PI systems in ECC

Hi Experts
I have a requirement where I need to configure the two PI systems from two different Landscapes. Is there a way to configure the two different PI systems from different landscape. When I connect the two PI Systems, and should be able to see the conent or service interfaces in SPROXY
Please send if there is a blog available or suggest how to configure the two PI systems in ECC
Thanks for your inputs
Thanks
PR
Edited by: PR on Jan 27, 2012 11:12 AM

Hi,
To configurate an ECC with two PI, that's not an issue when you exchange Idoc, because in ALE configuration you determine which Partner (logical system) you want to use to send/receive an idoc. So easy to do.
but with proxy, if I'm not wrong, as in SXMB_ADM of ECC, under "Integration Engione Configuration", you can precise only one parameter "RUNTIME > IS_URL = dest://INTEGRATIONSERVER (for instance)" with INTEGRATIONSERVER which coresponds to the RFC destination (e.g INTEGRATIONSERVER) to be used to reach the Integration Server you want to use (e.g PI)... and as you can see, there is only one entry!
So I don't think it's possible to have one ECC linked to Two PI for abap proxy exchanges.
Regards.
Mickael

Similar Messages

  • Stock value is not getting updated in APO system From ECC automatically

    Hi All,
    Stock value is not getting updated in APO system From ECC automatically but if we do it manually from transaction CFM2 it will get updated.
    for this we are using EXIT_SAPLCSTK_001.
    I am using VL10A for delivery and VL06G for PGI
    I have also checked integration model for material and stock.
    Please help me out as it is very urgent.
    Thanks,
    Gaurav Mittal
    Edited by: GAURAV MITTAL on Feb 6, 2008 6:09 PM

    Hi,
    for transferring the stock data from R/3 to APO automatically, you need to have the integration model for material and stock activated.
    please check the same.
    if this does not help, let me know in detail the steps which you are following..
    Ram

  • Data Migration from Legacy system to ECC systems via ETL through SAP PI

    Hi All,
    I wanted to know if we can migrate the data from Legacy systems to ECC systems via PI.
    What I understand is there is ETL tool is used to extract the data from legacy system, and what client is looking to load that data via PI?
    Can we do that ? I am concerned because this will involve mass data?
    If I have to use PI , I see option of  PROXY / IDOC /FILE as receiver in ECC system (take the data from ETL)?
    Can somebody has done this earlier , please share the approach.
    Thanks,
    Pushkar Patel

    Hi ,
    I require few details from you.
    1. What ETL tool you are using, If Informatica, it already have PowerConnect to connect to SAP. So you can create source and Target Structure and also you can use RFC's to send data to R/3. Else, for other ETL tools, can you prepare RFC's or any other way to send data to R/3. let me know the tool.
    2. Does R/3 contains the master data tables? If yes, then try to use LSMW for Mass upload of data to tables.
    If your client don't want to use either of these options please elaborate, what is the case.
    Regards
    Aashish Sinha

  • How Many systems like ECC and BI can connect to EP server

    Dear experts
    I want to know ,how many systems can connect to one EP server,like ECC dev,qty and prd ,and BI dev,qty and prd with JCO and SSO connection...can you please clarify
    Thanks in advance
    Regards
    krishna

    Hi Krishna,
    The best practice is to have separate systems for Development, Quality Assurance and Production.
    Suppose you have One EP system, One ECC system, One BW System and One SRM system.
    Then your landscape should be designed as stated below.
    Development Environment:
    Here you work on new developments/bug fixes and enhancements.
    One EP System, One ECC system, One BW System and One SRM system.
    And all these systems must be connected to EP system.
    All of the above systems must reside in same domain.
    QA Environment:
    Here testing is done by testers/business.
    Once you complete development and unit testing you have to transport those objects to QA system.
    In this environment you have maintain all the systems similar to Dev Environment.
    Production Environment:
    This environment is for end users.
    It should contain all the above said systems.
    Here strictly no development/testing is not allowed.
    Objects are transported from DEV> QA>PROD.
    Regards,
    Nagireddy.

