Plan/Actual cost for Deleted Material - reg

Hello,
Actually iam assigning one BOM to activicity.
Now i have released the project,after this in cns41 plan and actual costs r flowing correctly.
Now i have deleted that BOM from activity and saved the project also,
now again in cns41 the same BOM cost was flowing in Planded data,
pls give solution for this....
--Prakash.

Hi Manish,
Thanks for ur support,
but iam getting this error message,
Typ Ite Message text                                                           LTxt
    000 The project info database reconstruction starts with: 1 Projects
    000 Processing is complete
<b>   000 No value category could be determined for cost element 1000 50200000</b>
this error was coming thg cjen
--Prakash

Similar Messages

  • How can I crosscheck Total Planned/Actual Cost in MCI3 (S061) correct?

    Hi Masters,
    I want to crosscheck "Total Planned Cost" and "total Actual Cost" in MCI3(S061) - Location and Planning analysis is correct or not.'
    In my current system I am trying to compare the Orders in IW39 and MCI3 but costs are not matching.
    I have done some analysis and found that the costs are updated in S061 from PMCO.
    But for same Orders in months e.g August I am getting posting for July,August and Semptember.
    So I am not sure how I can compare the values of "Total Planned Cost " and Total Actual Cost" in S061 to IW39.
    If it is possible to compare what selection criteria I should use for fetcing the Orders from AUFK or IW39. Which dates are I should used ( Date range - Period, Basic start/end dates, Actual start/End Dates).
    With Best Regards,
    Narendra dere
    SAP- Manufacturing.

    Hello,
    Comparing the MCI3 & IW39 cost figures is not right as per my knowledge.
    S061-->following below logic for calculations for Actual Cost and Planned Cost
    Total planned costs for PM measures
    Sum of planning costs for PM measures
    This key figure will be updated when a PM order with a time reference is created and changed at the starting date of the posting period, in which the costs were created.
    Total of the actual costs for PM measures
    This key figure is updated with every cost-relevant transaction for a PM order (for example, completion confirmation, material withdrawal) for the beginning date of the posting period, in which the costs were created. For historical orders, the key figure is updated when creating and changing a historical order with a time reference to the starting date of the posting period which was determined for the reference date of the order.
    Total of actual costs for companyu2019s own material for PM measures
    This key figure is updated for every cost-relevant operation for a maintenance order (for example, time confirmation, material withdrawal).
    For historical orders, the key figure is updated when creating and changing a historical order with a time reference to the starting date of the posting period which was determined for the reference date of the order. The key figure update is important from a business point of view only when a material removal is made.
    Total of actual costs for external material for PM measures
    This key figure is updated with every cost-relevant transaction for a PM order (for example, completion confirmation, material withdrawal) for the beginning date of the posting period, in which the costs were created.
    Regards,
    Rakesh

  • Actual Costing concept in Material Ledger

    Hi
    Masters , can any body please explain the concept of Acutal costing in material ledger i think that involves the following steps:
    1 Activate actual costing.
    2.Define userdefined names for receipts and consumption
    3.Assign user defined names for receipts and consumption /
    for the above 2 and 3 points what is the purpose we have to define and assign user defined names in coantrolling level selecting the B+ Procurement and V+ Consumption.
    thanks in advance

    Hi,
    Actual costing is a huge concept. It is difficult to explain the concept in few words
    Please go through the following link for detailed informaton:
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/COPCACT/COPCACT.pdf
    Configuration Points:
    Path: IMG>Controlling>Product Cost Controlling --> Actual costing/Material Ledger
    1. Activate Material Ledger for valuation areas
    2. Assign Currency types to Material Ledger Type
    3. Assign Material Ledger Type to Valuation Area
    4. Configure Dynamic Price Changes
    5. Define Material Update Structure
    6. Assign Material Update Structure to a Valuation Area
    7. Activate Actual Cost Component Split
    8. Activate Actual Costing
    Coming to your Questions 2 and 3. they are required to be created if you want your own Controlling level for transactions that you would like to differentiate in the material ledger, further than the standard system offers. Normally we don't use unless there are some specific business requirements
    Some key points would be:
    ML records all receipts, consumptions and variances for each material.
    ML gives overview for each material of the starting balance, receipts, consumption, variance and ending balance.
    ML calculates the actual cost for each material u2013 finished goods, packaging.
    If a material has BOM, variances of lower levels are rolled up to next higher level up to finished goods, to calculate actual cost for raw material, semi finished & Finished goods in ML as unit price.
    Calculated actual cost at end of month can be used as standard price for next period in the material master.
    SAP MM is on standard price based costing, ML can do monthly average costing.
    Direct settlement of all kind of price differences / exchange rate difference/ to materials at the end of the period.
    Once activated , it is not that easy to deactivate although possible with implications like not having historic data.
    Cannot be used in isolation : All the plants within the company code shall be material ledger active.
    Material Price change is not possible after first transaction in that period.
    Using material ledger, inventory in US plant in Canada will be available in USD and CAD
    Hope this would help you.
    Best Regards
    Surya

