Plan assignment and equipment validity date

My user has added a new piece of equipment with a valid from date of 4/15/2008 -- he also did the same thing for the equipment task list key date.  But when he went to start his plan, we wants to use a start date for 3/15/2008 -- I have told them to be careful when they add equipment because the valid from date is very important -- he should have put an older valid from date to do what he needs to do.  How can I fix this?
Edited by: Isabelle Britten on Apr 17, 2008 10:01 AM

hI Carlo,
              I guess there should not be any problem as far as ur maintenance frequency is more than 1 month. The Key date and validity will be checked only if ur call object ( Maintenance order or Notification ) comes between 15/03/2008 to 15/04/2008, If ur maintenance order doesnt comes between above dates you shouldnt hv peoblem in assigning the start up date 15/03 for the plan.
        If ur Maintenance cycle frequency is less than one month then either introduce offset to hv first call object after 15/04/2008 or Use Functionality Start in Cycle.
          Try this you should not hv any problem.
narendra

Similar Messages

  • Extension functional location and equipment master data

    Hi,
    We have around 200 functional location (having 3 structure indicators) and 10,000 equipments (Having external number range) on a controlling area and on different company codes.
    Several orders have been created by this data and now company wants to change controlling area, company codes, maintenance plants and planning plants with having old data in the same system server and client.
    I want to know is it possible to create same codes functional locations and equipments on new maintenance plants and planning plants having new company codes and controlling area? (It has observed that once we assign maintenance plant, the system automatically picks company code and controlling area and these fields become highlighted and can't be changed) OR
    Is there any possibility to use old data in orders with reference of new plants company codes and controlling area?
    What will be the end solution, should I create the new structure indicators for functional locations and new equipment names that must not be matched with the old equipments?
    Regards,

    Hi,
    Thanks for prompt reply,
    a) If we change permanently then you mean to say the old master data record will remain in the system with all old transaction data, please confirm?
    **b)Alternatively, can I create same (exactly like old codes) functional locations and equipments codes on new maintenance plants (having new company coded and controlling area)?**
    I will have same client and server for the whole scenario 
    Please reply soon
    Best Regards,
    Edited by: PROCESSES EXPERT on Jun 29, 2010 8:36 AM

  • Planned Orders and Process Orders Data Extractor

    Hi,
    I am working on extracting process order and Planned Orders data into BW. I could not find any standard DataSources available for my req, so I want to develop generic extractor. the main key figures are Actual Labor and Machine Hours, Target Labor and Machine hours.
    Could you please help me if there are any standard datasource available or ECC tables to pull the data or any standard function modules available?
    Thanks,
    Hanuma

    hi,
    hope the mfg datasources were useful.
    chk the LBWE -> application 4 -> chk the DS 2lis_04_P_arbpl,2LIS_04_Matnr etc...
    All R/3 Tables
    http://www.sap-img.com/sap-download/sap-tables.zip
    Generic Extraction
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/84bf4d68-0601-0010-13b5-b062adbb3e33
    http://help.sap.com/saphelp_nw04/helpdata/en/3f/548c9ec754ee4d90188a4f108e0121/content.htm
    LO Extraction:
    /people/sap.user72/blog/2004/12/16/logistic-cockpit-delta-mechanism--episode-one-v3-update-the-145serializer146
    /people/sap.user72/blog/2005/01/19/logistic-cockpit-delta-mechanism--episode-three-the-new-update-methods
    /people/sap.user72/blog/2005/02/14/logistic-cockpit--when-you-need-more--first-option-enhance-it
    /people/sap.user72/blog/2004/12/23/logistic-cockpit-delta-mechanism--episode-two-v3-update-when-some-problems-can-occur
    /people/sap.user72/blog/2005/04/19/logistic-cockpit-a-new-deal-overshadowed-by-the-old-fashioned-lis
    Ramesh

  • Data for Actual/ Plan Cost and Budget

    Hi All,
    Can you please adviseme  which content i need to activate to get the Actaul, Plan cost and the Budget Data in SAP BW.
    Do i need to exploer CCA cubes or Fund managment Cubes.. Please let me know... I need to know the Tables in R/3 Side for budget data to make sure that in R/3 we have budget data..
    Please let me know.
    Thank you
    SAP

    Hi there,
    For those check in here:
    [http://help.sap.com/saphelp_bw33/helpdata/en/d3/561be24e8c11d596f30000e835339d/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/60/0f07d3532c864aab7ec5f113146da2/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/26/d0cccc8d98c344925915ec81d5a421/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/43/de43fcf6e2154bbbbcecbc63cdf287/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/23/d5cf85683c3348b2189199e49a35cf/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/ad/be383fd98d1201e10000000a114084/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/1a/8c42588afe11d496d80000e835339d/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/d3/29ae399c1a6651e10000000a114084/frameset.htm]
    Hope this helps.
    Diogo.