  • Determine linked SRM system in ECC

    Hi All,
    I need to be able to determine the linked SRM system from ECC in order to call a function module in SRM to return the URL for SRM to ECC to allow a workitem in ECC to contain a link to SRM.
    Table BBPC_RFC_DEST seems to hold a link but I've never seen this table used, does anyone know what this table is used for? The config help says:
    Definition of RFC Connections for Resource-Related Billing
    Use
    In this IMG activity, you define which connected SRM Systems are relevant for resource-related billing.
    Enter the logical system and the RFC destination.
    Requirements
    The connected SRM System must be Release 5.0 or higher.
    but would populating this table alone activate something else?
    Alternatively does anyone else have any other suggestions for retreiving the URL for SRM from ECC other than creating a custom table to hold the information.
    Regards
    Chris

    Hi all,
    perhaps I need to clairfy my question.
    I know how to find the URL in SRM, my requirement is to be able to work out the URL of the linked SRM system from within ECC.
    I have a couple of ideas such as call a function mdoule in SRM to read the user arrtibutes which will give me the URL for system. To do this I need to first determine the RFC destination for the linked SRM system, I think I can do this by populated table BBPC_RFC_DEST in ECC. However I sdon't know if popualtign this table in ECC will have any other implications?
    Does anyone know what the implications of populating table BBPC_RFC_DEST in ECC arE?
    or does anyone have an alternative soltuion for determining the URL for the linked SRM system from within ECC?
    Regards
    Chris

  • Partner profile to send Idoc to PI 7.4 system from ECC

    Dear Experts ,
    Do we need a partner profile to send Idoc to PI 7.4 system from ECC.
    or Just Port on TRFC is enough ..?
    if i need to create a Partner profile ...how to define a logical system and how Assign Logical System to Client... when there is no client for JAVA only PI system ..?
    thanks
    Shakif

    Hi Mohamed,
    You need to create a tRFC port on sending ECC system. The RFC destination selected in this port os the one created for IDOC transfer.
    Also you need a logical system, use client 000, i.e. PI1CLNT000.
    At last you have to create a partner profile to define the IDOC type used.
    Best Regards
    Harald

  • Technical upgrade from 4.6C MDMP system to ECC 6.0 using CU & UC approach

    Hi SAP Experts,
    We are embarking on a project for Technical upgrade from SAP R/3 4.6C MDMP system to ECC 6.0 using the CU & UC approach for our Asian operations (comprising of India, Japan, Taiwan & Singapore).
    Please share with me the Best Practices you followed in your projects, checklists, DOs, DONTs, typical problems you encountered and the possible safeguards, any other useful information, etc.
    Since very little information is available from Organizations who have used the CU & UC upgrade approach successfully, I am raising this in SDN to share your experiences during the Technical upgrade.
    All useful information will be surely awarded with suitable points.
    Looking for your invaluable inputs which will be a BIG help for our project.
    Best regards,
    Rajaram

    Hello Rajaram!:
    It's a very big project, that you have to do in a lot of steps........
    If you want sent me a email with the problems and you want.
    Regards,
    Alfredo.

  • Refreshing R/3 4.7 system from ECC 6.0 system

    HI Experts,
    We recently upgraded the system from R/3 4.7 (BASIS release 620) to ECC 6.0 (BASIS release 701). For one of the test system, a cross version refresh was performed. (Sandbox system was in 4.7 and production system is ECC 6.0).
    When the refresh was completed, we were not able to login in 000 client using any of the user ids including the standard ones. Seems like all the user ids were deleted in 000 client. Then we changed the sap* login parameter and restarted the system to reset the SAP* login. Later the user master was imported from production system to test system's 000 client.
    Are there any special steps to be carried out to prevent the above said incident?
    What are the special steps that needs to be taken care of in the scenario of 'cross version' refresh.
    Please let me know your inputs on this.
    Thank you.
    Balaji Singh

    Hi Mark,
    Yes the SAP Kernel was replaced.
    OS - HP UX B.11.31
    DB - ORACLE 10.2.0.4
    There were no issues during the start of DB, appl after refresh. We imported the User master in the productive client that was backed up before refresh and imported the same after refresh. coincidentall, after the import of user master in productive client, this particular issue occurred in client 000. could this be a reason for deletion of user master tables in 000 client?
    Regards,
    Balaji Singh

