Planer Profile

In GP12N I am getting below mentiond error with profit center
Can any one suggest possible reason.?
While saving error is coming :
msg no. :
FAGL_ORG_UNITS001
Profit center 47299000 not found in controlling area 1001
Edited by: sumathi lakshmi on Mar 25, 2010 1:07 PM

Hi,
Before you carryout planning, you need to maintain planning periods and that's what GPC5 is for.  With regards to profit center error, please check and make sure the profit center exists in the controlling area.  If it does not , you might want to exclude that number from your upload.
By the way, is the upload for a special purpose ledger because the transaction code you are trying to use is for plan data change.
Regards,
Elias
Edited by: Elias Akorli on Mar 25, 2010 8:10 AM

Similar Messages

  • Error while creating Rough cut planning profile

    Facing the following error while creating rough cut planning profile (mc35) in SOP for product group. "Work center x plant y does not exist for task list type 3". pls advise- do i need to create tsk list for product group? pls advise with tcode to be used.

    pls check the (task list ) usage you have maintained in the Work center.
    In OP45 , pls ensure that for the usage ,
    task list type 3 (Rough cut planning profile) is included.
    If it is not included there , pls include the TL type 3 for your usage and now the prob will get solved.
    Regards.,
    Sheik

  • How can we define time stamp in rough cut planning profile

    Hi all
    There is no time stamp(From date to date) in Rough cut planning profile and it is just time span (0-5 ,5-10,... workdays) . If I have different capacity for my resource in different intervals how should I define it so that in planning table it can take it to account and show me requirement versus avalilable capacity acoordingly.Note that we are working with repetitive plannig and our resources are lines which have different production rate between each interval.
    Regards
    Babak Bolourchi

    Dear,
    In REM you can use planning table through MF50 for your requirement.
    For time stamp in rough cut planning profile   please refer my reply from this link,
    [Rough cut planning|Rough cut planning profile]
    [Link 2|https://forums.sdn.sap.com/click.jspa?searchID=25236413&messageID=6404039]
    Hope it will help you.
    Regards,
    R.Brahmankar

  • Rough cut planning profile

    Hi Gurus,
    Our scenario is we have two plants.The sales orders and the PIRs will be created in the Plant 1 and these requirements will be transferred as Stock transport orders to plant 2(with special procurement key) .All the materials will be manufactured in plant2.BOMs and routings are maintained in Plant 2.
    In this case if i want to maintain the rought cut planning profile , how can i map the scenario.
    Please help me in this.
    Thanks in advance,
    Ravi

    Hi Krishna,
    There are two plants.
    Plant 1
    Plant 2
    We will be creating PIRs in Plant 1.There is a special procurement key maintained for material which will say stock transfer from plant 2.
    The below are the steps:
    1. Create PIRs in the plant1.
    2. Run MRP
    3. STO req. will be created in Plant 1 against the PIRs.
    4. As the special procurement key is maintained in material master Planned orders will be generated in plant 2 against these  STOs from plant1.And production will be done in plant 2.
    So, now if i want to do rough cut plannig profile how can i proceed.
    Thanks,
    Ravi

  • Rough Cut Planning Profile MC35

    Hi all,
    I was trying to check capacity rough cut planning in product group level, so i have to make the RCPP (ROugh Cut Planning Profile) in that product group level using MC35,
    i still confuse with the time span, base qty and the value in resource table at MC35, what is the connection between these 3 value??
    regards,
    MARUFAT

    Hi,
    i still confuse with the time span and the resource table in RCCP MC35
    i enter the time span with value 1, and the resource table column will give value 1,2,3,...
    and when i enter the time span with 5, the resource table column will give value 0-5, 6-10, ...
    if i enter the base qty is 5000 to, with time span value 1, and in resource table i enter for column 1 with value 40 and column 2 with value 50, what is the meaning of that? ( the Resource table use work center with UOM HR )
    regards,
    MARUFAT

  • Rough Cut Planning Profile-by Capacity category

    Hai,
    I am creating Rough Cut Planning Profiles in ECC6.0 for use in Standad SOP (S076). In MC35, I don't see a place where I can enter by Work center category- like I want both Machine and Labour categories as I have different times for each category.
    { when I view the rough-cut capacity situation in MC82, system displays both categroies, but it is based on only the hours I maintained for one of the categories- how do I maintain for both categories?}
    Thank you in advance:)
    Sonali
    Edited by: Sonali on Apr 28, 2009 3:05 PM

    Hello Sonali,
    Rough cut capacity planning is used only  for bottle neck resources.Analyze your process and you will come to know for the product group or material which category or machine is bottleneck.
    Create a rought cut planning profile for a production line or Workcenter or PRT or Cost(Relative cost not product cost).
    PS:Roughtcut capcity planning should not be used for all the workcenters.
    Thanks,
    Raj

  • Display error message in Campaigns - Planning profile templates

    Hi experts,
    I am facing an issue while trying to display error message in plannign profile template for campaigns.
    Issue is that even though i am able to add the error message to the parent campaign message container, it is not being displayed on the UI screen  message area(refresh is not happening) until the next screen refresh happens through another event like change of planning profile drop down / f2 pop up being closed on the message area etc.
    I need to display the error message as soon as it gets added in the global message container.Is there any way that i can refresh the UI from this method which would display my error message? I think round trip might work here
    I am tryign to add the message in the method IF_FLEX_DATA_PROVIDER~MODIFY_DATA of component KFPED_LAYOUT .
    But it doesn't get reflected in the message area.
    Appreciate a lot if anybody can help me out here.
    Thanks
    Swapna.

