updating the PI characterestics using a different Change Master, all the the relevant rows are getting disabled, thereby not making it possible to either enter or modify any values in future.
    Could you please let me know why this happens and how to over ride this problem ??
    Thanks in Advance.
    Lakshmi.

    Raju Garu,
    In C201 or C202 select the Phase for which you wanted to have QM, then press CtrlShiftF2 or from Menu Goto->Quality Planning->Inspection Characteristics, here you need to assign the MIC. You a control key relavant for QM in this phase.
    Regards,
    Prasobh

  • Error while changing the master recipe (C202)

    In transaction C202 (Material master recipe), I am trying to make a change but getting error message :Update was terminated.
    I am trying to change a  master recipe which contains an error. Recipe: A61234 transaction C202.
    Thanks.

    Hope, By this time you must have resolved this issue at your end. Due you know any root cause, If yes, could you please share it with us.

  • Deleting operations in master recipe of process orders

    Dear Guru's,
           I want to delete the operations in master recipe of process orders. The operation numbers are different in different process orders. This activity has to be performed on bit large number of process orders. Can anyone help me in providing the process for doing this activity in mass. Any suggestions?
    Thanks in advance.
    Regards
    Kalyan

    Dear Kalyan,
    Why do you want to delete the operations(basically phases)at process order level?
    If it's really required to execute the Shop floor activties and if the order numbers is huge in number means then in my
    understanding only a LSMW/BDC can help you,but technically I'm concerned about selecting the operation/phases for deletion
    by passing on the confirmation number or operation number for a particular process order.
    If it would be the latest operation/phase for a product means then make the changes in the master recipe so that the same is
    getting copied into the process orders in the future.
    Check and correct me if I'm wrong.
    Regards
    Mangalraj.S

  • Fb60 WHT screen get disable

    In Fb60 WHT screen get disable  even i already  make the setting  in vendor master for WHT liable how can I make enable the WHT Screen

    Hi
    I did like this:
    I checked the GL account in the vendor (the reconciliation account).
    I got the Field Status Group code: G019 (Other receivables/payables)
    Go to t-code SM30 and change view V_T004F
    Put the variant: 1000 > in my case
    Change the Field status group G019 > field Taxes
    >>> Withholding Tax Code          >>> set as optional entry
    >>> Withholding Tax Amounts     >>> set as optional entry
    With me work just fine
    Regards
    Arcturus

  • Read the valid Operation/Activity Master Recipe data using an FM

    Dear all,
    Can anyone guide me to a function module, which could read the relevant master recipe data taking the validity date into consideration. i.e. the function module should return the correct valid data based on the Key Date.
    Is there such a function module, and could anyone give an example of using this.
    Thanks & Best Regards,
    Dabre

    Hi Ravi,
    Thanks for the response, but does not seem like this FM would give me the required information, since this seems to be taking the process order number etc as the importing parameters.
    I would need to pass something like the recipe type, recipe group and maybe the recipe counter along with the Key Date inorder to get the valid operations/activities for the period.
    Best Regards,
    Dabre

  • C251-Master Recipe print list -Footnote customization

    Hi Team,
    Need experts inputs and help for addressing the below requirement .
    At the transaction C251 - Master Recipe Print list -Is there any way we can configure it to print a statement at the bottom as Company  confidentiality statement on the bottom every time this document is printed ?
    Or  do we need to achieve this through ABAP development only ?
    Thanks ,
    MK
    Even if we need to go for ABAP development , can some one advice for the effective way to get this done such that CONFIDENTIAL  is printed at each page of the C251 report print ?  Through some enhancement to the existing programme of the Tcode C251 - RCPDRK01 -can we achieve this or we need to have a Zcode  created copying the programme RCPDRK01  of C251 It would be grateful if some one could advice soon Thanks , MK
    One more point to understand is irrespective of the selection options selected at C251 , report output is same . Is it not restricted to the check boxes below checked and display only the concerned our put ?
    SELECTION OBJECTS TO BE LISTED  : here if we dont select any check box / or select all/select any : output is the same ?
    MK

    Hi
    First thing
    1)U have to create master Recipes for this recipe
    u have to create recipe profiles.
    2)BOM will be just same as it is.
    3)U have to create resource and there capacity settings.
    4)Please check the batch management is required or not, For PI it should be required and please check at which level
    5)Preparing the PI sheet and print.
    I think this is main requirement if ur going for PP-PI

  • Enabling Xsteps in master recipe and process order

    Hi experts,
    I am trying to enable the Xsteps by assigning 'Xsteps' in Master recipe profile. But Xsteps tab is not getting enabled in master recipe. I think this is the only one setting to activate Xstep. Can anybody help me on this.? IS this a technical issue(Something related to basis?)
    Similarly I dont see the Xsteps tab in process order also. Is the SAP version a reason for this. I think Xsteps functionality are available from 4.7 onwards.
    Can anybody help me on this please?
    Thanks in advance.

