PIR reduction during goods receipt for strategy 10

Hi Experts,
I am using the net requirement planning strategy. i.e strategy 10. My requirement is I wanted the PIRs to be reduced when do goods receipt for the production orders.
I know this is possible in strategy 11. But how how do it in strategy 10.
Regards
Prathib

Hi Ayethebing,
What you mentioned in correct. System may do the wrong net requirement calculation. Let me explain what is my requirement.
I have planning plant, where I get the sales orders and the PIR from Depots. And the production for all these quantities should be done in production plant. I need to do the goods receipt in the production plant itself first and do a plant to plant material transfer to planning plant.
But all the control of production should be with production plant. So I cant use the production in alternative plant because in this case i need to convert planned order in planning plant and while doing goods receipt the stock directly updates in planning plant.
So I was thinking of loading the PIRs in the production plant directly and use strategy 10. But since the sales orders wont come to production plant, the PIRs wont recduce at all. So thought of thinking about reducing PIR during goods receipt.
But I realized from what you explained, it would lead to wrong PIR calculation. Full mark to you.
Now Iam thinking the solution in a different way. Please give me your inputs
Iam creating a recusrive BOM in planning plant and I will assign special procurement key 70. i.e withdrawal from alternative plant. I will assign alternative plant as production plant.
So when I run MRP in planning plant for the main product, I will get dependant requirement created in the production plant for the main material as I created the recursive BOM in planning plant.
But Iam having only one issue to be resolved here as I understand. The planned order created in the planning plant during MRP is convertible.  Can I make it non convertible some how even if Iam having bill of material?
Thanks in advance for your valuable inputs
Regards
Prathib

Similar Messages

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Serial data tab page missing during Goods Receipt for Mvt type 501

    I have created and asigned the Seria data profile in plant data/Storage 2 of the material master record. Now i want to do the Goods receipt of this material with Mvtr type 501 w.r.t any documents for 5 no's and want the serial number to be createdment. I also have made relevant settings for automatic serial number and equipemnt number synchr, but wen i m in MIGO--Goods Receipt OtherMvt type 501 and enter, the serial data tab page is missing..
    How can I activate this tab page....Any steps missing....
    Can some one throw lights on this.....
    Refered relevant threads but not much useful to my query....
    Thanks
    Murad Shaikh

    Try 501 with MB1C, OR
    Check through Path SPRO -> Sales and Distribution -> Basic Functions -> Serial Numbers -> Determine Serial Number Profiles -> Select Profile 'MM' & double click on Serializing procedure at left & maintain obligatory(03) for procedure MMSL i.e. Maintain goods receipt and issue doc. Also press F1 in Serial Number Usage to read the usage.

  • Excise tab page not displayed during goods receipt for material.

    Dear All,
      The issue is we are doing GR for a PO in MIGO.Now the excise tab page is displayed in case of all other matl except for one.The matl type is manufacturing matl for this particular matl.I have checked all the settings in J1ID, also checked the tax code they are ok.can anyone guide me with any other possible solutions to this.
    Thanks in advance,
    Akshay

    Same problem we have faced after implementation of budgetory changes.
    SAP recommanded changes in program.
    Check with sap support.
    Regards
    Vijay

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

  • Why decimal Places are allowed during goods issue and Goods receipt for mat

    Why decimal Places are allowed during goods issue and Goods receipt for material with unit of measure PCS.
    MY config allows consumption in decimal places.
    How to restrict this?
    Prem Nivas

    Hi,
    Please check in customizing UOM (T code-CUNI).
    In dimensions check the decimal point for the unit of measurement.
    Regards,
    Krishnendu.

