Planes XY, XZ and YZ in LabVIEW 3D Graphs

Can you downcovert this Labview 8.5 VI file to Labview 7.1 version
Thanks & Regards
A.Jude
Attachments:
XY_XZ_YZ_Vector3D.vi ‏48 KB

Hey,
I am sure it would help if you could check out the link below.
http://forums.ni.com/t5/LabVIEW/Downconvert-VI-Requests/m-p/1067229?requireLogin=False
Regards,
Rohan Sood

Similar Messages

  • After writing an html report on a floppy disk and removing it, labview shows an error message window: disk not present

    after writing an html report on a floppy disk and removing it, labview shows an error message window: disk not present.
    My pc is based on asus motherboard. Labview 7 and Windows 2000 sp4 installed.
    The error message continue also if i stop the application that generated report on a: .
    I've got this problem only on a pc: on other machines i don't have this problem (Labview only continues to access floppy but it doesn't show any window).
    Find below an example: first press the button to create a report on a: then remove the floppy, after 30-35 sec i've got the error message
    Attachments:
    prova.vi ‏55 KB

    Hi,
    I tried your vi: I don't get any error message after removing the disk but LV7 keeps on accessing the drive at regular intervals even if you stop the vi and close it!!! This is not supposed to happen.
    The only way to stop it is exit LV7.
    If you don't use the file dialog and you wire a full path, you don't get any problem.
    I also created a very simple vi that conditionally writes a text file on a: and I got the same behaviour.
    This problem occurs only with LV7, I tried the same examples in LV6.1 and everything was fine.
    If anybody wants to try I attach this simple example,
    Alberto
    Attachments:
    salva_testo1.vi ‏22 KB

  • I presently use iCloud and run a laptop PC plus an iPad2 and an iPhone 4.  I plan to travel and want to take my netbook, rather than the laptop PC for travelling.  How do I get my apple tools to work mwith a new, temporary PC?

    I presently use iCloud and run a laptop PC plus an iPad2 and an iPhone 4.  I plan to travel and want to take my netbook, rather than the laptop PC for travelling.  How do I get my apple tools to work mwith a new, temporary PC?

    ayorico15 wrote:
    It's not the pictures I'm worried about. I can get them off my phone without iTunes. 
    You can export ONLY Camera Roll photos and videos.
    ayorico15 wrote:
    All my apps were downloaded from my new apple ID. Not his.
    Sign in to iTunes Store (on desktop itunes) with your ID. Plug your iphone to itunes, right click on it and choose transfer purchases.Right click again and choose backup. Then you can sync with iTunes.
    ayorico15 wrote:
    It's not the pictures I'm worried about.  It's all my saved conversations
    Your conversations will not deleted if you sync with your iTunes.
    What is the problem with iCloud? iCloud has nothing to do with iTunes syncing.

  • I smashed my iPhone and was wondering how much for a new one as it is now unusable. On a 2 year plan with telstra and just out of the 1 year mark. Please help me. Thanks

    Need help with how much a new iphone will be.
    I smashed my first one yesterday and is now unusable. Im currently on a 2 year contract plan with Telstra and just out of the 1 year mark.
    i dont know what to do next.. Please help.
    Thankyou

    Hi tiarnafromnsw,
    If you have a damaged iPhone, you may find the following page helpful:
    Service Answer Center - iPhone
    http://support.apple.com/kb/index?page=servicefaq&geo=Australia&product=iphone
    Regards,
    - Brenden

  • Getting an error while activating a planning area "Enter values for planning horizon From and planning horizon To for the storage time profile level"

    Dear S&OP community,
    I am getting following error while creating a planning ares in a newly installed sandbox. "Enter values for planning horizon From and planning horizon To for the storage time profile level".
    This what I did...
    1) Created new attributes and master data objects and activated them successfully.
    2) Time profile created and activated successfully
    3) Trying to create planing area by assigning  time profile in step 2 and assigned master data from step1..Unable to save the data and system returns 
    this error - "Enter values for planning horizon From and planning horizon To for the storage time profile level"
    My understanding is time profile needs to be active  but doesn't have to have values...
    Any help is appreciated.
    Thanks,
    Krishna

    YS,
    Here are my time profile settings
    Level       Name          Display Horizon - Past  Display Horizon - Future
    1             Monthly     -6                                       11         
    2             Quarterly     -2                                       3
    3             Yearly        -1                                       2
    Time profile is active and but time profile data is not loaded
    Thanks,
    Krishna

  • I have the photographer plan With Photoshop and Lightroom. Now suddenly The creative cloud app says that Lightroom isn´t installed. It is and how do i fix this. I don´t want to loose any pictures. Tried logging in and out. Also restarted my Imac with no l

    I have the photographer plan With Photoshop and Lightroom. Now suddenly The creative cloud app says that Lightroom isn´t installed. It is and how do i fix this. I don´t want to loose any pictures. Tried logging in and out. Also restarted my Imac with no luck.