    Closing the thread. Resolved myself .
    Thanks.
    Swapna V.

  • Issues in retrieving the Planning profiles in CRM from BW while doing CRM-BI Integration

    Dear Folks,
    We are in the process of doing the SAP CRM & BI Integration wrt Trade Promotion Mangement.
    For testing purposes, we tried to create a planning profile in BPS end i.e BW SEM system & trying to retrieve it from the CRM system using the below navigation.
    SPRO-->CRM--> Define Transaction types--> ZBPD is the transaction type we had created.
    And in Customizing Header level, in SEM Planning tab, trying to retrieve the Planning profile created in SAP SEM-BW.
    Tried to search in both ways i.e prefixing the 'zprofile' with /prf/zprofile but still CRM system is not reading the same from BW system.
    What ever the pre-requisites that are needed to be followed before doing all these, the same had been done in terms of creating the RFC Connections etc but still unable to retrieve the same.
    And also not finding any standard content in the form of Planning areas & profiles at BW end after installing the SEM BW component add on in BW system.
    Could you pls let us know what we are missing here.
    Thanks in advance.

    I meet the same problem, any solution?

  • GLPLADM Planning profile for new gl - default parameters

    i have copied the existing SAPFAGL profile and the layouts belonging to them and created a new profile with the same layouts. i am trying to set default parameters in order to get file description for each of the planning layout. i am able to do in our sandbox but not in the development client. the difference between two clients are sandbox is an upgraded version to 6.0 and the development client is a new box loaded with ECC 6.0. kindly help me on this.i would need to have the file description in order to do a excel planning upload. my excel planning upload works fine for the cost center profile and the layouts. i am having issue with the new g/l planning where the planning is done at the profit center and g/l Account

    no errors no issues.. usually when we click on the default parameters it takes us to the screen showing the layout and then we key in data and the excel sheet gets loaded . we key in data or we can save the file description , it is automatically generated and the file description generated by the system gets populated in the file description field of the planning layout in the planning profile. in my case, when i click the default parameters, it doesnt go any further, and no warning or erro messages are issued. the same default parameters take me to the layout screen when i click the default parameters from the Cost center planning profile. i am not able to resolve this, asked many people but of no use. hope you understand my issue.

  • Planning Profile for Project System

    Dear All,
    In planning Profile (T Code OPSB) for Project System we can find  RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
    Thanks and regards

    Mr. Sridhar,
    Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
    Regards
    Ramesh

  • Significance of Planning profile

    Hi PP Gurus,
    Can anybody pl tell me what is the significance of planning profile?
    I am getting an error saying maintain planning profile for the material during creation of PIR.
    regards,
    Pramod.

    Hi Pramod,
    As you know, we use configurable material when the scope for varaints are more. Generally, when we created sales order for the configurable material, we choose different characteristics for the selection of the finished product. So, information flows to production which is already configured. But in the case of MTS, the system does`nt configure the material on its own. Initially, you need to configure for the material, only then your dependent requirements will be defined. So, whenever you enter PIR, the requirements are created for the materials that are configured in the planning profile. Hope you got the point cleared.
    Reward if cleared and close the thread.

  • How to planning profile using BPS0 tcode

    Hi all ,
    I have a question about BPS.
    In BW7.0 system, using bps0, I could't see those standard planning profiles, such as 4CRMMP02, 4CRMMP03, 4CRMMP04, 4CRMMP05, 4CRMMP06, 4CRMMP09.
    And I could't find planning profiles in BI Content.
    I want to know what problem it is. Whether need I install some add-on about BPS?
    Thank you for your reply in advance.
    After installing SEM BPS patch on BI server does the planning profile gets configured auto...
    or do we need to install from Bi content
    Can you help me solving above issue, i new to BPS
    Regards,
    Anjan

    Hi Jaya,
    Go to any Tcode.
    Then Go to System -> Status.
    There you can get the program of that transaction code in Program (screen).
    Hope this will help.
    Regards,
    Nitin.

