PK01 Replenishment Strategy without MRP

Dear guru ,
i want to create a control cycle with a Replenishment Strategy without MRP.
The material master have MRP Type ND.
When I create a control cycle the system select strategy for  kanban control with MRP.
I have verified that I must also enter storage location mrp indicator equal to 1 in order to select strategy control without MRP.
If i enter storage location mrp indicator equal to blank why the system donu2019t check only material master mrp type ?
Thanks.

Not answered.
Closed.

Similar Messages

  • No suitable replenishment strategy

    Hi,
    While creating control cycle for kanban i am getting this error,
    No suitable replenishment strategy.
    strategy has been assign to plant .

    What is the replenishment strategy that you are using? Some of the external procurement strategies (without MRP) require storage location to be excluded from MRP.
    This can be done by maintaining 1 in the SLoc MRP Indicator field (MRP4 view of Material master for the storage level you are using)
    KANBAN Without MRP - PP KANBAN - SAP Library
    Anoop

  • Replenishment strategy in kanban

    Hi,
    I have created replenishment strategy for maintaining in control cycle of kanban.
    1) In house production strategy
    2) external procurement strategy
    3) stock transfer strategy.
    But while creating control cycle I couldnot view the strategy 1) and 2).
    I could see only 3rd stratgy.
    Pl. tell me what could be the reason.

    Hi
    The Problem is that the Strategy created is not allowed for storage location that is included in planning.
    Error msg no PK192
    Solution
    Change the MRP indicator for the storage location in the material master record.
    In MM02 for the material , Plant and Storage location combination  select the ind 1 for SLoc MRP indicator in MRP-4 view and chk whether the newly created Strategies are appearing in PK01 or not.
    Regards
    Brahmaji

  • MTO without MRP

    Hi,
    We are following MTO scenario in discrete manufacturing without MRP. I am creating the Production orders with
    reference to Sales Order for HALBs initially, then system gives message that Sales order is not for HALB material.
    I accept that message and proceeding to create Production Order.After creating the Production Orders for all HALBs is it correct to create production order for FERT with reference to Sales Order in which target quantity is displaying
    What is the exact procedure to do this MTO scenario without having MRP.
    Dilip

    Dear friend,
    The answer by JH is correct .
    with strategy 82 -Assembly procesing with production order.
      When you create a sales order for a material which has been assigned a strategy group 82 in MRP3 View  for assembly processing, an assembly order i.e procuction order  is created automatically .
    i.e Creation of sales order triggers the  creation of production order automatically..
    thanks ans regards,
    Girish.

  • Without MRP, with BOM explosion

    Hi,
    I'm new to SAP and learning SAP SCM. I would like someone to brief me on what the following lines imply, especially 'without MRP, with BOM explosion'.
    "dependent requirements must be determined for materials that are planned in SAP ECC. So, you assign the MRP type “X0” with MRP procedure “X” (“without MRP, with BOM explosion”) to the materials planned in SAP SCM."
    Thanks,
    Krish

    Hi,
    Without MRP , with BOM explosion - means the dependent requiremens are created for this materials from APO.
    The MRP will not run in APO. Only the dependent requirements will be created from APO. The MRP for this materials will be executed the ECC or R/3 system to create planned order anb purchase requisitions.
    Thanks and regards
    Murugesan

  • Kanban Replenishment Strategy with Reporting Points

    I am trying to implement a SAP kanban system with repetitive manufacturing using reporting points.  My problem is that when I change the status from empty to full I get error RM086 - GR with backflush not for reporting point logic with automatic GR option.  I get this error regardless of control key (auto GR or not auto GR) setting on the routing.  I reading SAP help on the subject; I see there is a page discussing replenishment strategy with reporting points which would infer that there should be a strategy with a similar name in configuration for replinishment strategies for in-house prodution.  We are on ECC 6.0 and this option is not available in our system.    What am I missing???

    Hi,
    As you are using In House production Replenishment Strategy , You must define Replenishment strategy for reporting points in Configuration as below:
    SPRO->Production>KANBAN>Replenishment Strategies>Define In-house Production Strategies>Working With Reporting Points Replenishment strategy you need to define.
    Then assigned this defined strategy in KANBAN Control Cycle in PKMC-->Replenishment Strategy->
    Choose In-house Production Radio Button and in front of that select the above defined replenishment strategy to work with reporting points.
    Hope this helps.
    Regards,
    Tejas

  • Purchase Requisition Release strategy for MRP based Requisition

    Hello Gurus
    We want to set up the urchase Requisition Release strategy for MRP based Requisition ..Any can one Please share your experience about the impact down the road?
    Thanks
    Nick

    Hi,
    If you want include the MRP related PR in Release strategy.
    You need to include the field CEBANESTKZ-Creation Indicator (Purchase Requisition/Schedule Lines) in one of the characteristics which you create and include the characteristics value as per the field values like AReal time, BMRP, CConverted Planned order etc.. and include the charactristic in the Release Strategy will release group & release codes.
    So when ever the PR is created through MRP run then this creation indicator will update in the PR as per that release Strategy will trigger in the PR.
    there is one more option you need to create the separate document type as MRP PR then create document type as characteristics and include the values of all these document types and include in Release strategy.
    But it will  not pop up for direct PR from MRP run only trigger when planned order is converted to PR manually there you need to select this MRP document type then release strategy will trigger.
    I think first one is best suited.
    rgds
    Chidanand

  • Release strategy for MRP generated PR.