    This has nothing to do with your pictures. As long as LR works, nothing happens. The CC app merely has lost an entry in the installer database. Would a reinstall fix it? Sure. Is it necessary? Not really (until the next version or update). So unless you have too much time to spend or something isn't working, I'm sure you can find more interesting things to do with your tiem. Otherwise use the cleaner tool and get to it:
    Use the CC Cleaner Tool to solve installation problems | CC, CS3-CS6
    Mylenium

  • HT201328 I have paid Bell to unlock my old iphone4 and they have said it is now unlocked. Can I skip the back up and restore process and just buy another carriers sim card from my daugther Kodoo plan, install it and active the iphone4 on itunes account in

    I have paid Bell to unlock my old iphone4 and they have said it is now unlocked. Can I skip the back up and restore process and just buy another carriers sim card from my daugther Kodoo plan, install it and active the iphone4 on itunes account in her name?
    thanks
    Dave

    The process is as follows:
    Backup the phone, Erase it, connect to iTunes for the unlock process, then your iProfile can be restored.
    You can go ahead and get the SIM, bout you have to Erase the phone and connect to iTunes before it will be unlocked.

  • Can I run 64 bit LabVIEW and 32 bit LabVIEW on the same machine?

    If I have a 64 bit OS (Windows 7 64 bit or Server 2008 64 bit) can I install and run 32 and 64 bit LabVIEW on the same machine?
    John

    LabVIEW 64-Bit vs. 32-Bit Applications FAQ
    Q. Can I have both LabVIEW 32-bit and LabVIEW 64-bit installed on the same 64-bit machine?
    A. Yes.
    The FAQ will likely answer other questions you have regarding the restrictions and issues you will have with having both versions and compiling in one vs the other.

  • Storing carriage return and other special characters in a TestStand variable and passing to LabVIEW

    I am using TestStand step to call a LabVIEW VI that writes commands to a serial device.  The device expects a carriage return at the end of the command.  I can create a constant string in TestStand with the carriage return, e.g., "ATA\x0D" and pass that to a LabVIEW string control which shows ATA\r and the VI works properly.
    To provide consistency and flexibility in my code, I want to store the terminator character(s) in a TestStand variable.  However, when I try to use an expression to create the command string, i.e. "ATA" + "Locals.Terminator", where Locals.Terminator is set to "\x0D", my LabVIEW VI string control shows "ATA\\x0D" which doesn't work.  And when I try Locals.Terminator set to "\r", the LabVIEW string control shows "ATA\\r" which doesn't work either.
    Is there a way to store special characters in a TestStand variable and pass them to LabVIEW as special characters?  I saw in another post that if you edit the TestStand variable by pressing Cntl-Enter, it will store  the newline \n properly and it can be sent to LabVIEW - that works for me as well for \n.  But  I need to send a carriage return.
    I've attached my test sequence and the corresponding LabVIEW VI with a string control.
    Hans
    Attachments:
    Special Chars.seq ‏27 KB
    String Passing.vi ‏13 KB

    Hi Hans, 
    Thanks for your detailed explanation and examples.  In TestStand, change the String parameter's String Type to Binary String instead of ASCII.  Then it will pass the desired value.
    Cheers,
    David Goldberg
    National Instruments
    Software R&D

  • Fieldes planned delivery date and actual good recipt date for SAP QUERY

    Hi Gurus
    I am changing sap query. I need to find two fieldes  : planned delivery date and actual goods recipt date
    I dont know MM tables, do you know wrhere are?
    in table EKPO i don't find the fieldes.
    Thanks in advance

    Thank a lot!
    Regards

  • Which is better for usb camera between VISA and imaqdx in labview 2010?

    i have done a program for usb camera to acquire images with imaqdx.
    now i want to know which is better between VISA and  imaqdx in labview 2010?
    i didn't study visa before
    thans for help.

