PIR reduction for PGI of STO's using delivery note.

Hi all,
Thanks in advance for the solution of this problem.
We have problem for PIR reduction against STO's. Planned qty gets reduces against PGI of STO's and withdrawal qty increases. This causes problem in actual demand qty.
Steps we do for STO posting.
1. STO's creation using transaction ME21n
2. Delivery note creation using transaction VL10b
3. PGI using transaction Vl02n
Startegy group : 10
Requirement Type: LSF
Requirement Class: 100
Cosumption Mode: 2
Movement type for PGI: 641 - Sytem picks up automatically.
Thanks and Best Regards
Prakash Shetty

Hi,
Not sure I completely understand the problem.  This strategy is supposed to reduce the PIR upon Goods Issue. It only takes into account the PIR and not the Actual demand.  If you want the demand to reduce based on the actual demand, then use strategy 40 which will take into account the greater of forecast or actual demand. Is that what you're trying to do?  Also, pay attention to the backward and forward consumption period as well as how you have your MD74 running to re-organize independent demand.

Similar Messages

  • Aleks 'higher ed' -- precalcus -- won't run on Firefox for windows; I want to use Firefox, not Chrome or Explorer per the ALEKS recomendation; what should I do

    I tried to join ALECKS. I received a Java warning that Google has not fixed a problem that makes Firefox running on Windows unstable when using a Java version = or > 7.0. I don't want to follow the Alex recommendation to use Chrome or Explorer; using the ALECKS path to install a 6.x version of Java didn't work for me. I want to use Firefox as my only browser. If that is not possible re: ALECKS, I will use the Khan Academy in lieu of ALECKS.

    check your plugins
    *https://www.mozilla.org/en-US/plugincheck/

  • Constant unresponsive script warnings - constant - no particular site - just slows computer- now using Explorer (not a fan) but computer now running smoothly. in English

    Constant "unresponsive script" warnings - no particular site - slows computer for considerable time. Now using Explorer (not a fan) but computer running smoothly. I believe the problem is with Firefox. What can be done so I can go back to Firefox?
    == This happened ==
    Every time Firefox opened
    == User Agent ==
    Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; .NET CLR 1.1.4322)

    I noted Dino had the same problem..many things crossed my mind..could it be my computer, could it be two other browsers parked in my computer but not be using as a default, or is it Firefox...I have not received any specific answers without spending a lot of bucks for professional help..any suggestions would be beneficial..Rob [email protected].Firefox Default user

  • Freight capitalization for STO process using shipment cost document

    Dear MM experts
    I have been testing and trying to charge freight to material using transportation module. I know how to do it in simple STO process without SCD (shipment cost document) but I am not able to do it with SCD.
    I have searched and tried every link I found on SCN. Unfortunately there are many open threads and non of them is answered or giving complete solution. For example I have tried this link where Ajit Kumar has explained the scenario in detail I am but unable to achieve my result. I have also tried other links and SAP note 427944 as well.
    Now what thing confusing me is accounting entries and documents/steps where these accounting entries will be posted.
    My current process is like this in plant to plant transfer under same company code
    STO > OBD > Shipment Document > PGI > Accouting Entry with 641 movement type. Material account debit and same account credit. > Shipment Cost document > GR with 101 without any accounting entry > Transfer freight cost to FI using Freight Service PO determination > Accounting Entry Freight Outward Expense Debit and Freight Clearing Account Credit > MIRO > Accounting Entry Freight Clearing Debit and Vendor Credit
    As you can see we are booking freight as an expense and not charging to material. Now what I want is that freight should be charged to material. If I am sending material from plant P000 to plant P201 under same comapny code then freight charges should be added in material cost in plant P201.
    I have done FRB1 condition type with accrual and copy shipment cost tick mark and other stuff suggested in all those threads but it is not working.
    My requirement is to understand the points where and what accounting entries will be created as per my new scenario which is same as old one except one difference which is to charge freight to material instead of booking expense in freight service PO.
    Lets take an example that material cost price is 100 and freight charges is 50. Now as per old threads at the time of GR against OBD system will create accounting document with 150 debiting the stock in plant P201. What about credit? If we have added freight here then what about 2nd accounting entry in my first scenario in which freight expense is debited and clearing account is credited? Could anyone please explain accounting entries and points where these entries will be posted?
    Another thing is that is it only possible with moving average price to charge freight to material or can we do this with standard price as well using some standard or customized solution?
    Detailed and easy to understand answer will be highly appreciated.
    Thank$

    Hi Moazzam ;
    Firstly, you can benefit Badi/s in package VTRA which is given belowed.
    Secondly , i think that  shipping method --> create sto with delivery --> create shipment document and shipment cost document (problem is starting so system will be create PO and service entry sheet automatically , can you try shipment document is non-related with cost document.
    Thirdly , you can post invoices charge to material with miro , if you success to direct freight costs to stock account (BSX).
    Also , you can benefit doc. sap behaviours for Std price/ Map --> Planned & unplanned delivery costs in mm
    I hope , you can manage your process ; for me standart way is the best.
    Regards.
    M.Ozgur Unal