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Quality Management During Goods Receipt (Inspection Lot)

    Hi all,
    >>>>>>>>>>>>
    REQUIREMENT
    <<<<<<<<<<<<
    I have a requirement that i need to write an interface program which will receive a file from external agency (manufacturer) and process goods receipt until inspection results. The following steps need to be taken care of;
    1) Create a equipment (Utilities - It is an unique identifier for each unit of the material).
    2) Do Goods Receipt for the PO with the equipment numbers created.
    3) Create Inspection Lot for the material document created during the GR for each equipment number.
    4) Execute Inspection Result.
    >>>>>>>>>>>>
    INFO NOW
    <<<<<<<<<<<<
    Inspection lot can be created from MIGO directly by SPRO config and MM master data maintenance.
    >>>>>>>>>>>>
    DONE
    <<<<<<<<<<<<
    Called BAPI to create Equipment.
    Called BAPI to create Goods Receipt.
    Inspection Lot Settings to create lots during MIGO
    1) New Inspection Type Created as SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection types. The maintenance is a copy of type 01.
    2) Assign Inspection Type to Lot Origin at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection Lot Origins and Assign Inspection Types. SG1 is maintained against lot origin 01 with variant 01.
    3) Set Default values for SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Define Default Values for Inspection Type with parameters same as for 01.
    4) In Material master for the record set the inspection setup in the quality management tab. put SG1 as active and preferred. Also set Post to insp Stock, Insp with task list, Auto Assign, Skips allowed, Serial Numbers poss, Control Insp lot as For each Material Doc Item.
    I have to kow how to select the Inspection Plan for the lot and thus set the status of lot to released and get it ready for results.
    I also have BAPI ready for Inspection Result.
    >>>>>>>>>>>>
    TESTING
    <<<<<<<<<<<<
    I have tested it and was working fine till last thursday. I have the above mentioned settings even now in the system. Can there be anything else which the functional consultants would have change that affected the process. Anyways now the inspection lot is not getting created for the Inspection during MIGO and I am really struggling to find the exact reason.
    For your info, I am working mostly on Utilities and so do not have much idea about the quality management stuff.
    >>>>>>>>>>>>
    QUESTION
    <<<<<<<<<<<<
    Why the inspection lot is not getting created during MIGO for my scenarion?
    How to select the inspection plan in the program?

    deleted

  • Goods Receipt for packaging material - Item cat. ELP

    Hi expert,
    I am facing a problem regarding receive Packaging Material Item i MIGO via inbound. Problem detail as below hope you can advise me:
    1. I create PO order 1pc of Throttle
    2. In Inbound Delivery Screen I do Packing for Throttle by using Handling Unit Function, packaging Material is Carton Box.
    3. After Pack complete, Item for packaging material is auto generated in inbound screen:
    - Item Cat. of Throttle = ELN
    - Item Cat. of Carton Box (Packaging Material) = ELP
    4. When i do MIGO via Inbound: there is only 1 item for Throttle is displayed. How to do Goods Receipt for Carton Box item? Do i Miss any setting for that?
    Thanks.

    i thnk u sould maintain material master with two units one is throttle and second is cartoon.
    u shud maintain that how many throttle is equal to 1 cartoon.
    this u can maintain directlt in PO (In condition tab, with these two field : OUN and UN). in PO as a OUN ,give throttle n UN , give cartoon in item overview as well as condition tab.
    and during delivery change the unit in cartoon. then while migo, material will show in cartoon.
    hope it will be helpful.
    Thanks
    Nisha

  • Goods receipt for import material

    Dear all,
    The excise tab does not appear during goods receipt of imported material. But when are doing the goods receipt for domestic material the tab does appear.
    Even after posting goods receipt and while trying to capture excise details in J1IEX i.e. incase of imports CVD, CVD-Ecess, CVD-HEcess and additional duty, the system asks for the invoice number and then throws a message that PO does not contain any selectable items. We have defined as separate pricing procedure for imports.Have maintained the material and vendor details in J1ID.
    Request to kindly suggest any settings that we need to check so that the excise tab appears for imported material also.
    regards,
    mahesh.

