Pipe line material - complete process

Hi,
Can anyone provide me the complete process for pipe line material..
ie. frm mmr to invoice setlement.
thanks in advance..

Hi,
For Pipeline Process,
1. Create Pipeline Material under material type PIPE
2. You need to maintain the Pipeline Info Record in ME11. Here maintain the Prices and Tax Code mandatory
Also in SPRO > Enterprise Structure > Assignment > Materials Management > Assign standard purchasing organization to plant
There will not be any PO and GR Process for Pipeline materials. We consider that materials are available via Pipes in our plant and we have tp directly book consumption and then settlement of the same.
If Stock is directly consumed from Pipeline Stock via 201 P or 261 P via transaction MB1A or MIGO then following FI Entry will appear;
(GBB-VBR) Consumption Account - Dr
(KON) Pipeline Liabilities - Cr
Now do Pipeline Settlement in MRKO. Here you can not change the Invoice Value. Here following FI Entry will appear;
Vendor Account - Cr
Pipeline Liabilities - Dr
Prerequisite for MRKO: -
- Maintain condition record for output type KONS in MRM1
Then take printout of the Settlement Document in MR91.
Also refer following link;
[Pipeline Handling 1|http://help.sap.com/saphelp_46c/helpdata/en/fd/45c3fe9d6411d189b60000e829fbbd/content.htm]
[Pipeline Handling 2|http://help.sap.com/saphelp_erp2005/helpdata/en/4d/2b926443ad11d189410000e829fbbd/frameset.htm]

Similar Messages

  • Pipe Line Material Scenario- interesting

    Hi Gurus,
    I have a very genuine scenario but not getting any SAP standard solution.
    Scenario is, my plant A (power plant) is producing material POWER as FERT  and my another plant B  consuming ELECTRICITY as pipe line material. So having two plants (different company code) & two material codes.
    Now I can consume ELECTRICITY as pipe line material in production order as non stock material and invoice is generating which I can forward that to my Power Plant but in Plant A which is producing POWER I donu2019t have means to reduce Stock.
    My Q is
    How can I consume or reduce stock in plant A? With reference of invoice is it possible?
    It looks me genuine situation of Customer and vendor where, customer is having Pipe line material in its R/3 and Vendor is declared it as finished product in its R/3. So isnu2019t we have any standard process to address this business situation.
    thanks in advance

    Hi,
    Refer the thread in which the sap experts discussed on the similar issue in detail, after going thro this  hope you will understand easily how you should map your scenario
    Re : Power and steam
    Pipe Line Material Creation
    Re : How to consider Power and Steam in power plants and paper mills
    ch pavan

  • Pipe Line Material Creation

    HI
    can we creatte process order for pipe line material for example electricity/steam. and can we create pipe line material without info record mean without any vender detail.
    Regards

    Dear Mr.R.Brahmankar,
    This is my problem also i will explain you  the scenario
    In Industrial Battery manufacturing The electrolyte is a material  (Like Potassium Hydroxide and sulphuric acid )which  are produced with  a certain concentration% in acid reactors in-house and used in Battery manufacturing heavily.
    We have assigned these materials thru Activity types in-spite of the requirement of pipe line material. Can we assign this materials which are produced in house (but Category similar to pipe line materials)as pipe line materials in BOM and what would be the Impact on the system.
    Pavan

  • Production order with pipe line material

    Production ordre created and got confirmed  and found pipe line materials got stuck in COGI and on analysis found in that specific ordrer ordre pipe line material are not activated with special stock key indicator i.e. 4.
    Due to this it got stuck in cogi and for the same material created an order and found there is a allocation and  activated with special stock key indicator i.e. 4.
    Help me to resolve the existing Goods issue from COGI and cause of not activated with special stock key indicator i.e. 4. in production order.