    VISA is primarily used to communicate with instruments via GPIB/TCP-IP/Serial/USB. In order to use easily VISA with an instrument over USB the instrument must adhere to the USBTMC spec. A camera is not likely to have this. Otherwise you have to use USB RAW, and that requires detailed knowledge of the data that is transmitted by the instrument. Manufacturers rarely give this information out. Normally they will provide a DLL to communicate with the instrument.
    Thus, in your case, VISA is not going to be an appropriate API to use for a USB camera.
    Out of curiosity, what prompted this question?

  • Planning method/Basic and Planning method/forecast field values are grey

    Hi Experts
    The Planning method/Basic and Planning method/forecast field values are grey in my project profile.
    What customization would influence for this setting. I wish to change from 2 to 4. Please advise the solution/
    warm regards
    ramSiva

    You can change the above field values only from WBS scheduling profile. If you want to change them, choose 'free scheduling' method.
    Regards,
    Mahendra

  • Plan in CO and Transfer to FI

    Hi,
    I have planned in KP06 through excel,now i wanted to bring the planned data to FI
    how can i do?
    Is it correct way - that if i plan in KP06 for cost element wise and trying to move to FI?
    or is there any other way that i can work around to plan in CO and transfer to FI?
    Kindly advice me
    Thanks Supriya

    Hi Supriya,
    1).If u have business process like that, then definitely either could have profit centers or business areas which is maintained in your order management.
    2) If you could not find neither profit center nor business area, verify your controlling version. This controlling version maintained by company code level so that u can find versions in both FI and CO. Normally versions for the use of plan/actual values.
    3).If you are unable to find above two, u can go through validations and substitutions. Here there is a structure for capturing planned values. I believe in validations & substitutions you can find planned integration between FI & CO.
    I hope any one option will be helpful for you.
    Cheers,
    Maahi.

  • Planned order number and Plnkn

    Dear All,
    I need the table link between planned order number and Number of the task list node(PLNKN).
    Thank you in advance
    Regards
    Sailendra.M
    Edited by: nivedita yadav on Jun 25, 2010 2:35 PM

    Dear Nivedita,
    Check with this functional Module in SE37
    BAPI_PLANNEDORDER_GET_DETAIL
    In my understanding I dont think nwe can get this data from table.
    Regards
    S Mangalraj

  • Planned Delivery Date and Actual Delivery date.

    Hi,
    Is there a report in SAP which shows the delivery date of a PO line item and actual GR posting date from PO history in one report?
    I need to display the planned delivery date and actual delivery date in one report, preferably in columns next to each other.
    Thanks in advance.

    Hi
    To my knowledge there is no such report. You will have to develop this report through ABAP help. You need to pick the planned delivery date from the PO and GR posting date from material document. Both this fields (EEIND & BUDAT) can be viewed in the PO history.
    However, challenge will be when you have multiple delivery dates and receipt posting dates are for part quantities.
    Regards,
    Jagadeesh

Maybe you are looking for

  • Why does low resolution warning show when I used a high resolution camera

    Hi, I am just learning about iphoto, and have been uploading photos I took with a 4 mega-pixel camera. I have printed out photos at Kodak printers directly from the camera, and they came out great. However, when I upload the photos to the Mac, then b

  • How to do packing for a delivery? (which transaction?)

    How to do packing for a outbound delivery? Which transaction is used for this purpose? I am trying to do post goods issue for a outbound delivery but it gives me the error 'Delivery item is not or only partially packed'. How to solve this? Thank you!

  • Help needed on movement of transports between two production systems

    Hi All,     Our client is implementing SAP in US and Europe and it has separate production systems for both. It already went live in US and now started SAP implementation for Europe. They wanted to leverage the development & configuration done for US

  • Getting from 10.3 to higher

    I have an earlier mac mini with OS panther 10.3.9. How do I upgrade to a higher OS? Do I need to purchase this, or does Apple expect me to buy a new computer?

  • UCCE Remote Redundancy

    Hi I'm looking for information on how to setup remote redundancy on an UCCE 8.0. Side A and Side B are to be separated by a WAN link. Any information, documentos and help appreciated. Thanks Rhobab.