    Hi,
    Import Process: -
    1. ME21N - Create Import PO
    2. MIRO - Customs Invoice
    3. J1IEX - Capture Bill of Entry
    4. MIGO - Goods Receipt
    5. J1IEX - Post Bill of Entry
    6. MIRO - LIV for Vendor Invoice
    7. MIRO - LIV for Clearing Agent
    Following condition types to be used in MM Pricing.
    JCDB     IN:Basic Custom Duty
    JCV1     IN : CVD
    JECV     IN : Ed Cess on CVD
    J1CV     IN : H&SECess on CVD
    JEDB     IN : Ed Cess on BCD
    JSDB     IN : H&SECess on BCD
    JADC     Addnl Duty of Custom
    Mandatorily, use a Zero % Tax Code in Import PO.
    Import Duties will not come from J1ID, in J1ID only you have to mainatin material and Vendor (Customs Office and Import both) excise details.
    Above all, check the Excise Defaults for CVD conditions in SPRO > LO > Tax on Goods Movement > India > Basic Settings > Mainatin Excise Deafults

  • Prevent quantity updating during Goods Receipt

    Hi,
    We have a particular requirement for a type of subcontracting process (not the standard SAP subcontracting) as mentioned below.
    We create a Purchase Order for a material (without a standard cost) and giving an account assignment category in the PO. The Net price mentioned in the PO is the processing charges for the vendor (service charges). It does not indicate price for the material.
    When we receive the finished material from the vendor, we perform a Goods receipt. The stock gets updated and accounting documents are created.
    Our requirement is to stop this quantity updating during Goods Receipt. But, at the same time, we would like the accounting documents to be created as we need to pay the vendor.
    Is there any way of achieving this?
    Pl let me know. Any inputs would be appreciated.

    Hi,
    Thanks for the response!
    I understand that in the standard process, the parent item inforecord takes care of the processing charges. But this is process that has been customized differently as the client has SAP as well as legacy systems talking to each other.
    Turning off the qty updating at the material type level will turn it off for all purchase orders created for the material at that particular plant which is something we would like to avoid.
    We would basically like to turn it off for particular purchase order type. The reason for turning it off is that after the GR is done, there is a separate process that comes from the legacy system and updates the same quantity of finished product and also posts the consumption of components.
    So, our basic requirement is , is it possible to turn off qty updating for the GR of a particular purchase order document type and yet create accounting document. Material is not a valuated material and has a standard cost zero.
    Any inputs in this regard will be helpful.
    Regards

  • Automatic Creation of Purchase order during Goods Receipt

    Hai Guys,
           Can you please tell me is there any ways to get a Automatic PO during Goods Receipt???
        Regards
        Jino.

    Config
    1.Automatic PO generation must be activated for the movment type in IMG>Inv Mgmt & Phy Inv> GR>Create PO automatically. ( Note that automatic PO is only possible for mvmt 101 & 161)
    2. The plant you are working with must be assigned to a standard purchase organisation.
    3. A default PO document type must be specified for the GR in IMG> MM>purchasing>specify default vaues for document types.
    Master Data
    1.In mateial master Auto PO is to be set.
    2.in Vendor Master Auto PO generation or agreed with him an indicator is to be set.
    3.Info-Record should exist with the combination of material,vendor and the auto PO flagged in info record.

  • Batch number issue when posting goods receipt for Subcontracting PO

    Dear expert,
    I always heard there will be issues while posting goods receipt for subcontracting PO. If the component is managered by batch.
    No batch number will be proposed during PGR in MIGO...
    I dont quite understand where is the issue??
    My understanding:
    We have batch managered components and End Product. All have batch numbers, then we PGI the stock to 'SC stock' via 541 movement type.
    Then Vendor will finish the end product and send us back the end product.
    We consumption the components use 543 O movement type? And GR the end product..
    So while goods receipt, the sytem just need pick the existing batch number for both components and finish products..
    Where are the issues???
    Thanks.