  • Requirements for SAP Document management system in ECC 5.0

    Hi All,
    Can any one provide me the requirements for SAP Document management system in ECC 5.0.
    SAP Component   ECC 5.0
    OS    Solaris 5.9
    DB    Oracle 9.2.0.7
    Thanks in advance.
    Regards,
    Surendra
    <removed_by_moderator>
    Edited by: Juan Reyes on Aug 6, 2009 12:49 PM

    That info is available either at http://service.sap.com/pam or http://service.sap.com/quicksizer
    Please do some research before posting
    Read the "Rules of Engagement"
    regards
    Juan

  • SLD connection need to made for the ECC apps system or ECC DB system

    hi Friends,
    We have installed the ECC 6.0 . But the ECCAPP is installed in one system and ECC Database is installed in different system.
    So , From portal we are planning to run some webdynpro iViews. Which are required to connect the ECC system for getting the data. Please let me know should i prepare the SLD connection for the ECCDB system or ECCAPP system.
    Regards
    Regards

    Hi,
    You can very well create SLD system for ECCAPP and internally it will connect to the database. direct database connectivity is not required in the SLD.
    Regards,
    Sanjeev Mourya

  • Need information related to Hookup of Portal System to ECC system

    Hi all,
    I need to hook up my Portal-NPX system to ECC PRD system.
    Could someone please let me know the procedure to follow in order to create the connectivity between them.
    My Portal Version is 7.01/SP3
    My Backend system is ECC6.0/EHP4/SP6
    Database is Oracle.
    Solaris OS.
    Thanks,
    Sandeep

    Hi Sandeep,
    Please follow below links:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e09b3304-07d8-2b10-dbbf-81335825454f?QuickLink=index&overridelayout=true
    http://wiki.sdn.sap.com/wiki/display/EP/8EstablishSingleSignOnbetweenPortal%28frontend%29andESS6.0%28backend%29
    http://www.sap-press.de/download/dateien/1618/sappress_content_integration_sap_netweaver_portal.pdf (Go to Page 347)
    Thanks.
    Sushil

  • Data migration from 4.7 system to ECC 6.0

    Hi All,
    I am a Solution Architect. Currently working on a typical pursuit requirement. the requirement is as below:
    One of our customer is currently on SAP 4.7 system.  Their current system is shared by 2 companies & the companies got demerged now. Hence they are palnning for fresh ECC 6.0 implementation & migrating Master data & transactional data related to this customer from the current 4.7 system to ECC 6.0.
    I am seeing possible way for data migration is through ALE or LSMW. But I am not confident about the execution plan & process.
    I would wish to know from you people is:
    1. The different methods to do data migration from 4.7 to ECC 6.0 with pros & cons
    2. How to plan for data migration
    3. Risks & mitigations during data migration
    4. different kind of skill set & duration required to accomplish this requirement
    Currently we are planning for 6 months for the ECC 6.0 core modules implementation.
    If you have undergone this kind of project then request you to share your experience. Any information on this regard is appreciated.
    Thanks & Regards,
    Suresh

    Hi
    Go through eh below link for Best Practices
    http://help.sap.com/bp_hcmv1600/HCM_US/HTML/master_data.htm
    [Risk Factors|http://www.informatica.com/INFA_Resources/article_sap_netweaver_mag_data_migration.pdf]
    [Different Methods|http://www.sap-img.com/general/what-are-the-methods-to-migrate-data-from-a-legacy-system-to-sap.htm]
    [Best Practices|http://partners.netapp.com/go/techontap/NGS_migration.pdf]
    Regards
    Pavan

  • Encrypt data send from a non-SAP system to ECC.