    Dear ,
    did the pipe line material is showing in  production reservation  as one of the BOM compoenent?
    If it is the case , then cancel the confirmation in CO13 and try to connfirm the operation with Clear Reservation Option .
    Refer the below thread which may help you to figure out the issue :
    Re : How to consider Power and Steam in power plants and paper mills
    Re : Power and steam
    Regards
    JH

  • QM for Pipe line Material

    Hi Experts
    Scenario: We have water as Pipe line material. We have activated 89 inspection type & user is creating manual Inspection lot for the same.
    Since this is a Pipe line material, there will not be any PO, GR so no inspection lot at GR. We do the GI with 201-P against the cost centre & vendor.
    So my requirement is that, can it be possible to somehow create the inspection lot at the time of above GI OR
    Any other way to create the inspection lot apart from creating it manually by Inspection type 89?
    Looking forward for the favourable reply
    Thanks
    Sachin

    Hi Sachin,
    For 201-P u can have GI inspection type 02.Again it is not a stock relevant like 89.
    Regards,
    Nitin

  • Pipe line material not inventorized

    Hi,
    While running pipeline scenario , when i did GI with Mvt 201 P...System allowed me to do this transaction...
    As i do not have any stock for this Material "X" (Material type as PIPE). Then how did system allowed me to issue this material...
    I know PIPELINE materials are not inventorized, but my question is WHY system did not asked that stock is not maintained for this material.
    There should be some logic behind that?
    Utsa

    Hi Utsav,
    Read documentation available on sap help website for clarifications.
    >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm
    >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
    Pipeline Handling  
    Use
    A pipeline material is a material that flows directly into the production process from a pipeline (for example, oil), from a pipe (for example, tap water), or from another similar source (for example, electricity).
    A material from the pipeline is always available; i.e. it can be withdrawn from the pipeline at any time and in any quantity.
    Depending on the system configuration, a material can be withdrawn only from the pipeline or, in addition to the pipeline, normal stocks of the material can also be managed.
    Materials with Material Type PIPE
    Pipeline handling is mandatory for materials with material type PIPE; i.e. only withdrawals from the pipeline can be posted for these materials.
    These materials have the following characteristics:
    They are neither procured nor planned. They can be withdrawn from the pipeline at any time and in any quantity.
    They are not stored or kept in stock. No physical inventory is taken.
    Pipeline movements are mandatory in all valuation areas; i.e. no other goods movements may be posted.
    Other Material Types
    For each material type, you can specify in the valuation area whether pipeline movements are:
    Mandatory
    Allowed
    If pipeline movements are not mandatory but allowed, the material can be kept in stock and both pipeline and other movements can be posted.
    A material of this type can be withdrawn from your companyu2019s own stock, from consignment stock, or from the pipeline.
    Activities
    Pipeline Withdrawal
    You can enter a pipeline withdrawal for an order or for a cost center. Pipeline withdrawals differ from other goods movements in that they are entered with the special stock indicator P.
    The withdrawal is valuated at the price defined in the pipeline info record.
    A withdrawal from the pipeline results in the following updates in the system:
    The pipeline withdrawal results in a vendor liability that must be settled periodically in a similar way to the management of consignment stocks. In the standard system the same account is used for both pipeline and consignment liabilities, but a different pipeline liabilities account can be defined in Customizing.
    A consumption history is kept.
    The pipeline withdrawal has no effect on existing warehouse stock or on the availability of the material.
    Posting Goods Issue from the Pipeline  
    A withdrawal from the pipeline is posted as follows:
    From the Inventory Management menu, choose Goods movement ® Goods issue.
    Maintain the data on the initial screen. Choose Movement type ® Consumption ® To cost center (or To order, To network, All account assignments) ® From pipeline (Movement types : 201 P, 261 P, 281 P, or 291 P)
    On the collective entry screen, enter the account assignment. Enter the items.
    You do not have to enter the vendor as this will be found automatically by the system.
    If more than one vendor is possible, a pop-up window appears with a list of pipeline vendors, from which you can select the vendor you require.
    Post the goods movement.
    Updates
    A withdrawal from the pipeline results in the following updates in the system:
    The pipeline withdrawal results in a vendor liability that must be settled periodically in a similar way to the management of consignment stocks.
    A consumption history is kept.
    The pipeline withdrawal has no effect on existing warehouse stock or on the availability of the material.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm
    regards,
    Uzair
    Edited by: Mohd Uzair Hussain on Jun 22, 2009 11:01 AM
    Edited by: Mohd Uzair Hussain on Jun 22, 2009 11:02 AM

  • New scenario - pipe line material - steam

    hai friends .
    Please guide ..Client wants to capture activity type "per MT" . please  inform in case this activity is created, how we can capture the quantity confirmation . Normally machine hours is used.
    2. Can we take material type PIPE as BOM component. Here different water consumptions are taken for the FG material costing.
    3. How steam and power consumptions are posted between plant to plant.