    Hoo Laa wrote:
    I have questions for people always mentioning there are issues with batch determination while post goods receipt for subcontracting orders.
    >
    > I am thinking maybe they didnt active the batch determination for 543 movement type..
    >
    > Thanks.
    Hi Hoo,
    You are right!!
    Setting of batch number determination has its importance in Mvt Type be it 541, 543....
    The issue you might have observed would be with Batch Determination in Goods Issues which folks find it bit tough to achieve n make it work for them.
    Cheers!!
    Shiva

  • Document type during Goods Receipt in Intercompany Transfer flow

    Hi,
    We create a PO, Delivery and GI in company A
    We do a Goods Receipt in company B.
    Can we customize that FI document type  ZZ is used during Goods Receipt in company B?
    Document type ZZ may only be used in the Intercompany flow.
    Where can I customize this setting?
    Thank you in advance,
    Best regards,
    Eric van Zundert.

    Hi,
      The following are the standard steps to create an accounting document type and assign it to a transaction.
    1) In T-code OBF4, click on "Financial accounting document types" and create a new document type.
    2)On the same T-code, Click on "Goods receipt document type" and assign the document type to the transaction.
    3)On the same T-code, Click on "Financial accounting No range" and assign the number range for each document type based on company code and fiscal year.
    Thanks and Regards,
    Maheshwari

  • Quantity related Scale pricing not considered during Goods receipt

    Hello Group,
    First thanks for looking into my issue.  I tried to follow the solution in SAP Note 401941 on assessing the right unit price as it relates to the quantity received during Goods receipt, but my ABAP developers are very green at this time and they cannot figure out where to place this code fix and how it would work.
    Background on issue.
    From quantity of 1 to 99, I want the price to be 4.00 each
    From quantity of 100 and above, I want the price to be 3.00 each.
    When doing goods receipts for quantities that have not reached 100 yet, it is still assessing 3.00 each.  I found the OSS note above that is really not helpful and was wondering if anyone else is using scale pricing and how their GRs are calculated for correct unit price.
    Thanks all for your assistance.
    Samantha

    The scale pricing cannot be used to influence price during goods receipt. Goods Receipt will pick up the price from the purchasing document.
    Suppose you want to have that the price be determined based on the quantity received over a period of time, you need to use rebate agreement.
    The OSS note mentioned in your question says that you can determine the price based on the schedule line quantity during GR (not quantity at the time of GR). It will not solve your requirement.
    Lakshman

Maybe you are looking for

  • HT204053 Can I use my icloud email address as apple id?

    I'm trying to update my current apple id ([email protected]) to [email protected] & I can't seem to get it to work. Can anyone advise why that might be???

  • Change position of thumbnails in preview ?

    I'm used to having the thumbnails of a pdf in preview display on the right-hand side of the window. They're now on the left, and it's really throwing me! Does anyone know if there's a setting or a tweak available which will move the preview sidebar b

  • 2011 Macbook pro slow boot up

    I recently bought a 2011 Macbook pro, and here are the specs. 2.3 Ghz i7 quad core 8gb ram and 500 gb HDD (7200) I had restored the laptop and formatted the HDD, and then installed Maverick on it. The bootup time is about 2-3 minutes before I get to

  • [svn:osmf:] 15951: Attempting to fix server build ( missing source path to sample plug-in).

    Revision: 15951 Revision: 15951 Author:   [email protected] Date:     2010-05-07 09:57:57 -0700 (Fri, 07 May 2010) Log Message: Attempting to fix server build (missing source path to sample plug-in). Modified Paths:     osmf/trunk/apps/samples/framew

  • Lenovo b570 wireless internet not working after repair

    i had my computer sent out it wouldnt power on they replaced the motherboard bios and ram i think it said, anyways the internet wont connect it keeps saying turn the switch on on the front of the computer well it is on and the logo even pops up on sc