  • Restricting for creating the Billing Document without PGI in STO Process

    We want to restrict creating the Billing Document  without PGI in STO Process
    Delivery Type:NL
    Item cataogory:NLN
    Billing Type: JEX Profroma Invoice
    I have check in VTFL
    At Header Level, Routine - 003.  for normal sales process LF-F2
    At Item Level , Routine  - 004
    in VTFL-- NL-JEX
    At Header Level, Routine - 009. 
    At Item Level , Routine  - 010. here when i changed to 003 and 004 for NL and JEX
    i am getting error after PGI when i am doing vf01 error is coming " document is not relevant for Billing"

    Hi
    Kindly do the belwo
    1. goto the t code VOV7 item category determination and select the item category and put  the billing relevance as "A"
    2. once the step 1 is completed then it will show the billing relevant status AS "A"in the delivery documnt at the item level
    The above configuration  will be applicable in the new documents only
    Regards
    Damu

  • PIR reduction during goods receipt for strategy 10

    Hi Experts,
    I am using the net requirement planning strategy. i.e strategy 10. My requirement is I wanted the PIRs to be reduced when do goods receipt for the production orders.
    I know this is possible in strategy 11. But how how do it in strategy 10.
    Regards
    Prathib

    Hi Ayethebing,
    What you mentioned in correct. System may do the wrong net requirement calculation. Let me explain what is my requirement.
    I have planning plant, where I get the sales orders and the PIR from Depots. And the production for all these quantities should be done in production plant. I need to do the goods receipt in the production plant itself first and do a plant to plant material transfer to planning plant.
    But all the control of production should be with production plant. So I cant use the production in alternative plant because in this case i need to convert planned order in planning plant and while doing goods receipt the stock directly updates in planning plant.
    So I was thinking of loading the PIRs in the production plant directly and use strategy 10. But since the sales orders wont come to production plant, the PIRs wont recduce at all. So thought of thinking about reducing PIR during goods receipt.
    But I realized from what you explained, it would lead to wrong PIR calculation. Full mark to you.
    Now Iam thinking the solution in a different way. Please give me your inputs
    Iam creating a recusrive BOM in planning plant and I will assign special procurement key 70. i.e withdrawal from alternative plant. I will assign alternative plant as production plant.
    So when I run MRP in planning plant for the main product, I will get dependant requirement created in the production plant for the main material as I created the recursive BOM in planning plant.
    But Iam having only one issue to be resolved here as I understand. The planned order created in the planning plant during MRP is convertible.  Can I make it non convertible some how even if Iam having bill of material?
    Thanks in advance for your valuable inputs
    Regards
    Prathib

  • Calling a driver program by submit in user exit for PGI

    Hi Gurus,
    I have a question regarding post goods issue (PGI) for transaction vl01n,vl02n and vl06g.
    earlier i have created a smartofrm and a driver program for sending the form output attachment in a mail after delivery posting manually.
    for this i have created a smartform and driver program in which all the logic to attach and mail send is written on delivery posting.
    but now customer want this fucntionality on Post goods issue (PGI), when user go to trasaction vl01n ,vl02n and vlo6g and pressing PGI button,
    then mail should be sent automatically with for output attachment.
    i have found a user exit which is being triggerd on PGI press MV50AFZ1 in which implemented the implecit enhancement in perform
    user_exit_save_document_prepeare with below code.
    ENHANCEMENT 1  ZPGI_MAIL_SEND.    "active version
    DATA c_zlf TYPE likp-lfart.
    IF sy-ucomm = 'WABU_T' and xlikp-lfart = c_zlf.
    SUBMIT ZSD_DECLARATION_CONFORMITY AND RETURN.
    ENDIF.
    ENDENHANCEMENT.
    After going to transaction vl02n i am putting unposted delivery number and clicking on PGI button.
    in debugging its going to condition check for ucomm for PGI buttion and delivery type.
    if condtion is fullfiled and curser going further on submit statement, but without executing the driver program ZSD_DECLARATION_CONFORMITY it coming out of enhancement.
    its not performing the task which is develped in the driver program.
    Please help me with the submit statement structure if i am missing any or other solution for my problem.
    Br,
    Surya

    Hi Team,
    I have used the perform.
    ENHANCEMENT 1  ZPGI_MAIL_SEND.    "active version
    DATA c_zlf TYPE likp-lfart.
    IF sy-ucomm = 'WABU_T' and xlikp-lfart = c_zlf.
    Perform entry( ZSD_DECLARATION_CONFORMITY )using return screen.
    ENDIF.
    ENDENHANCEMENT.
    Now i am able to communicate with my program.
    Thanks,
    surya

  • What are the different transaction codes for PGI?