    HI RS
    you can maintain steam consumption  in standard value key and activity in work center. and if u are working in the REM scenario then you can define the consumption of steam per Mt basis in routing.siliarly activity can be assigned to in cost center tab and can be taken in to cost estimate.
    plz revert if it works
    Regards
    Anupam Sharma

  • Pipe line material

    Hi all
       Am attaching material type pipeline in sub contracting BOM.So, when am taking GR (MVT Type 101) for sub contracting part number, system is issuing message the mesaage is
                             Components cannot be withdrawn from special stock P
      Kindly guide me to solve the above error
    Thanks & Regards
    P.Srinivasan

    For M/T 101, 'P' stock is not included in possible stock indicators. Try using m/t 201 to GR the material.
    201 Goods receipt for a cost center
          The goods can only be withdrawn from unrestricted-use stock.
          Possible special stock indicators:
              o K: Goods withdrawal from
              o consignment stock
              o P: Goods withdrawal from pipeline
          If you have withdrawals from consignment stock and from pipeline, payables to suppliers ensue.
    For details about M/Types, check SAP help at http://help.sap.com/saphelp_40b/helpdata/ru/fc/6cec6eb435d1118b3f0060b03ca329/content.htm

  • PO For PIPE Line

    Dear All,
    I have a pipe line material. Now for this how to raise a PO.
    Steps invloved in PO.
    Regards,
    Pardeep Malik

    Hi,
    1. You can create a material with PIPE material type or else you can use any material type but that should allow pipeline process.
    2. You should have Inforecord for the material with valid conditions, price will pick only from inforecord.
    3. If requied you can maintains ource list or else you can select during goods issue.
    4. From the Inventory Management menu, choose Goods movement ® Goods issue.
    Maintain the data on the initial screen. Choose Movement type ® Consumption ® To cost center (or To order, To network, All account assignments) ® From pipeline (Movement types : 201 P, 261 P, 281 P, or 291 P)
    5. On the collective entry screen, enter the account assignment. Enter the items.
    You do not have to enter the vendor as this will be found automatically by the system.
    If more than one vendor is possible, a pop-up window appears with a list of pipeline vendors, from which you can select the vendor you require.
    Post the goods movement.
    Regards,
    Prabu

  • Auto GR creation against PO after consumption of material in Process order.

    Hi GURU's
    My client is asking about automate GR against Purchase Order when he confirm the porcess order of GR consume material means when he confirm the process order, the GR is created for the comsume material( GR must be equal to consume qnty) against Purchase Order.
    1) Is thier any material type issue
    2) what are the setting need to be done
    Please take an Urgent action bocs its a critical point to me solve.
    Hope for the best for ur response.
    My ID:- [email protected]
    Thansks in to all
    Parminder

    Hi Guru's
    My Requirment is...............
    Suppose I have material  X (GAS) type ROH.
    I have already made  a monthy base Purchase Order this.
    We Get GAS through Pipe Line.
    stock my be vary( zero or some stock)
    my question or requirement is when I create a Process Order for Material Y where this Material X is consumed ( 261 Mov Type).
    When I confirm the Created Process order for Material Y(suppose 20) & require quantity of X for this Material Y is 40 & we have no stock or may be less than the require quantity at this time system check the availability & Generate GR for this material X against Related Purchase Order or If have Multiple Purchase Order then ask for Purchase order selection & then post the Confirmation (GOODS Movment).
    Hope u understand my requriment ,Please suggest
    Thanks
    Parminder

  • Error reads as "no stock in returns, line has been processed check mb51"

    Hello Experts,
    I am getting an error "no stock in returns, line has been processed check mb51" while processing the returns delivery and no material document exists in MB51 after PGI. Can anyone suggest whats missing or wrong ? 
    regards, sunny

    Hi,
    Go to VL02N and check the Goods Movement Status for the Delivery under "Status" Tab. It should be C i.e. Completed. If it is not then PGI has not been done for the delivery so first do PGI and then try for Returns.