  • Actual costs for laboratory exams / Material Ledger

    Hi Experts
    I have a doubt for actual cost scenario for laboratory industry.
    My  background is for product cost for consumer goods, specially food companies, so this is a new segment for me.
    This laboratory has baseline version, no service/production order, it means all material consumption goes to cost center and they use activities to send costs from cost center to cost center.
    They have BOM for all exams (finished product). They only run CK40N for standard costs but they don't have actual cost (material ledger - CKMLCP) implemented.
    This is the issue: they want actual cost for every exam in the way we have for consumer goods industry.
    So they can analyse profitability for product (exam) x customers.
    I wounder if the same industry actual cost scenario can be applied to this business segment or if there is a special SAP solution for this segment.
    The main issue is the stock, there is no stock, it´s service. I believe we could change the account in BSX key (OBYC) for some P&L accounts but I´d like your opinion/experience.
    I hope you help me to  clarify these doubts
    Thanks in advance.

    Dear Rupesh,
    I don't think so there will be any std.report in PS module to show plan vs actual cost of material component.
    For looking plan vs actual cost in PS having many std reports but they don't show for material component.
    I think for this you need to develop a Z report which will show Plan vs Actual cost of material component.
    In CN52N report (Component overview report) you can add two fields one is for plan cost & other for actual cost.This can be one of possibilty you can try.Otherwise develop a new Z report for the same.
    For this you need to take yr abaper's help.
    Regard's
    Sandeep

  • How to analyse actual cost for each operation in Process/Production Order?

    Hi all,
    IN SAP, I know that we can analyze plan cost for Operation in Process Order/ Production Order.
    However, I can not analyze Actual cost for Operation .
    I know the object when I good issue material is ORDER, not OPERATION.
    But, as requirement of users, they want to analyze actual cost for each Operation.
    CAn SAP do this analyze?
    If Yes, What should I do in SAP to have this reports?
    THanks in advance,
    Emily Nguyen

    Hi Emily,
    as I see from one other message that you're using material ledger. Then your expectation is apparently to also see the actual costs of materials in your production order by operation.
    This is not supported. Actual material costs are handed up in material ledger multi-level settlement from one material to the next, bypassing the production orders.
    That means the production order will always contain the material costs valuated at plan price, not at actual price.
    For activity prices that might be better, when you revalue the orders at actual activity prices with CON2. But even there I am not sure that it will always be assigned correctly to the operations.
    There is currently an enhancement in development, the operation level costing. But that will affect more the planned cost side not the actuals. Might be interesting to learn more about your requirements and the use case behind.
    best regards,
                      Udo

  • Abnormal cost for GR material

    Dear Experts,
    We have two production orders for which GR posted on the same date . The header material  R1 has the same material R1 as component . The production order header material is maintained in kgs and the component in MT ( Rs 50 / kg ). But while doing GR for one production order the value of the material  become abnormal ( Rs 15000 / kg ) while the other production order it is correct ( Rs 55 / kg  ) . The actual cost of issued material and the activity costs are correct for both the orders. Please advice how to proceed.

    Pijush,
    Since the confirmation is not reflected in the backend, but you are able to do the same in SRM, can you confirm if you have configured message type MBGMCR as outbound (from SRM to ECC) under partner profile  in SRM and distributed the same?
    Regards,
    Nikhil

  • Controlling of Plan & Actual Cost of Assets

    Hi gurus
    We want to monitor our Assets plan & actual cost . In other words. whenever Accounting document will create from Asset accounting. a Controlling document should be created . for monitoring Assets Plan & Actual Cost.
    Please give Expert opnion. is this justified.
    Thanks.

    Hi James
    Your requirement is justified... but it does not work the same way as for revenue expenses
    1. You need to create the Asset recon account as Cost Element (Category 90)
    2. Assign a Statistical  Internal Order in the Asset master and enter the Budget in it. (KO22) or Enter a Plan value in KPF6.. This would serve as the Plan expense of asset
    3. When you receive the asset, it would also trigger a posting in the Internal Order... This would serve as the Actual expense on account of asset
    Now, when you execute the report for Internal order, it would give you PLan Cost cost of Internal Order vs Actual Cost...
    BR,Ajay M

  • How to Post Actual Costs for Overhead

    Hi All,
       Kindly let me know the steps or T-Code as to how to post the actual costs for the Overheads.

    Hi
    Use the t.code KGI2 and post the actual costs for the Overheads.
    Award points if it is useful.
    Thanks & Regards,
    A.Anandarajan.