  • Variant Configuration - Planning tables disappearing from planning profiles

    Hi everyone,
    I'm having a strange problem with some planning profiles I've set up in MDPH for several of our configurable products. I'm getting reports from our production planners that certain planning tables within these profiles are suddenly disappearing from the profiles, along with all the values they've input for those characteristics. This is apparently happening without anyone making any changes to the profiles.
    By way of background, I've recently created several new variant models (including planning profiles) for a new series of products, several of which share characteristics with the variants that are experiencing the problem I described. Is it possible that this might somehow be impacting the planning profiles of the old variants?
    Any help is greatly appreciated. We're running 4.6c, FYI.
    Thanks,
    - Greg

    Hello Anil,
    Thank you very much for your reply. I've read both notes you referenced and they seemed very promising in that the symptoms described match what we are seeing. Unfortunately, however, they don't seem to reflect the root cause of the problem I'm seeing. Our users are logging in in English, and we have English names for the characteristics in question. Also, we are on a later patch version (55) than the one that fixed this issue (51). So I don't think this one will help us to fix the issue.
    If you have any other ideas, please let me know. Thank you again for your help on this!
    Regards,
    - Greg

  • Transport of planning layouts and planning profiles (CO - Cost Center Acc.)

    Dear Experts,
    I am new to SAP CO and would like to transport new planning layouts and planning profiles. Therefore I clicked on transport and the following customizing task is added to my transport request:
    IMG Activity  Create Planning Layouts for Cost Element Planning
    -> ke34
    ->
    CEFORMC
    CEFORMF
    CEFORMS
    CEFORMT
    CEFORMV
    CEFORMW
    CEPRINT
    CESETS
    TKEBS 
    TKEP1 
    TKEP2 
    TKES1 
    TKES2 
    TKES4 
    TKES5 
    TKESK 
    The transport worked without error.
    Unfortunately none of the layouts arrives in test environment.
    Do you have any idea of what I could have forgotten?
    Thanks a lot!!
    Thomas

    After you have released the transport request, the objects of the request are available in the target system and the target clients. If you want to carry out a client copy within the same system, proceed as follows:
           1.      Log onto the system in the desired target client.
           2.      Start the client copy (Tools > Administration > Administration > Client Administration > Special Functions > Copy Transport Request; transaction SCC1) and enter the source client and the number of the transport request.
           3.      Then start importing the objects.

  • Planning profile creation in budgeting in marketing plan

    Dear all,
    Please explain me how to create the planning profile and assign it to planning profile group in budgeting in marketing plan.I am unable to create the planning profile while creating the planning profile group.Please brief me.

    Hi Ramesh,
    Below link will help you a lot..
    Settings for Key Figure Planning (SAP CRM) - SAP for Consumer Products: Documentation for Solution Manager Co - SAP Libr…
    Rgds
    Hari

  • Activation of Planning Profile

    Hi Experts!!
    We are looking to  use the SAP BW-BPS planning profile CP: Deal Master for Trade Promotions (4TPM0010). This planning profile includes the Deal Master – Promotions (4TPM9540) planning level, as well as the Deal Master – Promotions (4TPM9541) planning layout.
    As this is standard one,but we are unable to look in planning profile.
    Could you please help me for activation such kind of planning profile so that we can use it as existing one.
    Thanks in anticipation.
    Surendra

    Hi Siva,
    I guess this is related to your other query. As mentioned there take a look at Note 1331066 which is part of SCM 7.0 SP 4.
    One easy way to determine the relevant notes by each application area is to check the Support Pack link as below
    https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/spat/index.htm?sp1=SAPKY70004
    You can then open each application area check for relevant notes for your issue. Use 70003, 70002 and 70001 to see the notes bundled in SP3, 2 and 1 respectively for SCM 7.0. The latest SP available for SCM 7.0 is SP5.
    Hope this helps.
    Somnath
    Edited by: Somnath Manna on Aug 25, 2009 2:41 PM

Maybe you are looking for

  • AppleTV 2 - Streaming Movies are Skipping

    I have had an AppleTV 2 since the day it came out and have never had a problem with 720P content skipping, until now. My setup is an Apple Airport Extreme 3rd Gen, MacbookPro Retina (late 2013), and an AppleTV 2. The AppleTV is hard wired via Cat5e c

  • Ipod Restore - Unknown Error

    I turned on my ipod this morning, and updated it from my library, on unpluggin my ipod from the USB, it stopped working, it then began to display the message "Connect to computer, use iTunes to restore". So i did, My computer didnt recognise my ipod.

  • SAP-MM Material Master

    Dear Friends, I have created material using T.code:MM01 but when I go in change mode(MM02) system throws an error message ::The material does not exist or is not activated..So,what may be the problem? Any clue? Thanks&regards Eliaz

  • Problem installing iTunes 10.7

    I recently purchased a new laptop.  When trying to install iTunes 10.7 for the first time, I receive this error:  "The installer encountered errors before iTunes could be configured.  Errors occured during installation.  Your system has not been modi

  • Compare Old Value (Session State) with New Value on Submit.

    Hi all, Is there an easy way to do comparison of Old Value (Session State Value) with the New Value? is there an API for that? like what we have in PLSQL Trigger :NEW & :OLD Thanks before -Joel