  • Maintain Validity Date for Documents

    Hi
    Any Idea how can we put and maintain Validity Dates for any Document uploaded in DMS Server.
    Validity Dates here means (Documents cannot be used if validty is over)
    I could not find any option in CV01*   T-Codes.
    Regards

    Dear Prasant,
    You can also do this solution also if you find it OK.
    1. Create a Class with "Validaty Date" as characteristics. Assign this Charac to class. Assign this class to doc Type. This charac should not be editable to any one except creator.
    2. Create a program with BAPI " Set Status" ( Check the name). which will run in background to check the validity date of Document. If the validity date is reached the BAPI will change the status to "S" as stated by Chritoph.
    This will help user to manually tracked which documents have exceded the validity date. You can also genegrate report and mail it to particular user that what documents have been set to Status "S".
    Hope I have provided a valid solution as I have tried similar kind of functionality with changing a characteristics with Date.
    With warm Regards
    Mangesh Pande

  • Change the validity date in change number

    hi team,
    I want to change the validity date of a change number from 01.01.09 to 01.03.09. I am getting an error "A BOM has already been changed using a change number with the same valid-from date as the selected date 03.01.2009".  I can change the date to before 01.01.09 but cannot after 01.01.09.
    Can you please help me.
    thank you,
    Satish

    Dear Mamiditi Satish Kumar,
    Is it a change number with release key or without release key?
    Do you want to assign a different validity date for the changes made using that change number?
    Try using alternative date field in CC02.and you have to select the object to assign the alternative date.
    Say if you want to assign an alternative date for a processed BOM,you have to select that object and
    enter the alternative date.
    Regards
    Mangalraj.S

  • Validity Date at BOM componet

    Dear all,
    I'm strugling on changing the valid-to date for a BOM component.
    Let me explain in detail what the scenario is and what I've done so far.
    I have a BOM header "Z" with 5 different components, Y, X, W, V and U. Validity dates should be as follows:
    - Y --> 02.04.2010 to 31.12.9999
    - X --> 02.04.2010 to 31.12.9999
    - W --> 02.04.2010 to 31.12.9999
    - V --> 02.04.2010 to 20.02.2012
    - U --> 21.02.2012 to 31.12.9999
    I have created a change number with validity date 21.02.2012, but when trying to change BOM components validity dates fields will be grey and won't allow me to do the necessary changes.
    Could you please guide me with the necessary steps that I need to follow or where my issue would be? - I have already been checking the forum and followed some of your tips(checked config and so on, and everything seems to be ok).
    Thanks a lot in advance for your help on this one as it's quite urgent to solve this so we can test it, as we need to provide with some explamples on how material variances report will be affected to client ASAP.
    Kind regards,
    Mario

    Hi Mariete ,
    you just need to create a change number with the valid date you want for component , example if you create a change number valid from 01.01.2010 and if you use it for changing BOM , all the changes you made will have this validity date.
    its not possible to input validity dates, so all the times it will be greyed out , you can control it as discribe above.
    in you case you need to create 2 change numbers , 1 with valid from date in 02.04.2010 and use it for component Y X W and V
    and others with validity date 21.02.2012 and use it for component U.
    another thing please keep in mind if you BOM is created in todays date or date which is greater then 02.04.2010 will be a problem , so suggestion is while creating BOM , use a change number which is valid from 02.04.2010 and cause of it all 4 components will be automitacily hace valid date 02.04.2010.
    and after creating this BOM with 4 component  use a second change number and add component U.
    please check i hope it wil help you.
    Thanks
    Ritesh

  • PLanned order and PO item for a same material in MD04

    A material with Procurement key as F.
    In MD04, There is a planned order for 8657 nos. for a material..
    below that there is a Dep Req XXXX
    Below that there is a purchase order for 8657 Nos.again.
    My question is if there is a open PO for the material,then why is the planned order created for the material.
    The PO reads as
    04/05/2012-POitem--- 4500016092/00050 04/09/2012 15----
    8657
    THe Planned order reads as PLdOrd----0000478483/stpo--
    8657
    Please help me out..

    In MD04,planned order and dependent requirement dates are 2/4/2012
    whereas the PO date is 5/4/2012.
    Inside the planned order the order finish date is 30/3/2012
    and inside the PO the delivery date is 2/4/2012..
    Its bit confusing..can you help in this..
    ANd for your information,the Planned order is now not found in MD04,it was there yesterday..