  • Actual cost for the Process Orders

    Hi Experts,
    I want to know the actual cost for total one month process orders.
    I can check actual cost for each order in COR2- by entering in to cost analysis.
    But, my request is, where to check actual cost for One perticular product for the total month (ex: 100 Orders) or certain period.
    can eny body give solution by sparing your precious time.
    adv. thanks and regards,
    Anand.M (Hyderabad)

    Hi,
    Try MCRI / MCRY or check the table entries of S027
    Regards,
    Srini

  • Total actual cost for a given PM Order

    hello all,
    how do i get total actual cost for a given PM order (in IW33 under cost tab we have total actual cost)..
    is stored in table or do i need to use any function module.....
    thanks in advance....

    Hi Vinay,
    You can use the following logic for extracting the Actual cost of a PM order.
    Pass the Order No (AUFNR) in Table AUFK and fetch the Object number (OBJNR).
    Pass OBJNR value in table COEP.
    You can get the actual cost of the order in COEP table.
    Please mark this as correct if it resolves your issue.
    Regards,
    Joydeep

  • Actual cost for Material - Very Very urgent

    < MODERATOR:  Message locked.  Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. >
    Dear All,
    I have a very urgernt requirement.
    My client wants to prepare MIS report, in which they need details of actual costs of FG i.e cost sheet (which includes RM qty/cosst, PM Qty/cost & overheads). We have not yet got any ABAP report developed for the same.
    We have just 2 days to work this issue.
    Can any one proivde some solution to this
    Regards,
    Ankita

    Can i take some field values from process order and map it in SQVI query to get data ???
    Regards,
    Ankita

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

  • Reducing freight cost for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    answered

  • Confirmation with errors in calc. actual costs for PM-order

    Hi,
    We have a PM-order with notifications and good movements that has tecnical completion status and is already settled. So we want to set it with bussines completion status, but an error arises: "Unprocessed future change recs for order 5009385 prevent del. flag/completion"
    We already checked for automatic goods receipt pending, backflushes, etc. and the only found is an error record in actual costs calculation (trn. COFC). Looking at this record the message says: "No prices could be determined for object Activity type CONA/900097/PM-100" (message KW 407).
    We checked price set for the activity type and cost center and is set for all the periods of actual fiscal year. Then looking at the details for above message, we found the following: "No price could be found for object Activity type CONA/900097/PM-100 with price indicator 7 and value type 4"
    The question is: why system is trying to get price for activity type PM-100 with price indicator 7 instead of 3 as usual for our PM-orders? How price indicator is defined from actual PM-order parameters? Any idea?
    Regards,
    mr.

    Hi
    Whats your activity type category? I believe it should be 1
    Your point is right, price indicator shud be 3 because while confirmation system uses the planned rate.. And price indicator pertains to actual activity price..
    Check whether you have calculated or maintaned actual activity price or not in KBK6
    Ajay M

  • Actual Costs for Production Order

    Hi All
      I have a scenerio where they dont want any product costing methods say WIP,Variance calculation & Settlement.
      When the Goods receipt is done for production order the actual costs and the Activity costs to be valuated.
    Regards
    Jayshankar.A

    Hi,
    In our case the Standard price is updated in the material master. For this, you need to create a costing estimate using T-Code CK11N and update & release in CK24.
    When CK11N is executed the standard price is calculated for the material by taking Moving Avg Price of RM (Price indicator V) and the activity costs are calculated as per data given in KP26. These cost components are added and a final cost estimate is prepared, which is updated using T Code CK24.
    the pre-requisites are:
    1. BOM should be maintained.
    2. Routing should be made.
    For executing the same procedure for all the materials, you can use T Code CK40N.
    Hope this is what you were looking for.
    Revert for further details.
    Regards,
    Rohit.

Maybe you are looking for

  • How to set the message in the textInput

    Hi, I have a textInput field as follows on my UIX form: <uix:textInput name="UserName"> Beneath/Under the textInput element, I would like to display a short message (something like, UserName should include alphabetic and numeric characters). How to a

  • Java.lang.ClassCastException at DriverManager.getConnection

    Hi all, i need to connect to SQL server DB which exist on a server and java.lang.ClassCastException appear when executing the line Connection conn = (Connection)DriverManager.getConnection(url,username,password); the following is the code which i use

  • Firefox is not launching again

    MY FIREFOX IS NOT LAUNCHING..I MEAN IT CAN NOT START. I HAVE INSTALLED IT MANY TIMES, YET IT CAN NOT START. I HAVE UNINSTALLED IT MANY TIMES, YET THE PROBLEM PERSISTS. PLEASE WHAT DO I LACK IN MY PC THAT MADE FIREFOX NOT LAUNCH? I AM USING HP 530 LAP

  • Got an e mail from apple not sure it's real

    Apple Account ******, (06 - September - 2014) This message is to therefore notify you that your Apple/iCloud Account (*****) has been temporarily suspended until we can confirm your Apple and iCloud information. This precautionary measure to guard yo

  • Upper lines showing File, Edit etc, gone

    Had to "restore to 2 days earlier" to get rid of music add-on, but found that top line showing "file, edit, tools, etc also disappeared. What did I do wrong? How do I get them back? Also "Back" arrow. Presently only shows "Firefox - Mozilla Firefox"