    1. What are the different transaction codes for PGI?
    2. What transaction code should I use for a Group Delivery?
    Regards,
    Nazim.

    Hi
    Go to VL02 and you can do the PGI.
    Regfarding Group Delivery, you can create a batch job and link the program to the batch job so that the job picks up all the orders and create deliveries.
    Creating a Background Job Using the Job Wizard
    •From the main menu select System>Services>Jobs>Define Job (transaction SM36).
    •Press the Job Wizard button and step through the screens as follows:
    •1:Continue
    •2: Enter a name for your job. Continue.
    •3: Continue with ABAP Program Step selected
    •4: Enter the ABAP Program Name and variant name.
    Press the Print Parameters button, specify the required printer and set the "Time of Print" to "Send to Print Spooler for now".
    Press green tick
    Continue
    •5: If more reports need to be added to the job tick the checkbox, press continue and repeat screens 3 and 4.
    •6: Select how the job is to scheduled (eg Date and Time)
    •7: Enter the required scheduling information ( eg Date and Time) and if required tick "Periodic Jobs"
    •8: If "Periodic Job" was selected select the frequency (eg Monthly)
    •9: Check the job details and press Complete
    Hope the above info helps.
    Reward if useful
    Regards

  • Determination of Different GL account for PGI (VL01n)

    We have a requirement wherein the customer needs to determine different GL accounts for PGI.
    Following is the  example.
    We need different financial entries for different customers at the time of  PGI (vl01n)
    Scenario 1) Intercompany sales process
                         Debit     1551000 -  Cost of goods sold - Inter-company
                         Credit    6031000 - Stock FG&R
    Scenario 2) Normal sales process (e.g Export)
                          Debit    1510000   Standard COGS
                          Credit   6031000 - Stock FG&R
    Note:- We are using same material for both process.
    Regards
    Amit

    Try as mentioned,
    You can have different movement type,for intercomapany sales,create new movement type  for example - 901 link it with
    a diff. schedule line category.
    For normal sales you can use movment type - 601 link it with schedule line category - 'CP'
    Other settings were done in OBYC,
    for stock account trans. key(BSX) for combination valuation group code,modification key,valuation class,
    assign debit,credit g/l accounts.
    Similary for COGS account trans. key is GBB,do configuration for above combination.

  • PIR creation for Configurable material

    Hi,
    Please let me know, the process for creating PIR's for a configurable material.
    Currently my client is using Stategy 82 for creation of prodcution order directly from sales order and does the selection of characteristics while creating the sales order.
    when i try to create PIR using MD61,the system is giving a error " No Planning Profile maintained".
    please help me out with the steps to be followed for creation of PIR's.
    Regards
    Ramesh

    Hi,
    you can not create PIR in MD61 with planning strategy 82. it is MTO stategy.
    If you want to plan for configurable materials, go for characteristic plannijg strategy like 56.
    In characteristic planning you need to maintain option (characteristics) usage % in MD61. In addtion to configurable profile it also needs planning profile 9 where you need to maintina exact characterisrics for whome option % should be maintinaed in MD61).
    If you dont include certain charcteristics from configurable profile in planning profile then they will not be planned in Md61.
    Check Charcteristic planning at below link:
    http://help.sap.com/saphelp_470/helpdata/en/75/504853a39a11d191930000e8a5f6e6/content.htm

  • EDI 944 "STO Receipts" using MIGO

    Hello:
    We are upgrading to ECC 6.0
    Does ECC 6.0 support processing of EDI 944 "STO Receipts" using MIGO transaction.. When we were in 4.6 C SAP did not support EDI 944
    processing using MIGO. So we ended up using MB transaction for EDI 944 processing

    My question did not concern the definition of a 944, but rather the implementation of the 944 with respect to SAP's outbound deliveries versus the transfer PO.
    Does anyone else have any thoughts on this?
    Regards,
    Laura

  • BAPI for PGI against delivery order

    Hi Guys:
               In my program, I'd like to use a BAPI to DO PGI, I try to use WS_DELIVERY_UPDATE, but I find it can't return material document number of PGI.
               Is there any BAPI can do BAPI and also return material document number?
               Thanks.
    Stephen

    Hi Tao,
    Please try to see the below code, it may be helpfull for you to create PGI with the belwo FM.
    DATA:
      L_VBELN LIKE LIKP-VBELN,
      L_VBKOK LIKE VBKOK,
      L_PROTT LIKE PROTT OCCURS 0 WITH HEADER LINE.
    * carry out goods issue
      L_VBKOK-VBELN_VL = L_VBELN.<-- fill this field with your delivery number
      L_VBKOK-WABUC = 'X'.
      CALL FUNCTION 'WS_DELIVERY_UPDATE'
      EXPORTING
      VBKOK_WA = L_VBKOK
      SYNCHRON = 'X'
      NO_MESSAGES_UPDATE = ' '
      UPDATE_PICKING = 'X'
      COMMIT = ' '
      DELIVERY = L_VBELN
      NICHT_SPERREN = 'X'
      TABLES
      PROT = L_PROTT
      EXCEPTIONS
      OTHERS = 0.
      COMMIT WORK AND WAIT.
    do an additional SELECT by delivery number to find the Material documents from VBFA table. pass the delivery number  and get data from VBFA.
    Regards,
    Prasenjit

  • No Acctng doc for 351 against STO !!!!