  • Planned order creation with PDS valid on only order start date and not finish date

    Hi All,
    We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date.  This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity  in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
    Is there any way in ECC to control this? Any config or customization?
    Regards,
    Santosh

    Nilesh,
    I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
    1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
    2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
    Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
    Hope this helps....
    Regards,
    Prasobh

  • IVL License and validity date

    Hello Experts,
    How do you apply an IVL license to a sales order that was placed before the validity date of the license? 
    The business scenario that I have is a sales order was placed in September, and it required a license.   We applied for the license and recieved it recently and the validatity date is December 2010 thru December 2011.   The license was maintained in the system as such, but the license will not apply to the order since it was placed prior to the stated validity of the license because the document reference date that is being used is the date the order was placed.    Is there a way to account for this without having the sales rep replace the order so the document reference date is inside the validity date of the license recieved from the government?
    Regards,
    annm

    hi
    In your GTS system go to Transaction- /n/SAPSLL/LCD_CHANGE and delete the existing license from the existing order.
    Then go to transaction- /n/SAPSLL/CUHD_MR_EXP and check boxes of "Display Log" and Save Log" and execute it with order number. New license will be assigned to it but make sure you have maintained the correct license determination strategy for it.
    Thanks
    DG

  • Web template :Error Valid Data provider not assigned

    Hello Friends we have the web template that was working before , we did the upgrade to SP13 from SP11.
    It gives the error Valid Data provider not assigned and
    Bad integer Parameter value of Parameter BLOCK_COLUMNS_SIZE of Object item:ANALYSIS_ITEM:ANALYSIS;
    Please help where do i need to assign the Data provider beacuse the Values are same for Dataprovider as before
         Portal Runtime Error
    An exception occurred while processing your request
    Exception id:
    See the details for the exception ID in the log file.
    Thanks
    Soniya
    Message was edited by:
            soniya kapoor

    Open the template in WAD and do a validation against the server and make sure the template is well formed.
    Also make sure you apply BI JAVA Patch 1 for SPS 13.

  • SNP heuristics and optimiser using transport lane validity dates

    I am using APO SNP 5.1.
    In particular I am trying to use the SNP heuristics and optimiser for supply planning.
    Can anyone confirm whether transport lane validity dates are respected by (a) SNP heuristics and (b) SNP optimiser, ie no transport requisitions will be created during times when the transport lane is not 'open' in terms of validity dates.
    Thanks for any advice on this...

    Hi,
    Irrespective of the SNP planning engine you are using, a t-lane will only be considered if the t-lane is active as per the validity dates.
    Regards,
    Umesh

  • 9320 BBM and Email not working on wifi with valid data subscrition

    Hi!
    Please I need your help.
    My phone is a blackberry curve 9320. I have a valid data plan back home in my country that expires 7th July 2013. While abroad I intended to wifi for BBM. However, this has not been possible for though connected to wifi BBM and my email do not work. Other applications namely facebook and whatsapp work very well. I am also able to get on the internet. Please urgent help needed.

    I believe there is a problem at  RIM at the BIS data level I have reported it to my network operator and they tell me they are dealing with Blackberry with the issue. Suggest you report it to your operator as well the more report the problem hopefully the quicked it will get fied.

  • Combination for Assignment and Validation

    Hello Experts
    I am looking for some insights on particular assignment-
    Condition: In my MDM box if I have a field calles S field (source field)  and a look up field L field - here both represent for the same master data object .
    suppose from some front end if user putting "valid" data for S field then respective "valid" data should be assign to L .
    Here can I make a combo for validation as in the "Valid" Data for S.  I think for that separate Validation needed. and directly I cannot call this validation into Assigment.
    Can somebody put more light..as in how the formula should be.
    TIA
    Deep

    Hi Deepak,
    if my source system ID is "X" then it should assign MDM id "Y" . here both are legal set of values and I dont want them to hardcode. See, i don't see any harm in writing values as hardcode if this solves your concern, Like i suggested in above workflow branch step (Condition). You can write following expression in Validation
    Status ID = "X"
    So when this validation pass, it will go to Assign step where assign step have expression as Y and then move to step stop1. If status ID is different than "X" it will not pass (means fail) thus should move to step stop2 without Assign step.
    as in future it may change. Ideally it should not change even if it changes then before reaching this file in MDM, you can also handle this thing in PI/XI (Msg Mapping) So as such it will not impact your MDM system.
    Also, if you don't want to handle this thing in PI, changing Expression in MDM does not take more than 1 minute to rectify it.
    Regards,
    Mandeep Saini

  • Is there standard report for planned and actual devlivery date?

    Hi Guru,
    Could you help me to find standard report to compare planned delivery date in PO and actual delivery date (GR Posting date)?
    I wonder, Is there standard report for planned and actual delivery date?
    or I have to create a customizing report.
    Thank you very much.

    hi
    i dont think it is possible to see both in one pan so try to create some Z report
    u try ME80fn here u have to change the views ,in del shedule view u can see the delivery dtae and in PO histry view u can see the posting date
    regards
    kunal