    Dear friends,
    Can we have release strategy for MRP generated purchase requisitions.....
    What are the steps required if yes.....
    Plz. suggest....
    Thanks in advance
    Navin

    HI,
    IF you want to characteris MRP genrated PR then you have to define different document type other than the standrad one.
    For this MRP define the release stratergy has usual procedure.
    In case if ou dont have a different document type also the standard release procedure which you have conffigured will hold good.
    Thanks & Regards,
    KIran

  • Purchase Requisition Realease Strategy without classification

    Hi,
    Request for detail process and configurations for Purchase Requisition Release Strategy without classification.
    We have 5 authorities like A1 (Lowest) and A5 (Highest authority) in the organisation to release the PR.
    The PR should be released according to value slabs.
    Thanks a Lot.
    Sachin

    Hi Sachin,
    IMG> Materials Management>Purchasing> Purchase Requistion> Set up procedure without classification
    This process is similar to process of with classification
    Go through the link below:
    for this no need of creating characteristics and classes
    http://www.sap123.com/showthread.php?t=59
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/75/ee150b55c811d189900000e8322d00/frameset.htm
    If useful, reward me
    Thanks & Regards,
    Swathi

  • Automatic Purchase Requisition using Reorder Point without MRP Run

    Dear Freinds,
    My client wants Purchase Requisition should be automatically created as soon as the stock falls below reorder level without MRP run.
    Is this possible? if possible then what are the settings required.
    Thanks
    Prashant Atri

    Dear,
    It is not possible in standard SAP.
    What is the problem to take MRP run?
    You can take the MRP run in background through MDBT so system will create automatic Purchase Requisition using Reorder Point.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Verifying understanding on Strategy group (MRP 3 View)

    Hello Forum,
    As per my understanding, if we don't have  any independent requirement or customer order for semi-finished or packaging products then there is no need to maintain any  Strategy group (MRP 3 View) field @ material master .
    Am I correct or you foresee any reason to maintain it ?
    Cheers
    Sam

    Dear Sam Das,
    For semi finished material if you leave the strategy group than it is ok if you do not run mrp. In case of mrp run and your semi finished product have different requirement than make to stock scenario than in that case it is necessary. If you leave it blank and run mrp system will consider it as 10.
    Regards,
    Saurabh Kumar

  • MRP without MRP views

    Hi Experts,
    Is it possible to carry out MRP, without maintaining MRP views and Planning file entries (Manual) for a material?, Please explain!!
    Thanks and Regards,
    Suresh.

    Hi,
    Is it not possible to rum MRP without MRP views extended for the materials.
    For running MRP system requires some key parameters like :
    Procurement Type
    Lot Size
    Rounding Profiles
    Reorder level / point
    MRP Type
    MRP Group
    ..........etc
    As all these fields are available in MRP views only it is not possible to run MRP without extending MRP views for the Materials.
    Hope this will help you.
    Regards
    Rdahk mk

  • Generating a production order through projects, without MRP run?

    Hi to all
    Is it possible to generate planned orders and further proceed to production order through projects  WITHOUT MRP run?
    Regards
    surya

    create the production order in CO01 and assign WBS element in the assignment tab of the order.
    whether it ll solve ur purpose....
    ashis

  • Process order required for each sales order without mrp run

    Hi, it is mto scenario. wants system to create a process order for each sales order without running mrp. please advise is it possible? if possible please guide what settings need to be done. Thabk you.

    HI
    You can create production order with reference  to sales order using t code CO08.
    Check and revert
    Regards
    Anupam Sharma

  • Shipment tracking without MRP relevance

    I have a Shipment with associated Deliveries.  The deliveries are based on Schedulung Agreements, which have Confirmation Control keys assigned.
    I have to mark the confirmation control key as being relevant for Tracking to get the tracking available on the Shipment.  The problem is that I also have to mark the confirmation control key as MRP relevant, which means that everytime I update the tracking of the shipment, MRP and the demand gets affected.
    What I want to do is track the shipment as an internal information only, using the standard functions and not have MRP affected.
    When I try to set it an error is displayed that does not let me save.
    As far as I can find there is nothing in the SAP Help, nothing on the notes and nothing here in the SDN.
    Can you please assist me in setting this or finding a easy standard solution.
    Your assistance would be appreciated.
    Thanks

    Hi,
    Would you know if/which user-exit or any other functionality can be called during MRP runs to manipulate the data at delivery schedules?
    I was trying eg. 'EXIT_SAPMM06E_013' or 'EXIT_SAPMM61X_001' but without success.
    Regards,
    Dominik Modrzejewski