  • Unable to see pipe line steps in the SXMB_MONI

    HI,
    i have done the development and quality work for my p i7.1
    i was testing the messages in the Quality System.
    So i went to SXMB_MONI to see the messages.
    After double clicking on the  successfully processed message, it shows
    pipe line steps.
    in that I am able to see
    1.inbound message(CENTRAL)
    2.XML Validation inbound channel Request
    3. call adapter
    4. Response
    but i am unable to see
    1. Receiver Determination
    2. Interface Determination
    3. Receiver Grouping
    4. Request Message Mapping
    5. Technical Routing
    whereas  in the develoment system i am able to see the above all.
    is there any configuration i have to do in the SXMB_ADM?

    can i know that   Configuration objects were created/ imported by using transport mechanisum?
    if created ,
    check the cache status and re activated those objects whatever u r posted in thread.
    if transported :
    u ll follow ,whatever posted by Earlier

  • Material Reservation Process for Work Order

    I am new to the Plant Maintenance work order and material reservation process.
    Here is my scenario:
    I create a work order with a material that is maintained in WM and IM.
    Reservation is created.
    I got to MB26 to post goods issue
    Once I do this I see the qty of material moved as a negative amount to storage type 914 in IM (LS26) and stock removed out of WM (MMBE).
    Is this where the business process stops?
    Do I ever remove the stock out of 914?
    Does the material go from 914 to 916 and then get cleared out of inventory?
    Thank you

    Check [thread|PR Marked for deletion after Business Complete]  and [search|http://forums.sdn.sap.com/search.jspa?threadID=&q=PR+deletion&objID=f159&dateRange=all&numResults=15&rankBy=10001]
    -S.N

  • Share won't complete processing to burn sequence to DVD

    Share has gotten to 4 min. 39 sec. processing time left and just frozen three times.  It worked on the last two sequences I burned from the same project.  Is there something in the sequence that is causing it not to complete processing  and burn the DVD?

    Actually, I'm not sure it's extremely rare.  I'm pretty sure most Hollywood movies are encoded at 24p.  The issues of a sequence containing mixed frame rates are serious, but if all your material is 24p, there's no reason not to use it as far as I know.   I had always understood that when you encode 24p material properly it stays 24p and it's the player that adds the pulldown.    If I'm wrong, please clear this up. 
    Thanks,
    Michael

  • Delivery Status in VBUP/VBUK is showing as 'C' completely processed though

    Hi All,
    Delivery Status in VBUP/VBUK is showing as 'C' completely processed though invoice for the delivery is already cancelled, and delivery in document flow says being process. So now I cannot invoice this delivery. Is there any utility to correct the VBUP/VBUK status from 'C' completely to 'A' Not yet processed  As I belive SDVBUK00 is to update the VBUP/VBUK status from A to C only.
    Please help...

    Try using SD_ACTUAL_OPEN_DATA_RESET & SD_ORDER_SUBSEQUENT_ALLOWED FMs to change the values in VBUK table. I have not used it myself but i think this would be of some use to you.
    Regards,
    Mani

Maybe you are looking for

  • Creative MediaSource setup.exe ha

    I downloaded CMS_PCAPP_LB_3_30_2.exe and tried to install it. After doing CRC checks and downloading some files, the setup program hangs. I see it on the taskbar, but all of the options (Move, Size, Close, etc.) are grayed out, and the Task Manager l

  • Can I keep BootCamp as is and upgrade from Tiger to Leopard?

    Just about to move to Leopard, and wondering if I can just leave my BootCamp as is and will it work with Leopard. I've got BootCamp 1.3 and will upgrade to 1.4 - but then want to install Leopard. OK I'm guessing I can leave it and then install the ve

  • Disk Utility - Time Machine & iCloud

    I don't understand why Disk Utility doesn't automatically run Verify & Repair after a resizing a disc partition.  This simple failure on my part (unGENIUSness) lead to additional failures on when I tried to run TIME MACHINE.  Time Machine never stopp

  • Photoshop & Bridge not talking

    I have Windows 7 and a full membership to Cloud - all software. For the past week, since the last update of Cloud Desktop, Photoshop requires licence validation every time I start my computer (which is taking a lot of time and shouldn't happen) and e

  • Blackberry desktop software cannot communicat​e with the connected device for the playbook

    Hey whats up..... I'm new to the playbook and I'm having serious problems trying to connect my playbook with the blackberry desktop software. when i tried connecting it, a small windows popped up, saying "blackberry desktop software cannot communicat