    Hi,
    Normally, when we do a 351 against a STO, accounting documents are generated. However, in some cases, I notice that accounting documents are not created, even though the goods are valuated  & MAP exists. Could sombody explain.
    Secondly, is it necessary to have a schema for STO, if we do not want to debit/credit the delivery cost ?
    Thanks & regards,
    Sheeja

    Hi,
    A 351 should always trigger an accounting document but only if the material has a value.
    If you have a material with a value that is NOT generating an accounting document then are you SURE that there is a value greater than zero on the ISSUING Plant (it does not use the receiving plant price).
    Steve B

  • User Exit for PGI

    Dear All,
    I have a requirement where client wants del. qty. & pick qty. should be uneditable i.e. not changeable before PGI. The net wt. i.e. del. qty. & pick qty. is updated in VL02N through weigh bridge system by internally run BDC. Users are creating D.O. by entering a expected qty. in VL01N.
    can anybody suggest any specific USEREXIT for PGI to fix this issue.
    Regards
    Subrat
    Message was edited by:
            subrat panda

    Hi try exit  MV50AFZ1 - This include is reserved for user modifications
    Forms for delivery processing
    also verify OSS note 415716 for this
    sugested code: if user name <> ADMIN User, no change allowed.
    Ask your abapper to do this. (use appropirte user name for ADMIn user)

  • How to reverse goods issue for delivery note by using IDoc

    Hi all,
    I would like to reverse goods issue and picking request for delivery note by using inbound IDoc.
    I used message type SHPCON and IDoc type DEVLRY03 for posting goods issue in inbound processing and it's work but I couldn't find solution for posting reverse goods issue.
    Pls let me know which IDoc type or any ways for posting goods issue reversal and cancelling picking request.
    Thanks for your time.
    Su R.

    Hello,
              For this requirements we can actually follow two Approaches that I can think of. Here they are.
    Approach 1
             Little Complex Approach. What we can do is to make use of the Same Function Module (Posting Program) IDOC_INPUT_DELVRY to do the Delivery Updates (Except reversing the Goods Issue). During this,  we can make use of one of the Customer Functions available in the Enhancement V55K0001 and satisfy our Requirement.
    Approach 2
            We can actually code a Custom Posting Program (Function Module) in which the first part will take care of updating the Delivery & if the PGI is done, then we can make use of the Function Module BAPI_GOODSMVT_CANCEL to reverse the PGI.
            I think the later Approach is much easier rather than going for the Standard Function Module (Posting Program), Exits and find a place where we have to find another Enhancement Spot / Enhancement where we can call the above FM to Cancel the Goods Movement.
    Hope these inputs were helpful.
    Thanks and Regards,
    Venkat Phani Prasad Konduri

Maybe you are looking for

  • Inserting data from comobo box

    Hi all. I have a problem and I hope someone can help. I have two tables CREATE TABLE manager( managerID INTEGER NOT NULL, (PK) groupID INTEGER NOT NULL, mname VARCHAR2(20), msurname VARCHAR2(20)NOT NULL, memail VARCHAR2(50)NOT NULL, mpassword VARCHAR

  • Ultimate iChat connection problem

    Just yesterday, iChat started refusing to connect to AIM for some reason. The connection continually timed out. Neither iChat, AIM proper, nor any other instant messaging client will connect to the AIM network. I tried changing both the AIM server, a

  • How comples return types and parameters are mapped

    Hi all! I want to know how complex return types and parameters in a java interface gets mapped to wsdl? for example how would the wsdl for the following interface shall look like: interface ComplexReturns{    java.util.Date getLuckyDate(java.util.Dat

  • OIM 11gR2 : Problem while starting managed server

    Hello Experts, I ran config.sh in order to extend my schema to include APM (Authorization Policy Manager) in OIM 11gR2. After that i took a restart of the servers. When i am trying to start the managed servers they're not starting in the RUNNING mode

  • HT201250 Need to free up space!

    I have an external drive, it's hooked up and everything. Can I now delete files taking up massive amounts of space and get them back later down the line? The reason for this is that my drive is taken up by 105 GB of "other" and I cannot identify what