    Hi,
    We are tryign to encrypt the credit card details send from web (non-sap system) via a xml file to ECC.
    From Basis side, I have exported the public key from the ECC for the web server to encrypt the CC details while sending via xml.
    The external web consultants encrypted the cc detail with the public key and send it via xml but that was not able to decrypt at the ECC side.
    The developers were using the FM 'CCARD_DEVELOPE'at ECC to decrypt the data in the xml file. It was saying SSF error: No data transfered.
    Meanwhile SAP CryptoLib is installed and credit card encryption/decryption is working fine for CC details entered via GUI interface.
    Is there anything I am missing out here to encrypt CC details send from a Non-SAP system to ECC.? Do we need to load the SAP cryptolib in the non-SAP system to ecrypt this data at the senders end. Or is there a alternate solution for this ?
    We are in ECC6.0/RHEL/Oracle10204.
    Appreciate your help.
    Thanks

    Hi Nelis,
    Thanks for your reply.
    This note does not get any information regarding encrypting data from a non-SAP system to SAp system.
    I am looking setup/information for encrypting data from a non-SAP system to SAP system.
    Thanks

  • Can UCCHECK be performed on already UNICODE migrated system during ECC upgr

    Hi there,
    Can UCCHECK be performed on already UNICODE migrated system during ECC upgrade?
    If NO, why? What is the technical reason?
    Prakash

    Hi,
    first unicode means
    Unicode is a 16-bit code to represent universal character set, which is used to facilitate a better exchange of data between different systems.
    for uncheck
    The transaction UCCHECK is used to find Unicode related issues. You can use transaction UCCHECK to examine a Unicode program set for syntax errors without having to set the program attribute "Unicode checks active" for every individual program. From the list of Unicode syntax errors, you can go directly to the affected programs and remove the errors. It is also possible to automatically create transport requests and set the Unicode program attribute for a program set.
    why you are checking second time.
    Regards,
    Madhu

  • Migrate BSC to BW based system to ECC system

    Hello all,
    We have very unique situation.
    We implemented BSC (Balance Score Card) in BW system. but we have to stop use current BW system. and only we can use ECC 6.0. I'd like to implement BSC in ECC and migrate all previous history date to ECC 6.0.
    Does anybody know how to migrate BSC data from BW based system to ECC based system?
    Thank you,
    Jeongbae Min

    What you should do is doing the following:
    1. In R/3 create a transport request.
    2. Include freely selected objects and select all odjects of type OSOA (Active Datasource).
    3. Transport it to R/3 QA.
    4. Connect QA to BW and replicate the data sources.
    5. In BW Transport Connection collect all Transfer rules (only necessary objects).
    6. In the source system mapping (F8 in the transport connection) map source system R/3 DEV to R/3 QA.
    7. Import the BW transport request into the BW DEV. Now you should get a QA transfer rule for each dev trasfer rule.
    I didn't try this out but it should work this way. Maybe you start and try it with one Transfer Rule.
    Best regards
       Dirk

Maybe you are looking for

  • How to diagnose a broken 30 pin dock connector?

    Is there a "diagnostic" application to determine if my Iphone 4 - 30 pin dock connector is fully functional? BTW - all lint and dirt has been removed (delicately). This iPhone has been able to perform TV/video out and mirror display with a (still) fu

  • G/L Balance

    Hello G/L a/c 100101 Main Cash book as on 31.03.2008 balance Rs. 50500 Dr Our client requirement is the transaction details of last day of month as per line item wise along with previous day cash or g/l a/c balance i.e. on 30.03.2008  G/l or cash bal

  • Warnings with objective C protocols

    I can't work out how to post code here without the formatting going all screwy, so here's an English description. I have a formal protocol declaring "MyFunction". I have a class heirarchy, and an object which is an instance of something in that heira

  • Aperture on a Dual 2 Ghz G5?

    What is the performance of Aperture on a Dual 2 Ghz G5? It is outfitted with the GeForce 7800GT video card and currently has 2.5GB RAM. I plan on updating to 4.5 shortly. Will the RAM upgrade speed things up? I have downloaded the trial and w/@1000 D

  • Problem with regex being used to filter filenames ...

    I wrote a simple FilenameFilter that takes a regular expression (String) in it's constructor. It uses that regex to determine which files to return when a directory is read using the listFiles(FilenameFilter) syntax. The problem I'm having is probabl