    Dear experts,
    I encounter the same problem of Prathib. I'm working on ECC 6.0 and would like to use Xsteps. The repository is available (R/3 Enterprise SCM Extension 2.0 is imported) and I created several xsteps but i cannot imprt them in the master recipe because the button "Xsteps" is not active in C202, even the recipe profile is correctly set to PI01_XS.
    All SAP notes i found (01466 and 607815) are referring to 4.7 and are correctly implemented in my system. So the customizing and extensions are in place, but the button "Xsteps" is not active.
    Can anybody help and suggest further settings i need to do in order to use xsteps?
    Thanks & Regards.

  • Earliest/Latest start - Earliest/Latest finish in master recipe scheduling

    Hi everybody,
    I'm struggling here to understand why only phases 0061 and 0071 have different earliest and latest starts and finishes.
    This is a very simple example with all the relevant phases being set for a 1 hr duration.
    This is a sequencial process (0011 - 0021 - 0031 - 0051 - 0061 - 0071 - 0081), except phases 0041 and 0091, which are not relevant for the analysis.
    These are the relations of phase 0061:
    And these are the relations of phase 0071:
    Any idea about what else could I check?
    Regards
    Fernando

    Hi Caetano.
    This example uses backward scheduling.
    What I don't understand is the different earliest and latest start time for phase 0071 and 0061.
    My screenshot shows a example of a master recipe scheduling having as finish date 28/03. So, following a backward scheduling way:
    phase 0091: not relevant (duration = zero)
    phase 0081: duration = 1 hour. Finish = 24:00:00 / Start = 23:00:00 (for both earliest and latest dates)
    phase 0071: duration = 1 hour. But then, latest finish = 23:00:00 and earliest finish = 22:00:00 ...
    back to phase 0051 you can see that this doesn't happen.
    Basically what I don't get is:
    If the operations have a duration of 1 hour each, why latest start of phase 0061 is 21:00:00 and the latest finish of phase 0050 is 20:00:00 and not 21:00:00 ?
    Regards
    Fernando Luz

  • Master Recipe operation / phase "Valid to date"

    I am developing a production master data report, where Master Recipe operation / phase "Valid to date" (PLPOD-DATUB) is required. I have searched in structure PLPOD and table PLPO, but not able to find this date. Please help me in this regard.
    Thanks in advance.
    Regards,
    Jack

    Hi,
    The "valid-to-date" is mainly a concept, that's why you don't find the field in PLPO; it exists in the structure PLPOD.
    The "concept" gets a value, I think only when we delete a phase with reference to a change number. The change master's  (table AENR) valid-from-date becomes the deleted line's vali-to-date.
    So, what you need to do is link PLPO and AENR via the change number, and when deletion indicator in PLPO is, I guess, "1", read the valid-from-date in AENR as your valid-to-date (logically) in PLPO.
    Hope that this helps a bit.
    Regards,
    Mario

  • Master Recipe table PLPO

    Dear All,
    I have a one issue like in Master Recipe Table PLPO Field for Activity Type LAR01 ,LAR02 ,LAR03,LAR04,LAR05,LAR06 Value
    does not get Updated even i maintain Activity type and it's value in Master Recipe.
    so from which table i can found Activity Type for Particular Operation Phase?
    Regards,
    Murari Shah

    Hi,
    Use Database MAPL with WERKS+MATNR Pickup PLNTY,PLNNR & PLNAL
    Use Database PLPO With PLNTY,PLNNR & PLNAL obtained above & pickup the required Fields.
    I hope this helps.
    Regarrds
    Raju Chitale

  • Master Recipe by LSMW

    Hello gurus,
    Is it possible to use the LSMW for Master Recipe (TCODE c201) data migration? If so, is there a document or a web site which can guide me? Please help

    Hi,
    Unfortunately, i could not found any LSMW for master recipes.
    What I have done past is in LSMW create a screen recording of C201 and use the LSMW structure to do the rest (the mapping, conversions, etc). This work very well. It may take a few recordings to get all the data loaded (one for the operation/phases, one for the material assignment, etc) but it will work.
    Or you can try with BDC For master recipe both in creation and change mode.
    hope you will find this useful !!
    Pradeep

Maybe you are looking for

  • Editable Blocked ALV

    HI,     I have created a Blocked ALV with 2 blocks.. first block is editable by the user , I want to store the editted date into my Internal table for further processing.. Kindly guide me how to do.. Plz dont give any links... all sites are blocked h

  • IOS 7 error message??

    Everytime I try to download ios7 it says error and stops almost immediately.. whats wrong? I've tried restarting my phone, that did nothing.

  • Configuring APEX in oracle 11.1.0.7.0: apex admin screen is blank

    I am trying to configure apex in a oracle 11g (11.1.0.7.0) and after running the apxconf script and unlocking the anonymous account, I get blank screen for http://hostname:8080/apex/apex_admin same behavior for http://hostname:8080/apex Any ideas on

  • ACPI error and warnings on Linux Thinkpad T430

    Hello, i found in dmesg command output on my linux 3.13 (fedora 20) running on Thinkpad T430 (2349-H2G) the following warnings/errors about ACPI tables -> ACPI FADT declares the system doesn't support PCIe ASPM, so disable it -> ACPI Warning: 0x00000

  • The back of my mac is coming of can i replace this??

    the rubber o the bottom of my macbook is peeling of can i get this fixed or replaced??